I, MARITEZ B. GALBAN, Procurement Analyst B of NIA Ilocos Sur IMO, commit to deliver and agree to be rated on the attainment
of the following targets in accordance with the indicated measures for the period JANUARY to JUNE, 2022.
ENGR. MERFINO S. BIRALDE January 3, 2022 ENGR. AURELIA G. REASONDA January 3, 2022
Senior Engineer A / Chief, Engineering & Operations Section Acting Division Manager A/Ilocos Sur IMO
RATING
MFO/PAP SUCCESS INDICATOR ACTUAL ACCOMPLISHMENTS REMARKS
(TARGETS + MEASURES) Q 1
E 2
T3 A4
(1) (2) (3) (4) (5)
STRATEGIC
PRIORITY / THEMES
Preparation of Invitation to Bid/Request 22 CY 2022 ITB, 10 RFQs to be 21 CY 2022 ITB, 30 RFQs accomplished at the end of
5.00 5.00 5.00 5.00
for Quotation accomplished at the end of June 2022 June 2022
Preparation of Bid Evaluation, NOA, 22 projects, 10 RFQs to be accomplished at 19 projects, 30 SVP accomplished at the end of June
4.80 4.80 4.80 4.80
CFM Contract, NTP the end of June 2022 2022
Preparation of Procurement Report (PMR, 2 PMR, 1 APCPI, 2 APP/PPMP to be 2 PMR, 1 APCPI, 2 APP/PPMP accomplished at the
5.00 5.00 5.00 5.00
APCPI, APP/PPMP) accomplished at the end of June 2022 end of June 2022
Sorting & Consolidation of Contract 10 projects to be sorted/consolidated at the 15 projects sorted/consolidated at the end of June
4.50 4.50 4.50 4.50
Documents for submission to COA end of June 2022 2022
Obligations, Disbursements and 90% obligations/disbursements within the 90% obligations/disbursements within the approved
SFM 1 4.00 4.00 4.00 4.00
expenditures approved POW POW
Submission of Reports (Costruction All required reports submitted on All required reports submitted on schedule; 100%
SFM 3 4.80 4.80 4.80 4.80
Monitoring Reports) schedule; 90% accurate and complete accurate and complete
All required reports submitted on All required reports submitted on schedule; 100%
SFM 4 BAC (Member, BAC Secretariat) 4.50 4.50 5.00 4.67
schedule; 90% accurate and complete accurate and complete
ISO Core Team (Risk Management Team, All required reports submitted on All required reports submitted on schedule; 95%
SFM 6 4.00 4.00 4.00 4.00
Secretariat) schedule; 90% accurate and complete accurate and complete
sub-total stratgic support functions (30%) 5.06 5.06 5.16 5.09 1.53
Discussed with: Date: Assessed by: Date: Final Rating by: Date:
I, MERFINO S. BIRALDE, Senior Engineer A of NIA Ilocos Sur IMO, commit to deliver and agree to be rated on the attainment
of the following targets in accordance with the indicated measures for the period JANUARY to JUNE, 2022.
ENGR. AURELIA G. REASONDA July 4, 2022 ENGR. AURELIA G. REASONDA July 4, 2022
Acting Division Manager/Ilocos Sur IMO Acting Division Manager / Ilocos Sur IMO
RATING
MFO/PAP SUCCESS INDICATOR ACTUAL ACCOMPLISHMENTS REMARKS
(TARGETS + MEASURES) Q 1
E 2
T3 A4
(1) (2) (3) (4) (5)
STRATEGIC
PRIORITY / THEMES
CORE FUNCTIONS (70%)
S3 Improve Planning, Design and Implementation of Irrigation Projects to be Climate Change Adaptive
Areas generated and restored
a. Generated (ha)
18 has of CY 2022 GAA target generated by
- Current Year 9
end of June 2022
Discussed with: Date: Assessed by: Date: Final Rating by: Date:
I, EMILIO Y. BONDAD, Sr. Engineer A of NIA Ilocos Sur IMO, commit to deliver and agree to be rated on the attainment
of the following targets in accordance with the indicated measures for the period JANUARY to JUNE, 2022.
ENGR. MERFINO S. BIRALDE July 4, 2022 ENGR. AURELIA G. REASONDA July 4, 2022
Senior Engineer A / Chief, Engineering & Operations Section Acting Division Manager / Ilocos Sur IMO
RATING
MFO/PAP SUCCESS INDICATOR ACTUAL ACCOMPLISHMENTS REMARKS
(TARGETS + MEASURES) Q 1
E 2
T3 A4
(1) (2) (3) (4) (5)
STRATEGIC
PRIORITY / THEMES
S3 Improve Planning, Design and Implementation of Irrigation Projects to be Climate Change Adaptive
Areas generated and restored
a. Generated (ha)
6 has of CY 2022 GAA target generated by
- Current Year
end of June 2022
Discussed with: Date: Assessed by: Date: Final Rating by: Date:
I, MARIO N. RABOY, Sr. Engineer A of NIA Ilocos Sur IMO, commit to deliver and agree to be rated on the attainment
of the following targets in accordance with the indicated measures for the period JANUARY to JUNE, 2022.
ENGR. MERFINO S. BIRALDE January 3, 2022 ENGR. AURELIA G. REASONDA January 3, 2022
Senior Engineer A / Chief, Engineering & Operations Section Acting Division Manager / Ilocos Sur IMO
RATING
MFO/PAP SUCCESS INDICATOR ACTUAL ACCOMPLISHMENTS REMARKS
(TARGETS + MEASURES) Q1 E2 T3 A4
(1) (2) (3) (4) (5)
STRATEGIC
PRIORITY / THEMES
CORE FUNCTIONS (70%)
S3 Improve Planning, Design and Implementation of Irrigation Projects to be Climate Change Adaptive
Areas generated and restored
a. Generated (ha)
6 has of CY 2022 GAA target generated by ___ has of CY 2022 GAA target generated by end of
- Current Year
end of June 2022 June 2022
30 has of carry over projects generated by 30 has of carry over projects generated by end of
- Carry Over 0.00
end of June 2022 June 2022
SM 4
b. Restored (ha)
__ has of CY 2022 GAA target restored by ___ has of CY 2022 GAA target restored by end of
- Current Year 0.00
end of June 2022 June 2022
2 CY 2022 POW reviews, evaluated and 7 CY 2022 POW reviews, evaluated and approved by
CFM 4 Submit Program of Work 0.00
approved by June 2022 for implementation June 2022 for implementation
5 contracts approved and issued with NTP 7 contracts approved and issued with NTP within 40
CFM 5 Procurement of Contract Works 0.00
within 40 days after issuance of ASA days after issuance of ASA
Monitoring/Review and All required reports submitted on All required reports submitted on schedule; 100%
CFM 7 0.00
Preparation/Consolidation of Reports schedule; 90% accurate and complete accurate and complete
All required reports submitted on All required reports submitted on schedule; 100%
BAC (Technical Working Group) 0.00
schedule; 90% accurate and complete accurate and complete
sub-total strategic + core functions (70%) 0.00 0.00 0.00 0.00 0.00
Submission of Reports (Costruction All required reports submitted on All required reports submitted on schedule; 100%
5.00 5.00 5.00 5.00
Reports) schedule; 90% accurate and complete accurate and complete
ISO Core Team (Chairperson, Risk All required reports submitted on All required reports submitted on schedule; 95%
4.50 4.50 4.50 4.50
Management Team) schedule; 90% accurate and complete accurate and complete
Discussed with: Date: Assessed by: Date: Final Rating by: Date:
I, JENRICKZ ABELLA, Engineer A of NIA Ilocos Sur IMO, commit to deliver and agree to be rated on the attainment
of the following targets in accordance with the indicated measures for the period JANUARY to JUNE, 2022.
ENGR. MERFINO S. BIRALDE January 3, 2022 ENGR. AURELIA G. REASONDA January 3, 2022
Senior Engineer A / Chief, Engineering & Operations Section Acting Division Manager/ Ilocos Sur IMO
RATING
MFO/PAP SUCCESS INDICATOR ACTUAL ACCOMPLISHMENTS REMARKS
(TARGETS + MEASURES) Q1 E2 T3 A4
(1) (2) (3) (4) (5)
STRATEGIC
PRIORITY / THEMES
CORE FUNCTIONS (70%)
S3 Improve Planning, Design and Implementation of Irrigation Projects to be Climate Change Adaptive
Areas generated and restored
a. Generated (ha)
___ has of CY 2022 GAA target generated
- Current Year
by end of June 2022
10 has of carry over projects generated by 10 has of carry over projects generated by end of
- Carry Over 0.00
end of June 2022 June 2022
SM 4
b. Restored (ha)
___ has of CY 2022 GAA target restored by
- Current Year
end of June 2022
0.25 km of concrete lined canal completed 0.08 km of concrete lined canal completed by end of Target unmet due to late start of construction
b. Concrete Lined Canal (km) 0.00
by end of June 2022 June 2022 activities caused by election ban
3 CY 2022 POW reviews, evaluated and 4 CY 2022 POW reviews, evaluated and approved by
CFM 4 Submit Program of Work 0.00
approved by June 2022 for implementation June 2022 for implementation
2 projects monitored/inspected end of June 2 project monitored/inspected end of June 2022 after
Project Monitoring/Inspection 0.00
2022 after receipt of ASA receipt of ASA
CFM 6
1 project monitored/inspected end of June 1 project monitored/inspected end of June 2022 after
- Carry Over 0.00
2022 after receipt of ASA receipt of ASA
Monitoring/Review and All required reports submitted on All required reports submitted on schedule; 100%
CFM 7 0.00
Preparation/Consolidation of Reports schedule; 90% accurate and complete accurate and complete
Submission of Reports (Costruction All required reports submitted on All required reports submitted on schedule; 100%
0.00
Reports) schedule; 100% accurate and complete accurate and complete
Discussed with: Date: Assessed by: Date: Final Rating by: Date:
I, PATRICK S. AZCUETA, Engineer A of NIA Ilocos Sur IMO, commit to deliver and agree to be rated on the attainment
of the following targets in accordance with the indicated measures for the period JANUARY to JUNE, 2022.
Discussed with: Date: Assessed by: Date: Final Rating by: Date:
I, EFREN I. CASTAÑEDA, Foreman A of NIA Ilocos Sur IMO, commit to deliver and agree to be rated on the attainment
of the following targets in accordance with the indicated measures for the period JANUARY to JUNE, 2022.
ENGR. MERFINO S. BIRALDE January 3, 2022 ENGR. AURELIA G. REASONDA January 3, 2022
Senior Engineer A / Chief, Engineering & Operations Section Acting Division Manager / Ilocos Sur IMO
RATING
MFO/PAP SUCCESS INDICATOR ACTUAL ACCOMPLISHMENTS REMARKS
(TARGETS + MEASURES) Q1 E2 T3 A4
(1) (2) (3) (4) (5)
STRATEGIC
PRIORITY / THEMES
CORE FUNCTIONS (70%)
S3 Improve Planning, Design and Implementation of Irrigation Projects to be Climate Change Adaptive
Areas generated and restored
a. Generated (ha)
6 has of CY 2022 GAA target generated by 42 has of CY 2022 GAA target generated by end of
- Current Year 0.00
SM 4 end of June 2022 June 2022
30 has of carry over projects generated by Assist in generating 30 has of carry over projects by
- Carry Over 0.00
end of June 2022 (assist) end of June 2022
b. Restored (ha)
5 has of CY 2022 GAA target restored by ___ has of CY 2022 GAA target restored by end of
- Current Year
end of June 2022(assist) June 2022(assist)
Monitoring/Review and All required reports submitted on All required reports submitted on schedule; 100%
CFM 7 0.00
Preparation/Consolidation of Reports schedule; 90% accurate and complete accurate and complete
Strengthening of Partnerships and
convergence activities; Internal and 2 coordination/stakeholders meetings 3 coordination/stakeholders meetings
CFM 8 0.00
External Coordination (for project attended(assist) attended(assist)
implementation)
RATING
MFO/PAP SUCCESS INDICATOR ACTUAL ACCOMPLISHMENTS REMARKS
(TARGETS + MEASURES) Q1 E2 T3 A4
(1) (2) (3) (4) (5)
sub-total strategic + core functions (70%) 0.00 0.00 0.00 0.00 0.00
Submission of Reports (Costruction All required reports submitted on All required reports submitted on schedule; 100%
0.00
Reports) schedule; 90% accurate and complete accurate and complete
All required reports submitted on All required reports submitted on schedule; 100%
Preparation of Plans, Cost Estimates 0.00
schedule; 90% accurate and complete accurate and complete
Discussed with: Date: Assessed by: Date: Final Rating by: Date:
I, RUSSEL S. DELIZO, Engineering Assistant A of NIA Ilocos Sur IMO, commit to deliver and agree to be rated on the attainment
of the following targets in accordance with the indicated measures for the period JANUARY to JUNE, 2021.
/
Ratee Date
85 has of carry over projects generated by Assist in accomplishing 85 has of CY 2019 GAA target Low accomplishment due to strict implementation of
- Carry Over 3.00 4.50 4.00 3.83
end of June 2020 generated by end of June 2020 Provincial IATF Guidelines in Ilocos Sur
1.01 kms of earth canal completed by end Assist in accomplishing 1.01 kms of earth canal
SM 5 - Carry Over 3.00 5.00 5.00 4.33
of June 2020 completed by end of June 2020
0.34 kms of concrete lined canal completed Assist in accomplishing 0.34 kms of concrete lined canal
- Carry Over 5.00 5.00 5.00 5.00
by end of June 2020 completed by end of June 2020
RATING
MFO/PAP SUCCESS INDICATOR ACTUAL ACCOMPLISHMENTS REMARKS
(TARGETS + MEASURES) Q1 E2 T3 A4
(1) (2) (3) (4) (5)
60 CY 2020 POW reviews, evaluated and Assist in accomplishing 60 POWs of CY 2020 reviewed,
CFM 4 Submit Program of Work 3.00 5.00 5.00 4.33
approved by June 2020 for implementation evaluated, approved end of June 2020
Monitoring/Review and All required reports submitted on All required reports submitted on schedule; 100%
CFM 7 5.00 5.00 5.00 5.00
Preparation/Consolidation of Reports schedule; 90% accurate and complete accurate and complete
Strengthening of Partnerships and
convergence activities; Internal and ____coordination/stakeholders meetings
CFM 8 3 coordination/stakeholders meetings attended 5.00 5.00 5.00 5.00
External Coordination (for project attended
implementation)
sub-total stratgic + core functions (70%) 3.89 4.94 4.89 4.57 3.20
Submission of Reports (Costruction All required reports submitted on All required reports submitted on schedule; 100%
5.00 5.00 5.00 5.00
Reports) schedule; 90% accurate and complete accurate and complete
sub-total stratgic support functions (30%) 5.00 5.00 5.00 5.00 1.50
Discussed with: Date: Assessed by: Date: Final Rating by: Date:
I, JORNALYN Q. PALAGANAS, Engineer B of NIA Ilocos Sur IMO, commit to deliver and agree to be rated on the attainment
of the following targets in accordance with the indicated measures for the period January to June 2022.
ENGR. MERFINO S. BIRALDE January 3, 2023 ENGR. AURELIA G. REASONDA January 3, 2023
Senior Engineer A / Chief, Engineering & Operations Section Acting Division Manager / Ilocos Sur IMO
RATING
MFO/PAP SUCCESS INDICATOR ACTUAL ACCOMPLISHMENTS REMARKS
(TARGETS + MEASURES) Q 1
E 2
T3 A4
(1) (2) (3) (4) (5)
STRATEGIC
PRIORITY / THEMES
CY 2020 ASA Monitored, projects
financially closed. CY 2020 ASA Monitored, projects financially closed.
2021 ASA Monitored, projects 2021 ASA Monitored,
CFM1 Monitor ASA Utilization 4.50 4.20 4.50 4.40
financially closed. 2022 projects financially closed. 2022 ASA
ASA Monitored, projects financially Monitored, projects financially closed.
closed.
2 CY 2022 POW reviews, evaluated and
approved by December 2022 for 2 CY 2022 POW (FAW) reviews, evaluated and approved
implementation. by December 2022 for implementation.
CFM 2 Submit Program of Work 4.50 4.20 4.50 4.40
2 CY 2023 POW submitted by 2 CY 2023 POW submitted by December 2022 for
December 2022 for online checking of online checking of Regional Office
Regional Office
___contracts approved and issued with 3 contracts approved and issued with NTP within 40 days
CFM 5 Procurement of Contract Works 4.20 4.20 4.50 4.30
NTP within 40 days after issuance of ASA after issuance of ASA
Monitoring/Review and All required reports submitted on All required reports submitted on schedule; 100% accurate
CFM 7 4.50 4.50 4.50 4.50
Preparation/Consolidation of Reports schedule; 90% accurate and complete and complete
Strengthening of Partnerships and
convergence activities; Internal and ___ coordination/stakeholders meetings
CFM 8
External Coordination (for project attended
implementation)
sub-total strategic + core functions (70%) 4.43 4.28 4.50 4.40 3.08
Submission of Reports (Monthly All required reports submitted on All required reports submitted on schedule; 100% accurate
SFM 1 5.00 5.00 5.00 5.00
Accomplishment Reports) schedule; 90% accurate and complete and complete
sub-total support functions (30%) 5.00 5.00 5.00 5.00 1.50
Discussed with: Date: Assessed by: Date: Final Rating by: Date:
JORNALYN Q. PALAGANAS July 4, 2022 ENGR. MERFINO S. BIRALDE ENGR. AURELIA G. REASONDA July 4, 2022
Engineer B Senior Engineer A / Chief, Engineering & Operations Section Acting Division Manager / Ilocos Sur IMO
I, PEDRO P. FABRIGA JR., Engineering Assitant A of NIA Ilocos Sur IMO, commit to deliver and agree to be rated on the attainment
of the following targets in accordance with the indicated measures for the period JANUARY to JUNE, 2021.
/
Ratee Date
24 has of carry over projects generated by _______ has of CY 2020 GAA target generated by end of
- Carry Over
end of June 2021 June 2021
0.55 kms of concrete lined canal completed ____ kms of concrete lined canal completed by end of
- Carry Over
by end of June 2021 June 2020
____ project monitored/inspected end of ____ projects monitored/inspected end of June 2021 after
Project Monitoring/Inspection
June 2021 after receipt of ASA receipt of ASA
CFM 6
6 project monitored/inspected end of June
- Carry Over ____ projects monitored/inspected end of June 20201
2021 after receipt of ASA
Monitoring/Review and All required reports submitted on All required reports submitted on schedule; ___%
CFM 7
Preparation/Consolidation of Reports schedule; 90% accurate and complete accurate and complete
Submission of Reports (Costruction All required reports submitted on All required reports submitted on schedule; ___%
Reports) schedule; 90% accurate and complete accurate and complete
Discussed with: Date: Assessed by: Date: Final Rating by: Date:
I, HERMIE S. SONIDO, Engineering Assistant A of NIA Ilocos Sur IMO, commit to deliver and agree to be rated on the attainment
of the following targets in accordance with the indicated measures for the period JANUARY to JUNE, 2022.
Discussed with: Date: Assessed by: Date: Final Rating by: Date:
I, LORNA T. MERCADO, Data Encoder of NIA Ilocos Sur IMO, commit to deliver and agree to be rated on the attainment
of the following targets in accordance with the indicated measures for the period JANUARY to JUNE, 2022.
ENGR. MERFINO S. BIRALDE July 4, 2022 ENGR. AURELIA G. REASONDA July 4, 2022
Senior Engineer A / Chief, Engineering & Operations Section Acting Division Manager /Ilocos Sur IMO
RATING
MFO/PAP SUCCESS INDICATOR ACTUAL ACCOMPLISHMENTS REMARKS
(TARGETS + MEASURES) Q 1
E 2
T3 A4
(1) (2) (3) (4) (5)
STRATEGIC
PRIORITY / THEMES
CORE FUNCTIONS (70%)
Monitoring/Review and All required reports submitted on All required reports submitted on schedule; 90% accurate
0.00
Preparation/Consolidation of Reports schedule; 90% accurate and complete and complete
MCs, memos, information materials MCs, memos, information materials disseminated
CFM 7 Information dissemination 0.00
disseminated within 2 days upon receipt within 2 days upon receipt
100% of communications to and from the 100% of communications to and from the office
Receiving, releasing and filing 0.00
office properly recorded and file properly recorded and file
Monitoring/Review and Checking of All required documents submitted on All required documents submitted on schedule; 95%
0.00
DTR's of Engineering Section Personnel schedule; 90% accurate and complete accurate and complete
Submission of Reports (Project All required reports submitted on All required reports submitted on schedule; 90%
0.00
Completion Reports) schedule; 90% accurate and complete accurate and complete
sub-total support functions (30%) 0.00 0.00 0.00 0.00 0.00
Discussed with: Date: Assessed by: Date: Final Rating by: Date:
I, GERAMY M. GADONG, Engineer A of NIA Ilocos Sur IMO, commit to deliver and agree to be rated on the attainment
of the following targets in accordance with the indicated measures for the period JANUARY to JUNE, 2022.
ENGR. MERFINO S. BIRALDE July 4, 2022 ENGR. AURELIA G. REASONDA July 4, 2022
Senior Engineer A / Chief, Engineering & Operations Section Acting Division Manager / Ilocos Sur IMO
RATING
MFO/PAP SUCCESS INDICATOR ACTUAL ACCOMPLISHMENTS REMARKS
(TARGETS + MEASURES) Q 1
E 2
T3 A4
(1) (2) (3) (4) (5)
STRATEGIC
PRIORITY / THEMES
CORE FUNCTIONS (70%)
S3 Improve Planning, Design and Implementation of Irrigation Projects to be Climate Change Adaptive
Areas generated and restored
a. Generated (ha)
12 has of CY 2022 GAA target generated by 12 has of CY 2022 GAA target generated by end of
- Current Year 0.00
end of June 2022 June 2022
20 has of carry over projects generated by 30 has of carry over projects generated by end of
- Carry Over 0.00
end of June 2022 June 2022
SM 4
b. Restored (ha)
___ has of CY 2022 GAA target restored by
- Current Year
end of June 2022
7 CY 2022 POW, 1 POW (TD Maring) 11 CY 2022 POW, 1 POW (TD Maring) reviews,
CFM 4 Submit Program of Work reviews, evaluated and approved by June evaluated and approved by June 2022 for 0.00
2022 for implementation implementation
9 contracts approved and issued with NTP 11 contracts approved and issued with NTP within
CFM 5 Procurement of Contract Works 0.00
within 40 days after issuance of ASA 40 days after issuance of ASA
Submission of Reports (Costruction All required reports submitted on All required reports submitted on schedule; 100%
0.00
Reports, CARP-IC) schedule; 90% accurate and complete accurate and complete
Discussed with: Date: Assessed by: Date: Final Rating by: Date:
I, GEROME D. SORIANO, Data Encoder of NIA Ilocos Sur IMO, commit to deliver and agree to be rated on the attainment
of the following targets in accordance with the indicated measures for the period JANUARY to JUNE, 2022.
ENGR. MERFINO S. BIRALDE July 4, 2022 ENGR. AURELIA G. REASONDA July 4, 2022
Senior Engineer A / Chief, Engineering & Operations Section Acting Division Manager A/Ilocos Sur IMO
RATING
MFO/PAP SUCCESS INDICATOR ACTUAL ACCOMPLISHMENTS REMARKS
(TARGETS + MEASURES) Q1 E2 T3 A4
(1) (2) (3) (4) (5)
STRATEGIC
PRIORITY / THEMES
CORE FUNCTIONS (70%)
Monitoring/Review and All required reports submitted on schedule; 90% All required reports submitted on schedule; 100%
0.00
Preparation/Consolidation of Reports accurate and complete accurate and complete
MCs, memos, information materials MCs, memos, information materials disseminated
CFM 7 Information dissemination 0.00
disseminated within 2 days upon receipt within 2 days upon receipt
100% of communications to and from the office 100% of communications to and from the office
Receiving, releasing and filing 0.00
properly recorded and file properly recorded and file
sub-total core functions (70%) 0.00 0.00 0.00 0.00 0.00
Submission of Reports (Project Completion All required reports submitted on schedule; 90% All required reports submitted on schedule; 90%
0.00
Reports) accurate and complete accurate and complete
All required reports of CY 2021 & CY 2022 All required reports of CY 2021 & CY 2022 Projects
Project Monitoring/Inspection of Projects Projects (Geotag Pictures & Drone Shot) 90% (Geotag Pictures & Drone Shot) 95% accurate and 0.00
accurate and complete complete
Monitoring/Review and Checking of DTR's of All required documents submitted on schedule; All required documents submitted on schedule;
0.00
Engineering Section Personnel 90% accurate and complete 100% accurate and complete
sub-total support functions (30%) 0.00 0.00 0.00 0.00 0.00
Discussed with: Date: Assessed by: Date: Final Rating by: Date:
GEROME D. SORIANO July 4, 2022 ENGR. MERFINO S. BIRALDE July 4, 2022 ENGR. AURELIA G. REASONDA July 4, 2022
Data Encoder Senior Engineer A / Chief, Engineering & Operations Section Acting Division Manager A/Ilocos Sur IMO
(1) (2)
STRATEGIC
PRIORITY / THEMES
E2 - Efficiency
T3 - Timeliness
A4 - Average
National Irrigation Administration
Strategic Performance Management System (SPMS)
Individual Performance Commitment and Review (IPCR)
NEDA, Engineering assistant A of NIA Ilocos Sur IMO, commit to deliver and agree to be rated on the attainment
ollowing targets in accordance with the indicated measures for the period November to December 2022.
CARLO B. CASTANEDA
Ratee
Approved by:
Rating Scale:
Numerical Adjectival
5.00 - Outstanding (O) - target exceeded by 30%
4.00 - 4.99 - Very Satisfactory (VS) - target exceeded by 15% to 29 %
3.00 - 3.99 - Satisfactory (S) - met 100% to 114% target
2.00 - 2.99 - Unsatisfactory (US) - only met 51% to 99 % target
1.00 - 1.99 - Poor (P) - failed to deliver most target by 50% and below
n the attainment
022.
Date:
(1) (2)
STRATEGIC
PRIORITY / THEMES
E2 - Efficiency
T3 - Timeliness
A4 - Average
National Irrigation Administration
Strategic Performance Management System (SPMS)
Individual Performance Commitment and Review (IPCR)
NEDA, Engineering assistant A of NIA Ilocos Sur IMO, commit to deliver and agree to be rated on the attainment
ollowing targets in accordance with the indicated measures for the period November to December 2022.
CARLO B. CASTANEDA
Ratee
Approved by:
Rating Scale:
Numerical Adjectival
5.00 - Outstanding (O) - target exceeded by 30%
4.00 - 4.99 - Very Satisfactory (VS) - target exceeded by 15% to 29 %
3.00 - 3.99 - Satisfactory (S) - met 100% to 114% target
2.00 - 2.99 - Unsatisfactory (US) - only met 51% to 99 % target
1.00 - 1.99 - Poor (P) - failed to deliver most target by 50% and below
n the attainment
022.
Date:
I, CARLO B. CASTANEDA, Engineering Assistant Aof NIA Ilocos Sur IMO, commit to deliver and agree to be rated on the attainment
of the following targets in accordance with the indicated measures for the period JANUARY to JUNE 2023.
ENGR. MERFINO S. BIRALDE January 3, 2023 ENGR. AURELIA G. REASONDA January 3, 2023
Senior Engineer A / Chief, Engineering & Operations Section Acting Division Manager / Ilocos Sur IMO
SUCCESS INDICATOR RATING
MFO/PAP ACTUAL ACCOMPLISHMENTS
(TARGETS + MEASURES) Q1 E2 T3 A4
(1) (2) (3) (4) (5)
STRATEGIC
PRIORITY / THEMES
3 CY 2023 POW reviews, evaluated and
CMF 1 Submit program of works approved by june 2023 for implementaion
(Assist)
Area generated and restored
a. Generated (ha)
_ has of CY 023 GAA target generated by the
-Current year
SM 2 end of 2023 (assist)
b. Restored
_ has of CY 023 GAA target restored by the
-Current year
end od 2023 (assist)
3 Project monitored/ inspected by the end of
CMF 3 Project monitoring/inspection
2023 after receipt of ASA (assist)
Discussed with: Date: Assessed by: Date: Final Rating by: Date:
CARLO B. CASTANEDA January 3, 2023 ENGR. MERFINO S. BIRALDE January 3, 2023 ENGR. AURELIA G. REASONDA January 3, 2023
Engineering Assistant A Senior Engineer A / Chief, Engineering & Operations Section Acting Division Manager / Ilocos Sur IMO
I, KIMBERLY MARIE A. BALUBAR, Engineering Assistant B of NIA Ilocos Sur IMO, commit to deliver and agree to be rated on the attainment
of the following targets in accordance with the indicated measures for the period JANUARY to JUNE 2023.
ENGR. MERFINO S. BIRALDE January 3, 2023 ENGR. AURELIA G. REASONDA January 3, 2023
Senior Engineer A / Chief, Engineering & Operations Section Acting Division Manager / Ilocos Sur IMO
SUCCESS INDICATOR RATING
MFO/PAP ACTUAL ACCOMPLISHMENTS
(TARGETS + MEASURES) Q1 E2 T3 A4
(1) (2) (3) (4) (5)
STRATEGIC
PRIORITY / THEMES
S3 Improve Planning, Design and Implementation of Irrigation Projects to be Climate Change Adaptive
a. Earth Canal (km) __ kms of earth canal completed by end of June 2023 (assisted)
- Carry Over __ kms of earth canal completed by end of June 2023 (assisted)
SM 5 b. Concrete Lined Canal (km) 0.25 kms of concrete lined canal completed by end of June 2023 (assisted)
- Carry Over __ kms of concrete lined canal completed by end of June 2023 (assisted)
c. Concrete Lined Canal (km) __units of structures completed by end of June 2023 (assisted)
- Carry Over __units of structures completed by end of June 2023 (assisted)
Area covered with coconet along irrigation facilities for slope
protection
SM 6 Current __s.q.m. covered with coconet completed by end of June 2023 (assisted)
- Carry Over __s.q.m. covered with coconet completed by end of June 2023 (assisted)
1 CY 2022 POW reviews, evaluated and approved by June 2023 for
CFM 4 Submit Program of Work
implementation (assisted)
___ contracts approved and issued with NTP within 40 days after issuance of
CFM 5 Procurement of Contract Works
ASA (assisted)
Project Monitoring/Inspection __ project monitored/ inspected end of June 2023 after receipt of ASA (assisted)
CFM 6
- Carry Over __ project monitored/ inspected end of June 2023 after receipt of ASA (assisted)
Discussed with: Date: Assessed by: Date: Final Rating by: Date:
KIMBERLY MARIE A. BALUBAR January 3, 2023 ENGR. MERFINO S. BIRALDE January 3, 2023 ENGR. AURELIA G. REASONDA January 3, 2023
Engineering Assistant B Senior Engineer A / Chief, Engineering & Operations Section Acting Division Manager / Ilocos Sur IMO
I, CARLO B. CASTANEDA, Engineering Assistant Aof NIA Ilocos Sur IMO, commit to deliver and agree to be rated on the attainment
of the following targets in accordance with the indicated measures for the period JANUARY to JUNE 2023.
ENGR. MERFINO S. BIRALDE January 3, 2023 ENGR. AURELIA G. REASONDA January 3, 2023
Senior Engineer A / Chief, Engineering & Operations Section Division Manager A / Ilocos Sur IMO
SUCCESS INDICATOR RATING
MFO/PAP ACTUAL ACCOMPLISHMENTS
(TARGETS + MEASURES) Q1 E2 T3 A4
(1) (2) (3) (4) (5)
STRATEGIC
PRIORITY / THEMES
3 CY 2023 POW reviews, evaluated and
6 CY 2023 POW reviews, evaluated and approved by june
CMF 1 Submit program of works approved by june 2023 for implementaion 5.00 4.80 4.80 4.87
2023 for implementaion (Assist)
(Assist)
Area generated and restored
a. Generated (ha)
_ has of CY 023 GAA target generated by the
-Current year
SM 2 end of 2023 (assist)
b. Restored
_ has of CY 023 GAA target restored by the
-Current year
end of 2023 (assist)
3 Project monitored/ inspected by the end of 6 Project monitored/ inspected by the end of 2023 after
CMF 3 Project monitoring/inspection 5.00 4.80 4.80 4.87
2023 after receipt of ASA (assist) receipt of ASA (assist)
Monitoring/ review and oreparation/ All required reports submitted on schedule; All required reports submitted on schedule; 90% accurate and
CFM 4 4.00 4.00 4.00 4.00
consoloidation of reports 90% accurate and complete (assisted) complete (assisted)
Discussed with: Date: Assessed by: Date: Final Rating by: Date:
CARLO B. CASTANEDA July 3, 2023 ENGR. MERFINO S. BIRALDE July 3, 2023 ENGR. AURELIA G. REASONDA July 3, 2023
Engineering Assistant A Senior Engineer A / Chief, Engineering & Operations Section Division Manager A / Ilocos Sur IMO
I, CARLO B. CASTANEDA, Engineering Assistant Aof NIA Ilocos Sur IMO, commit to deliver and agree to be rated on the attainment
of the following targets in accordance with the indicated measures for the period JULY to DECEMBER 2023.
ENGR. MERFINO S. BIRALDE July 3, 2023 ENGR. AURELIA G. REASONDA July 3, 2023
Senior Engineer A / Chief, Engineering & Operations Section Division Manager A / Ilocos Sur IMO
SUCCESS INDICATOR RATING
MFO/PAP ACTUAL ACCOMPLISHMENTS
(TARGETS + MEASURES) Q1 E2 T3 A4
(1) (2) (3) (4) (5)
STRATEGIC
PRIORITY / THEMES
2 CY 2023 POW reviews, evaluated and
CMF 1 Submit program of works approved by june 2023 for implementaion
(Assist)
Area generated and restored
a. Generated (ha)
_ has of CY 023 GAA target generated by the
-Current year
SM 2 end of 2023 (assist)
b. Restored
_ has of CY 023 GAA target restored by the
-Current year
end of 2023 (assist)
2 Project monitored/ inspected by the end of
CMF 3 Project monitoring/inspection
2023 after receipt of ASA (assist)
Discussed with: Date: Assessed by: Date: Final Rating by: Date: