AMETEK Brookfield Viscometer Torque

You might also like

Download as pdf
Download as pdf
You are on page 1of 6
AMETEK Brookfield Viscometer Torque Range Decals Location 2 Crean AMETEK Brookfield eon 1 (top) These optional decals can be attached to your Brookfield Viscometer/Rheometer to indicate the instrument torque range (if desired). The large decal is intended for locations such as #1 or #2, while the small decal is intended for location #3. Compan Chom Geran Cigar LV RV HAH merge ummm aga ‘AMETEK Ph: 508-946-6200 or 800-628-8139 www. brookfieldengineering.com rosso © (800) 528-7411 or (602) 470-1414 OKFIELD @ brookfieldengineeringcom AMETEK DVPLUS Quick Start Guide Instrument Setup @ 8 Assemble the Mode! G Laboratory Stand (refer to assembly instructions in Appendix | of the operations manual). @ Insert the instrument mounting rod into the lab stand clamp and tighten. @ Connect the RTD probe (optional) into the socket of the rear panel of the DVPlus Viscometer. @ Remove the shipping cap. Power Up © = Connect power cable into provided power supply, plug power cable into outlet and barrel connector into the rear of the DVPlus. © Turn on the DVPlus by using the power switch on the rear of the instrument. Product Registration ———_________—__—_@ Use the QR code at initial instrument startup or below to register your product and receive information on how to download the instrument operating instructions, F Ensure faster support by registering your instrument. Ce ‘Scan the QR code or visit: GESEGRUEYI §— www.brookfieldengineering.com/contactus/register-product Digital Leveling © After start-up, User will be prompted to level the DVPlus, follow the on-screen instructions. Note: if the DVPlus is level, there will be no prompt for leveling. AutoZero () ® Once leveling is complete, an AutoZero must bbe performed before making a viscosity measurement, Configure Viscosity Test —____——@© ® In this screen, select spindle and speed, «Immerse the spindle gently at an angle into the test = a sample. C od C+ Inala ® Lower the DVPIus using the lab stand. = © Attach the spindle to the coupling nut. Note: Left-hand thread. f equipped with magnetic coupling, use the appropriate procedure to connect the spindle (see Section 24 of User Manual). ® Align the immersion mark on the spindle to the fluid surface by adjusting the lab stand. © Press the Run button, take appropriate action for Pop-up dialogs. The screen will change to the Running Viscosity Test Screen. Erm CES ® When ready to record the measurement results, press the Stop Test button. The screen will change to the Viscosity Test Results. Record the results as needed, ® To return to the Home Menu, press the Home Icon. ® For more detailed information, please refer to the Operating Instructions: Manual No; M21-400 Sere Laboratory Stand Instructions J Peease tev uh andere move up and dn, Model G & Model G18 Model QB [PartNumber ‘| Description =m a Qty.) VS-CRA-14S | Rod (14") and Clamp Assembly (Model Gt 1 Or L VS-CRA-18S Rod (18") and Clamp Assembly (Model G 18)¢ 1 2_|wsaa-tooy | Rodand Clamp Assembly (Model Qeyt Ere 3 _|6v-1203 _ Leveling Screw, Model G and QB sale 4 |evaz0r Base, Models Gand QB (includes 2 GV-1203 leveling screws) 1 5 |N/A Zz | 14" oF 18" Upright Rod (Model A & 6) | [6 ia _ Upright Rod (Model 08) [7 5053118825018 | Screw, 5/16-18x "hexhead a 8 | 5020280718338 Flat washer 5/16 x7/8x.071" | 9 |N/A Universal Lab Stand Clamp Assembly. 7 [10 [vssry | knob Assembly a boa | Nva [Tension Screw 1 | 12 [NWA Knob Assembly (Model 08) 1 ‘ncuiessreu and nacer (tems 7 and 8) NVA Wot for ine prchase Model G & Model G18 Model G Lab Stand - Comes with 14” rod (VS-CRA-14S). Used with all Viscometers/Rheometers. Model G18 Lab Stand - Comes with 18° rod (VS-CRA-185). ‘Optional choice when additional height is required. UNPACKING Check to see that all the components are received with no concealed damage: 1 GV-1201 Base with two leveling screws 1 VS-CRA-14S (Model G) or \VS-CRA-185 (Model G 18) Rod and clamp assembly with ‘one mounting screw and washer. ASSEMBLY 1, Remove the mounting screw and washer from. the upright rod. Place the rod and clamp assem- bly into the hole in the top of the base. Note: Be sure the clamp assembly has the tension screw (item 11) facing forward. 2. Position the rod and clamp assembly until the slot on the bottom of the rod intersects the pin located in the base, 3. While holding the rod and base together, insert the screw and washer as shown and tighten se- curely. 4, Adjust the tension screw so that the clamp os- sembly is not loose on the upright rod, VISCOMETER MOUNTING AND USE Insert the Viscometer mounting rod into the hole (with the cut-awayslot)in the clamp assembly. Adjustthe viscometer level until the bubble leveliscenteredandtightenthe clamp knob (Clockwise). Use the base leveling screws to “fine” adjust the viscometerlevel. Note: The DVNext Rheometer has a Digital Bubble Level AX cAUTION: Do not tighten the camp knob unless the Viscometer mounting rod sinserted inthe clamp dsserniy. AX caution: Do not use the DV2T of DYNext with ony other laboratory stand shot does nat utilize the CV-1204 base. This large base is necessary for stability of the DV2T Viscometer ond DY Next Rheometer during use. Eorler versions of the Broolfield Laboratory Stand including Madel A and Mode! S should not be used with the DV2T or DVNext Model QB Model QB Lab stand - Comes with 14” rod (VSQA-100Y), Available as an optional choice for all Viscometers) Rheometers when easier up/down movement of instrument head is desired, AX cauTION: the ModelQ8uprightrodisa spring-loaded, non-serviceable device. Do not disassemble the clamp and upright rod assembly. UNPACKING Check to see that all the components are received with no concealed damage: 1. GV-1201 Base with two leveling screws 1 VSQA-100Y Clamp and upright rod assembly with one mounting screw and washer ASSEMBLY 1. Remove the mounting screw and washer from the upright rod. Place the red and clamp assern- bly into the hole in the top of the base with the releose lever facing forward. 2. Position the rod and clamp assembly until the slot on the bottom of the rod intersects the pin located in the base. 3. While holding the rod and base together, insert tthe screw and washer as shown and tighten se- curely, VISCOMETER MOUNTING AND USE Insert the viscometer mounting rod into the cutaway slot of the clamp assembly. Adjust the instrument until the viscometer,rheometer bubblelevelis centered and tighten the clamp knob. Use the base leveling screws to “fine” ‘adjust the instrument level. Note: The DVNext Rheometer thas a Digital Bubble Level. AX cauTion: Do not tighten the clamp knob unless the viscometer mounting rods insertedin the clamp assembly. Push the release lever on the clamp assembly. Move viscometer/theometer head to desired height ond release. lever. Elevate your sample container, if necessary, to ensure that. the proper spindle immersion is achieved AX caumion: do not use the DV2T or DVNext with any other laboratory stand thot does not ulize the GV-126 Base. This large bases necessory for stability ofthe DVIT Viscometer and DVNext Rheometer during use. Earlier versions of the Brookfiels Laboratory. Stand sncluding Model A and Model S should not be used with the DV2T or DVNext CERTIFICATE NUMBER 325604 50 9001:2015 CERTIFIED INSTRUMENTATION & SPECIALTY CONTROLS DIVISION 41.Commerce Bl. | Mideleboro MA 02348, 508.646.6200 | F:$08.946.6262 CERTIFICATE OF VISCOMETER CALIBRATION MODEL, SERIAL NUMBER CALIBRATION DATE CALIBRATION DUE DATE DVPL 6054588, 2116/2023 211512024 JGALBRATION OF THIS INSTRUMENT WILL BE ACCURATE TO WITHIN 1% OF ITS FULL SCALE RANGE WHEN OPERATED ACCORDING TO |GALIBRATION CONDITIONS AS SPECIFIED IN THE BROOKFIELD VISCOMETER INSTRUCTION MANUAL THIS NSTROMENT Fixe ces REFERENCE EQUIPMENT USED TO CALIBRATE THE EQUIPMENT TPEMODEL LOT NUMBE: ‘SALIBRATION DATE ‘CALIBRATION DUE DATE Lv Master ‘86050277 syoa2023 rsw20za TPEMODEL, ‘SERIALILOT NUMBER (CALIBRATION DATE ‘SALIGRATION DUE DATE zo4¢2sc) 20625 sreeraoze 1312026 ‘TYPEMODEL ‘SERIALILOT NUMBER ‘GALIBRATION DATE (CALIBRATION DUE DATE 1804 e864 202021 sreoraza ‘TyPEIMODEL ‘SERIALILOT NUMBER CALIBRATION DATE ‘GALIGRATION DUE DATE seat 31s ern2021 erz023 NIST TRACE # LvSe60sc277_012023p0t PROCEDURE #: RHE_PROC_O01 ‘Allretecence equipment use fo calbrate the instrument sted upon tis certificate have caltralins tha are tabeabl othe Natal nate of Standards fend Technolgy (NIST) APPROVAL SIGNATURE TODD PLACE, QUALITY ENGINEER CALIBRATION PERFORMED BY TL

You might also like