Download as pdf or txt
Download as pdf or txt
You are on page 1of 3

CURRICULUM VITAÉ

Full Name : PRAVIN VIJAYAN KAPLLAMUTHIL KARTHYANI

Father’s Name : Vijay Baskaran

Permanent Address : Room no-1563 Dhondiram nivas, Mhatre Ali, Baudh

Wadi, Ghansoli, Navi Mumbai, PIN – 400701,

Maharashtra, India

Date of Birth : 27th November 1997

Gender : Male

Religion : Hindu

Marital Status : Unmarried

Nationality : Indian

EDUCATION QUALIFICATION

COURCE UNIVERSITY PERCENTAGE YEAR


SSC MUMBAI 40% 2015
HSE MUMBAI 45% 2017

Contact No. : +91 8693038744 / + 91 9967807780


Email Id : kkpravin14@gmail.com
Language Known : English, Hindi, Marathi & Malayalam
PASSPORT DETIAL’s

Passport Number U4003920


Date of issue 09/03/2021
Place of issue MUMBAI
Date of Expiry 08/03/2031
TECHNICAL QUALIFICATION

 Worked in DOOSAN Babcock for ADNOC(UAE) as


Mechanical Fitter From 13/01/2022 to 09/04/2022

 Worked in SI GROUP as Mechanical Fitter, From 10/01/2021 to


15/12/2021

 Worked in LARSEN & TURBO LIMITED ECC CONSTRUCTION


GROUP as Mechanical Fitter, From 08/10/2017 to 17/12/2020

 Worked in V-TECH ENGNEERING in Industrial Plant’s as


Mechanical Fitter, From 21/02/2016 to 06/06/2016

SKILL SUMMARY
 Hot Tapping, Bolt’s Torquing, Flange Alignment Zero Tolerance,
bolt’s Inspections Bolt’s Material inspections, Worked on Special
Joint’s as per Vendor Joints and Special gaskets and critical Joints,
Compact flanges, Nut Splitting and flange Spreading piping Line
Alignment, Spool Placement and Replacement’s Valve Alignment
and Valve Replacement, Spading and Dispending Working in Live
Line, leak Arrest with Breathing Apparatus, Column and Vessel
Leak Arrest Live Line. Compressor Joints Alignment, Turbine
Joints Alignment Flange to Flange Zero Tolerance.

 Worked with Isometric Drawings and P&ID Drawing’s


 COLUMM: Spending, Remove All the Tray and Material, The
After-hydro Testing and fine back Tray and box up.
 VESSEL: Spacing Remove the Tray and Filter s Clean and Hydro
testing and Fire back tray and bore up Then after Dispending.
 EXCHANGER: Remove the Coil bundle and Test’s leakage Coil’s
the Shel hydrotest and box up.
 ALSO WORKED IN FIN FAN COOLER, REACTOR, BOILER,
TURBINE & PIPE REINSTATMENT.

DATE: - SIGNATURE: -

You might also like