Professional Documents
Culture Documents
A320 Weekly Check Sheet (N) Issue 16 Dated Mar 31,2022
A320 Weekly Check Sheet (N) Issue 16 Dated Mar 31,2022
(For Technical Records Office Use Only) Weekly Sheet No: _______________
b)Carry out visual check of nose, main landing gear wells and
doors for general condition, cleanliness, delimitation, including:
TANKS
Drain Water Content from Fuel Tanks.
2.01 Check flight deck seats are in good condition and normal operating. Check
Seat Belts.
2.02 Ensure cleaning of flight compartment.
Carry out general visual inspection of FWD, AFT and BULK cargo
compartment decompression panels, side panels, ceiling panels, floors
and pressure compensation valve, nets for seals missing, cracks,
damage, and corrosion. Repair as required.
4.03 Ensure clean FWD, AFT and BULK cargo department.
4.04 Check condition/operation of cabin crew seats / seat belts / seat covers
1.05 Check and dean all instruments and display units, ensure no loosen parts.
NOTE:
In addition to attached Cabin Check Lists, Cabin maintenance & Aircraft Appearance and Furnishing
section supervisory staff is required to perform maintenance activities in cabin as per requirement of
concerned certifying staff of B1 or B2.
TASK ACCOMPLISHMENT
‘Certifies that the work specified was carried out in accordance with applicable PCAA regulations and in
respect to that work the task is considered as accomplished’
NOTE I: Any defects / observations noted against Checklist shall be intimated to concerned
Certifying Staff for recording in Aircraft Technical log Book / Aircraft Cabin Log Book /
Continuation Sheet for corrective actions.
NOTE II: Items that are not installed needs to be crossed out (X). *
NOTE III: This Checklist shall be certified by Deputed Aircraft Engineer / Approval Holder
/Signature Authority/ Supervisor of Cabin Maintenance / Aircraft Appearance / Aircraft
Furnishing section.
NOTE IV: In addition to attached Cabin Check Lists, Cabin maintenance & Aircraft
Appearance and Furnishing section supervisory staff is required to perform maintenance
activities in cabin as per requirement of concerned certifying staff of B1 or B2
Signature: _______________________
Name: __________________________
AML # / Approval # / P #___________
Date: __________________________
Time: _____________________________
2.00 COCKPIT
2.01 Check Condition
Signature: _______________________
Name: __________________________
AML # / Approval # / P #___________
Date: __________________________
Time: _____________________________
TITLE:
A/C Reg.: 24-21-00-210-046-A - Check IDG Oil Level
** ON A/C ALL and Differential Pressure Indicator (DPI)
MPD Task 242100-02-1
CARD: ZONE: 438, 448 INTERVAL:
SKILL: ACCESS: 438AR, 438DR, 448AR, 448DR
MECH. INSP.
** ON A/C ALL
TASK 24-21-00-210-046-A
Check IDG Oil Level and Differential Pressure Indicator (DPI)
WARNING: BE CAREFUL WHEN YOU DO WORK ON THE ENGINE PARTS AFTER THE
ENGINE SHUTDOWN. USE APPLICABLE THERMAL GLOVES. THE ENGINE
PARTS CAN STAY HOT FOR ONE HOUR AFTER SHUTDOWN AND CAN
BURN YOU.
REFERENCE QTYDESIGNATION
No specific 1 AIR SOURCE FILTERED, DRY
No specific AR LIGHT SOURCE - INSPECTION
No specific AR MIRROR - INSPECTION
No specific AR WARNING NOTICE(S)
B. Consumable Materials
REFERENCE DESIGNATION
(Material No. 08BBB1) Non Aqueous Cleaner-- Petroleum Based -
(Material No. 14SBA1) Textile-Lint free Cotton -
JCP Title: temporary job card package CERTIFICATE OF TASK / INSPECTION COMPLETION: Page 1 of 12
JCP Ref: reference DATABASE REV DATE: Nov 01/2021
CERTIFIES THAT THE TASK / INSPECTION HAS BEEN COMPLETED TO THE REQUIRED PRINT DATE: Nov 22/2021 09:03
STANDARD AND SUPPORTS THE FINAL MAINTENANCE RELEASE / CERTIFICATE OF RELEASE
TO SERVICE
JOB CARD MPD-TASK: 242100-02
PIA - A318/A319/A320/A321 AMM TASK : 24-21-00-210-046-A
24-21-00 PB 601
TITLE:
A/C Reg.: 24-21-00-210-046-A - Check IDG Oil Level
** ON A/C ALL and Differential Pressure Indicator (DPI)
MPD Task 242100-02-1
MECH. INSP.
** ON A/C ALL
FOR 1000EM2 (ENGINE-2)
** ON A/C ALL
D. Referenced Information
REFERENCE DESIGNATION
(Ref. 12-13-24-612-041-B). Integrated Drive Generator (IDG) Servicing - Filling of the
IDG with Oil or Addition of Oil after a level Check
(Ref. 12-13-24-680-040-B). Draining of the Oil from the Integrated Drive Generator
(IDG)
(Ref. 24-21-00-210-047-A). Visual Inspection of the IDG for Oil Leaks and Check of
the Electrical Circuits
(Ref. 24-21-00-210-047-A- Visual Inspection of the IDG for Oil Leakage Engine
01). Static and Check of the Electrical Circuits
** ON A/C ALL
Ref. TSM 24-21-00-810- The Differential Pressure Indicator (DPI) of the IDG1 Oil
815 Filter is Extended - Alternate Procedure
Ref. TSM 24-21-00-810- The Differential Pressure Indicator (DPI) of the IDG2 Oil
816 Filter is Extended - Alternate Procedure
Ref. TSM 24-21-00-810- Abnormal Oil Consumption of the IDG1 (2)
817
Ref. TSM 24-21-00-810- IDG 1(2) Oil Leak
849
JCP Title: temporary job card package CERTIFICATE OF TASK / INSPECTION COMPLETION: Page 2 of 12
JCP Ref: reference DATABASE REV DATE: Nov 01/2021
CERTIFIES THAT THE TASK / INSPECTION HAS BEEN COMPLETED TO THE REQUIRED PRINT DATE: Nov 22/2021 09:03
STANDARD AND SUPPORTS THE FINAL MAINTENANCE RELEASE / CERTIFICATE OF RELEASE
TO SERVICE
JOB CARD MPD-TASK: 242100-02
PIA - A318/A319/A320/A321 AMM TASK : 24-21-00-210-046-A
24-21-00 PB 601
TITLE:
A/C Reg.: 24-21-00-210-046-A - Check IDG Oil Level
** ON A/C ALL and Differential Pressure Indicator (DPI)
MPD Task 242100-02-1
MECH. INSP.
REFERENCE DESIGNATION
** ON A/C 001-003
Check of the Oil Level and the Differential Pressure Indicator Button
** ON A/C 004-050
Check of the IDG Oil Level and the DPI Button
** ON A/C ALL
Z430 (Z440)
B C
D E F G
01
01
B
NORMAL
(RESET)
C
EXTENDED
NOTE:
01 DPI BUTTON (SILVER END, RED CYLINDRICAL SIDE) N_MM_242100_6_UAM0_01_02
JCP Title: temporary job card package CERTIFICATE OF TASK / INSPECTION COMPLETION: Page 3 of 12
JCP Ref: reference DATABASE REV DATE: Nov 01/2021
CERTIFIES THAT THE TASK / INSPECTION HAS BEEN COMPLETED TO THE REQUIRED PRINT DATE: Nov 22/2021 09:03
STANDARD AND SUPPORTS THE FINAL MAINTENANCE RELEASE / CERTIFICATE OF RELEASE
TO SERVICE
JOB CARD MPD-TASK: 242100-02
PIA - A318/A319/A320/A321 AMM TASK : 24-21-00-210-046-A
24-21-00 PB 601
TITLE:
A/C Reg.: 24-21-00-210-046-A - Check IDG Oil Level
** ON A/C ALL and Differential Pressure Indicator (DPI)
MPD Task 242100-02-1
MECH. INSP.
ADD
OIL
CFM
ADD
OIL
CFM
FWD E
AFTER ENGINE
SHUTDOWN
(HOT OIL/IDG)
N_MM_242100_6_UAM0_02_02
JCP Title: temporary job card package CERTIFICATE OF TASK / INSPECTION COMPLETION: Page 4 of 12
JCP Ref: reference DATABASE REV DATE: Nov 01/2021
CERTIFIES THAT THE TASK / INSPECTION HAS BEEN COMPLETED TO THE REQUIRED PRINT DATE: Nov 22/2021 09:03
STANDARD AND SUPPORTS THE FINAL MAINTENANCE RELEASE / CERTIFICATE OF RELEASE
TO SERVICE
JOB CARD MPD-TASK: 242100-02
PIA - A318/A319/A320/A321 AMM TASK : 24-21-00-210-046-A
24-21-00 PB 601
TITLE:
A/C Reg.: 24-21-00-210-046-A - Check IDG Oil Level
** ON A/C ALL and Differential Pressure Indicator (DPI)
MPD Task 242100-02-1
MECH. INSP.
ADD
OIL
CFM
FWD F
AFTER SERVICING OR
ENGINE SHUTDOWN
(COLD OIL/IDG)
ACTION:
DO THE IDG SERVICING TO GET THE CORRECT IDG OIL LEVEL.
ADD ADD
OIL OIL
CFM CFM
FWD G
AT ALL TIMES
(HOT OR COLD OIL/IDG)
ACTION:
DO THE IDG SERVICING TO GET THE CORRECT IDG OIL LEVEL.
N_MM_242100_6_UAM0_03_00
JCP Title: temporary job card package CERTIFICATE OF TASK / INSPECTION COMPLETION: Page 5 of 12
JCP Ref: reference DATABASE REV DATE: Nov 01/2021
CERTIFIES THAT THE TASK / INSPECTION HAS BEEN COMPLETED TO THE REQUIRED PRINT DATE: Nov 22/2021 09:03
STANDARD AND SUPPORTS THE FINAL MAINTENANCE RELEASE / CERTIFICATE OF RELEASE
TO SERVICE
JOB CARD MPD-TASK: 242100-02
PIA - A318/A319/A320/A321 AMM TASK : 24-21-00-210-046-A
24-21-00 PB 601
TITLE:
A/C Reg.: 24-21-00-210-046-A - Check IDG Oil Level
** ON A/C ALL and Differential Pressure Indicator (DPI)
MPD Task 242100-02-1
MECH. INSP.
Z430 (Z440)
B C
OIL FILTER
DP INDICATOR
D E F G
01 A
TYPICAL 01
B
NORMAL
(RESET) C
EXTENDED
NOTE:
01 DPI BUTTON (SILVER END, RED CYLINDRICAL SIDE) N_MM_242100_6_UAPA_01_02
JCP Title: temporary job card package CERTIFICATE OF TASK / INSPECTION COMPLETION: Page 6 of 12
JCP Ref: reference DATABASE REV DATE: Nov 01/2021
CERTIFIES THAT THE TASK / INSPECTION HAS BEEN COMPLETED TO THE REQUIRED PRINT DATE: Nov 22/2021 09:03
STANDARD AND SUPPORTS THE FINAL MAINTENANCE RELEASE / CERTIFICATE OF RELEASE
TO SERVICE
JOB CARD MPD-TASK: 242100-02
PIA - A318/A319/A320/A321 AMM TASK : 24-21-00-210-046-A
24-21-00 PB 601
TITLE:
A/C Reg.: 24-21-00-210-046-A - Check IDG Oil Level
** ON A/C ALL and Differential Pressure Indicator (DPI)
MPD Task 242100-02-1
MECH. INSP.
A320
OVER FULL
ADD ADD
OIL OIL
PW6000
CFM
ADD ADD
OIL OIL
PW6000
CFM
FWD E
AFTER ENGINE
SHUTDOWN
(HOT OIL/IDG)
N_MM_242100_6_UAPA_02_02
JCP Title: temporary job card package CERTIFICATE OF TASK / INSPECTION COMPLETION: Page 7 of 12
JCP Ref: reference DATABASE REV DATE: Nov 01/2021
CERTIFIES THAT THE TASK / INSPECTION HAS BEEN COMPLETED TO THE REQUIRED PRINT DATE: Nov 22/2021 09:03
STANDARD AND SUPPORTS THE FINAL MAINTENANCE RELEASE / CERTIFICATE OF RELEASE
TO SERVICE
JOB CARD MPD-TASK: 242100-02
PIA - A318/A319/A320/A321 AMM TASK : 24-21-00-210-046-A
24-21-00 PB 601
TITLE:
A/C Reg.: 24-21-00-210-046-A - Check IDG Oil Level
** ON A/C ALL and Differential Pressure Indicator (DPI)
MPD Task 242100-02-1
MECH. INSP.
OVER FULL
ADD ADD
OIL OIL
PW6000
CFM
FWD F
AFTER SERVICING OR
ENGINE SHUTDOWN
(COLD OIL/IDG)
ACTION:
DO THE IDG SERVICING TO GET THE CORRECT IDG OIL LEVEL.
PW6000 PW6000
CFM CFM
FWD G
AT ALL TIMES
(HOT OR COLD OIL/IDG)
ACTION:
DO THE IDG SERVICING TO GET THE CORRECT IDG OIL LEVEL.
N_MM_242100_6_UAPA_03_00
JCP Title: temporary job card package CERTIFICATE OF TASK / INSPECTION COMPLETION: Page 8 of 12
JCP Ref: reference DATABASE REV DATE: Nov 01/2021
CERTIFIES THAT THE TASK / INSPECTION HAS BEEN COMPLETED TO THE REQUIRED PRINT DATE: Nov 22/2021 09:03
STANDARD AND SUPPORTS THE FINAL MAINTENANCE RELEASE / CERTIFICATE OF RELEASE
TO SERVICE
JOB CARD MPD-TASK: 242100-02
PIA - A318/A319/A320/A321 AMM TASK : 24-21-00-210-046-A
24-21-00 PB 601
TITLE:
A/C Reg.: 24-21-00-210-046-A - Check IDG Oil Level
** ON A/C ALL and Differential Pressure Indicator (DPI)
MPD Task 242100-02-1
MECH. INSP.
3. Job Set-up
Subtask 24-21-00-941-059-A
A. Safety Precautions
(1) On the center pedestal, on the ENG panel 115VU:
(a) Put a WARNING NOTICE(S) in position to tell persons not to start the engine.
(2) Make sure that the engine 1(2) shutdown occurred not less than 5 minutes before
you do this procedure.
(3) On the overhead maintenance panel 50VU:
(a) Make sure that the ON legend of the ENG/FADEC GND PWR/1(2)
pushbutton switch is off.
(b) Put a WARNING NOTICE(S) in position to tell persons not to energize the
FADEC 1(2).
** ON A/C ALL
4. Procedure
** ON A/C 001-003
(Ref. Fig. Check of the Oil Level and the Differential Pressure Indicator Button)
** ON A/C 004-050
(Ref. Fig. Check of the IDG Oil Level and the DPI Button)
** ON A/C ALL
Subtask 24-21-00-210-057-A
A. Check of the IDG Oil Level
JCP Title: temporary job card package CERTIFICATE OF TASK / INSPECTION COMPLETION: Page 9 of 12
JCP Ref: reference DATABASE REV DATE: Nov 01/2021
CERTIFIES THAT THE TASK / INSPECTION HAS BEEN COMPLETED TO THE REQUIRED PRINT DATE: Nov 22/2021 09:03
STANDARD AND SUPPORTS THE FINAL MAINTENANCE RELEASE / CERTIFICATE OF RELEASE
TO SERVICE
JOB CARD MPD-TASK: 242100-02
PIA - A318/A319/A320/A321 AMM TASK : 24-21-00-210-046-A
24-21-00 PB 601
TITLE:
A/C Reg.: 24-21-00-210-046-A - Check IDG Oil Level
** ON A/C ALL and Differential Pressure Indicator (DPI)
MPD Task 242100-02-1
MECH. INSP.
WARNING:DO NOT GET THE FLUID ON YOUR SKIN OR IN YOUR EYES. IF YOU
DO:
- FLUSH IT AWAY WITH CLEAN WATER
- GET MEDICAL AID.
CAUTION: IF YOU DRY MOTORED THE ENGINE OR DID AN ENGINE RUN, MAKE
SURE THAT THE OIL LEVEL IS STABLE BEFORE YOU DO THE
INSPECTION. THE OIL LEVEL BECOMES STABLE ONLY AFTER A
PERIOD OF:
- 30 MINUTES IF YOU DRY-MOTORED THE ENGINE, OR
- 5 MINUTES IF YOU DID AN ENGINE RUN.
THUS, THE LEVEL INDICATIONS ON THE SIGHTGLASS ARE NOT
CORRECT BEFORE THE END OF THIS PERIOD. IF YOU ADD OIL
WHEN IT IS NOT NECESSARY, FAILURE OF THE IDG CAN OCCUR.
** ON A/C 001-003
(Ref. Fig. Check of the Oil Level and the Differential Pressure Indicator Button)
** ON A/C 004-050
(Ref. Fig. Check of the IDG Oil Level and the DPI Button)
** ON A/C ALL
(4) Look at the IDG oil-level sightglass:
JCP Title: temporary job card package CERTIFICATE OF TASK / INSPECTION COMPLETION: Page 10 of 12
JCP Ref: reference DATABASE REV DATE: Nov 01/2021
CERTIFIES THAT THE TASK / INSPECTION HAS BEEN COMPLETED TO THE REQUIRED PRINT DATE: Nov 22/2021 09:03
STANDARD AND SUPPORTS THE FINAL MAINTENANCE RELEASE / CERTIFICATE OF RELEASE
TO SERVICE
JOB CARD MPD-TASK: 242100-02
PIA - A318/A319/A320/A321 AMM TASK : 24-21-00-210-046-A
24-21-00 PB 601
TITLE:
A/C Reg.: 24-21-00-210-046-A - Check IDG Oil Level
** ON A/C ALL and Differential Pressure Indicator (DPI)
MPD Task 242100-02-1
MECH. INSP.
NOTE: The IDG oil temperature is shown on the ECAM "ELEC SD" page. If the
oil temperature is less than 49 DEG.C (120 DEG.F), the oil is cold. If the
oil temperature is equal to or more than 49 DEG.C (120 DEG.F), the oil is
hot.
TITLE:
A/C Reg.: 24-21-00-210-046-A - Check IDG Oil Level
** ON A/C ALL and Differential Pressure Indicator (DPI)
MPD Task 242100-02-1
MECH. INSP.
JCP Title: temporary job card package CERTIFICATE OF TASK / INSPECTION COMPLETION: Page 12 of 12
JCP Ref: reference DATABASE REV DATE: Nov 01/2021
CERTIFIES THAT THE TASK / INSPECTION HAS BEEN COMPLETED TO THE REQUIRED PRINT DATE: Nov 22/2021 09:03
STANDARD AND SUPPORTS THE FINAL MAINTENANCE RELEASE / CERTIFICATE OF RELEASE
TO SERVICE
JOB CARD MPD-TASK: 242400-01
PIA - A318/A319/A320/A321 AMM TASK : 24-24-00-710-001-A
24-24-00 PB 501
TITLE:
A/C Reg.: 24-24-00-710-001-A - Operational
** ON A/C ALL Check of Emergency Generating System
MPD Task 242400-01-2
CARD: ZONE: 210 INTERVAL:
SKILL: ACCESS: 812, 822
MECH. INSP.
** ON A/C ALL
TASK 24-24-00-710-001-A
Operational Check of Emergency Generating System
REFERENCE QTYDESIGNATION
No specific 1 ACCESS PLATFORM 2M (6 FT) - ADJUSTABLE
No specific AR WARNING NOTICE(S)
(98D27803500001) 1 LOCKING TOOL ZERO POS
C. Referenced Information
REFERENCE DESIGNATION
(Ref. 24-41-00-861-002-A). Energize the Aircraft Electrical Circuits from the External
Power
(Ref. 24-41-00-861-002-A- Energize the Aircraft Electrical Circuits from the APU
01).
(Ref. 24-41-00-861-002-A- Energize the Aircraft Electrical Circuits from Engine 1(2)
02).
(Ref. 24-41-00-862-002-A). De-energize the Aircraft Electrical Circuits Supplied from
the External Power
(Ref. 24-41-00-862-002-A- De-energize the Aircraft Electrical Circuits Supplied from
01). the APU
(Ref. 24-41-00-862-002-A- De-energize the Aircraft Electrical Circuits Supplied from
02). the Engine 1(2)
(Ref. 29-10-00-863-003-A- Pressurize the Blue Hydraulic System with the Blue
01). Electric Pump
JCP Title: temporary job card package CERTIFICATE OF TASK / INSPECTION COMPLETION: Page 1 of 5
JCP Ref: reference DATABASE REV DATE: Nov 01/2021
CERTIFIES THAT THE TASK / INSPECTION HAS BEEN COMPLETED TO THE REQUIRED PRINT DATE: Nov 22/2021 09:04
STANDARD AND SUPPORTS THE FINAL MAINTENANCE RELEASE / CERTIFICATE OF RELEASE
TO SERVICE
JOB CARD MPD-TASK: 242400-01
PIA - A318/A319/A320/A321 AMM TASK : 24-24-00-710-001-A
24-24-00 PB 501
TITLE:
A/C Reg.: 24-24-00-710-001-A - Operational
** ON A/C ALL Check of Emergency Generating System
MPD Task 242400-01-2
MECH. INSP.
REFERENCE DESIGNATION
(Ref. 31-60-00-860-001-A). EIS Start Procedure
(Ref. 31-60-00-860-002-A). EIS Stop Procedure
Ref. TSM 29-12-00-810- Continues Running of the Blue Electric Pump
810
3. Job Set-up
Subtask 24-24-00-860-050-A
A. Aircraft Maintenance Configuration
TITLE:
A/C Reg.: 24-24-00-710-001-A - Operational
** ON A/C ALL Check of Emergency Generating System
MPD Task 242400-01-2
MECH. INSP.
ACTION RESULT
1.On the EMER ELEC PWR section of On the lower ECAM Display Unit (DU):
panel 21VU: · The "ELEC" page comes into view
· Open the safety guard. automatically.
· Push and hold the EMER GEN TEST · The green lines between the AC1 and
pushbutton switch. AC ESS busbars and the DC1 and DC
ESS busbars go out of view.
· The white "EMER GEN" and "ESS TR"
indications come into view. The related
green parameters come into view.
· The green lines come into view between
- The "EMER GEN" indication and the
AC ESS busbar
- The "EMER GEN" indication and the
"ESS TR" indication
- The "ESS TR" indication and the DC
ESS busbar.
· The "SHED" indication comes into
view below the AC ESS and DC ESS
busbars.
2.On panel 21VU: On panel 21VU:
· Release the EMER GEN TEST · The safety guard goes back to its initial
pushbutton switch. position.
NOTE:
The Blue electric pump stops
automatically.
3. If the Blue electric pump does not stop, The Blue electric pump stops.
on the HYD section of panel 50VU, push
and release the BLUE PUMP/OVRD
pushbutton switch.
4.Make sure that the ON legend of the
BLUE PUMP/OVRD pushbutton switch
goes off.
5.If the Blue electric pump does not stop,
do the troubleshooting procedure of
JCP Title: temporary job card package CERTIFICATE OF TASK / INSPECTION COMPLETION: Page 3 of 5
JCP Ref: reference DATABASE REV DATE: Nov 01/2021
CERTIFIES THAT THE TASK / INSPECTION HAS BEEN COMPLETED TO THE REQUIRED PRINT DATE: Nov 22/2021 09:04
STANDARD AND SUPPORTS THE FINAL MAINTENANCE RELEASE / CERTIFICATE OF RELEASE
TO SERVICE
JOB CARD MPD-TASK: 242400-01
PIA - A318/A319/A320/A321 AMM TASK : 24-24-00-710-001-A
24-24-00 PB 501
TITLE:
A/C Reg.: 24-24-00-710-001-A - Operational
** ON A/C ALL Check of Emergency Generating System
MPD Task 242400-01-2
MECH. INSP.
ACTION RESULT
continuous operation of the Blue electric
pump Ref. TSM 29-12-00-810-810 .
6.On the ECAM control panel: On the lower ECAM DU:
· Push the ELEC key to get access to the · The usual configuration comes into view,
"ELEC" page. the emergency AC generator stops and
the AC1 busbar supplies the AC ESS
NOTE: busbar.
It is possible that the ESS TR busbar
continues to supply the DC ESS
busbar.
NOTE:
After the reset of the two FWCs, they
will not keep a record of the indication
in the Post Flight Report (PFR) in the
next flight.
JCP Title: temporary job card package CERTIFICATE OF TASK / INSPECTION COMPLETION: Page 4 of 5
JCP Ref: reference DATABASE REV DATE: Nov 01/2021
CERTIFIES THAT THE TASK / INSPECTION HAS BEEN COMPLETED TO THE REQUIRED PRINT DATE: Nov 22/2021 09:04
STANDARD AND SUPPORTS THE FINAL MAINTENANCE RELEASE / CERTIFICATE OF RELEASE
TO SERVICE
JOB CARD MPD-TASK: 242400-01
PIA - A318/A319/A320/A321 AMM TASK : 24-24-00-710-001-A
24-24-00 PB 501
TITLE:
A/C Reg.: 24-24-00-710-001-A - Operational
** ON A/C ALL Check of Emergency Generating System
MPD Task 242400-01-2
MECH. INSP.
ACTION RESULT
· Open circuit breaker 2HA2 for five to 10
seconds.
· Close circuit breaker 2HA2.
5. Close-up
Subtask 24-24-00-860-051-A
A. Put the aircraft back to its initial configuration.
(1) If the test continues for more than 30 seconds, on panel 22VU, the FAULT legend
of the EXTRACT pushbutton switch comes on.
In this case, release then push the EXTRACT pushbutton switch (the FAULT
legend goes off).
(2) On the HYD section of panel 50VU, push the LEAK MEASUREMENT VALVES/B
pushbutton switch (the OFF legend goes off).
(3) Remove the LOCKING TOOL ZERO POS (98D27803500001) of the flap/slat
control levers.
(4) Do the EIS stop procedure
(Ref. AMM TASK 31-60-00-860-002) .
(5) De-energize the aircraft electrical circuits
(Ref. AMM TASK 24-41-00-862-002) .
Subtask 24-24-00-410-051-A
B. Close Access
(1) Close the access doors 812 and 822.
(2) Remove the WARNING NOTICE(S).
(3) Remove the access platform(s).
*** END OF CARD ***
JCP Title: temporary job card package CERTIFICATE OF TASK / INSPECTION COMPLETION: Page 5 of 5
JCP Ref: reference DATABASE REV DATE: Nov 01/2021
CERTIFIES THAT THE TASK / INSPECTION HAS BEEN COMPLETED TO THE REQUIRED PRINT DATE: Nov 22/2021 09:04
STANDARD AND SUPPORTS THE FINAL MAINTENANCE RELEASE / CERTIFICATE OF RELEASE
TO SERVICE
JOB CARD MPD-TASK: 242800-01
PIA - A318/A319/A320/A321 AMM TASK : 24-28-00-710-001-A
24-28-00 PB 501
TITLE:
A/C Reg.: 24-28-00-710-001-A - Operational Test of the Static
** ON A/C ALL Inverter when the Aircraft Electrical Circuits a...
MPD Task 242800-01-2
CARD: ZONE: 210 INTERVAL:
SKILL: ACCESS: 812, 822
MECH. INSP.
** ON A/C ALL
TASK 24-28-00-710-001-A
Operational Test of the Static Inverter when the Aircraft Electrical Circuits are Energized from
the External Power
NOTE: If the external power is not available, there is an alternative method (with the APU)
for this procedure. This task gives the first method. For the alternative method, refer
to the other task in this page block.
NOTE: If the external power is available and the APU is in operation, you must refer to the
alternative method with the APU to do the operational test of the static inverter.
REFERENCE QTYDESIGNATION
No specific 1 ACCESS PLATFORM 2M (6 FT) - ADJUSTABLE
C. Referenced Information
REFERENCE DESIGNATION
(Ref. 24-41-00-861-002-A). Energize the Aircraft Electrical Circuits from the External
Power
(Ref. 24-41-00-862-002-A). De-energize the Aircraft Electrical Circuits Supplied from
the External Power
(Ref. 31-60-00-860-001-A). EIS Start Procedure
(Ref. 31-60-00-860-002-A). EIS Stop Procedure
Job Set-up
JCP Title: temporary job card package CERTIFICATE OF TASK / INSPECTION COMPLETION: Page 1 of 5
JCP Ref: reference DATABASE REV DATE: Nov 01/2021
CERTIFIES THAT THE TASK / INSPECTION HAS BEEN COMPLETED TO THE REQUIRED PRINT DATE: Nov 22/2021 09:06
STANDARD AND SUPPORTS THE FINAL MAINTENANCE RELEASE / CERTIFICATE OF RELEASE
TO SERVICE
JOB CARD MPD-TASK: 242800-01
PIA - A318/A319/A320/A321 AMM TASK : 24-28-00-710-001-A
24-28-00 PB 501
TITLE:
A/C Reg.: 24-28-00-710-001-A - Operational Test of the Static
** ON A/C ALL Inverter when the Aircraft Electrical Circuits a...
MPD Task 242800-01-2
MECH. INSP.
3.
Subtask 24-28-00-860-050-A
A. Safety Precautions
(1) Do not energize the aircraft electrical circuits.
(2) On the panel 35VU, make sure that:
· the BAT1 and BAT2 pushbutton switches are released,
· the BUS TIE and AC ESS FEED pushbutton switches are pushed.
NOTE: On the panel 2000VU, put the MAINT BUS switch (5XX) in the OFF
position during the test.
Subtask 24-28-00-010-050-A
B. Get access to the avionics compartment.
(1) Put an ACCESS PLATFORM 2M (6 FT) - ADJUSTABLE at the access doors 812
and 822 of the avionics compartment.
(2) Open the access doors 812 and 822.
Subtask 24-28-00-865-050-A
C. Make sure that this(these) circuit breaker(s) is(are) closed:
4. Procedure
Subtask 24-28-00-710-050-B
A. Operational Test of the Static Inverter
ACTION RESULT
1.On the ELEC panel 35VU:
JCP Title: temporary job card package CERTIFICATE OF TASK / INSPECTION COMPLETION: Page 2 of 5
JCP Ref: reference DATABASE REV DATE: Nov 01/2021
CERTIFIES THAT THE TASK / INSPECTION HAS BEEN COMPLETED TO THE REQUIRED PRINT DATE: Nov 22/2021 09:06
STANDARD AND SUPPORTS THE FINAL MAINTENANCE RELEASE / CERTIFICATE OF RELEASE
TO SERVICE
JOB CARD MPD-TASK: 242800-01
PIA - A318/A319/A320/A321 AMM TASK : 24-28-00-710-001-A
24-28-00 PB 501
TITLE:
A/C Reg.: 24-28-00-710-001-A - Operational Test of the Static
** ON A/C ALL Inverter when the Aircraft Electrical Circuits a...
MPD Task 242800-01-2
MECH. INSP.
ACTION RESULT
· Make sure that the voltage of the
batteries 1 and 2 is higher than 25.5V.
2.Power supply the aircraft electrical
circuits:
· Energize the aircraft electrical
circuits from the external power
(Ref. AMM TASK 24-41-00-861-002) ,
3.Do the EIS start procedure (upper
ECAM DU and lower ECAM DU only)
(Ref. AMM TASK 31-60-00-860-001) .
4.On the ECAM control panel: On the lower ECAM display unit:
· Get the ELEC page. · Make sure that the external power
energizes correctly the aircraft electrical
circuits.
5.On the ELEC panel 35VU: On the ELEC panel 35VU:
· Release the BAT1 pushbutton switch. · The OFF legend of the BAT1 pushbutton
switch comes on.
· Push the BAT1 pushbutton switch. · The OFF legend of the BAT1 pushbutton
switch goes off.
· Release the BAT2 pushbutton switch. · The OFF legend of the BAT2 pushbutton
switch comes on.
· Push the BAT2 pushbutton switch. · The OFF legend of the BAT2 pushbutton
switch goes off.
On the lower ECAM display unit:
· Make sure that the battery charge
current (for BAT1 and BAT2) is lower
than 60A after approximately 10
seconds.
NOTE:
If the current does not decrease
after 10 seconds, it is necessary to
do a charging cycle of the batteries.
When the charging cycle is completed
(batteries no longer connected to the DC
BAT BUS), do the check again.
JCP Title: temporary job card package CERTIFICATE OF TASK / INSPECTION COMPLETION: Page 3 of 5
JCP Ref: reference DATABASE REV DATE: Nov 01/2021
CERTIFIES THAT THE TASK / INSPECTION HAS BEEN COMPLETED TO THE REQUIRED PRINT DATE: Nov 22/2021 09:06
STANDARD AND SUPPORTS THE FINAL MAINTENANCE RELEASE / CERTIFICATE OF RELEASE
TO SERVICE
JOB CARD MPD-TASK: 242800-01
PIA - A318/A319/A320/A321 AMM TASK : 24-28-00-710-001-A
24-28-00 PB 501
TITLE:
A/C Reg.: 24-28-00-710-001-A - Operational Test of the Static
** ON A/C ALL Inverter when the Aircraft Electrical Circuits a...
MPD Task 242800-01-2
MECH. INSP.
ACTION RESULT
· Release the BUS TIE pushbutton · The OFF legend of the BUS TIE
switch. pushbutton switch comes on.
8.On the ECAM control panel: On the upper ECAM display unit:
· Push and hold the ELEC key, the ELEC · The DC ESS and AC ESS indications
page comes into view and stays on come on green,
during the test. · The amber SHED indication comes
on under the DC ESS and AC ESS
indications,
· The STAT INV indication comes on white
and the related parameters come on
green.
NOTE:
There is no green line between the
STAT INV box and the AC ESS and DC
ESS indications.
5. Close-up
Subtask 24-28-00-860-051-A
A. Put the aircraft back to its initial configuration.
(1) Do the EIS stop procedure
(Ref. AMM TASK 31-60-00-860-002) .
(2) De-energize the aircraft electrical circuits
(Ref. AMM TASK 24-41-00-862-002) .
Subtask 24-28-00-410-050-A
B. Close Access
(1) Close the access doors 812 and 822.
(2) Remove the access platform(s).
JCP Title: temporary job card package CERTIFICATE OF TASK / INSPECTION COMPLETION: Page 4 of 5
JCP Ref: reference DATABASE REV DATE: Nov 01/2021
CERTIFIES THAT THE TASK / INSPECTION HAS BEEN COMPLETED TO THE REQUIRED PRINT DATE: Nov 22/2021 09:06
STANDARD AND SUPPORTS THE FINAL MAINTENANCE RELEASE / CERTIFICATE OF RELEASE
TO SERVICE
JOB CARD MPD-TASK: 242800-01
PIA - A318/A319/A320/A321 AMM TASK : 24-28-00-710-001-A
24-28-00 PB 501
TITLE:
A/C Reg.: 24-28-00-710-001-A - Operational Test of the Static
** ON A/C ALL Inverter when the Aircraft Electrical Circuits a...
MPD Task 242800-01-2
MECH. INSP.
JCP Title: temporary job card package CERTIFICATE OF TASK / INSPECTION COMPLETION: Page 5 of 5
JCP Ref: reference DATABASE REV DATE: Nov 01/2021
CERTIFIES THAT THE TASK / INSPECTION HAS BEEN COMPLETED TO THE REQUIRED PRINT DATE: Nov 22/2021 09:06
STANDARD AND SUPPORTS THE FINAL MAINTENANCE RELEASE / CERTIFICATE OF RELEASE
TO SERVICE
JOB CARD MPD-TASK: 255000-01
PIA - A318/A319/A320/A321 AMM TASK : 25-50-00-200-002-A
25-50-00 PB 601
TITLE:
A/C Reg.: 25-50-00-200-002-A - Visual Check of
** ON A/C ALL Cargo Compartment Decompression,
Lining, Floor Panels and Press...
MPD Task 255000-01-2
CARD: ZONE: 130, 150, 160 INTERVAL:
SKILL: ACCESS:
MECH. INSP.
** ON A/C ALL
TASK 25-50-00-200-002-A
Visual Check of Cargo Compartment Decompression, Lining, Floor Panels and Pressure
Compensation Valve (as far as Visible, if ACT(s) or Sliding Carpet System Installed)
REFERENCE QTYDESIGNATION
No specific 1 ACCESS PLATFORM 2M (6 FT)
No specific AR SAFETY CLIP - CIRCUIT BREAKER
** ON A/C 004-009
No specific 1 WARNING NOTICE(S)
** ON A/C ALL
No specific Torque wrench: range
to between 0.055 and 0.060 m.daN
(4.87 and 5.31 lbf.in)
TITLE:
A/C Reg.: 25-50-00-200-002-A - Visual Check of
** ON A/C ALL Cargo Compartment Decompression,
Lining, Floor Panels and Press...
MPD Task 255000-01-2
MECH. INSP.
C. Referenced Information
REFERENCE DESIGNATION
(Ref. 24-42-00-861-001-A). Energize the Ground Service Network from the External
Power
(Ref. 24-42-00-862-001-A). De-energize the Ground Service Network Supplied from
the External Power
(Ref. 25-50-00-200-024-A). Cargo Compartment Linings with Honeycomb Core -
General Repair/Protection Information
(Ref. 25-54-11-400-001-A). Installation of the Forward Cargo-Compartment Partition
FR24A
(Ref. 25-54-12-000-001-A). Removal of the Forward Cargo-Compartment Partition
(Ref. 25-54-12-300-001-A). Fasteners Missing from the Lining Panels of the Forward
Cargo Compartment
(Ref. 25-54-12-400-001-A). Installation of the Forward Cargo-Compartment Partition
(Ref. 25-54-12-400-002-A). Installation of the Ceiling Panels in the Forward Cargo
Compartment
(Ref. 25-54-12-400-003-A). Installation of the Sidewall Panels in the Forward Cargo
Compartment
(Ref. 25-55-11-300-001-A). Fasteners Missing from the Lining Panels of the Aft
Cargo Compartment
(Ref. 25-55-11-400-001-A). Installation of the Aft Cargo-Compartment Partition at
FR47
(Ref. 25-55-11-400-002-A). Installation of the Ceiling Panels in the Aft Cargo-
Compartment - FR47/FR59
(Ref. 25-55-11-400-003-A). Installation of the Sidewall Panels in the Aft Cargo
Compartment - FR47/FR59
(Ref. 25-55-12-000-001-A). Removal of the Aft Cargo-Compartment Partition at FR65
(Ref. 25-55-12-300-001-A). Fasteners Missing from the Lining Panels of the Bulk
Cargo Compartment
(Ref. 25-55-12-400-001-A). Installation of the Aft Cargo-Compartment Partition at
FR65
(Ref. 25-55-12-400-002-A). Installation of the Ceiling Panels in the Aft Cargo
Compartment at FR59/FR65
(Ref. 25-55-12-400-003-A). Installation of the Sidewall Panels in the Aft Cargo
Compartment - FR59/FR65
(Ref. 52-30-00-860-001-A). Open the FWD or Aft Cargo-Compartment Door with the
Yellow Electric Pump
JCP Title: temporary job card package CERTIFICATE OF TASK / INSPECTION COMPLETION: Page 2 of 12
JCP Ref: reference DATABASE REV DATE: Nov 01/2021
CERTIFIES THAT THE TASK / INSPECTION HAS BEEN COMPLETED TO THE REQUIRED PRINT DATE: Nov 22/2021 09:16
STANDARD AND SUPPORTS THE FINAL MAINTENANCE RELEASE / CERTIFICATE OF RELEASE
TO SERVICE
JOB CARD MPD-TASK: 255000-01
PIA - A318/A319/A320/A321 AMM TASK : 25-50-00-200-002-A
25-50-00 PB 601
TITLE:
A/C Reg.: 25-50-00-200-002-A - Visual Check of
** ON A/C ALL Cargo Compartment Decompression,
Lining, Floor Panels and Press...
MPD Task 255000-01-2
MECH. INSP.
REFERENCE DESIGNATION
(Ref. 52-30-00-860-002-A). Close the FWD or Aft Cargo-Compartment Door with the
Yellow Electric Pump
(Ref. 53-42-14-400-001-A). Installation of the Aft Cargo-Compartment Floor-Panels
Zone 150
(Ref. 53-42-14-400-001-A- Installation of the Aft Cargo-Compartment Floor-Panels
01). (Alternative Installation Procedure with the Skyflex
Option)
(Ref. 25-50-00-200-024-A). Cargo Compartment Linings with Honeycomb Core -
General Repair/Protection Information (for corrective
action)
(Ref. 25-50-00-340-002-A). Repair of the Flanges of the Cargo-Compartment
Decompression Panels (for corrective action)
(Ref. 51-76-11-300-001-A). Repair of the Sealing (for corrective action)
(Ref. 53-22-14-000-001-A). Removal of the Forward Cargo-Compartment Floor-
Panels (for corrective action)
(Ref. 53-22-14-400-001-A). Installation of the Forward Cargo-Compartment Floor-
Panels (for corrective action)
(Ref. 53-22-14-400-001-A- Installation of the Forward Cargo-Compartment Floor-
01). Panels (Alternative Installation Procedure with the Skyflex
Option) (for corrective action)
(Ref. 53-42-14-000-001-A). Removal of the Aft Cargo-Compartment Floor-Panels
Zone 150 (for corrective action)
(Ref. 53-42-14-400-001-A). Installation of the Aft Cargo-Compartment Floor-Panels
Zone 150 (for corrective action)
(Ref. 53-42-14-400-001-A- Installation of the Aft Cargo-Compartment Floor-Panels
01). (Alternative Installation Procedure with the Skyflex
Option) (for corrective action)
Ref. SRM 530200 (for corrective action)
** ON A/C 001-003
Decompression Panel SHEET 1
** ON A/C 004-012
Decompression Panel SHEET 1
** ON A/C 013-050
Decompression Panel SHEET 1
Pressure Compensation Valve SHEET 1
JCP Title: temporary job card package CERTIFICATE OF TASK / INSPECTION COMPLETION: Page 3 of 12
JCP Ref: reference DATABASE REV DATE: Nov 01/2021
CERTIFIES THAT THE TASK / INSPECTION HAS BEEN COMPLETED TO THE REQUIRED PRINT DATE: Nov 22/2021 09:16
STANDARD AND SUPPORTS THE FINAL MAINTENANCE RELEASE / CERTIFICATE OF RELEASE
TO SERVICE
JOB CARD MPD-TASK: 255000-01
PIA - A318/A319/A320/A321 AMM TASK : 25-50-00-200-002-A
25-50-00 PB 601
TITLE:
A/C Reg.: 25-50-00-200-002-A - Visual Check of
** ON A/C ALL Cargo Compartment Decompression,
Lining, Floor Panels and Press...
MPD Task 255000-01-2
MECH. INSP.
1. DECOMPRESSION PANEL
(INSTALLED)
A
SECTION
A-A
A EXAMPLE (INSTALLED)
CEILING
PANEL
TAPE
SLIDE
AREA
FIREBLOCKER
DECOMPRESSION
PANEL
LATCH
FRAME
N_MM_255000_6_AEM0_01_00
JCP Title: temporary job card package CERTIFICATE OF TASK / INSPECTION COMPLETION: Page 4 of 12
JCP Ref: reference DATABASE REV DATE: Nov 01/2021
CERTIFIES THAT THE TASK / INSPECTION HAS BEEN COMPLETED TO THE REQUIRED PRINT DATE: Nov 22/2021 09:16
STANDARD AND SUPPORTS THE FINAL MAINTENANCE RELEASE / CERTIFICATE OF RELEASE
TO SERVICE
JOB CARD MPD-TASK: 255000-01
PIA - A318/A319/A320/A321 AMM TASK : 25-50-00-200-002-A
25-50-00 PB 601
TITLE:
A/C Reg.: 25-50-00-200-002-A - Visual Check of
** ON A/C ALL Cargo Compartment Decompression,
Lining, Floor Panels and Press...
MPD Task 255000-01-2
MECH. INSP.
A A
SECTION
A-A
EXAMPLE
CATCH ASSY
N_MM_255000_6_AEU0_01_00
JCP Title: temporary job card package CERTIFICATE OF TASK / INSPECTION COMPLETION: Page 5 of 12
JCP Ref: reference DATABASE REV DATE: Nov 01/2021
CERTIFIES THAT THE TASK / INSPECTION HAS BEEN COMPLETED TO THE REQUIRED PRINT DATE: Nov 22/2021 09:16
STANDARD AND SUPPORTS THE FINAL MAINTENANCE RELEASE / CERTIFICATE OF RELEASE
TO SERVICE
JOB CARD MPD-TASK: 255000-01
PIA - A318/A319/A320/A321 AMM TASK : 25-50-00-200-002-A
25-50-00 PB 601
TITLE:
A/C Reg.: 25-50-00-200-002-A - Visual Check of
** ON A/C ALL Cargo Compartment Decompression,
Lining, Floor Panels and Press...
MPD Task 255000-01-2
MECH. INSP.
A A
CATCH ASSY
DECOMPRESSION
ADHESIVE TAPE PANEL
CEILING PANEL INSERT
ADHESIVE TAPE
WASHER
SCREW
A A
N_MM_255000_6_MPL0_01_01
JCP Title: temporary job card package CERTIFICATE OF TASK / INSPECTION COMPLETION: Page 6 of 12
JCP Ref: reference DATABASE REV DATE: Nov 01/2021
CERTIFIES THAT THE TASK / INSPECTION HAS BEEN COMPLETED TO THE REQUIRED PRINT DATE: Nov 22/2021 09:16
STANDARD AND SUPPORTS THE FINAL MAINTENANCE RELEASE / CERTIFICATE OF RELEASE
TO SERVICE
JOB CARD MPD-TASK: 255000-01
PIA - A318/A319/A320/A321 AMM TASK : 25-50-00-200-002-A
25-50-00 PB 601
TITLE:
A/C Reg.: 25-50-00-200-002-A - Visual Check of
** ON A/C ALL Cargo Compartment Decompression,
Lining, Floor Panels and Press...
MPD Task 255000-01-2
MECH. INSP.
FR65
FR59
FR34
FR32 A
Z160
A A
EXAMPLE
B
Z130
SECTION
B-B
3 EXAMPLE
2 2
VALVE IN OPEN POSITION
5 1 5
B
4
2 3 2
VALVE IN CLOSED POSITION
5 5
4
1
N_MM_255000_6_VALV_01_00
JCP Title: temporary job card package CERTIFICATE OF TASK / INSPECTION COMPLETION: Page 7 of 12
JCP Ref: reference DATABASE REV DATE: Nov 01/2021
CERTIFIES THAT THE TASK / INSPECTION HAS BEEN COMPLETED TO THE REQUIRED PRINT DATE: Nov 22/2021 09:16
STANDARD AND SUPPORTS THE FINAL MAINTENANCE RELEASE / CERTIFICATE OF RELEASE
TO SERVICE
JOB CARD MPD-TASK: 255000-01
PIA - A318/A319/A320/A321 AMM TASK : 25-50-00-200-002-A
25-50-00 PB 601
TITLE:
A/C Reg.: 25-50-00-200-002-A - Visual Check of
** ON A/C ALL Cargo Compartment Decompression,
Lining, Floor Panels and Press...
MPD Task 255000-01-2
MECH. INSP.
3. Job Set-up
** ON A/C 004-009
Subtask 25-50-00-010-061-A
A. Get Access
(1) Energize the ground service network (Ref. AMM TASK 24-42-00-861-001) .
(2) Open the forward and/or aft cargo-compartment doors (Ref. AMM TASK 52-30-
00-860-001) .
(3) Put the ACCESS PLATFORM 2M (6 FT) in position at the opening of the forward
and/or aft cargo-compartment door(s).
(4) Set the light switch to on.
(5) Put the WARNING NOTICE(S) on the control panel(s) of the cargo loading system
to tell persons not to use it.
** ON A/C ALL
Subtask 25-50-00-865-127-A
B. Open, safety and tag this(these) circuit breaker(s):
** ON A/C 004-009
2000VU SEMI AUTO CLS-FWD 3MY E08
2000VU SEMI AUTO CLS-FWD 2MY E06
2001VU SEMI AUTO CLS-AFT 103MY D08
2001VU SEMI AUTO CLS-AFT 102MY D06
** ON A/C ALL
4. Procedure
Subtask 25-50-00-210-057-A
JCP Title: temporary job card package CERTIFICATE OF TASK / INSPECTION COMPLETION: Page 8 of 12
JCP Ref: reference DATABASE REV DATE: Nov 01/2021
CERTIFIES THAT THE TASK / INSPECTION HAS BEEN COMPLETED TO THE REQUIRED PRINT DATE: Nov 22/2021 09:16
STANDARD AND SUPPORTS THE FINAL MAINTENANCE RELEASE / CERTIFICATE OF RELEASE
TO SERVICE
JOB CARD MPD-TASK: 255000-01
PIA - A318/A319/A320/A321 AMM TASK : 25-50-00-200-002-A
25-50-00 PB 601
TITLE:
A/C Reg.: 25-50-00-200-002-A - Visual Check of
** ON A/C ALL Cargo Compartment Decompression,
Lining, Floor Panels and Press...
MPD Task 255000-01-2
MECH. INSP.
** ON A/C 001-003
(Ref. Fig. Decompression Panel SHEET 1)
** ON A/C 004-012
(Ref. Fig. Decompression Panel SHEET 1)
** ON A/C 013-050
(Ref. Fig. Decompression Panel SHEET 1)
** ON A/C ALL
(a) Examine each decompression panel for cracks and other damage.
(b) If a decompression panel is damaged, refer to (Ref. AMM TASK 25-50-00-
200-024) (Ref. AMM TASK 25-50-00-340-002) .
(c) Make sure that each decompression panel has a seal installed, missing seals
are not permitted.
(d) Make sure that the seal of each decompression panel is in the correct
condition.
(e) Make sure that each decompression panel is in the correct position.
(2) Lining panels:
(a) Examine each lining panel for cracks and other damage.
(b) If a lining panel is damaged, refer to (Ref. AMM TASK 25-50-00-200-024) .
(c) Make sure that each lining panel has a seal installed, missing seals are not
permitted.
(d) Make sure that the seal of each lining panel are in the correct condition.
(e) Make sure that each lining panel is in the correct position.
(f) Make sure that the linings panels are correctly attached:
JCP Title: temporary job card package CERTIFICATE OF TASK / INSPECTION COMPLETION: Page 9 of 12
JCP Ref: reference DATABASE REV DATE: Nov 01/2021
CERTIFIES THAT THE TASK / INSPECTION HAS BEEN COMPLETED TO THE REQUIRED PRINT DATE: Nov 22/2021 09:16
STANDARD AND SUPPORTS THE FINAL MAINTENANCE RELEASE / CERTIFICATE OF RELEASE
TO SERVICE
JOB CARD MPD-TASK: 255000-01
PIA - A318/A319/A320/A321 AMM TASK : 25-50-00-200-002-A
25-50-00 PB 601
TITLE:
A/C Reg.: 25-50-00-200-002-A - Visual Check of
** ON A/C ALL Cargo Compartment Decompression,
Lining, Floor Panels and Press...
MPD Task 255000-01-2
MECH. INSP.
NOTE: The strips of different colors are not considered as a damage of the
floor panel. The bright points of the panel edge are not considered as
a damage of the floor panel.
(b) If a floor panel is damaged, do a repair Ref. SRM 530200 or replace the panel
(Ref. AMM TASK 53-22-14-000-001) (Ref. AMM TASK 53-42-14-000-001)
or (Ref. AMM TASK 53-22-14-400-001) (Ref. AMM TASK 53-42-14-400-
001) .
(c) Make sure that the floor panels are correctly installed.
(d) If the section hoses come out of the space between floor panels, refer to
(Ref. AMM TASK 53-42-14-400-001) .
(e) Make sure that the sealant at the floor panel joints is in the correct condition.
(f) If the sealant is damaged, repair it (Ref. AMM TASK 51-76-11-300-001) .
(4) Pressure compensation valve:
(Ref. Fig. Pressure Compensation Valve SHEET 1)
(a) Make sure that each pressure compensation valve (4) is in closed position.
(b) If a pressure compensation valve (4) is in open position, close it:
JCP Title: temporary job card package CERTIFICATE OF TASK / INSPECTION COMPLETION: Page 10 of 12
JCP Ref: reference DATABASE REV DATE: Nov 01/2021
CERTIFIES THAT THE TASK / INSPECTION HAS BEEN COMPLETED TO THE REQUIRED PRINT DATE: Nov 22/2021 09:16
STANDARD AND SUPPORTS THE FINAL MAINTENANCE RELEASE / CERTIFICATE OF RELEASE
TO SERVICE
JOB CARD MPD-TASK: 255000-01
PIA - A318/A319/A320/A321 AMM TASK : 25-50-00-200-002-A
25-50-00 PB 601
TITLE:
A/C Reg.: 25-50-00-200-002-A - Visual Check of
** ON A/C ALL Cargo Compartment Decompression,
Lining, Floor Panels and Press...
MPD Task 255000-01-2
MECH. INSP.
NOTE: When you tighten the studs you will hear a click. This is a sign
that you have used the correct procedure to tighten the studs.
This click is not a sign that the correct torque value is applied.
When the studs are tightened, make sure that the correct torque
value is applied.
** ON A/C 004-009
2000VU SEMI AUTO CLS-FWD 3MY E08
2000VU SEMI AUTO CLS-FWD 2MY E06
2001VU SEMI AUTO CLS-AFT 103MY D08
2001VU SEMI AUTO CLS-AFT 102MY D06
Subtask 25-50-00-410-060-A
B. Close Access
(1) Make sure that the work area is clean and clear of tools and other items.
(2) Remove the WARNING NOTICE(S).
(3) Set the light switch to off.
(4) Close the forward and/or aft cargo-compartment doors (Ref. AMM TASK 52-30-
00-860-002) .
(5) Remove the access platform(s).
(6) De-energize the ground service network
(Ref. AMM TASK 24-42-00-862-001) .
JCP Title: temporary job card package CERTIFICATE OF TASK / INSPECTION COMPLETION: Page 11 of 12
JCP Ref: reference DATABASE REV DATE: Nov 01/2021
CERTIFIES THAT THE TASK / INSPECTION HAS BEEN COMPLETED TO THE REQUIRED PRINT DATE: Nov 22/2021 09:16
STANDARD AND SUPPORTS THE FINAL MAINTENANCE RELEASE / CERTIFICATE OF RELEASE
TO SERVICE
JOB CARD MPD-TASK: 255000-01
PIA - A318/A319/A320/A321 AMM TASK : 25-50-00-200-002-A
25-50-00 PB 601
TITLE:
A/C Reg.: 25-50-00-200-002-A - Visual Check of
** ON A/C ALL Cargo Compartment Decompression,
Lining, Floor Panels and Press...
MPD Task 255000-01-2
MECH. INSP.
JCP Title: temporary job card package CERTIFICATE OF TASK / INSPECTION COMPLETION: Page 12 of 12
JCP Ref: reference DATABASE REV DATE: Nov 01/2021
CERTIFIES THAT THE TASK / INSPECTION HAS BEEN COMPLETED TO THE REQUIRED PRINT DATE: Nov 22/2021 09:16
STANDARD AND SUPPORTS THE FINAL MAINTENANCE RELEASE / CERTIFICATE OF RELEASE
TO SERVICE
JOB CARD MPD-TASK: 281100-01
PIA - A318/A319/A320/A321 AMM TASK : 12-32-28-281-001-A
12-32-28 PB 301
TITLE:
A/C Reg.: 12-32-28-281-001-A - Drain Water Content
** ON A/C ALL
MPD Task 281100-01-2
CARD: ZONE: 190, 500, 600 INTERVAL:
SKILL: ACCESS: 195BB, 196BB
MECH. INSP.
** ON A/C ALL
TASK 12-32-28-281-001-A
Drain Water Content
WARNING: PUT THE SAFETY DEVICES AND THE WARNING NOTICES IN POSITION
BEFORE YOU START A TASK ON OR NEAR:
- THE FLIGHT CONTROLS
- THE FLIGHT CONTROL SURFACES
- THE LANDING GEAR AND THE RELATED DOORS
- COMPONENTS THAT MOVE.
MOVEMENT OF COMPONENTS CAN KILL OR CAUSE INJURY TO PERSONS
AND/OR CAN CAUSE DAMAGE TO THE EQUIPMENT.
NOTE: If possible, Airbus recommends you to do the water drain procedure before the
flight or the refuel procedure. If you do this procedure after the flight or the refuel
procedure, you must wait for one hour for the separation of the water and the fuel.
NOTE: It is permitted to do this procedure when the APU is in operation only if the fuel tank
pumps are set to OFF.
For the gravity procedure, Airbus recommends that there must be more than 10% content
of the fuel in each tank.
If you have less than 10% content of the fuel, then the indirect water drain valves will have
a decreased flow.
It is recommended that you use the suction procedure when you have less than 10%
content of the fuel.
2 Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment
REFERENCE QTYDESIGNATION
No specific AR CONTAINER 10 L(2 1/2 USGAL)
No specific 1 CONTAINER-CLEAN, STERILIZED, TRANSPARENT
GLASS
JCP Title: temporary job card package CERTIFICATE OF TASK / INSPECTION COMPLETION: Page 1 of 12
JCP Ref: reference DATABASE REV DATE: Nov 01/2021
CERTIFIES THAT THE TASK / INSPECTION HAS BEEN COMPLETED TO THE REQUIRED PRINT DATE: Nov 22/2021 09:19
STANDARD AND SUPPORTS THE FINAL MAINTENANCE RELEASE / CERTIFICATE OF RELEASE
TO SERVICE
JOB CARD MPD-TASK: 281100-01
PIA - A318/A319/A320/A321 AMM TASK : 12-32-28-281-001-A
12-32-28 PB 301
TITLE:
A/C Reg.: 12-32-28-281-001-A - Drain Water Content
** ON A/C ALL
MPD Task 281100-01-2
MECH. INSP.
REFERENCE QTYDESIGNATION
No specific 1 CONTAINER-FUEL RESISTANT, TRANSPARENT
PLASTIC
No specific AR HYDROKIT
No specific 1 PUMP - SUCTION (ATEX APPROVED)
No specific AR SAFETY BARRIER(S)
No specific AR WARNING NOTICE(S)
(97A28002117002) 1 TOOL-PURGING
(98A28101000000) 1 ADAPTING PIPE - WATER DRAINING FROM FUEL
(98A28104000000) 1 PURGER - WATER DRAIN
(98A28104000002) 1 TOOL - PURGING
(98A28104031001) 1 WATER DRAIN PURGER
(98D28104000000) 1 PIPE ADAPTING-WATER DRAINING
C. Referenced Information
REFERENCE DESIGNATION
(Ref. 12-31-28-660-001-A). Cold Weather Maintenance - Fuel
(Ref. 12-32-28-281-003-A). Sample Fuel for Microbiological Contamination Analysis
(Ref. 28-00-00-910-001-A). Fuel Safety Procedures
Fuel Sampling For Analysis
Fuel Sampling For Analysis - Suction Procedure
JCP Title: temporary job card package CERTIFICATE OF TASK / INSPECTION COMPLETION: Page 2 of 12
JCP Ref: reference DATABASE REV DATE: Nov 01/2021
CERTIFIES THAT THE TASK / INSPECTION HAS BEEN COMPLETED TO THE REQUIRED PRINT DATE: Nov 22/2021 09:19
STANDARD AND SUPPORTS THE FINAL MAINTENANCE RELEASE / CERTIFICATE OF RELEASE
TO SERVICE
JOB CARD MPD-TASK: 281100-01
PIA - A318/A319/A320/A321 AMM TASK : 12-32-28-281-001-A
12-32-28 PB 301
TITLE:
A/C Reg.: 12-32-28-281-001-A - Drain Water Content
** ON A/C ALL
MPD Task 281100-01-2
MECH. INSP.
25QM
RIB2
(26QM)
C C
23QM
(24QM)
21QM
(22QM)
A A
A
95QM 94QM
RIB15
RIB16
RIB22
RIB23
A B 1
WATER
DRAIN VALVE
FUEL TANK
BOTTOM-SKIN PLUNGER
PURGING TOOL
98A28104000000
N_MM_123228_3_ACM0_01_01
JCP Title: temporary job card package CERTIFICATE OF TASK / INSPECTION COMPLETION: Page 3 of 12
JCP Ref: reference DATABASE REV DATE: Nov 01/2021
CERTIFIES THAT THE TASK / INSPECTION HAS BEEN COMPLETED TO THE REQUIRED PRINT DATE: Nov 22/2021 09:19
STANDARD AND SUPPORTS THE FINAL MAINTENANCE RELEASE / CERTIFICATE OF RELEASE
TO SERVICE
JOB CARD MPD-TASK: 281100-01
PIA - A318/A319/A320/A321 AMM TASK : 12-32-28-281-001-A
12-32-28 PB 301
TITLE:
A/C Reg.: 12-32-28-281-001-A - Drain Water Content
** ON A/C ALL
MPD Task 281100-01-2
MECH. INSP.
FUEL TANK
BOTTOM-SKIN
D 1
WATER
DRAIN VALVE
PLUNGER
PURGING TOOL
98A28104000002
NOTE:
1 CORRECT ALIGNMENT OF THE PLUNGER
WITH THE WATER DRAIN VALVE.
N_MM_123228_3_ACM0_02_00
JCP Title: temporary job card package CERTIFICATE OF TASK / INSPECTION COMPLETION: Page 4 of 12
JCP Ref: reference DATABASE REV DATE: Nov 01/2021
CERTIFIES THAT THE TASK / INSPECTION HAS BEEN COMPLETED TO THE REQUIRED PRINT DATE: Nov 22/2021 09:19
STANDARD AND SUPPORTS THE FINAL MAINTENANCE RELEASE / CERTIFICATE OF RELEASE
TO SERVICE
JOB CARD MPD-TASK: 281100-01
PIA - A318/A319/A320/A321 AMM TASK : 12-32-28-281-001-A
12-32-28 PB 301
TITLE:
A/C Reg.: 12-32-28-281-001-A - Drain Water Content
** ON A/C ALL
MPD Task 281100-01-2
MECH. INSP.
A C RIB2
25QM
(26QM)
23QM
(24QM)
A C 21QM
(22QM)
95QM 94QM
A C RIB15
RIB16 RIB22
RIB23
FUEL TANK 1
BOTTOM SKIN
5
B 4
PURGING TOOL
97A28002117002
3
A B 01
TYPICAL
NOTE:
01 CORRECT ALIGNMENT OF THE PLUNGER WITH THE WATER DRAIN VALVE N_MM_123228_3_ANM0_01_03
JCP Title: temporary job card package CERTIFICATE OF TASK / INSPECTION COMPLETION: Page 5 of 12
JCP Ref: reference DATABASE REV DATE: Nov 01/2021
CERTIFIES THAT THE TASK / INSPECTION HAS BEEN COMPLETED TO THE REQUIRED PRINT DATE: Nov 22/2021 09:19
STANDARD AND SUPPORTS THE FINAL MAINTENANCE RELEASE / CERTIFICATE OF RELEASE
TO SERVICE
JOB CARD MPD-TASK: 281100-01
PIA - A318/A319/A320/A321 AMM TASK : 12-32-28-281-001-A
12-32-28 PB 301
TITLE:
A/C Reg.: 12-32-28-281-001-A - Drain Water Content
** ON A/C ALL
MPD Task 281100-01-2
MECH. INSP.
WATER
DRAIN VALVE
FUEL TANK
BOTTOM SKIN PLUNGER
D
WATER DRAIN
PURGER
WATER DRAIN
PURGER
98A28104031001
C D 01
TYPICAL
NOTE:
01 CORRECT ALIGNMENT OF THE PLUNGER WITH THE WATER DRAIN VALVE N_MM_123228_3_ANM0_02_00
JCP Title: temporary job card package CERTIFICATE OF TASK / INSPECTION COMPLETION: Page 6 of 12
JCP Ref: reference DATABASE REV DATE: Nov 01/2021
CERTIFIES THAT THE TASK / INSPECTION HAS BEEN COMPLETED TO THE REQUIRED PRINT DATE: Nov 22/2021 09:19
STANDARD AND SUPPORTS THE FINAL MAINTENANCE RELEASE / CERTIFICATE OF RELEASE
TO SERVICE
JOB CARD MPD-TASK: 281100-01
PIA - A318/A319/A320/A321 AMM TASK : 12-32-28-281-001-A
12-32-28 PB 301
TITLE:
A/C Reg.: 12-32-28-281-001-A - Drain Water Content
** ON A/C ALL
MPD Task 281100-01-2
MECH. INSP.
3. Job Set-up
(Ref. Fig. Fuel Sampling For Analysis)
Subtask 12-32-28-941-054-B
A. Safety Precautions
(1) You must obey the fuel safety procedures when you do work on the fuel system
(Ref. AMM TASK 28-00-00-910-001) .
(2) As necessary, use the applicable SAFETY BARRIERS, specified by the operator's
instructions and your local regulations.
(3) In the cockpit, on panel 400VU:
· Make sure that the landing-gear control-lever 6GA is in the DOWN position
· Put the WARNING NOTICE(S) in position to tell persons not to operate the
landing gear.
(4) Put the WARNING NOTICE(S) in position to tell persons not to operate the landing
gear doors.
(5) If the fuel temperature is less than 0 DEG.C (32.00 DEG.F) and/or the water drain
valves are frozen, to keep the flight turnaround times, one of the two steps that
follow:
· Do the cold weather maintenance procedure to warm the water drain valve
(Ref. AMM TASK 12-31-28-660-001)
· Remove the fuel samples 60 minutes after the refuel procedure.
NOTE: Removal of the fuel samples in less than 60 minutes will not remove the
water content as satisfactorily as samples removed one hour after the
refuel procedure.
NOTE: Airbus recommends you that not to apply unusually high force to open the
water drain valve.
(6) If the APU is in operation during this procedure, you must make sure that the fuel
tank pumps are set to OFF.
Subtask 12-32-28-010-050-B
B. Get Access
(1) For access to the center tank water drain valves, open the applicable access
panels:
· For water drain valve 94QM, open access panel 195BB
· For water drain valve 95QM, open access panel 196BB.
Subtask 12-32-28-480-050-A
C. Preparation of the Equipment
(1) To get access to the high water drain valves from the ground, attach the:
· ADAPTING PIPE - WATER DRAINING FROM FUEL (98A28101000000)
or the
· PIPE ADAPTING-WATER DRAINING (98D28104000000)
JCP Title: temporary job card package CERTIFICATE OF TASK / INSPECTION COMPLETION: Page 7 of 12
JCP Ref: reference DATABASE REV DATE: Nov 01/2021
CERTIFIES THAT THE TASK / INSPECTION HAS BEEN COMPLETED TO THE REQUIRED PRINT DATE: Nov 22/2021 09:19
STANDARD AND SUPPORTS THE FINAL MAINTENANCE RELEASE / CERTIFICATE OF RELEASE
TO SERVICE
JOB CARD MPD-TASK: 281100-01
PIA - A318/A319/A320/A321 AMM TASK : 12-32-28-281-001-A
12-32-28 PB 301
TITLE:
A/C Reg.: 12-32-28-281-001-A - Drain Water Content
** ON A/C ALL
MPD Task 281100-01-2
MECH. INSP.
1 Push the center of the applicable water drain valve with the PURGER -
WATER DRAIN (98A28104000000) :
a Drain approximately 1.0 l (0.26 USgal) of fuel from the water drain
valve.
2 Remove the PURGER - WATER DRAIN (98A28104000000) from the
water drain valve.
(c) For the center-tank water drain-valves:
1 Push the center of the applicable water drain valve with the TOOL -
PURGING (98A28104000002) :
a Drain approximately 1.0 l (0.26 USgal) of fuel from the water drain
valve.
2 Remove the TOOL - PURGING (98A28104000002) from the water drain
valve.
3 Examine the water drain valve for fuel leakage:
a If the water drain valve does leak, use the TOOL -
PURGING (98A28104000002) to push (in) and release (out) the
center of the valve three or four times.
b Make sure that there are no leaks.
c This step is very important at center-tank water-drain-valves 94QM
and 95QM, where access is not easy.
(d) Put the fuel sample into a CONTAINER-CLEAN, STERILIZED,
TRANSPARENT GLASS or CONTAINER-FUEL RESISTANT,
JCP Title: temporary job card package CERTIFICATE OF TASK / INSPECTION COMPLETION: Page 8 of 12
JCP Ref: reference DATABASE REV DATE: Nov 01/2021
CERTIFIES THAT THE TASK / INSPECTION HAS BEEN COMPLETED TO THE REQUIRED PRINT DATE: Nov 22/2021 09:19
STANDARD AND SUPPORTS THE FINAL MAINTENANCE RELEASE / CERTIFICATE OF RELEASE
TO SERVICE
JOB CARD MPD-TASK: 281100-01
PIA - A318/A319/A320/A321 AMM TASK : 12-32-28-281-001-A
12-32-28 PB 301
TITLE:
A/C Reg.: 12-32-28-281-001-A - Drain Water Content
** ON A/C ALL
MPD Task 281100-01-2
MECH. INSP.
3 Put the hexagonal end of the bush (2) into the bottom of the water drain
valve.
4 Turn the bush (2) through 30 deg (30 deg).
5 Turn the nut (5) until it touches and seals against the bottom skin.
6 Attach the PUMP - SUCTION (ATEX APPROVED) to the hose (3).
7 Put the outlet of the PUMP - SUCTION (ATEX APPROVED) to the
CONTAINER 10 L(2 1/2 USGAL).
8 Hold the bush (2) and turn the screw (4) clockwise to its stop:
a This causes the plunger (1) to open the drain valve. Fuel can now
flow into the PUMP - SUCTION (ATEX APPROVED).
9 Start the PUMP - SUCTION (ATEX APPROVED).
10 Continuously monitor the fuel flow into the CONTAINER 10 L(2 1/2
USGAL).
11 Drain approximately 1.0 l (0.26 USgal) of fuel (as a sample) from the
drain valve.
12 When you drained sufficient fuel sample, turn the screw (4) counter
clockwise to its stop.
13 Stop the PUMP - SUCTION (ATEX APPROVED).
14 Remove the PUMP - SUCTION (ATEX APPROVED) from the hose (3).
JCP Title: temporary job card package CERTIFICATE OF TASK / INSPECTION COMPLETION: Page 9 of 12
JCP Ref: reference DATABASE REV DATE: Nov 01/2021
CERTIFIES THAT THE TASK / INSPECTION HAS BEEN COMPLETED TO THE REQUIRED PRINT DATE: Nov 22/2021 09:19
STANDARD AND SUPPORTS THE FINAL MAINTENANCE RELEASE / CERTIFICATE OF RELEASE
TO SERVICE
JOB CARD MPD-TASK: 281100-01
PIA - A318/A319/A320/A321 AMM TASK : 12-32-28-281-001-A
12-32-28 PB 301
TITLE:
A/C Reg.: 12-32-28-281-001-A - Drain Water Content
** ON A/C ALL
MPD Task 281100-01-2
MECH. INSP.
15 Turn the nut (5) until it does not touch the bottom skin.
16 Turn the hexagonal end of the bush (2) 30 deg (30 deg):
a Remove the TOOL-PURGING (97A28002117002) from the bottom
of the water drain valve.
17 Examine the water drain valve for leaks:
a Airbus recommends that the test for microbiological contamination
should be done in less than 10 days, if:
· The sample you drain from the tank has a strong sulphide smell.
· You can see particles in the sample (Ref. AMM TASK 12-32-28-
281-003) .
18 Do this procedure at all of the water drain valves.
(b) If you use the WATER DRAIN PURGER (98A28104031001) , do the steps
that follow:
1 Push the center of the applicable water drain valve with the WATER
DRAIN PURGER (98A28104031001) .
2 Operate the WATER DRAIN PURGER (98A28104031001) and collect
approximately 1 l (0.26 USgal) of fuel (as a sample) from the drain valve.
3 Continue to operate the water drain valve until only fuel comes out.
4 Remove the WATER DRAIN PURGER (98A28104031001) from the
water drain valve.
5 Examine the water drain valve for fuel leakage:
a If the water drain valve does leak, use the WATER DRAIN
PURGER (98A28104031001) to push (in) and release (out) the
center of the valve three or four times.
b Make sure that there are no leaks.
6 Do this procedure at all the water drain valves.
Subtask 12-32-28-750-050-A
B. Water Contamination Test
(1) Let the sample become stable:
(a) Airbus recommends that you do the test for microbiological contamination in
less than 10 days, if:
· The sample you drain from the tank has a strong sulphide smell.
· You can see particles in the sample (Ref. AMM TASK 12-32-28-281-003) .
JCP Title: temporary job card package CERTIFICATE OF TASK / INSPECTION COMPLETION: Page 10 of 12
JCP Ref: reference DATABASE REV DATE: Nov 01/2021
CERTIFIES THAT THE TASK / INSPECTION HAS BEEN COMPLETED TO THE REQUIRED PRINT DATE: Nov 22/2021 09:19
STANDARD AND SUPPORTS THE FINAL MAINTENANCE RELEASE / CERTIFICATE OF RELEASE
TO SERVICE
JOB CARD MPD-TASK: 281100-01
PIA - A318/A319/A320/A321 AMM TASK : 12-32-28-281-001-A
12-32-28 PB 301
TITLE:
A/C Reg.: 12-32-28-281-001-A - Drain Water Content
** ON A/C ALL
MPD Task 281100-01-2
MECH. INSP.
(b) If the sample moves into two layers it contains water. Continue to drain from
the water drain valve until it has no water.
(c) If the sample stays in one layer, it can be all fuel or all water. To find if the
sample is fuel or water, do the test that follows:
If you test for microbiological contamination, do not use a HYDROKIT or put
any other additive in the fuel (except water).
ACTION RESULT
1.If you have a HYDROKIT available · If the powder stays white, the
put the contents into the sample. sample is fuel and the test is
complete.
or
· If the white powder changes color to
purple, the sample is water.
· Continue to take the samples and
test it until the water drain valve has
no water.
2.If you do not have a HYDROKIT · If the sample moves into two layers,
available, add water to the sample. then the sample is all fuel and the
test is complete.
or
· If the sample stays in one layer,
then the sample is water.
· Continue to take the samples and
test it until the water drain valve has
no water.
NOTE:
You can use the same procedure
to do an analysis on a sample from
a fuel tanker. You can remove the
sample from the supply connector
of the fuel tanker.
5. Close-up
Subtask 12-32-28-410-050-B
A. Close Access
(1) Make sure that the work area is clean and clear of tools and other items.
(2) Close the applicable access panels:
· For water drain valve 94QM, close access panel 195BB
JCP Title: temporary job card package CERTIFICATE OF TASK / INSPECTION COMPLETION: Page 11 of 12
JCP Ref: reference DATABASE REV DATE: Nov 01/2021
CERTIFIES THAT THE TASK / INSPECTION HAS BEEN COMPLETED TO THE REQUIRED PRINT DATE: Nov 22/2021 09:19
STANDARD AND SUPPORTS THE FINAL MAINTENANCE RELEASE / CERTIFICATE OF RELEASE
TO SERVICE
JOB CARD MPD-TASK: 281100-01
PIA - A318/A319/A320/A321 AMM TASK : 12-32-28-281-001-A
12-32-28 PB 301
TITLE:
A/C Reg.: 12-32-28-281-001-A - Drain Water Content
** ON A/C ALL
MPD Task 281100-01-2
MECH. INSP.
JCP Title: temporary job card package CERTIFICATE OF TASK / INSPECTION COMPLETION: Page 12 of 12
JCP Ref: reference DATABASE REV DATE: Nov 01/2021
CERTIFIES THAT THE TASK / INSPECTION HAS BEEN COMPLETED TO THE REQUIRED PRINT DATE: Nov 22/2021 09:19
STANDARD AND SUPPORTS THE FINAL MAINTENANCE RELEASE / CERTIFICATE OF RELEASE
TO SERVICE
JOB CARD MPD-TASK: 335100-01
PIA - A318/A319/A320/A321 AMM TASK : 33-51-00-710-001-A
33-51-00 PB 501
TITLE:
A/C Reg.: 33-51-00-710-001-A - Operational Check of
** ON A/C ALL Emergency Power Supply Units by BITE-Check
MPD Task 335100-01-1
CARD: ZONE: 210 INTERVAL:
SKILL: ACCESS:
MECH. INSP.
** ON A/C ALL
TASK 33-51-00-710-001-A
Operational Check of Emergency Power Supply Units by BITE-Check
B. Referenced Information
REFERENCE DESIGNATION
(Ref. 23-73-00-861-001-A). Energize the Cabin Intercommunication Data System
(CIDS)
(Ref. 24-41-00-861-002-A). Energize the Aircraft Electrical Circuits from the External
Power
(Ref. 24-41-00-861-002-A- Energize the Aircraft Electrical Circuits from the APU
01).
(Ref. 24-41-00-861-002-A- Energize the Aircraft Electrical Circuits from Engine 1(2)
02).
(Ref. 24-41-00-862-002-A). De-energize the Aircraft Electrical Circuits Supplied from
the External Power
(Ref. 24-41-00-862-002-A- De-energize the Aircraft Electrical Circuits Supplied from
01). the APU
(Ref. 24-41-00-862-002-A- De-energize the Aircraft Electrical Circuits Supplied from
02). the Engine 1(2)
(Ref. 31-32-00-860-003-A). Procedure to Get Access to the SYSTEM REPORT/
TEST/COM Page
3. Job Set-up
JCP Title: temporary job card package CERTIFICATE OF TASK / INSPECTION COMPLETION: Page 1 of 4
JCP Ref: reference DATABASE REV DATE: Nov 01/2021
CERTIFIES THAT THE TASK / INSPECTION HAS BEEN COMPLETED TO THE REQUIRED PRINT DATE: Nov 22/2021 09:20
STANDARD AND SUPPORTS THE FINAL MAINTENANCE RELEASE / CERTIFICATE OF RELEASE
TO SERVICE
JOB CARD MPD-TASK: 335100-01
PIA - A318/A319/A320/A321 AMM TASK : 33-51-00-710-001-A
33-51-00 PB 501
TITLE:
A/C Reg.: 33-51-00-710-001-A - Operational Check of
** ON A/C ALL Emergency Power Supply Units by BITE-Check
MPD Task 335100-01-1
MECH. INSP.
NOTE: The teach-in procedure of the EPSUs measures and keeps the load values that
are related to each EPSU. The EPSU controller refers to these load values when
the BITE test of the emergency lighting system operates. Thus, it is necessary that
the emergency lights of the related EPSUs operate correctly during the teach-in
procedure.
** ON A/C 001-003
Subtask 33-51-00-860-079-A
A. Aircraft Maintenance Configuration
(1) Energize the aircraft electrical circuits
(Ref. AMM TASK 24-41-00-861-002) .
(2) Get access to the SYSTEM/REPORT/TEST COM Page : (Ref. AMM TASK 31-
32-00-860-003) .
(3) Make sure that the Cabin-Intercommunication Data System (CIDS) is energized
(Ref. AMM TASK 23-73-00-861-001) .
(4) On the Forward Attendant Panel (FAP) 120RH in the cabin, make sure that the
pushbutton-switch EMER is released (position out/indicator light is off).
(5) On the overhead panel 25VU in the cockpit make sure that:
· The switch 4WL EMER EXIT LT is in the OFF position
· The switch 190RH NO SMOKING is in the OFF position
· The indicator 5WL EMER EXIT LT OFF is on.
** ON A/C 004-012
Subtask 33-51-00-860-079-D
A. Aircraft Maintenance Configuration
(1) Energize the aircraft electrical circuits
(Ref. AMM TASK 24-41-00-861-002) .
(2) Get access to the SYSTEM/REPORT/TEST COM Page : (Ref. AMM TASK 31-
32-00-860-003) .
(3) Make sure that the Cabin-Intercommunication Data System (CIDS) is energized
(Ref. AMM TASK 23-73-00-861-001) .
(4) On the Flight Attendant Panel (FAP) 120RH in the cabin, make sure that the
pushbutton-switch EMER is released (position out/indicator light is off).
(5) On the overhead panel 25VU in the cockpit make sure that:
· The switch 4WL EMER EXIT LT is in the OFF position
· The switch 190RH NO SMOKING is in the OFF position
· The indicator 5WL EMER EXIT LT OFF is on.
** ON A/C 013-050
Subtask 33-51-00-860-079-F
A. Aircraft Maintenance Configuration
(1) Energize the aircraft electrical circuits
JCP Title: temporary job card package CERTIFICATE OF TASK / INSPECTION COMPLETION: Page 2 of 4
JCP Ref: reference DATABASE REV DATE: Nov 01/2021
CERTIFIES THAT THE TASK / INSPECTION HAS BEEN COMPLETED TO THE REQUIRED PRINT DATE: Nov 22/2021 09:20
STANDARD AND SUPPORTS THE FINAL MAINTENANCE RELEASE / CERTIFICATE OF RELEASE
TO SERVICE
JOB CARD MPD-TASK: 335100-01
PIA - A318/A319/A320/A321 AMM TASK : 33-51-00-710-001-A
33-51-00 PB 501
TITLE:
A/C Reg.: 33-51-00-710-001-A - Operational Check of
** ON A/C ALL Emergency Power Supply Units by BITE-Check
MPD Task 335100-01-1
MECH. INSP.
** ON A/C ALL
Subtask 33-51-00-865-050-A
B. Make sure that this(these) circuit breaker(s) is(are) closed:
** ON A/C 001-003
Subtask 33-51-00-710-050-A
A. Test of the Emergency Lights
(1) Do this test:
ACTION RESULT
1.On Programming and Test Panel On PTP 110RH:
(PTP) 110RH:
· Push the TEST EMER LIGHT/SYS · The SYS OK light comes on after
membrane switch for not less than 3 approx. 30 seconds.
seconds.
On the display of PTP 110RH:
· The EMER SYSTEM ATA 33-51-38
TEST OK status comes on.
NOTE:
If the SYS OK LED comes on, there
are no limitations in the operation of
the emergency light system. You can
ignore all the associated messages
for maintenance.
On PTP 110RH:
JCP Title: temporary job card package CERTIFICATE OF TASK / INSPECTION COMPLETION: Page 3 of 4
JCP Ref: reference DATABASE REV DATE: Nov 01/2021
CERTIFIES THAT THE TASK / INSPECTION HAS BEEN COMPLETED TO THE REQUIRED PRINT DATE: Nov 22/2021 09:20
STANDARD AND SUPPORTS THE FINAL MAINTENANCE RELEASE / CERTIFICATE OF RELEASE
TO SERVICE
JOB CARD MPD-TASK: 335100-01
PIA - A318/A319/A320/A321 AMM TASK : 33-51-00-710-001-A
33-51-00 PB 501
TITLE:
A/C Reg.: 33-51-00-710-001-A - Operational Check of
** ON A/C ALL Emergency Power Supply Units by BITE-Check
MPD Task 335100-01-1
MECH. INSP.
ACTION RESULT
· The SYS OK light goes off after
approx. 60 s.
** ON A/C 004-050
Subtask 33-51-00-710-050-B
A. Operational Test
(1) Do this test:
ACTION RESULT
1.In the cockpit on the MCDU: In the cockpit on the MCDU:
· Push line select key CIDS 1. · The menu page
CIDS 1 comes into view.
· Push the line select key SYSTEM · The menu page
TESTS. SYSTEM TESTS comes into view.
· Push the line select key EPSU SYS · The menu page
TEST. EPSU SYS TEST comes into view.
· Push the line select key START · The system test starts and
TEST. the message TEST IN PROGRESS
60S shows, then
the message TEST OK shows.
· Push the line select key RETURN
until the menu page SYSTEM
REPORT/TEST comes into view.
** ON A/C ALL
5. Close-up
Subtask 33-51-00-862-050-A
A. Put the aircraft back to the serviceable condition.
(1) De-energize the aircraft electrical circuits
(Ref. AMM TASK 24-41-00-862-002) .
*** END OF CARD ***
JCP Title: temporary job card package CERTIFICATE OF TASK / INSPECTION COMPLETION: Page 4 of 4
JCP Ref: reference DATABASE REV DATE: Nov 01/2021
CERTIFIES THAT THE TASK / INSPECTION HAS BEEN COMPLETED TO THE REQUIRED PRINT DATE: Nov 22/2021 09:20
STANDARD AND SUPPORTS THE FINAL MAINTENANCE RELEASE / CERTIFICATE OF RELEASE
TO SERVICE
JOB CARD MPD-TASK: 383100-06
PIA - A318/A319/A320/A321 AMM TASK : 38-31-00-100-018-A
38-31-00 PB 701
TITLE:
A/C Reg.: 38-31-00-100-018-A - Cleaning of the Vacuum Waste
** ON A/C ALL Lines with Chemical Cleaning Agent and Crushed Ice
MPD Task 383100-06-1
CARD: ZONE: 200 INTERVAL:
SKILL: ACCESS:
MECH. INSP.
** ON A/C ALL
TASK 38-31-00-100-018-A
Cleaning of the Vacuum Waste Lines with Chemical Cleaning Agent and Crushed Ice
NOTE: Three procedures are given here that you can use to clean the toilet waste lines:
- One procedure uses crushed ice for cleaning of the toilet waste lines.
- Two procedures uses a chemical cleaning agent and crushed ice for cleaning of
the toilet waste lines.
NOTE: The airline can make the decision about which of the three procedures they will
use.
B. Referenced Information
REFERENCE DESIGNATION
(Ref. 38-31-00-100-005-A). Cleaning of the Toilet Waste Lines with Crushed Ice
(Ref. 38-31-00-100-005-A- Cleaning of Vacuum Waste Lines with Cleaners
01).
(Ref. 38-31-00-100-010-A). Cleaning of the Vacuum Waste Lines with Chemical
Cleaning Agent and Crushed Ice
(Ref. 38-31-00-100-805-A). Cleaning of Vacuum Waste Lines with Chemical Cleaning
Agent (and Crushed Ice)
3. Job Set-up
Subtask 38-31-00-861-085-A
A. There is no special job set-up for this task.
4. Procedure
Subtask 38-31-00-100-062-A
JCP Title: temporary job card package CERTIFICATE OF TASK / INSPECTION COMPLETION: Page 1 of 2
JCP Ref: reference DATABASE REV DATE: Nov 01/2021
CERTIFIES THAT THE TASK / INSPECTION HAS BEEN COMPLETED TO THE REQUIRED PRINT DATE: Nov 22/2021 09:21
STANDARD AND SUPPORTS THE FINAL MAINTENANCE RELEASE / CERTIFICATE OF RELEASE
TO SERVICE
JOB CARD MPD-TASK: 383100-06
PIA - A318/A319/A320/A321 AMM TASK : 38-31-00-100-018-A
38-31-00 PB 701
TITLE:
A/C Reg.: 38-31-00-100-018-A - Cleaning of the Vacuum Waste
** ON A/C ALL Lines with Chemical Cleaning Agent and Crushed Ice
MPD Task 383100-06-1
MECH. INSP.
JCP Title: temporary job card package CERTIFICATE OF TASK / INSPECTION COMPLETION: Page 2 of 2
JCP Ref: reference DATABASE REV DATE: Nov 01/2021
CERTIFIES THAT THE TASK / INSPECTION HAS BEEN COMPLETED TO THE REQUIRED PRINT DATE: Nov 22/2021 09:21
STANDARD AND SUPPORTS THE FINAL MAINTENANCE RELEASE / CERTIFICATE OF RELEASE
TO SERVICE
JOB CARD MPD-TASK: 521000-01
PIA - A318/A319/A320/A321 AMM TASK : 52-10-00-210-004-A
52-10-00 PB 601
TITLE:
A/C Reg.: 52-10-00-210-004-A - Check Pressure of Emergency
** ON A/C ALL Cylinder/Accumulator of the Passenger/Crew Doors
MPD Task 521000-01-1
CARD: ZONE: 831, 832, 841, 842 INTERVAL:
SKILL: ACCESS: 831, 832, 841, 842
MECH. INSP.
** ON A/C ALL
TASK 52-10-00-210-004-A
Check Pressure of Emergency Cylinder/Accumulator of the Passenger/Crew Doors
NOTE: The effectivity of this task is "ALL". To know if this task is applicable to your aircraft,
refer to the MPD task applicability.
NOTE: This task is only applicable to aircraft with the door damper and emergency
operation cylinder not connected to the CIDS.
REFERENCE QTYDESIGNATION
No specific 1 ACCESS PLATFORM 4M (13 FT)-ADJUSTABLE
C. Referenced Information
REFERENCE DESIGNATION
(Ref. 52-10-00-010-001-A).
Opening of the Passenger/Crew Door
(Ref. 52-10-00-410-001-A).
Closing of the Passenger/Crew Door
(Ref. 52-10-00-614-001-A).
Discharging/Charging of the Door Damper and
Emergency Operation Cylinder of the Passenger/Crew
Doors
Door-Damper and Emergency-Operation Cylinder SHEET 1
JCP Title: temporary job card package CERTIFICATE OF TASK / INSPECTION COMPLETION: Page 1 of 4
JCP Ref: reference DATABASE REV DATE: Nov 01/2021
CERTIFIES THAT THE TASK / INSPECTION HAS BEEN COMPLETED TO THE REQUIRED PRINT DATE: Nov 22/2021 09:22
STANDARD AND SUPPORTS THE FINAL MAINTENANCE RELEASE / CERTIFICATE OF RELEASE
TO SERVICE
JOB CARD MPD-TASK: 521000-01
PIA - A318/A319/A320/A321 AMM TASK : 52-10-00-210-004-A
52-10-00 PB 601
TITLE:
A/C Reg.: 52-10-00-210-004-A - Check Pressure of Emergency
** ON A/C ALL Cylinder/Accumulator of the Passenger/Crew Doors
MPD Task 521000-01-1
MECH. INSP.
B A FWD
Z842
Z841
A
Z832
1
Z831
D 2
D C
B FWD
C C
TEMP PRESSURE
(°C) (PSI ±5%)
2
+50 1950
+40 1880
+30 1810 D
+20 1740
+10 1660
0 1610
-10 1540
-20 1465
-30 1395
-40 1325
N_MM_521000_6_DAN0_01_00
JCP Title: temporary job card package CERTIFICATE OF TASK / INSPECTION COMPLETION: Page 2 of 4
JCP Ref: reference DATABASE REV DATE: Nov 01/2021
CERTIFIES THAT THE TASK / INSPECTION HAS BEEN COMPLETED TO THE REQUIRED PRINT DATE: Nov 22/2021 09:22
STANDARD AND SUPPORTS THE FINAL MAINTENANCE RELEASE / CERTIFICATE OF RELEASE
TO SERVICE
JOB CARD MPD-TASK: 521000-01
PIA - A318/A319/A320/A321 AMM TASK : 52-10-00-210-004-A
52-10-00 PB 601
TITLE:
A/C Reg.: 52-10-00-210-004-A - Check Pressure of Emergency
** ON A/C ALL Cylinder/Accumulator of the Passenger/Crew Doors
MPD Task 521000-01-1
MECH. INSP.
3. Job Set-up
Subtask 52-10-00-010-079-A
A. Get Access
(1) Put the ACCESS PLATFORM 4M (13 FT)-ADJUSTABLE in position in front of the
passenger/crew door 831 or 841 or 832 or 842.
(2) Open the passenger/crew door (Ref. AMM TASK 52-10-00-010-001) .
4. Procedure
Subtask 52-10-00-210-080-A
A. Check of the Pressure.
(Ref. Fig. Door-Damper and Emergency-Operation Cylinder SHEET 1)
NOTE: The minimum operating pressure value for the door to be serviceable
is 1305 PSI at 20°C only for maintenance operation.
NOTE: To get a correct pressure, the air bottle must be stable at ambient
temperature before you do the inspection.
NOTE: Bubbles in the pressure gauge with a maximum diameter equal to the
dial are permitted.
(3) If the pressure is not correct, charge the cylinder bottle. (Ref. AMM TASK 52-10-
00-614-001)
5. Close-up
Subtask 52-10-00-410-088-A
JCP Title: temporary job card package CERTIFICATE OF TASK / INSPECTION COMPLETION: Page 3 of 4
JCP Ref: reference DATABASE REV DATE: Nov 01/2021
CERTIFIES THAT THE TASK / INSPECTION HAS BEEN COMPLETED TO THE REQUIRED PRINT DATE: Nov 22/2021 09:22
STANDARD AND SUPPORTS THE FINAL MAINTENANCE RELEASE / CERTIFICATE OF RELEASE
TO SERVICE
JOB CARD MPD-TASK: 521000-01
PIA - A318/A319/A320/A321 AMM TASK : 52-10-00-210-004-A
52-10-00 PB 601
TITLE:
A/C Reg.: 52-10-00-210-004-A - Check Pressure of Emergency
** ON A/C ALL Cylinder/Accumulator of the Passenger/Crew Doors
MPD Task 521000-01-1
MECH. INSP.
A. Close Access
(1) Make sure that the work area is clean and clear of tools and other items.
(2) Close the applicable passenger/crew door 831 or 841 or 832 or 842
(Ref. AMM TASK 52-10-00-410-001) :
(3) Remove the access platform(s).
*** END OF CARD ***
JCP Title: temporary job card package CERTIFICATE OF TASK / INSPECTION COMPLETION: Page 4 of 4
JCP Ref: reference DATABASE REV DATE: Nov 01/2021
CERTIFIES THAT THE TASK / INSPECTION HAS BEEN COMPLETED TO THE REQUIRED PRINT DATE: Nov 22/2021 09:22
STANDARD AND SUPPORTS THE FINAL MAINTENANCE RELEASE / CERTIFICATE OF RELEASE
TO SERVICE