Manpower

(mason &
No. Description Unit Vol carpenter)

Person
Tarjuowon Mill
1 Repair of rail track (Tippler)
Demolishing existing concrete m3 2.3
Reconcrete 20 Mpa m3 2.3
Sika Fume/Sika Condensil Kg 100.0
Sika MEN LN Liter 9.0
Installation of cover plate 6 mm Kg 340.0
2 Repair of pedestals hopper (L.Ramp A) - 34 pcs
Demolishing existing concrete m3 0.6
Formworking 2.9768 m2/plywood m2 6.1
Grouting pedestals 1920 kg/m3 m3 0.6
3 Re installation of cover plate for stopper beam (L.Ramp A)
Installation of cover plate 9 mm Kg 334.6
4 Repair of washing drain towards Sludge Condensate Pit (Clarification st.)
Installation of cover plate SS 3 25 0.4 0.3 Kg 647.6
Reconcrete 20 Mpa m3 2.0
Sika Fume/Sika Condensil Kg 32.5
Sika MEN LN Liter 6.5
5 Modification of Ash Collection (Boiler)
Demolishing existing concrete m3 0.4
Reinforcement Kg
319.6 D16 6.2 1.9 31% Kg 97.9
140.6 Ø 12 mm Kg 43.1
Formworking 2.9768 m2/plywood m2 5.7
Reconcrete 20 Mpa m3 0.6
Removal of broken concrete m3 0.6
6 Repair of roofing sheet (Boiler)
Removal of existing zinc & purlin 24 4.75 m2 114.0
Re-installing zinc m2 114.0
7 Cable trench Capstan to Capstan (Cable trench)
Demolishing existing concrete 10 0.2 0.3 m3 0.2
Soil excavation m3 0.6
Laying down cables Lot 1.0
Sand backfill m3 0.2
Reinforcement of floor (wiremesh) m2 2.0
Reconcrete 20 Mpa m3 0.2
Removal of excess soil m3 0.7
8 Cable trench MCC 3 Clarification towards Sludge Centrifuge (Clarification st.)
Demolishing existing concrete 13 0.8 0.5 m3 1.0
Soil excavation m3 5.2
Laying down cables Lot 1.0
Sand backfill m3 1.0
Reinforcement of floor (wiremesh) m2 10.4
Reconcrete 20 Mpa m3 1.0
Tiles installation m2 10.4
Removal of excess soil m3 6.2
9 Cable trench new genset toward MSB
Demolishing tiles & existing conc 6 0.8 0.5 m2 0.5
Soil excavation m3 2.4
Sand backfill m3 0.5
Reinforcement of floor (wiremesh) m2 4.8
Reconcrete 20 Mpa m3 0.5
Tiles installation m2 4.8
Removal of excess soil m3 2.9
10 Cable trench old genset toward MSB
Demolishing tiles & existing conc 4 0.8 0.5 m2 0.3
Soil excavation m3 1.6
Sand backfill m3 0.3
Reinforcement of floor (wiremesh) m2 3.2
Reconcrete 20 Mpa m3 0.3
Tiles installation m2 3.2
Removal of excess soil m3 1.9
11 Concrete road 150 thk towards Boiler area
Demolishing existing concrete 0.15 30 4 m3 9.0
Soil excavation m3 18.0
Base coarse m3 18.0
Formworking 2.9768 m2/plywood m2 18.0
Reinforcement
Wiremesh m2 120.0
Ø 19 mm dowel 40 0.000283643 89.06385714 Kg 89.1
Reconcrete 20 Mpa m3 18.0
Asphalt 0.03 0.05 4 m3 0.036
12 Repair of Bollard foundations 2 unit
Demolishing existing concrete 0.6 0.6 0.5 m3 0.4
Formworking 2.4 0.1 2.9768 m2 0.5
Installation of anchors Pc 8.0
Reconcrete 20 Mpa m3 0.4

13 Repainting all structures of GRNB 50 41% 939.16 m2 7701.1


UNLOADING SHED
Steel Profile Painting m2 206.2
BOILER & PUMP HOUSE - BUILDING
Steel Profile Painting m2 1512.3
BOILER & PUMP HOUSE - MACHINERY FOUNDATION
Steel Profile Painting m2 24.2
KERNEL RECEIVING
Steel Profile Painting m2 393.5
KERNEL WAREHOUSE
Steel Profile Painting m2 3597.4
SHELL RECEIVING BUILDING
Steel Profile Painting m2 174.0
OFFICE PARKING AREA
Steel Profile Painting m2 65.7
FERTILIZER STORE
Steel Profile Painting m2 964.5
GATE & FENCE
Steel Profile Painting m2 763.4

TOTAL -
Wooden
Manpower Cement Sand Gravel Grout (1920 Plywood
Concrete Formworking beam 5x5
(erector) (325) (0,293) (0,394) kg/m3) (2,9768 m2)
cm

Person m3 sak m3 m3 sak (25 kg) m2 Pc Pc

2.25 14.625 0.65925 0.8865

6.12 2.055898952 2
47.0016

2 13 0.586 0.788

5.7 1.914807847 6
0.57 3.705 0.16701 0.22458

0.2

0.2 1.3 0.0586 0.0788

1.04

1.04 6.76 0.30472 0.40976

0.48

3.12 0.14064 0.18912

0.32

2.08 0.09376 0.12608


18.0
18.0 3 27

18.0 117 5.274 7.092

0.5 0.10 2

0.4 2.34 0.10548 0.14184

- 24.4 163.9 9.4 27.9 47.0 30.3 7.1 37.0


Sika Fume /
Wooden
Concrete Sika Sika MEN Ø 19 mm Ø 12 mm
beam 5x10 Nail 3" Nail 4" D16 Wiremesh
Nail 3" Condensil (1%)
cm
(5%)
Pc Box Kg Kg Kg Liter Kg Kg Kg m2

100
9

2.448 2 2

32.5
6.5

97.94594087
43.09621398
4 3 4

10.4

4.8

3.2
120.0
89.1

4.0 2.4 5.0 6.0 132.5 15.5 97.9 89.1 43.1 140.4
Tapping Marine Oil
Zinc Plate 9 mm Plate 6 mm SS plate Oil Paint Thinner Bolt & nuts Asphalt
screw Paint

m2 Pc Kg Kg Kg Liter Liter Liter Pc m3

340

334.609704

647.625

114 570
0.04

939.2 94

114.0 570.0 334.6 340.0 647.6 - 939.2 93.9 - 0.04


Tiles

m2

10.4

4.8
3.2

18.4
No.
UNLOADING SHED
Steel Profile Painting m2 206
BOILER & PUMP HOUSE - BUILDING
Steel Profile Painting m2 1,512
BOILER & PUMP HOUSE - MACHINERY FOUNDATION
Steel Profile Painting m2 24
KERNEL RECEIVING
Steel Profile Painting m2 393
KERNEL WAREHOUSE
Steel Profile Painting m2 3,597
SHELL RECEIVING BUILDING
Steel Profile Painting m2 174
OFFICE PARKING AREA
Steel Profile Painting m2 66
FERTILIZER STORE
Steel Profile Painting m2 964
GATE & FENCE
Steel Profile Painting m2 763

TOTAL m2 7,701
List of materials for miscellaneous works
TARJUOWON MILL PROJECT
No. Description Unit Qty Remarks
1 Cement (325) sak 164
2 Sand (0,293) m3 9
3 Gravel (0,394) m3 28
4 Grout (1920 kg/m3) sak (25 kg) 47
5 Plywood (2,9768 m2/pc) Pc -
6 Wooden beam 5x5 cm Pc 37
7 Wooden beam 5x10 cm Pc 4
8 Concrete Nail 3" Box 2
9 Nail 3" Kg 5
10 Nail 4" Kg 6
11 Sika Fume / Sika Condensil (5%) Kg 133 Most available stock in Africa is Sika Condensil
12 Sika MEN (1%) Liter 16
13 D16 Pc 6 10 m length available in Monrovia
14 Ø 19 mm Pc 4 10 m length available in Monrovia
14 Ø 12 mm Pc 5 10 m length available in Monrovia
15 Wiremesh m2 140
16 Zinc m2 114
17 Tapping screw Pc 570
18 Plate 9 mm Kg 335
19 Plate 6 mm Kg 340
20 SS plate Kg 648
21 Oil Paint Liter -
22 Marine Oil Paint Liter 939 Steel structures of Greenville Bulking
23 Thinner Liter 94
24 Bolt & nuts Pc -
25 Tiles box 18
26 Asphalt m3 0.04