A MOBILIZATION 1
B 5
CLEARING & EXCAVATING
C EXCAVATION 10
D EMBANKMENT FROM 5
STRUCTURE EXCAVATION
E GRAVEL FILL 5
F STRUCTURAL 30
CONCRETE(FOOTING AND SLAB
ON FILL, CLASS A, 28 DAYS)
G STRUCTURE CONCRETE 40
(COLUMN, CLASS A, 28 DAYS)
H STRUCTURE CONCRETE 20
(SUSPENDED SLAB, CLASS A, 28
DAYS)
I STRUCTURAL CONCRETE(BEAMS, 35
CLASS A, 28 DAYS)
J REINFORCING STEEL 50
K FORMWORKS 65
L 100mm CHB NON-LOAD 15
BEARING(INCLUDING
REINFORCING STEEL)
M 150mm CHB NON-LOAD 30
BEARING(INCLUDING
REINFORCING STEEL)
N WOODEN DOORS AND 3
WINDOWS
O GLASS WINDOW 3
P CEMENT PLASTER FINISH 20
Q 4.5MM FIBER CEMENT BOARD 5
ON METAL FRAME CEILING
R GLAZED TILES AND TRIMS 20
S PAINTING WORKS (WOOD) 3
T PAINTING (STEEL) 20
U FABRICATED METAL ROOFING 10
ACCESSORY (FLASHING)
V STRUCTURAL STEEL 40
W SEWER LINE WORKS 7
X WATERLINE WORKS 7
Y PLUMBING FIXTURES 7
Z SEPTIC TANK 25
Aa CONDUITS, BOXES, AND FITTINGS 5
(CONDUIT WORKS/CONDUIT
ROUGH-IN)
Ab WIRES AND WIRING DEVICES 5
Ac BREAKERS 5
Ad LIGHTING FIXTURES 5
Ae AIRCONDITIONING AND 2
REFRIGERATION SYSTEM
Af PROPER TURNOVER 1