S.No.

Construction Material Type

1 Cement
2 Sand
3 01 Agg
4 02 Agg
5 Admix
6 Masonry Stone
7 HCB 20cm
8 HCB 15cm
9 Re-bar
10 ∅ 1.5 BW
11 Nail
12 ∅ 2.5 BW
13 Eucal. Pol.
14 Timber
15 Plastic Paint
16 Rigid PVC pipe of dia 60mm
17 Select Material
18 Base coarse Mat
19 Fine agg
20 3/8 agg
21 3/4 agg
22 mc3000 bitumen
23 Kerosene
24 Coper Wire
25 Road/ Traffic Sign Boards
26 uPVC Pipe Fittings
27 Down Pipe
28 Concrete Pipe
29 Street Light Pole (Double Arm)
30 Street Light Pole (Single arm)
31 Stainless Steel
32 Glass
33 Sheet metal
34 Metal Door and Window
35 RHS
36 LTZ
37 HDP Fittings
38 Window Sill
39 Power Cable
40 Geomembrane
41 Wire Mesh
42 HDPE Pipe
43 Electrode
44 LED Street road Lamp
45 Distribution board (Type 1)
46 Distribution board (Type 2)
47 Distribution board (Type 3)
48 Distribution board (Type 4)
49 Reflecting clothe
50 Helmet
51 First Aid kit

S.No. Construction Material Type

1 Cement
2 Sand
3 01 Agg
4 02 Agg
5 Admix
6 Masonry Stone
7 HCB 20cm
8 HCB 15cm
9 Re-bar
10 ∅ 1.5 BW
11 Nail
12 ∅ 2.5 BW
13 Eucal. Pol.
14 Timber
15 Plastic Paint
16 Rigid PVC pipe of dia 60mm
17 Select Material
18 Base coarse Mat
19 Fine agg
20 3/8 agg
21 3/4 agg
22 mc3000 bitumen
23 Kerosene
24 Coper Wire
25 Road/ Traffic Sign Boards
26 uPVC Pipe Fittings
27 Down Pipe
28 Concrete Pipe
29 Street Light Pole (Double Arm)
30 Street Light Pole (Single arm)
31 Stainless Steel
32 Glass
33 Sheet metal
34 Metal Door and Window
35 RHS
36 LTZ
37 HDP Fittings
38 Window Sill
39 Power Cable
40 Geomembrane
41 Wire Mesh
42 HDPE Pipe
43 Electrode
44 LED Street road Lamp
45 Distribution board (Type 1)
46 Distribution board (Type 2)
47 Distribution board (Type 3)
48 Distribution board (Type 4)
49 Reflecting clothe
50 Helmet
51 First Aid kit
Total
Plan of 2015 Amount (birr) July
Unit
Week 1
Qty Birr Qty
Qts. 15,606.31 -
m³ 2,228.23 -
m³ 799.89 -
m³ 3,069.07 -
kg 755.83 -
M³ 1,539.37 -
pcs 32,317.50 -
pcs 3,387.50 -
kg 163,485.97 -
kg 175.23 -
kg 1,879.67 -
Kg 4,214.85 -
Pcs 21,851.34 -
Pcs -
lit 1,532.24 -
m 13,650.00 -
m³ 12,946.35 -
m³ 10,191.12 -
m³ 1,262.81 -
m³ 25.48 -
m³ 806.80 -
kg 214,013.52 -
lit 11,040.38 -
pcs 10.00 -
Pcs 13.37 -
Pcs 2.00 -
m 79.20 -
m 176.40 -
Ea 104.00 -
Ea 332.00 -
m 81.38 -
m2 23.88 -
Pcs 8.99 -
m2 70.20 -
m 598.25 -
Pcs 21.01 -
Pcs 14.00 -
Kg 17.82 -
LS 9,362.16 -
m2 1,277.71 -
m2 640.20 -
m 105.00 -
packet 45.00 -
pcs 540.00 -
m 1.00 -
Set 1.00 -
Set 1.00 -
Ls 4.00 -
Pcs 150.00
Pcs 100.00
set 4.00

Amount (birr) for


Unit cost July
Unit 2015 E.C
Week 1
Birr Birr Qty
Qts. 550.00 8,583,468.20 -
m³ 600.00 1,336,939.99 -
m³ 785.40 628,234.70 -
m³ 750.45 2,303,182.62 -
kg 162.10 122,520.72 -
M³ 50.00 76,968.45 -
pcs 61.00 1,971,367.50 -
pcs 47.00 159,212.50 -
kg 125.56 20,527,297.90 -
kg 160.00 28,036.10 -
kg 200.00 375,934.57 -
Kg 150.00 632,228.04 -
Pcs 100.00 2,185,133.89 -
Pcs 510.00 - -
lit 443.75 679,931.50 -
m 211.00 2,880,150.00 -
m³ 166.67 2,157,724.54 -
m³ 602.00 6,135,054.24 -
m³ 690.63 872,131.17 -
m³ 618.38 15,754.96 -
m³ 646.28 521,416.77 -
kg 37.00 7,918,500.24 -
lit 67.30 743,017.57 -
pcs 24,001.48 240,014.81 -
Pcs 3,500.00 46,777.50 -
Pcs 4,000.00 8,000.00 -
m 366.67 29,040.00 -
m 650.00 114,657.40 -
Ea 50,303.53 5,231,567.12 -
Ea 46,635.56 15,483,005.59 -
m 700.00 56,966.58 -
m2 1,100.00 26,262.50 -
Pcs 4,500.00 40,455.00 -
m2 3,500.00 245,700.00 -
m 333.34 199,420.66 -
Pcs 400.00 8,404.00 -
Pcs 1,200.00 16,800.00 -
Kg 70.00 1,247.40 -
LS 3,305.31 30,944,806.68 -
m2 537.00 686,127.59 -
m2 420.00 268,884.00 -
m 450.00 47,250.00 -
packet 600.00 27,000.00 -
pcs 19,714.54 10,645,850.02 -
m 80,098.53 80,098.53 -
Set 88,810.58 88,810.58 -
Set 81,103.39 81,103.39 -
Ls 75,691.96 302,767.83 -
Pcs
Pcs
set
125,775,223.34 -
July
Total July
Week2 Week3 Week4
Qty Qty Qty Qty
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -

- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -

July
Total July
Week2 Week3 Week4
Qty Qty Qty Qty
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -

- - - -
August
Total August
Week 1 Week2 Week3 Week4
Qty Qty Qty Qty Qty
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -

- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -

August
Total August
Week 1 Week2 Week3 Week4
Qty Qty Qty Qty Qty
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- -
- -
- -
- - - - -
September
Total September
Week 1 Week2 Week3 Week4
Qty Qty Qty Qty Qty
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -

- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
-
-
-

September
Total September
Week 1 Week2 Week3 Week4
Qty Qty Qty Qty Qty
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -

- - - - -
October
Total October
Week 1 Week2 Week3 Week4
Qty Qty Qty Qty Qty
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -

- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
-
-
-

October
Total October
Week 1 Week2 Week3 Week4
Qty Qty Qty Qty Qty
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -

- - - - -
Arabsa 5 Lot - 1 Project 2015 fiscal Year Construction Material Demand In qty.
November
Week 1 Week2 Week3 Week4
Qty Qty Qty Qty
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -

- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
-
-
-

Arabsa 5 Lot - 1 Project 2015 fiscal Year Construction Material Demand In BIRR
November
Week 1 Week2 Week3 Week4
Qty Qty Qty Qty
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -

- - - -
Material Demand In qty.
December
Total November
Week 1 Week2 Week3
Qty Qty Qty Qty
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -

- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -

Material Demand In BIRR


December
Total November
Week 1 Week2 Week3
Qty Qty Qty Qty
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -

- - - -
January
Total December
Week4 Week 1 Week2
Qty Qty Qty Qty
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -

- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -

January
Total December
Week4 Week 1 Week2
Qty Qty Qty Qty
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -

- - - -
January
Total January Total February Total March
Week3 Week4
Qty Qty Qty Qty Qty
- - - 1,891.18 9,694.75
- - - 341.28 1,434.29
- - - 61.82 472.27
- - - 146.65 1,907.43
- - - 253.69 221.62
- - - 86.40 1,166.40
- - - - 18,894.00
- - - - 3,387.50
- - - 28,287.32 116,464.33
- - - - 57.03
- - - 195.12 1,260.09
- - - 1,152.72 2,525.92
- - - 4,452.96 13,700.43

- - - 277.50 126.89
- - - 756.00 10,206.00
- - - 1,496.92 9,495.69
- - - - 4,896.00
- - - - 804.20
- - - - 16.32
- - - - 516.80
- - - - 132,056.00
- - - - 5,304.00
- - - - -
- - - - -
- - - - 2.00
- - - - 36.00
- - - - 162.80
- - - 24.00 80.00
- - - 73.10 246.72
- - - - 66.38
- - - - 23.88
- - - - 4.26
- - - 1.28 22.76
- - - - 414.50
- - - - 21.01
- - - - 14.00
- - - - -
- - - 432.29 5,620.28
- - - - 533.50
- - - - 640.20
- - - - 105.00
- - - - 39.00
- - - - 241.64
- - - - -
- - - - -
- - - - -
- - - - -

January
Total January Total February Total March
Week3 Week4
Qty Qty Qty Qty Qty
- - - 1,040,148.53 5,332,110.68
- - - 204,768.65 860,574.36
- - - 48,555.04 370,917.25
- - - 110,052.28 1,431,430.73
- - - 41,124.29 35,924.78
- - - 4,320.00 58,320.00
- - - - 1,152,534.00
- - - - 159,212.50
- - - 3,551,756.40 14,623,261.36
- - - - 9,124.58
- - - 39,024.89 252,017.40
- - - 172,907.46 378,887.81
- - - 445,296.00 1,370,043.36
- - - - -
- - - 123,140.63 56,305.22
- - - 159,516.00 2,153,466.00
- - - 249,487.20 1,582,614.38
- - - - 2,947,392.00
- - - - 555,404.65
- - - - 10,091.96
- - - - 333,997.50
- - - - 4,886,072.00
- - - - 356,959.20
- - - - -
- - - - -
- - - - 8,000.00
- - - - 13,200.00
- - - - 105,820.00
- - - 1,207,284.72 4,024,282.40
- - - 3,409,102.15 11,505,719.75
- - - - 46,466.58
- - - - 26,262.50
- - - - 19,170.00
- - - 4,480.00 79,660.00
- - - - 138,169.43
- - - - 8,404.00
- - - - 16,800.00
- - - - -
- - - 1,428,857.62 18,576,770.27
- - - - 286,489.50
- - - - 268,884.00
- - - - 47,250.00
- - - - 23,400.00
- - - - 4,763,792.24
- - - - -
- - - - -
- - - - -
- - - - -

- - - 12,239,821.86 78,875,202.38
May
Total April Total May
Week 1 Week2 Week3 Week4
Qty Qty Qty Qty Qty Qty
4,020.38 0.00 0.00 0.00 0.00 0.00
452.66 0.00 0.00 0.00 0.00 0.00
265.80 0.00 0.00 0.00 0.00 0.00
1,014.99 0.00 0.00 0.00 0.00 0.00
280.51 - - - - -
286.57 - - - - -
13,423.50 - - - - -
- - - - - -
18,734.31 - - - - -
118.20 - - - - -
424.46 - - - - -
536.22 - - - - -
3,697.95 - - - - -

1,127.86 - - - - -
2,688.00 0.00 0.00 0.00 0.00 0.00
1,953.74 - - - - -
5,295.12 - - - - -
458.61 - - - - -
9.16 - - - - -
290.00 - - - - -
81,957.52 - - - - -
5,736.38 - - - - -
10.00 - - - - -
13.37 - - - - -
- - - - - -
43.20 - - - - -
13.60 - - - - -
- - - - - -
12.18 0.00 0.00 0.00 0.00 0.00
15.00 - - - - -
- - - - - -
4.73 - - - - -
46.16 - - - - -
183.75 - - - - -
- - - - - -
- - - - - -
17.82 - - - - -
3,309.58 0.00 0.00 0.00 0.00 0.00
744.21 - - - - -
- - - - - -
- - - - - -
6.00 - - - - -
298.36 - - - - -
1.00 - - - - -
1.00 - - - - -
1.00 - - - - -
4.00 - - - - -

May
Total April Total May
Week 1 Week2 Week3 Week4
Qty Qty Qty Qty Qty Qty
2,211,208.99 0.00 0.00 0.00 0.00 0.00
271,596.97 0.00 0.00 0.00 0.00 0.00
208,762.41 0.00 0.00 0.00 0.00 0.00
761,699.61 0.00 0.00 0.00 0.00 0.00
45,471.65 - - - - -
14,328.45 - - - - -
818,833.50 - - - - -
- - - - - -
2,352,280.14 - - - - -
18,911.52 - - - - -
84,892.28 - - - - -
80,432.77 - - - - -
369,794.54 - - - - -
- - - - - -
500,485.66 - - - - -
567,168.00 0.00 0.00 0.00 0.00 0.00
325,622.97 - - - - -
3,187,662.24 - - - - -
316,726.52 - - - - -
5,663.00 - - - - -
187,419.26 - - - - -
3,032,428.24 - - - - -
386,058.37 - - - - -
240,014.81 - - - - -
46,777.50 - - - - -
- - - - - -
15,840.00 - - - - -
8,837.40 - - - - -
- - - - - -
568,183.69 0.00 0.00 0.00 0.00 0.00
10,500.00 - - - - -
- - - - - -
21,285.00 - - - - -
161,560.00 - - - - -
61,251.23 - - - - -
- - - - - -
- - - - - -
1,247.40 - - - - -
10,939,178.78 0.00 0.00 0.00 0.00 0.00
399,638.09 - - - - -
- - - - - -
- - - - - -
3,600.00 - - - - -
5,882,057.79 - - - - -
80,098.53 - - - - -
88,810.58 - - - - -
81,103.39 - - - - -
302,767.83 - - - - -

34,660,199.10 0.00 0.00 0.00 0.00 0.00


June
Total June
Week 1 Week2 Week3 Week4
Qty Qty Qty Qty Qty
0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -

- - - - -
0.00 0.00 0.00 0.00 0.00
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
0.00 0.00 0.00 0.00 0.00
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
0.00 0.00 0.00 0.00 0.00
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -

June
Total June
Week 1 Week2 Week3 Week4
Qty Qty Qty Qty Qty
0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
0.00 0.00 0.00 0.00 0.00
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
0.00 0.00 0.00 0.00 0.00
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
0.00 0.00 0.00 0.00 0.00
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
-
-
-
0.00 0.00 0.00 0.00 0.00
Cement
Sand
Gravel
Water Stop
Stone
Timber
Pole
Nail
Cheeken wire
Cheep wood
Cis
Reinforcement
Black wire
Sheet metal
GI Pipe
DCI pipe
DCI Fitting
HCB
HDPE pipe
HDPE fitting
Fuel
Benzine

You might also like