Penggantian Talang Air Atap

By General Affair

08 March 2023
Penggantian Talang Air

Lokasi Talang

Job Activity Rail Repair Work


1 Old Gutter Demolition Work

2 Install Gutters Zincalum 0.5 mm

CONFIDENTIAL PT. SUMMIT ADYAWINSA INDONESIA


Bill Of Quantity

BILL OF QUANTITY
JOB : PERBAIKAN TALANG AIR
PT SUMMIT ADYAWINSA INDONESIA

No Information Unit Volume Unit Price Total Price Information


I Pembongkaran Dan Pemasangan Talang Depan Office 2
1 Pekerjaan Pembongkaran Talang Lama M' 15.00 30,000.00 450,000.00
2 Install Talang Zincalum tebal 0,5 mm M' 15.00 250,000.00 3,750,000.00
Sub. Total I 4,200,000.00

Total 4,200,000.00
Keuntungan 10% 420,000.00
Grand Total 4,620,000.00

CONFIDENTIAL PT. SUMMIT ADYAWINSA INDONESIA


Schedule

SCHEDULE
JOB : PERBAIKAN TALANG AIR
PT SUMMIT ADYAWINSA INDONESIA
Maret
No Information
8 9 10 11 12 13 14 15 16 17 18 19 20 21 22
PR
PO
I Pembongkaran Dan Pemasangan Talang Depan Office 2
1 Pekerjaan Pembongkaran Talang Lama
2 Install Talang Zincalum tebal 0,5 mm

CONFIDENTIAL PT. SUMMIT ADYAWINSA INDONESIA


PR

CONFIDENTIAL PT. SUMMIT ADYAWINSA INDONESIA