Operation Manual
2009,2
Following standards:
o API Spec 16D 2nd Edition (Specification for Control Systems for
Drilling Well Control Equipment and Control Systems for Diverter
Equipment)
o SY/T 5A53.2-2007 (Specification for control systems for drilling well
control equipment and control systems for diverter equipment) (Apl
Spec 16D: 2004, IDT)
o Q/JS J070101-2007 (Ex-works Testing Method of the Control System
for Surface Mounted BOP Stacks)
,f*"6r$#tfi,r
BEIJING PETROLEUM MACHINERY CO.
The man who operates or repairs the Control System for Surface
Mounted BOP Stacks must accept a technical training, qualified to
have the certificate of operating and maintenance. The operator
should know the potential danger of pressure vessel and pipetine
clearly and do some precaution to protect from harming.
The accumulator bank is the major source of pressure for the normal
operation of the system. The user should make regular checks on the
nitrogen pressure pre-charged in the accumulators to see if there are
such malfunctions as damaged bladder or lack of nitrogen pressure.
The oil tank should be full filled with hydraulic oil according to
regulations in case the accumulator is not filled with oil. The hydraulic
oil must be changed in time to keep clean, to prevent damage the
hydraulic component. No oil supplementation to the oil tank is allowed
after the accumulator is filled with oil and is pressurized.
No fuel oil like diesel or kerosene is allowed to fill into the tank.
After using the control system, you must examine and maintenance in
time. calibrate and check the relief valve and other pressure
CONTENTS
l.lntroduction ............1
2.Model lllustration...... ................1
3.Main Technical Parameters... ...............1
4.Features and Structure ....,2
4.1 Remote control panel ...........3
4.2 Driller's panel ........ ...........4
4.3 Air cable .............s
4.4 Hydraulic cable
ii
C .........:5
4.5 Alarm device ............... .......: ......8
4.6 Nitrogen backup system..... .....".g
4.7 Pressure compensation unit. .........g
4.8 Auxiliary control panel ............g
S.Working Principles and Operation lnstruction. ..........11
5.1 control of starting and stopping of Electric oil pump ..........11
5.2 Control principles of Hydraulic System .......12
5.3 Control of Auxiliary Pump ... g 1
fi Lubrication... .,.......
7. Use, Maintenance and ......27
operation
7.1 Notice of .....27
7 .2 Maintenance ......29
lubrication
7.3 Notice of .........30
1. lntroduction
The control system for surface mounted BOP stacks (hereinafter
called control system for short) is important equipment for controlling
wellhead BOP stacks, choke valve and kill valve, and is an indispensable
device for the prevention of well blow out during drilling and workover
operations.
This manual does not stipulate the reparation and discarding of the
control system, but it does not mean the unlimited use of the system. The
user and maintenance personnel should judge if the maintenance,
overhaul or discarding is required for the system. i
2. Model lllustration
The symbols of the models of the control system for surface
mounted BOP stacks are shown AS below (take FKQ400-58 as an
example):
Page2
9PM Beijing Petroleum Machinery Co. The Control System for Surface Mounted BOp Stacks
1. Alarm device
2. Nitrogen backup system
3. Pressure compensation unit
4. Auxiliary control panel
Closed bent
pipe
Triple-bent
pipe
!r Flexible
hose
Page 3
BPM Beijing Petroleum Machinery Co. The Control System for Surface Mounted BOP Stacks
panel, which is currently installed at the drilling rig floor and thus, the
driller may conveniently control the remote control panel.
The features of the driller's panel include:
1. compressed air is used as the working medium, which may
guarantee the safety in operation.
2. The valve core of each air-operated valve is y type, which may be
automatically reset and will not influence the operation of prevention unit
in remote panel in any cases.
3. The function of operation memory. Each control valve is
connected with a display cylinder. Therefore, when the valve comes to
positions of "OPEN" or "closE", the Ietter of "opEN" oi "closE" wilt
appear in the display window simultaneously. After the reset of the valve
handle, the window display does not change, thus make the operator
know previous operation status in driller's panel.
4. ln order to guarantee the reliability of the operation, the valve on
the driller's panel is handled in a two-step procedure, i.e., first to turn the
air supply valve to connect the air supply and in the meantime, turn other
valves to activate relevant control objects.
Page 5
BPM Beijing Petroleum Machinery Co. The Control System for Surface Mounted BOp Stacks
The closed bent pipe (Figure 2) may extend to 2,3 or 4 meters long.
Flexible elbows are used to connect each oil pipes and they turn flexibly
and much easy for installation on site.
The triple-bent pipe (Figure 3) may be either connected with the
body of the preventer, or used to connect the outlet of the remote control
pane! and the pipe racks.
The two ends of flexible pipeline (Figure 4) have setf-sealed quick
union, in substitution for rigid piperines of pipe rack, closed bent pipe,
etc., to link up control system and preventer.
Page 6
BPM Beijing Petroleum Machinery Co. The Control System for Surface Mounted BOp Stacks
Page 7
BPM Beijing petroleum Machinery
Co. The Control System for Surface
Mounted BOp Stacks
4.5 Alarm device
Remote control panel may be equipped
with alarm device to monitor
the pressure of accumurator bank, air suppry pressure,
the riquid rever of
oil tank and the running of electric purnp.
when the above parameters
exceed the alarm limits, the signal
of sound and light will be given
on the
remote control panel and driller's
controt panel, indicating the operator
to
take proper measures' operators
should use the information provided
by
the alarm device and other instruments
and make an overall analysis of
equipment operation status in
order to ensure the reliable work
of the
control system of surface mounted
BOp stacks.
The functions of the ararm device
are as foilows:
) Ararm for rower pressure of accumurator
bank
) Alarm for tower pressure of air
supply
) Alarm for lower liquid level of oil tank
) lndicating of the running of electric pump
4.6 Nitrogen backup system
Nitrogen backup system consists
of a number of high_pressure
nitrogen cytinders connected with
control manifold and used for
supplying emergent auxitiary energy
to control manifotd. Nitrogen backup
system is linked up with control
manifold via isolate valve, check
vatve
and high-pressure ball valve. lf accumulator
and /or pump unit ;annot
provide the.contror maniford
with enough power fruid, nitrogen
backup
system may be used to provide high-pressure
fluid for the manifold in
order to close the preventer.
Pressure fruid can be prevented
from entering nitrogen backup
system by means of linking up nitrogen
backup system and manifold and
entry of nitrogen to accumulator
circuit should be avoided in operation.
Nitrogen backup circuit is designed
with exhaust valve to control the
Page 8
BPM Beijing Petroleum Machinery Co. The Control System for Surface Mounted BOp Stacks
make the rubber core rapidly reset after passing through the connector,
as a result the drilling safety is guaranteed.
Page 10
BPM BeUing Pefroleum Machinery Co.
The Control System for Surface Mounted BOp
Stacks
5. working Principles and operation lnstruction
5.1 start and stop controt of electric-operated
oir pump
Turn the main switch in power switch box (Fig.
5) to ,,AUTO, position,
thus the complete equipment is under the position
of automatic control.
Now if system pressure is rower than l gMpa (2700psi),
pressure switch
will. automatically start etectric-operated oil pump. pressure
oil is fed to
accumulator bank through non-return valve (The
isolate valve of
accumulator bank must be opened previousry).
when system pressure
PE N L1 L2L3
Page 12
BPM Beijing Petroleum Machinery Co. The Control System for Surface Mounted BOp Stacks
valve changes direction on the driller's panel, compressed air pushes the
piston of the display cylinder, and you will see the letters of "opEN,, or
"CLOSE" from the hole on the top of each air valve on the driller's panel.
The letters of "OPEN" or "closE" indicate the preventer is in the
.OPEN"
or "CLOSE" position.
When regulated manually, turn the hand wheel on the reducing and
regulating valve, the output pressure may be regulated to set pressure.
Turning down to increase output pressure and turning up to decrease it.
Page 13
?L o6ed
-T-l
ax
(-/)
(D
:.
(D
a
w
O
-U
-r-l
\r-x-
^
L'
J-U ii^{
-{ ,F
=Et s
{'#
,^E1L
v) -&
+iE
(D iEiti
-=
f-l
-,\
xo
O?
o)i
.N L_J
C)l
l-{
'i6
\] Fr
Til€
s
--EI ,
,-n U
C
C)
FTI
C)
r
z
a
-
C)
&xo r@ 5@
*m gF TE
zE
m
C
-o a
a
s)|cels dog polunoht ecetns roJ rxolslstorx.6a€ql
'oC Irountcef1 unatoJled-6[[tog
t t1f,A
BPI Bdjing ffir,m llacfrineryCo. The Control System for Surface Mounted BOp Stacks
Serial l
r Name
No.
'! Airtreafrnent 5126990110
2 Pressure gfl{;e 0-2.5MPa ( 350psi)
Afu ftessure regulator
F!*ogneurnatic pressure
9161500000
5 Akshut<fivalve
check valve
I 1'Suction strainer wu-160X100
g Ballvatve
10 Explosion-proof electric motor
3101030040
't1 Tr
12 Ballvalve
13 1 1/2"Suction strainer
14 ; YTK series 9170100000
15 check valve
16 ballvalve QI rNS-31.5
17 Relief valve
'!8 Double
19 controlvalve
n Pressure reducing and
valve
2'l valve 91 61 000000
n NXQ/model bladder
acqrmulator
n Vibrati:n-proof pressu re ga u ge
21 Retrief valve
Shut-ofi valve
Akoperated pressure
26
fryrsducer
C n Air+rated pressure
trartsduoer
n ballvalve
x
Ai, ard valve
31
Aifnad operde regulating
rd€ | 9161400000
3Q
M! ?h openated valve
refue
3[l Akte*neril 5126990't00
3* hessue
35 Fressue
s vahre 9163100000
3i7 affiy:f ryenaEd rrahre 9163100000
3E [he
Page 15
BPM Beijingpetroteum Mdchinery Co. The Control System for Surface Mounted BOp
Stacks
a
30. 4401000010 Suction shut-offvalve &rH 1 J13W-320P Dg15
31. 3808000030 Air filtering and reducing valve A^1dffi#.i,EFl 1 QFH-261 0-0.6MPa(85psi)
32. 3802000190 Vibration-proof pressure gauge ffiH.Ehf{ 1 YTN_IOO 0-25MPa(3500psi)
33_ 9161400000 Air/manual operate regulating n+affiEw 1 JYSQ.21,25B
4-way air operated ={tEiE-1+tlfr
v. 9163200000
(
1 34ZR6Y-L8A
valve(Distribution valve) aErhn )
35. 9163100000 4-way air operated valve =.fiEiE<4tE 5 34ZR6Y-18
36_ 5126990100 Air treatment <fr-Ag)r'W 1 AC4O1H4
Y-10027 t^fr\
37- 3802000080 Pressure gauge Ehfi 2
40MPa
0-0.2 MPa (29psi)
Y-1002r t^fr\
38. 3802mOO70 Pressure gauge Ehf,. 1 0-0.2 MPa (29psi)
25MPa
!H
&
- -
=*'
H'xl-
=l =<{
I
t
t
lt
I
L
I
=.
II BefrrE Pefoleum Machinery Co. The Control System for Surface Mounted BOP Stacks
CAUTION: When air operated function fails (e.9., zero air pressure
due to air cable explosion), the control pressure for the' annular
peventer will be automatically reset to the initially set value
[10.5]rlPa or 1500psi), in order to guarantee safety.
For the control systems with air-operated oil pump, opgn air supply
valve, close bypass valve' of the hydro-pneumatic pressure switch,
compressed air entering hydro-pneumatic pressure switch via air supply
processing components. lf the pressure of manifold is Iower than 17.85
MPa (2580psi), hydro-pneumatic pressure switch will open automaticallr
Compressed air enters air-operated oil pump via hydro-pneumatic
pressure switch, make it work. The pressure oil exhausted enters
manifold via chock valve. When system pressure rises to about 21MPa
(3000psi), under the effect of pressure oil, hydro-pneumatic pressure
switch is automatically closed, air supply is cut off and air-operated oil
pump stops working. '-
Page 18
BPt Beiiing Petroleum Machinery Co. The Control System for Surface Mornt"i l9I J99!o
it work.
Page 19
BPM Beijing Petroleum Machinery Co. The Control System for Surface Mounted BOp Stacks
6.1 lnstallation
l
house, l
of the I
l
base for the smooth hoist. When hoisting driller's panet
or pipe rack, the
steel rope must pass through or hook the rifting ring.
2'The remote control panet should be installed no less than
30
meters from the wellhead (refer to relevant standard and
specification),
while the driller's panet should be placed near the driller
on the rig floor.
3. Connection of oil pipes
When connecting the oil pipes, it is recommended to connect
the
preventer body first, and then connect the pipes in
succession. ln doing
so, you place the pipes in good order, which will facilitate direction
changes, and save labor. Besides, all the oil pipes or air cable
shoutd be
blown clean with compressed air before installation. lt is necessary
to
pay full attention to this.
On the upper side of the hind channel section steel of the base
of the
remote control panel, welded letter of ,o,, or "C, is shown
a
corresponding to each oil pipe, with "o" meaning "open and *c,
meaning "Close". The pipes connected should'not only in accordance
with the instruction (blind ram, pipe ram, annular, choke, etc) of the brand
plate on the remote control panel, but also in accordance with
the
marked letters of "O" and *C", so that the pipes may be correctty
connected with the "open" or,,close,, function.
Page 20
BPI Beijing Petoleum Machinery Co. The Control System for Surface Mounted BOP Stacks
),G . Flexible hose..with 32mm (1,26") and 16mm (0.63") diameter are
used to connect air supply of remote control panel and driller's panel
respectively. The point joining flexible hose and connector must be
tastened with hoops to avoid being loosened. The flexible hose should be
free of defects, such as aging, crack, etc. in order to avoid its explosion.
CAUTION: When connecting air cable, take care and prevent dead
bends. The pipes should be closely connected with the connectors,
so as to prevent troubles like pipe explosion and disconnection.
j resulting in failure.
The preparatory work for the test run is carried out according
to the
following procedures.
1' Pre-charge or check the nitrogen pressure in each accumulator,
the pressure should be Tt}.TMpa (1000r100psi), and fill
nitrogen when
pressure is not enough.
Page22
til;miliilunmq m*mrumum !Ws::- ne-. Co The Control System for Surface Mounted BOP Stacks
J. ffiift fie ei iank. Make sure the oil lever reaches its upper limit.
&\mmnu,nm6 :1t.e :rr f," [ne oil tank weekly. To check the oil after an operation
effi,M, r ffie :nr s r"rddy. it is necessary to change the oil.
illflfrfr*E- ar*ient temperature is above 0C, use D.T.E24(MOBH)
^' -'r,* ii:: : :-::.s"s, check and adjust the pressure switch until the
Page 23
BPM Beijing pekoleum Machinery Co. The Control System for Surface Mounted
BOp Stacks
electrical oil pump stops and starts automati",
is any oil leak in the connectors on the remote
control panel while the
pressure is going up.
5. Opening/Closing tests
lffien the pressure of the accumulators goes up to 21MPa (3000psi),
[rn the by-pass valve of the contro! manifold to the "CLOSE" position.
@rate the 3-position 4-way control valve for direction change on the
remote control panel. Check and see if the functions of the control valve
colrrcide with those of the preventer or the choke/kill valve. On the
drilbr's panel, turn the air valve "OPEN" or "CLOSE", and check and see
) if the functions of the air valve coincide with those of the control objects.
Offierwise, you should check and see if the circuit is connected properly.
I tr mp by tum off the power switch, check and see if the overflow valve
tfioroughly opened. After compete open and orierflow, push the power
switch to the "STOP" position to stop the electrical oil pump, Overflow
nalve should be completely closed at the pressure not less than 19MPa
(27oopsi).
Tests on high pressure overflow valve: close the isolate valve of the
mrnulator bank on the circuit, turn the by-pass valve on the manifold to
fr IOPEN' position. Open the air supply valve and by-pass valve to
Wer# the airoperated oil pump, oil pressure in the manifold goes up to
nurd 34-5MPa (5000psi). Check and see if the overflow valve opens
Page25
.t
BPM Beijing Petroleum Machinery Co. The Control System for Surface Mounted BOP Stacks
for full overflow. After full open and complete overflow, stop the pump by
shutting off air supply, overflow valve should be completely closed on the
pressure not less than 29MPa (4200psi).
You may adjust the overflow pressure of the overflow valve if required.
E.
BPI Beijing Petloleum Machinery Co. The Control System for Surface Mounted BOP Stacks
technique.
UOSE'position.
Page 27
BPM Beijing Petroleum Machinery Co. The Control System for Surface Mounted BOP Stacks
7.2 Maintenance
1. Remove and check the oil strainer and filter screens of the intake
on the top of the oil tank monthly. Take the screens out and wash them
carefully in order to protect them from being blocked by dirt.
2, To the water-trap in the air treatment unit: Open the water
discharge valve at its lower end and drain dirty water out of the cup daily.
Page 28
ltl B€ng Peffieum MachineryCo. The Control System for Surface Mounted BOP Stacks
Remove and wash the filter cup and the water cup once every two weeks.
ytash them with gasoline or other mineral oils, and dry them with
oqnpressed air. Do not use acetone or toluene to wash them avoiding
damage.
3. To the oil mist filter of the air treatment unit: Check the oil level in
the cup daily. Refill and replace Iubricant (N32 hydraulic oil or other
proper oil). Dismount and wash the filter promptly when the oil does drip
srnoothly
4. check the pressure of the pre-charged nitrogen in the
i amrmulator periodically. During the beginning period, check nitrogen
pessure weekly, and thereafter, during normal operation, check it
nronthly. Recharge nitrogen at once when its pressure is below 6.3MPa
(900psi). Check nitrogen pressure only after the accumulator releases
pressure thoroughly. The pressure may be released by the ball valve on
the bottom of accumulator.
5. For long distance transport of the control system, decrease
pressure of nitrogen in the accumulator to about lMPa (140psi), so as to
guarantee safety during transportation.
6. Check oil level in the oil tank at all time. Open the plug on the
T n bofrom of the oil tank to drain water periodically. Observe if there is any
ilnpurity on the bottom, and clean the bottom if necessary.
the seal packs in the crankshaft plunger pump, the
7. Check
ak-operated hydraulic pump or the hand-operated oil pump. Do not
over{ighten the packing only adequate if no oil leakage is found.
Replace the damaged packing in time.
8. When removing the quick connectors, take care not to lose the
U rirqs in quick- change union. Put the removed "O" rings together and
bep in good condition.
9- Often wipe and clean the surface of the remote control panel and
Page 29
BPM Beijing Petroleum Machinery Co. The Control System for Surface Mounted BOp Stacks
the driller's panel, and keep nameplates in places.
10. Once finishing drilling a well, inspect and calibrate the
pressure gauges.
Page 30
L-
l"I tsei;5ng Petrobum Machinery Co. The Control System for Surface Mounted BOP Stacks
S.Trouble Shooting
(1). Noise from the system
Cause: there is gas contained in the system oil
Remedy: running the system without any load, exhausting the gas
repeatedly. Check if the capsule of the accumulator is
broken and make a prompt change.
Cause: the chain ;s too loose or isn't in a straight line. The
concentricity of the pump shaft and the motor shaft is
above the degree.
Remedy: regulate the chain; re-regulate and tighten the screw
Cause: low oil temperature or high viscosity.
Remedy: heating the oil tank. Replace the suitable oil liquid.
Cause: the oil pump sucks air or the oil level is too low in the oil
tank.
Remedy: when the accumulator has no pressure, fills oil in the oil
tank.
Cause: if there is any dirt in the oil inlet of pump or in the filter
screen.
Remedy: wash the filter screen.
+tr
"i'-
(2). Electrical motor failed to start.
Cause: the electric power parameters do not comply with the
requirement, voltage is low.
Remddy: repair electric circuit.
C,ause: electric components in power switch box are damaged or
out of order.
Remedy: repair power switch-box.
t3)- Ttle system pressure doesn't raising or raising slowly after starting
electric-operated oil pump and there is abnormal noi.se during the
Page 31
BPM Beijing Petroleum Machinery Co. The Control System for Surface Mounted BOP Stacks
pump operation
Cause: the oil level is too low in the oil tank, the oil pump sucks air.
Remedy: refill oil.
Cause: the valve for the oil suction orifice is closed or the oil filter is
blocked.
Remedy: check pipe line, open valve and wash oil filter.
Cause: the bleeder valve on the control manifold is not closed
Remedy: close the bleeder valve.
Cause: malfunction of electric-operated oil pump.
Remedy: check and repair oil pump.
Cause: "V" sealing ring wears out.
Remedy: Replace the sealing ring.
Cause: sealing surface wears out or is blocked.
-
Remedy: replace the valve core and the valve seat, or regulate the
position between them.
(4) The electric pump doesn't stop automatically.
Cause: oil pipe or oil connector of pressure controller is blocked or
Ieaks.
Remedy: check pipeline of the pressure controller.
Cause: pressure controller does not work. ."
)
BPM Beijing Petroleum Machinery Co. The Control System for Surface Mounted BOp Stacks
L.
Co. The Control System for Surface Mounted BOP Stacks
Page35
BPill Beijing Petroleum Machinery Co. The Control System for Surface Mounted BOp
Stacks
9. lnstruction of order
Technicat parameter of the control system
of surface mounted BOp
stacks is rather complicated and a large variety
of structure and models
are avairabre for this product. rn order to herp
customers make right
choice and a
proper order, and make its configuration
compry with
national standard and API specification,
customers are kindly requested
to provide technical data and operation requirements
as detailed as
possible. These data and requirements
incrude:'
1. Number of contror objects and their modets
2. Range of order
lf the follow optional parts are needed:
tr Driller's panel
tr Air cable
tr Pipe lines (tr pipe racks, fr ctose bent pipe, fr hoseE others_)
tr Others:
3.Special requirements
when there are speciar requirements on products or parts,
users
should specify in detail. Those without special
requirements will be
Page 36
U
e.rr- The Control System for Surface Mounted BOP Stacks
Wlllmnr device
hckup system
compensation device
control pangl
house
1S
,t?
ii$
Page 37
BPt Beijing Petroleum Machinery Co. The Control System for Surface Mounted BOP Stacks
1. Weight
1 kg = 2'2lbs'
1 lbs. = 0.454 kg
2. Volume
1 L = 0.264 US gal = 61 cu. in
I US gal = 3.785 L= 231 cu. in
3. Pressure
lMPa = 145psi
l psi = 0.0069MPa
4. Length {
1m=3.28ft=39.37in
1ft=0.305m
5. Temperature
1C= 5/9("F-32)
1T= 1.8X"C+32
6. Power
1kW = 1.34 HP
.1 HP = 0.746 kW
rso 32 32
Page 38
L.
6ta6ed
x ox ox o x ox ox ox ox ox ox ox ox ox ox o ox ox o
x o xox oxo
o o
@ o, @ @ @ @ @ @ @ (o
o @ @ (o
o PPqq=
\)L)vL)v=- , D
D
o 5 o oo o
o o o o
o oo o o
o 5 N N N 5 N N 5 o)@ic--:lJ
(/)
o c) o No N
o o, @ N o N
o O) o N
@ @ @ o 5 @ @ 5 so)c:\:s:
o o o o OCCS=EY
o, { { { !.Tt ! { { { \t o o @ @ @ o o o o
I I I I I I I I I I I
o
a
I o m C- o @ { { I I r
@
t
@ @ @ @ (o
c) (D
I I
o o N 5 \ii!!YY
sj
I I I I I I
== =
-l
@,
a,l3
J =,
-:= -
--A ft
LJ
i8?
(, (, (, 5 (, (, s (, 5 l
g a-1
q) G' o) O) (.) CD (l) (/) (f,) OJ 5 OJ (^) E 5 q) ww9u
:
j
--=EI Ea
N) N N N l\) N) l\) f\) N N N N) t\) (, o) (r) u) N N) (, (, N 5 { N c,:lN s cc
= 3=
,*
i-d
:q
!q 0
N N { 19 ,i- - r: D
=!
5 5 5 5 5 5 5 A s o, @ o, s (') O) o, @ @ @ o) @ @ @ O) 5 <D
ox ox ox ox ox ox ox ox ox ox ox Ox Ox Ox ox c)x ox ox Ox c)x ox ox ox ox ox AA!\:\:-=&a
ox @ i'X;i-=: |l
N o N N N N N N l\) N N) N N
o o o o O o o O 5 O o) l\) N N
N o s o) o O) O) o, o @ (,) C') s OJ ocJcs 5- a
t
5 5 5 s 5 s sO 5o s@ o)o O)s o)o) 5o Al\) sOo o, (')
c') !
o t\) o) o) o) s,s o, r ^ 5; l
838=_==>3
-.1
o
o
O)
N)o c) o
o (f, o o
o
o o
o o o o o o io o o o
O)
O
<)
so O)
5
o A 5 5 N N
c) c) o o o O o
f,fi:
I .-= -o
tt
o)N OJ (, (, (, o)OJ OJ CD 5 s(o E (, N o) s s s 5 5 (,l 5 s (,r N
o 0)'(, s st\: =-= = -
o 5o N) o o O) N (o (r) N (o (o (o N (tl (o (o (,l (ji(,) : 1{
N)
o No No o N
N) T\)
O o N s No O) N o .r O) o O) o) o) O o OJ o, s o) o)'o Nl
C=-==-o- =
i 56 -
=
t*
-t
o @ a a. ll @ a @ a a U, a ll a a a o (f, @ (t 1l a. a. a 1l 1l -UllE
=
-
=A o
d d o- o d d d d d d
o o o o o o o o
o d d d o o- d o o ooo; 5 =
!
o o o o U' o o o o o CN o o o CNa, 999
E o o E o o a o rc o 1, 1f
o o o o o o o o
o
o o o IJ E o rf o
o o 1'o oo o PE= E3 -r
o o o
@ o @
o
(, a 9.. a o 9.. 9.. 9.. 9.. a a a o o o o
a a 9.. 9.. 9.. o oa o@ 9.. 9..
CJ) dili
0 0-q =g
a
d;
6' 6' 6' 6'
5 =
6' 6' 6' 6' =
= =
o =
d.
o o = o 6' 6' 6' 6' 6' = o =
o =. o 6' 6' 6' =
J
o =-o o' o ===
)i)=!
o
= = J = = = = = = =
N t\) N N N) IO N N t$NN
i. ) @
t
O) O) (,l @ N (,t N) (,r O) o(', (,l O) o, O) o) o) N) l\) O) N) 5
N)
(I) o, N -:3i D
o (, (Jt O o (tl O (, OI
c)
o o @ O (,l o
o o
o o
o o
o o O (Jl o
o o ooc
c
O (Jl O
o c) o o O O o O O o o c) o O o o o o O)
o O oo3-=== -=t
-{
t!
o _ a- C!
o
(, -=- -==
90 P 90 @ 90 90 P co @ @ @ @
90 90 P @ @ @ @ 90 9o (Jl (Jl (rl (Jl 90 90 (Jt (Jr ir' i, (, i, i,x Ln iJr iJ! @
90
(,r (,r(rr
9D
(,r (, (Jr (, irt Ltr i.n i"n (,
x x x x ('l (,r x x x X x x x x x iJ' x X X X ==a
-=n d
N) N N N N N N l\) N) l\) N l\) N N N) N)tJt\: --:
o
5 5O) 5 5 A s s s s s A so) so) S 5 s 5 -NS.\,:>-=
t
o \T
s
O)
5 o)
o) x x
so) s s s
o) o, o,
5
o)
O)
x
O) o) O)
x x x o)
5
O)
O) O) O)
x x x
O)
x x
o) o) o)
O)
x x x x x
5 AAA^==-
O) x,x x x :- - o,
N) N) N l\) l\) N N) N) N) N) N) N N) N) N N I$'N N N + = :
@
! o
!
r I - >=' !
d!
o)
J
O) c') o)ox o) o) OJ O) O) O) o, O) O) o) O) O) O) o, O) O) o) o) O) o) o) o) v)lw)lv) D
(Jt (,l (,t (,1 ot (,l (Jr (Jr (,t (Jr (Jr (,r (, (,l ('r ot (,l (Jr (Jt (,l (, (tI (,l(,i(, !) a r
(Jt (,l (,l ir - - CI
x x x 5 x x (, x x x x x x x x x x x x x x x x x x x x xix x x =
-l ==:
3 -
N) N) N) N) N) (, N) N) N) N) l\) (, N (,) (, N) N (, N rr:irul<,: c.: + =
N N) N N N ,e
a=="<
= = !-
-+a
<a=
= -4
:E:_
5= 3
J=;
-===
?3 =-<
N N N) N) N) N) N) N) N N t\) N) N N) N) N) N) N) N t\) N N) N) N N N N N N-! I\C
uea=
JJII =E=,
slcels doE palunoy\,| ecelJns.lol uels^s loJluoc eql 'oO fueur+3eH uJrGaF-@# 6+Ueg II
The Control System for Surface Mounted B!fg'"kt
BPM Beijing Petroleum Machinery Co'
Page 40
L? ased