(SOP-TFCWDP-0034)
PK237SOP24183K06145PC
Rev. 0
MarchDecemberJUNE 20198
PAEC PROPERTY
OPERATING PROCEDURE
Prepared by
Rashid PervaizWaqas
AhmedTypeyourname,
SJE
M. Omer Iqbal,
M (QAD)
Approved by
Page 2 of 278
KARACHI NUCLEAR POWER PLANT UNIT-2 (K-2)
OPERATING PROCEDURE
PK237SOP24183K06145PC
Rev. 0
Page 3 of 278
Karachi Nuclear Power Waste Water Neutralizationing, S2TFCWDP004
Plant Unit-2 Recycling and DischargeingLoading
and Unloading Of Bulk Chemicals
PK237SOP24183K06145PC Agent Rev. 0
CONTENT
1. DESCRIPTION..............................................................................................................6
1.1 REFERENCE DOCUMENTS....................................................................................6
1.2 SCOPE..........................................................................................................................7
1.3 AUTHORIZATION.....................................................................................................7
1.4 DEFINITIONS AND ABBREVIATIONS.................................................................8
2. SPECIFICATIONS AND PRECAUTIONS..............................................................9
3. PRELMINARY CONDITIONS...............................................................................10
3.1 Particular Requirement.............................................................................................10
3.2 Electrical Requirements............................................................................................10
3.3 Mechanical Requirements.........................................................................................10
4. STARTUP PREPARATION.....................................................................................12
4.1 Initial Condition.........................................................................................................12
4.2 Instrument Control Power........................................................................................13
4.3 System Alignment......................................................................................................13
4.4 Power Supply..............................................................................................................22
5. START UP..................................................................................................................23
5.1 Neutralization discharge operation of #1 waste water pond..................................23
5.2 Neutralization discharge operation of #2 waste water pond..................................24
6. SHUT DOWN.............................................................................................................27
6.1 Shutdown operation of #1 waste water pond neutralization.................................27
6.2 Shutdown operation of #2 waste water pond neutralization.................................27
7. IN-SERVICE INSPECTION....................................................................................29
7.1 Waste water neutralization discharge units............................................................29
8. PARTICULAR OPERATION INSTRUCTION....................................................30
9. INCIDENTS...............................................................................................................31
9.1 The outlet water conductivity is abnormal after the recycling water mix bed
operating.....................................................................................................................31
9.2 Wastewater pump outlet PH values are abnormal.................................................32
Page 4 of 278
Karachi Nuclear Power Waste Water Neutralizationing, S2TFCWDP004
Plant Unit-2 Recycling and DischargeingLoading
and Unloading Of Bulk Chemicals
PK237SOP24183K06145PC Agent Rev. 0
Page 5 of 278
Karachi Nuclear Power Waste Water Neutralizationing, S2TFCWDP004
Plant Unit-2 Recycling and DischargeingLoading
and Unloading Of Bulk Chemicals
PK237SOP24183K06145PC Agent Rev. 0
9. INCIDENTS...............................................................................................................37
9.1 Industrial hydrochloric acid spill emergency response..........................................38
9.2 Industrial liquid alkali spill emergency response...................................................41
9.3 Accident treatment of ammonia leakage.................................................................43
10. LOCAL OPERATOR SHEET.................................................................................49
11. ANNEXURE...............................................................................................................50
ANNEXURE I 50
ANNEXURE II 62
Page 6 of 278
Karachi Nuclear Power Waste Water Neutralizationing, S2TFCWDP004
Plant Unit-2 Recycling and DischargeingLoading
and Unloading Of Bulk Chemicals
PK237SOP24183K06145PC Agent Rev. 0
1. DESCRIPTION
SYSTEM MANUALS
Page 7 of 278
Karachi Nuclear Power Waste Water Neutralizationing, S2TFCWDP004
Plant Unit-2 Recycling and DischargeingLoading
and Unloading Of Bulk Chemicals
PK237SOP24183K06145PC Agent Rev. 0
Running procedure
Other
Page 8 of 278
Karachi Nuclear Power Waste Water Neutralizationing, S2TFCWDP004
Plant Unit-2 Recycling and DischargeingLoading
and Unloading Of Bulk Chemicals
PK237SOP24183K06145PC Agent Rev. 0
1.2 SCOPE
1.3 AUTHORIZATION
ABBREVIATIONS:
Page 9 of 278
Karachi Nuclear Power Waste Water Neutralizationing, S2TFCWDP004
Plant Unit-2 Recycling and DischargeingLoading
and Unloading Of Bulk Chemicals
PK237SOP24183K06145PC Agent Rev. 0
Page 10 of 278
Karachi Nuclear Power Waste Water Neutralizationing, S2TFCWDP004
Plant Unit-2 Recycling and DischargeingLoading
and Unloading Of Bulk Chemicals
PK237SOP24183K06145PC Agent Rev. 0
DEFINITIONS
NONE.
Page 11 of 278
Karachi Nuclear Power Waste Water Neutralizationing, S2TFCWDP004
Plant Unit-2 Recycling and DischargeingLoading
and Unloading Of Bulk Chemicals
PK237SOP24183K06145PC Agent Rev. 0
There is gel-type strong acid cation exchange resin and gel-type strong alkaline anion
exchange resin in the high-speed mix bed with the total height of 1100mm, and the
cation-anion resin ratio of 1: 2. Mix beds operations are controlled by differential
pressure, outlet water conductivity, sodium, silica, etc. When one high-speed mix
bed runs to any of the following indications: a) outlet water conductivity (25 ℃) ≥
0.30μs / cm; b) mix bed differential pressure > 0.3MPa; c) outlet resin trapper
differential pressure ≥ 0.lMPa; d) outlet water sodium ion> 0.06 μg / L; e) outlet
water silica> l0μg / L, the system will automatically put the spare bed into service
and split the faulted bed.
Condensate Polishing System (TFC) is provided with two complete sets of outside
regeneration devices. One is used for the scrubbing and regeneration of cation
resin for cation bed, the other is used for the scrubbing, stratification, separation
and regeneration of cation and anion resin of high-speed mix beds. The outside
regeneration devices for cation beds are two regeneration towers being spare for
each other which can be used as resin storage towers. The outside regeneration
device of high-speed mix beds contains one resin separation tower, one cation
resin regeneration tower, one anion resin regeneration tower, and one resin mixing
and pluralized storage tower.
Regeneration of ineffective high-speed mix bed resin 1 send the ineffective resin to the
separation tower, and perform the air scrubbing with the remained mixed resin in
the tower which can be performed for several times, in order to remove the
Page 12 of 278
Karachi Nuclear Power Waste Water Neutralizationing, S2TFCWDP004
Plant Unit-2 Recycling and DischargeingLoading
and Unloading Of Bulk Chemicals
PK237SOP24183K06145PC Agent Rev. 0
impurities and the broken resin adsorbed on the resin surface. Then backwash the
resin step by step to make the mixed resin stratify under sufficient backwashing,
and there will form obvious cation, anion two parts of resin layers 2 send the
regenerated resin in the mix and pluralized storage tower to the emptied operating
mix bed 3 send respectively the cation and anion resin in separation towers to their
own regeneration towers for scrubbing in order to backwash the tiny, broken resin
out, and then perform the acid, alkali replacement regeneration to make the
ineffective cation, anion resin be transited into OH- type and H +-type respectively,
and then perform the washing standard reaching 4 Send the already regenerated
cation and anion resin to the resin mix and pluralized storage tower for thoroughly
mixing and washing until the effluent is qualified. The resin will be stored in the resin
mix and pluralized storage tower for spare.
The FTC system sets up dedicated acid-alkali system for regeneration of the fore cation
beds and high-speed Mix bed ion exchange resin, including transportation, storage
metering, etc. The acid and alkali used for resin regeneration and wastewater
neutralization are concentrated sulfuric acid (H2SO4 concentration is 98%) and
high purity alkali (NaOH concentration is 32%).
Acid and alkali are transported to the field by dedicated tanks, and then discharged into
the corresponding high-level acid, alkali storage tanks by acid, alkali unloading
pumps. The high-level acid, alkali storage tanks send acid, alkali to corresponding
metering tanks by gravity self-flow. The tops of high-level acid, alkali storage tanks
metering tanks are connected to moisture absorber by pipelines, and are stuffed
with granular silica gel to absorb the water in the intake gas. Similarly, the tops of
high-level acid, alkali storage tanks metering tanks are connected to CO2 absorber
by pipelines, and are stuffed with granular alkaline lime to absorb the CO2 in the
intake gas.
The acid for regeneration from the fore cation bed goes through the acid ejector and
diluted with demineralized water, then be transferred to # 1, # 2 fore cation bed
resin regeneration towers. Cation resin is regenerate by diluted H2SO4 solution
with concentration of 3.5% ~ 5.5%.
Condensate Polishing System (FTC) is provided with one complete set of neutralization
facilities for acids-alkali regeneration wastewater. The wastewater is sent to SEK CI
waste collection system after it is neutralized to pH 6-9.
Condensate Polishing System (FTC) is also provided with one complete set of
wastewater recycling facilities used for processing the micro-polluted washing
drainage of resin regeneration anaphase. After the washing water is treated and its
quality meets recycling standards, it will be transferred to the recycling tank.
Page 13 of 278
Karachi Nuclear Power Waste Water Neutralizationing, S2TFCWDP004
Plant Unit-2 Recycling and DischargeingLoading
and Unloading Of Bulk Chemicals
PK237SOP24183K06145PC Agent Rev. 0
Otherwise, it will be discharged and treated by recycling water mix bed and sent
back, when it meets the standard, to resin regeneration cleaning process for reuse.
The input and output programs, and the resin regeneration program of FTC system for
cation beds are started and stopped by manual buttons, and must be executed with
manual intervention which is slightly different from fore cation bed fully automatic
start-stop program.
Shall start the wastewater neutralization operation before the regeneration of FTC system
high-speed mix bed, refer to S2 FTC 004 waste water recycling and neutralization
discharging operating procedure.
During the FTC operations, there is danger of the secondary circuit losing water, the
water being polluted to impact the unit safety operation, so must be particularly
rigorous to prevent mis operation during the operation process.
Before the acid-alkali related operations, the operators shall have worn fully protective
equipment (helmets, masks or glasses, anti-acid-alkali clothes and shoes).
The TFC wastewater neutralization and recycling programs are automatic, the
regeneration program of recycling water mix bed ineffective resin is started up by
manual buttons, of which the backwashing straitening operation is operated by local
manual manipulationFlocculants is composed of PAC. Solid PAC (including about
30% of AL2O3 ), powdery state , in bag (25Kg / bag), easy to hygroscopic moisture.
Liquid PAC (including about 10% of AL2O3 ), liquid PAC with a weak acid, a certain
corrosive characteristics, when operate shall wear acid-proof fatigue uniform,
protective masks, masks, acid-proof gloves, work shoes specifically, maintain good
ventilation in the workplace, the staff need to work in the windward to the best of his
abilities. If PAC entered into eyes accidentally. must flush with water immediately, if
Page 14 of 278
Karachi Nuclear Power Waste Water Neutralizationing, S2TFCWDP004
Plant Unit-2 Recycling and DischargeingLoading
and Unloading Of Bulk Chemicals
PK237SOP24183K06145PC Agent Rev. 0
it is serious should take hospital treatment; if skin contacted, then must flush with
plenty of water immediately, if it is serious should take hospital treatment; if
swallowed incautiously, then wash mouth immediately , rushed to the hospital for
treatment.
In order to protect the safety of the environment and wastewater discharging facilities, the
acid and alkaliCaustic wastewater can be sent to WLC CI waste collection system
only after it is neutralized to pH of 6-9.Anti-scalant agent is composed of GTCTM-
P300, liquid in barrels, 5 gallons / barrel, slightly acidic state, there is a certain
corrosive characteristics, when operate shall wear acid-proof fatigue uniform,
protective masks, masks, acid-proof gloves, work shoes specifically, maintain good
ventilation in the workplace, the staff need to work in the windward to the best of his
abilities. If anti-scalant agent entered into eyes accidentally. must flush with water
immediately, if it is serious should take hospital treatment; if skin contacted, then
must flush with plenty of water immediately, if it is serious should take hospital
treatment; if swallowed incautiously, then wash mouth immediately , rushed to the
hospital for treatment.
The reducer agent is composed of sodium bisulfite, solid in barrels or bag, 25kg / barrel
(bag), easy to hygroscopic moisture, with a weak acid, a certain corrosive
characteristics; it produce SO2 gas in the air which has a special smell and can
stimulate and corrode respiratory tract; it has a strong reduction, it is strictly
prohibited mix with oxidizing materials, its storage sites require dark and ventilation.
when operate shall wear acid-proof fatigue uniform, protective masks, masks, acid-
proof gloves, work shoes specifically, maintain good ventilation in the workplace,
the staff need to work in the windward to the best of his abilities. If reducer agent
entered into eyes accidentally. must flush with water immediately, if it is serious
should take hospital treatment; if skin contacted, then must flush with plenty of
water immediately, if it is serious should take hospital treatment; if swallowed
incautiously, then wash mouth immediately , rushed to the hospital for treatment.
CBefore operations related to acid and alkaliCaustic, the operator must wear acid-
alkaliCaustic safety protection equipment’s (wear helmet, face shield or glasses,
anti acid-alkaliCaustic clothes and shoes).
Page 16 of 278
Karachi Nuclear Power Waste Water Neutralizationing, S2TFCWDP004
Plant Unit-2 Recycling and DischargeingLoading
and Unloading Of Bulk Chemicals
PK237SOP24183K06145PC Agent Rev. 0
the best of his abilities. If accidentally skin or eyes contaminated with it, must flush
with plenty of water 15 minutes or more, and rushed to the hospital for treatment
immediately; if inhaled ammonia accidentally, be out of the contaminated area
quickly, if breathing is weak or stops, carry out artificial respiration immediately.
The regenerating agent which is used for cation resion regenerate of Fangjiashan
condensate Polishing is sulfuric acid, and the WDPSDA system used a hydrochloric
acid, so each time you unload, you must confirm the type of acid and acid delivery
locations to send personnel to avoid sending or mixing acid event mistaken. And
should identify eye-catching "hydrochloric acid" two words particularly in the mouth
of acid unloading, not only identified as "acid" or " alkali."
Acid unloading mouth, alkali unloading mouth, acid and alkali storage room, ammonia
bottle storage room must have a dedicated safety showers and eyewash near,
when accident , it facilitatefacilitates personnel emergency . In addition, it should
configure large flow flushing pipes and rinse nozzle, it is easy to clean、diluted and
fire extinguishing when acid, alkali leak..
According to regulations of the State Council, "The Regulations of Precursor Chemicals "
(State Council Decree No. 445) and the other laws, sulfuric acid, hydrochloric acid,
belongs to the third category of precursor chemicals, buy sulfuric acid, hydrochloric
acid should record the management by the public department , sales sulfuric acid、
hydrochloric acid should be recorded by safety supervision departments of the
district administration, the illegal trade of sulfuric acid, hydrochloric acid should be
investigated by the public, industry and commerce department ,safety supervision
departments ,in accordance with their respective responsibilities. So when
requisitioned hydrochloric acid, 10 to 15 days in advance, should call the
Commerce Department to prepare for the acid into, Commerce arrange for
personnel escorted the acid to the designated location. Operating personnel should
deal with the safekeeping of hydrochloric after it is put in storage, each outfall
should be strictly locked, set up special management.
In YADP building, it must have adequate amounts of the chemical cleaning agents within
period of validity after acid burns (0.5% sodium bicarbonate solution), must have a
sufficient amount of the chemical cleaning agents within period of validity after alkali
burns (1% acetic acid solution and 2% boric acid solution), facilitate emergency
personnel for acid- alkali leakage.
Ammonia cylinders stored in the warehouse of chemicals, required recipients to drive the
forklift when the shipment. In forklift transportation process, liquid ammonia cylinder
must be effective fixed not brakes in the way, ammonia cylinders easily slipped from
the forklift, if light, it damage to storage tanks, if severe ,it cause injury or ammonia
Page 17 of 278
Karachi Nuclear Power Waste Water Neutralizationing, S2TFCWDP004
Plant Unit-2 Recycling and DischargeingLoading
and Unloading Of Bulk Chemicals
PK237SOP24183K06145PC Agent Rev. 0
Chemical storage room in YADP building should be equipped with forced ventilation
device, explosion-proof lights, and ensured to be available readily. Before personnel
enter to the storage room, forced ventilation should be operated, after forced
ventilation operated 1 to 2 minutes, then lit , after that staff can enter.
Chemicals in YADP building should be storage in strictly classified, the same class of
drugs should be stored in batches time of purchase, first come, first use; it must
have eye-catching logos and safe tips in medicines partition storage area to avoid
drug misuse, mix.
During chemical loading and unloading, the staff must wear protective equipment PH :
acid clothes, work shoes, gloves, masks and dip plastic gloves.。
Page 18 of 278
Karachi Nuclear Power Waste Water Neutralizationing, S2TFCWDP004
Plant Unit-2 Recycling and DischargeingLoading
and Unloading Of Bulk Chemicals
PK237SOP24183K06145PC Agent Rev. 0
PRELMINARY CONDITIONS
Operation
Operation Steps Check Identification Remarks
Location
Particular Requirement
Page 19 of 278
Karachi Nuclear Power Waste Water Neutralizationing, S2TFCWDP004
Plant Unit-2 Recycling and DischargeingLoading
and Unloading Of Bulk Chemicals
PK237SOP24183K06145PC Agent Rev. 0
Operation
Operation Steps Check Identification Remarks
Location
In the area that personnels may be [ ][ ]
acid and alkiline burned, set
eyewashers and safety
showers which should be
available.Personnel may be
acid, alkaliCaustic burn area,
set eyewash, safety showers
and checked regularly to
ensure it becomes available.
(YADP building)
Page 20 of 278
Karachi Nuclear Power Waste Water Neutralizationing, S2TFCWDP004
Plant Unit-2 Recycling and DischargeingLoading
and Unloading Of Bulk Chemicals
PK237SOP24183K06145PC Agent Rev. 0
Operation
Operation Steps Check Identification Remarks
Location
380V AC Power System [ ]
110V DC Power
9ETP0LTR DPYA
SystemGrounding and
Lightning Protection system
Available48V DC Power []
System
220V AC Power System [ ]
Grounding and lighting 9ETP
protection system
AvailableTFC Control System [ ][ ] TFC
110V DC Power System
Mechanical
Rrequirementsequirements
AvailableThe following []
systems are available and in
service:
48V DC Power System [ ]
WPW0SEP
Potable Water Systems
AvailableDemineralized water [ ][ ] WND9WDP
from WND production system 0SDA
Conventional island liquid [
WLCSS0SE
waste systemStation Sewer ]
O
System
The following systems should also be [ ]
FMC0JPS
available:Mobile Fire Fighting System
Page 21 of 278
Karachi Nuclear Power Waste Water Neutralizationing, S2TFCWDP004
Plant Unit-2 Recycling and DischargeingLoading
and Unloading Of Bulk Chemicals
PK237SOP24183K06145PC Agent Rev. 0
Operation
Operation Steps Check Identification Remarks
Location
KIC System [ ][ ]
AvailableService compressed air KICWAS
distribution System
TFCATE Control System []
Available ATETFC 1MP
Page 22 of 278
Karachi Nuclear Power Waste Water Neutralizationing, S2TFCWDP004
Plant Unit-2 Recycling and DischargeingLoading
and Unloading Of Bulk Chemicals
PK237SOP24183K06145PC Agent Rev. 0
3. STARTUP PREPARATION
Operator
Operation Steps Check Identification Remarks
location
INITIAL CCONDITION
When two
3.1 Initial conditionAt least one concentrated
waste water neutralization pond acid storage
is availableconcentrated acid tanks are
storage tank. available, after
the level
3.2 is available . dropped below
1.4 m then can
require to
High-speed mix bed is available #1 purchase
1# waste water pond Concentrated hydrochloric
acid storage tank acid (10
tons);
1ATE201DE2
1MX101Y
availableAvailable [ ][ ] TFC471PS9W * Only one
BDT
DP501BA concentrated
available #2 2# waste water pond is acid storage
availableConcentrated acid storage [] 1ATE202DE 1MX101 tank is
tanks available, after
the level
dropped below
0.7m then can
1ATE203DE2
1MX101Y require to
availableAvailable [ ][ ] TFC472PS9W
BDT purchase
DP502BA
hydrochloric
acid (10
tons);
available [] 1ATE204DE 1MX101
availableAcid and Caustic [ ][ ] 1ATE205DE 1MX101 When two
regeneration unit is concentrated
available.At least one alkali storage
concentrated alkali storage tank are
tank is available available, after
Page 23 of 278
Karachi Nuclear Power Waste Water Neutralizationing, S2TFCWDP004
Plant Unit-2 Recycling and DischargeingLoading
and Unloading Of Bulk Chemicals
PK237SOP24183K06145PC Agent Rev. 0
Operator
Operation Steps Check Identification Remarks
location
1ATE201PO2
AvailableAvailable [ ][ ] 1MX101
TFC412CW
Dehydrating Breather2#
the level
Concentrated alkali storage tank
dropped below
Condensate Polishing control system 2TFC411AD9 1.4 m then can
[ ] YBDT require to
available:Available WDP602BA
purchase liquid
1ATE001AR2 alkali (10
AvailableAvailable [ ][ ] 1MP302
TFC412AD tons);
Available Only one
Available 1#CO2 Absorber concentrated
[] 1ATE002AR 1MP302
Anyone mix bed acid alkali storage
metering pump is available tank is
1ATE003AR2 available, after
1MP302Y the level
AvailableAvailable [ ][ ] TFC415PO9
BDT dropped below
WDP601DS
1ATE004AR2 0.7m then can
AvailableAvailable [ ][ ] 1MP302 require to
TFC416PO
purchase liquid
AvailableAnyone 2#CO2
alkali (10
Absorber of caustic storage [] 1ATE005AR 1MP302
tons);
tank is available.
1ATE001HC2
1MP302Y
AvailableAvailable [ ][ ] TFC421CW9
BDT
WDP6021DS
1ATE002HC2
AvailableAvailable [ ][ ] 1MP302
TFC422CW
1ATE471PS2
AvailableAvailable [ ][ ] 1MX101
TFC422AD
Page 24 of 278
Karachi Nuclear Power Waste Water Neutralizationing, S2TFCWDP004
Plant Unit-2 Recycling and DischargeingLoading
and Unloading Of Bulk Chemicals
PK237SOP24183K06145PC Agent Rev. 0
Operator
Operation Steps Check Identification Remarks
location
AvailableAnyone mix bed caustic
[] 1ATE472PS 1MX101
metering pump is available
Available [ ] 2TFC423PO
AvailableWater Heater
[] 1ATE301CW 1MX101
Tank
1ATE302CW2
AvailableAvailable [ ][ ] 1MX101
TFC431CW
AvailableSafety Shower [] 1ATE303CW 1MX101
1ATE304CW2
AvailableAvailable [ ][ ] 1MX101
TFC600DO
AvailableTFC
Demineralized water tank,
flush pump and 1ATE306CW 1MX101
regeneration pump is
available.
TFC Demineralized water storage
tank
1ATE412CW2 1MP303
AvailableAvailable [ ][ ]
TFC442PO
Page 25 of 278
Karachi Nuclear Power Waste Water Neutralizationing, S2TFCWDP004
Plant Unit-2 Recycling and DischargeingLoading
and Unloading Of Bulk Chemicals
PK237SOP24183K06145PC Agent Rev. 0
Operator
Operation Steps Check Identification Remarks
location
1MP303
[] 1ATE411EJ
Available #1 Regeneration pump
1ATE411AD2 1MP303
AvailableAvailable [ ][ ]
TFC443PO
Available #2 Regeneration 1ATE412AD2 1MP303
[]
pump TFC444PO
AvailableAvailable [ ][ ] 1ATE421PO 1MP303
AVAILABLEINSTRUMENT 1MP303
[] 1ATE422PO
CCONTROL PPOWER
1MP303
High alkali storage tank
[ ][ ] 1ATE421CW
Available level is higher than
0.5 mNone.
AVAILABLESYSTEM 1MP303
[] 1ATE423CW
AALIGNMENT
AvailableConcentrated acid 1MP303
[] 1ATE421EJ
system alignment
CO2 absorber Available 1MP303
[] 1ATE421AD
Close the following valve
1ATE423AD9 1MP303Y
CO2 absorber AvailableClose [ ][ ]
WDP510VK BDT
Safety shower Available Open
[] 1ATE441AD 11MP303
the following valve
Open [ ] 9WDP511VR YBDT
Condensate polishing demineralized
water tank, regeneration pumps, flush
[]
water pumps are available Close the
following valve
Polishing demineralized water
1ATE441BA9 1PBYBD
tank [ ][ ]
WDP512VTE T
AvailableClose
#1 flushing water pump
[] 1ATE441PO 1MX101
Available Open the following valve
Page 26 of 278
Karachi Nuclear Power Waste Water Neutralizationing, S2TFCWDP004
Plant Unit-2 Recycling and DischargeingLoading
and Unloading Of Bulk Chemicals
PK237SOP24183K06145PC Agent Rev. 0
Operator
Operation Steps Check Identification Remarks
location
#2 flushing water pump 1ATE442PO9 1MX101Y
[ ][ ]
AvailableOpen WDP513VR BDT
#1 regeneration pump 1ATE443PO9 1MX101Y
[ ][ ]
AvailableOpen WDP514VR BDT
#2 regeneration pump 1ATE444PO9 1MX101Y
[ ][ ]
AvailableOpen WDP515VR BDT
Open [ ] 9WDP516VR YBDT
Recycling water units are available
[]
Close the following valve
Recycling tank 1ATE481BA9 1MX101Y
[ ][ ]
AvailableClose WDP520VK BDT
Recycling pump
[] 1ATE481PO 1MX101
Available Open the following valve
Recycling water mix bed 1ATE481DN9 1MX101Y
[ ][ ]
AvailableOpen WDP521VR BDT
Close the following valve
Compressed air units are 9WDP522VT
[ ][ ] YBDT
availableClose E
Instrument compressed air
storage tank [ ] 1ATE502CW 1MX301
AvailableOpen the following valve
Technology compressed air storage 1ATE501CW 1MX301Y
[ ][ ]
tank AvailableOpen 59WDP23VR BDT
Open [ ] 9WDP524VR YBDT
At least two Roots fans are
[ ][ ] 9WDP525VR YBDT
vailableOpen
#1 roots blower available 1ATE461ZV9 1MX101Y
[ ][ ]
AvailableOpen WDP526VR BDT
#2 roots blower available
[] 1ATE462ZV 1MX101
AvailableClose the following valve
#3 roots blower available 1ATE463ZV9 1MX101Y
[ ][ ]
AvailableClose WDP5010VR BDT
9WDP50417
Close [ ] YBDT
VR
Page 27 of 278
Karachi Nuclear Power Waste Water Neutralizationing, S2TFCWDP004
Plant Unit-2 Recycling and DischargeingLoading
and Unloading Of Bulk Chemicals
PK237SOP24183K06145PC Agent Rev. 0
Operator
Operation Steps Check Identification Remarks
location
High-speed mix beds associated
solenoid valve boxes and sampling
detection units are [] 1MX101
availableUnloading acid pump outlet
check valve
High-speed mix bed #1 solenoid 9WDP50318
[ ] YBDT
valve boxAvailable VR
AvailableOpen the following valve [] 1ATE201AR 1MX101
High-speed mix bed #2 solenoid 9WDP687VT
[ ] YBDT
valve boxOpen 507VE
1ATE202AR9
1MX101Y
AvailableOpen [ ][ ] WDP50219V
BDT
R
High-speed mix bed #3 solenoid
valve box1# Concentrated acid
storage tank level meter
1ATE203AR9 1MX101Y
AvailableAvailable [ ][ ]
WDP501MN BDT
Net condensate pump and # 1 mix
bed instrument frame2#
Concentrated acid storage tank level
meter
1ATE202CR9 1MX101Y
AvailableAvailable [ ][ ]
WDP502MN BDT
Relevant Alignment of check
of compressed air
valvesConcentrated alkali
system alignment
Available [] 1ATE421AD 1MP303
Available [] 1ATE423AD 1MP303
Available [] 1ATE441AD 11MP303
Page 28 of 278
Karachi Nuclear Power Waste Water Neutralizationing, S2TFCWDP004
Plant Unit-2 Recycling and DischargeingLoading
and Unloading Of Bulk Chemicals
PK237SOP24183K06145PC Agent Rev. 0
Operator
Operation Steps Check Identification Remarks
location
[] 1ATE481DN 1MX101
Available
[] 1ATE461ZV 1MX101
Available
[] 1ATE462ZV 1MX101
Available
Page 29 of 278
Karachi Nuclear Power Waste Water Neutralizationing, S2TFCWDP004
Plant Unit-2 Recycling and DischargeingLoading
and Unloading Of Bulk Chemicals
PK237SOP24183K06145PC Agent Rev. 0
Operator
Operation Steps Check Identification Remarks
location
[] 1ATE463ZV 1MX101
Available
Page 30 of 278
Karachi Nuclear Power Waste Water Neutralizationing, S2TFCWDP004
Plant Unit-2 Recycling and DischargeingLoading
and Unloading Of Bulk Chemicals
PK237SOP24183K06145PC Agent Rev. 0
Operator
Operation Steps Check Identification Remarks
location
Available #1 Waste water discharge
1ATE304AR2
pump outlet check valve. [ ][ ] 1MX101
TFC636VK
Available
#1 Waste water discharge pump
outlet valve [ ] 2TFC632VK
Open
Available#1 Waste water discharge
1ATE302CR2
pump recirculation valve. [ ][ ] 1MX101
TFC633VK
Closed
#1 Waste water pond Acid inlet valve
[ ] 2TFC629VR
Closed
Available#1 Waste water pond
1ATE403CR2
caustic inlet valve [ ][ ] 1MX101
TFC627VR
Closed
#1 Waste water pond pressure
gauge. [ ] 2TFC471LP
Available
Available#1 Waste water pond
1ATE305AR2
pressure gauge root valve. [ ][ ] 1MX101
TFC635VK
Open
#1 Waste water pond sampling
solenoid valve. [ ] 2TFC631EF
Closed
Available Waste water neutralizing
1ATE401AR2
discharge PH meter. [ ][ ] 1MX101
TFC470MG
Available
#2 Waste water pond
[ ] 472PS
Available
Available #2 Waste water pond inlet
1ATE401CR2
valve. [ ][ ] 1MX301
TFC641VK
Open
#2 Waste water discharge pump
[ ] 2TFC472PO
Available
Available #2 Waste water discharge
1ATE402CR2
pump outlet check valve. [ ][ ] 1MP303
TFC646VK
Available
Page 31 of 278
Karachi Nuclear Power Waste Water Neutralizationing, S2TFCWDP004
Plant Unit-2 Recycling and DischargeingLoading
and Unloading Of Bulk Chemicals
PK237SOP24183K06145PC Agent Rev. 0
Operator
Operation Steps Check Identification Remarks
location
Page 32 of 278
Karachi Nuclear Power Waste Water Neutralizationing, S2TFCWDP004
Plant Unit-2 Recycling and DischargeingLoading
and Unloading Of Bulk Chemicals
PK237SOP24183K06145PC Agent Rev. 0
Operator
Operation Steps Check Identification Remarks
location
Closed2TFC411CW level 1ATE002
[] 020JA
meter AR
Available [ ] 2TFC411MN
Closed2TFC411CW level
1ATE003
meter root valve #1 and root [] 020JA
AR
valve #02
Open [ ] 2TFC538VR
Open [ ] 2TFC539VR
Closed2TFC411CW outlet 1ATE003
[] 020JA
primary AND secondary Valve AR
Primary valve, Open [ ] 2TFC534VR
Secondary valve, Open [ ] 2TFC535VR
Closed2TFC411CW 1ATE004
[] 020JA
dehydrating breather AR
Available [ ] 2TFC411AD
ClosedAlignment of 1ATE004
[] 020JA
2TFC412CW AR
2TFC412CW blowdown
primary AND secondary
Valve.
020JA2TFC54
ClosedClosed [ ][ ] 1ATE002
4VR
Closed [ ] AR
2TFC545VR
2TFC411CW level meter
020JA2TFC41 1ATE002
ClosedAvailable [ ][ ]
2MN AR
2TFC412CW level meter root
valve #1 and root valve #02
020JA2TFC54
ClosedOpen [ ][ ] 1ATE002
6VR
Open [ ] AR
2TFC547VR
Page 33 of 278
Karachi Nuclear Power Waste Water Neutralizationing, S2TFCWDP004
Plant Unit-2 Recycling and DischargeingLoading
and Unloading Of Bulk Chemicals
PK237SOP24183K06145PC Agent Rev. 0
Operator
Operation Steps Check Identification Remarks
location
2TFC412CW outlet primary AND
secondary Valve
020JA2TFC54
ClosedOpen [ ][ ] 1ATE002
2VR
Open [ ] AR
2TFC543VR
2TFC412CW dehydrating breather
Available [ ] 2TFC412AD
ANYONE mixed bed acid
metering pump
020JA2TFC41 1ATE002
ClosedAvailable [ ][ ]
5PO AR
Available [ ] 2TFC416PO
Closed2TFC415PO inlet and 1ATE002
[] 020JA
Outlet valves AR
Inlet valve, Open [ ] 2TFC415PO
020JA2TFC41 1ATE003
ClosedOutlet valve, Open [ ][ ]
5PO AR
2TFC416PO inlet and Outlet
valves
020JA2TFC41 1ATE003
ClosedInlet valve, Open [ ][ ]
6PO AR
Outlet valve, Open [ ] 2TFC416PO
Page 34 of 278
Karachi Nuclear Power Waste Water Neutralizationing, S2TFCWDP004
Plant Unit-2 Recycling and DischargeingLoading
and Unloading Of Bulk Chemicals
PK237SOP24183K06145PC Agent Rev. 0
Operator
Operation Steps Check Identification Remarks
location
StartupMix bed acid metering pump
[] 1ATE002AR 1MP302
outlet acid concentration meters.
1ATE003AR2
StartupAvailable [ ][ ] 1MP302
TFC411MG
StartupStainless steel dilute acid
[] 1ATE004AR 1MP302
solution manual sampling valve
1ATE001HC2
Startup [ ][ ] 1MP302
TFC583VR
StartupCation Acid
[] 1ATE002HC 1MP302
metering pump inlet valve
Closed [ ] 2TFC550VR
Page 35 of 278
Karachi Nuclear Power Waste Water Neutralizationing, S2TFCWDP004
Plant Unit-2 Recycling and DischargeingLoading
and Unloading Of Bulk Chemicals
PK237SOP24183K06145PC Agent Rev. 0
Operator
Operation Steps Check Identification Remarks
location
2TFC421CW outlet primary AND
secondary Valve
4833VA2TFC
AvailablePrimary valve, Open [ ][ ]
734VR 1MX301
Secondary valve, Open [ ]
2TFC735VR
2TFC421CW CO2 absorber
3712VA2TFC
ShutdownAvailable [ ][ ] 1MX101
421AD
Alignment of 2TFC422CW
Shutdown 2TFC422CW blowdown
[] 3812VA 1MX101
primary AND secondary Valve.
Closed [ ] 2TFC744VR
Closed [ ] 2TFC745VR
Shutdown 2TFC422CW level meter [ ] 3111VA 1MX101
Available [ ] 2TFC422MN
Shutdown 2TFC422CW level meter
[ ] 3212VA 1MX101
root valve #1 and root valve #02
Open [ ] 2TFC746VR
Open [ ] 2TFC747VR
Shutdown 2TFC422CW outlet
[ ] 3312VA 1MX101
primary AND secondary Valve
Primary valve, Open [ ] 2TFC742VR
Secondary valve, Open [ ] 2TFC743VR
Shutdown 2TFC422CW CO2
[ ] 3412VA 1MX101
absorber
Available [ ] 2TFC422AD
Available ANYONE mixed
[ ] 501CW 1MX301
bed caustic metering pump
Available [ ] 2TFC423PO
4502VA2TFC
AvailableAvailable [ ][ ] 1MX301
424PO
2TFC423PO inlet and Outlet
valves
4521VA2TFC
AvailableInlet valve, Open [ ][ ] 1MX301
750PO
Page 36 of 278
Karachi Nuclear Power Waste Water Neutralizationing, S2TFCWDP004
Plant Unit-2 Recycling and DischargeingLoading
and Unloading Of Bulk Chemicals
PK237SOP24183K06145PC Agent Rev. 0
Operator
Operation Steps Check Identification Remarks
location
Outlet valve, Open [ ] 2TFC752PO
Available 2TFC424PO inlet
[ ] 4522VA 1MX301
and Outlet valves
Inlet valve, Open [ ] 2TFC753PO
4523VA2TFC
AvailableOutlet valve, Open [ ][ ] 1MX301
755PO
Mixed bed acid metering
2TFC4
outlet header pressure gauge
22LP
available
4504VA2TFC
AvailableRoot valve, Open [ ][ ] 1MX301
756VR
Mix bed acid metering pump
outlet acid concentration
meters.
4511VA2TFC
AvailableAvailable [ ][ ] 1MX301
421MG
Stainless steel dilute acid
solution manual sampling
valve
4520VA2TFC
Available [ ][ ] 1MX301
773VR
Alignment check of
Regeneration pumps, Heating
tanks and Regeneration
pipelines.
Shut down Cation bed acid
[ ] 4505VA 1MX101
dilution line inlet valve
Closed [ ] 2TFC571VR
Available Mix bed acid dilution
[ ] 451MP 1MX301
inlet valve
Closed [ ] 2TFC581VR
Available Mix bed acid dilution
[ ] 451LP 1MX301
inlet check valve
Closed [ ] 2TFC582VR
Page 37 of 278
Karachi Nuclear Power Waste Water Neutralizationing, S2TFCWDP004
Plant Unit-2 Recycling and DischargeingLoading
and Unloading Of Bulk Chemicals
PK237SOP24183K06145PC Agent Rev. 0
Operator
Operation Steps Check Identification Remarks
location
Open Mix bed acid
[ ] 4571VL 1MX301
regeneration flowmeter
Available [ ] 2TFC411MD
Open Mix bed acid
regeneration flowmeter root [ ] 4573VL 1MX301
valve #1
Open [ ] 2TFC574VD
Open Mix bed acid
regeneration flowmeter root [ ] 4501VA 1MX101
valve #2
Open [ ] 2TFC575VD
Open Cation bed acid dilution inlet
[] 4503VA 1MX101
manual valve
Available [ ] 2TFC570VR
Available Mix bed acid dilution
[ ][ ] 502CW 1MX301
inlet manual valve
Available [ ] 2TFC580VR
Available Mix bed caustic
[ ] 4524VA 1MX301
regeneration flow meter
Available [ ] 2TFC421MD
AvailableMix bed caustic
regeneration flowmeter root [ ] 4507VA 1MX301
valve #1
Open [ ] 2TFC774VD
AvailableMix bed caustic
regeneration flowmeter root [ ] 4509VA 1MX301
valve #2
Open [ ] 2TFC775VD
Shut downHot Water Tank [ ] 4510VA 1MX301
Available [ ] 2TFC431CW
AvailableHot Water Tank
[ ] 452MP 1MX301
upper drainage valve
Closed [ ] 2TFC783VK
AvailableHot water Tank
[ ] 452LP 1MX301
blowdown valve
Page 38 of 278
Karachi Nuclear Power Waste Water Neutralizationing, S2TFCWDP004
Plant Unit-2 Recycling and DischargeingLoading
and Unloading Of Bulk Chemicals
PK237SOP24183K06145PC Agent Rev. 0
Operator
Operation Steps Check Identification Remarks
location
Closed [ ] 2TFC782VK
OpenHot water tank
thermostatic proportional [ ] 4572VL 1MX301
control valve
Available [ ] 2TFC780VD
OpenHot water tank safety
[ ] 4574VL 1MX301
valve
Available [ ] 2TFC784VJ
OpenHot water Tank Inlet
[ ] 4506VA 1MX301
valve
Open [ ] 2TFC781VD
OpenHot water tank pressure
[ ] 4508VA 1MX301
gauge
Available [ ] 2TFC431LP
OpenHot water tank pressure
[ ] 4541VA 1MX101
gauge root valve
Open [ ] 2TFC790VD
OpenHot water Tank pressure
[ ] 4542VA 1MX101
switch
Available [ ] 2TFC431SN
OpenHot water tank
[ ] 4543VA 1MX101
thermometer
Available [ ] 2TFC431LT
OpenRegeneration water
[ ] 4544VA 1MX101
Temperature switch
Available [ ] 2TFC421KT
OpenHot water Tank
[ ] 4545VA 1MX101
Temperature switch
Available [ ] 2TFC431KT
OpenRegeneration Pump
[ ] 4546VA 1MX101
pressure regulating valve
Available [ ] 2TFC510VD
Open#1 Regeneration pump
[ ] 4547VA 1MX101
inlet and Outlet valve
Page 39 of 278
Karachi Nuclear Power Waste Water Neutralizationing, S2TFCWDP004
Plant Unit-2 Recycling and DischargeingLoading
and Unloading Of Bulk Chemicals
PK237SOP24183K06145PC Agent Rev. 0
Operator
Operation Steps Check Identification Remarks
location
Inlet valve, Open [ ] 2TFC503VD
4548VA2TFC
OpenOutlet Valve, Open [ ][ ] 1MX101
513VD
#1 Regeneration pump outlet
check valve
4549VA2TFC
OpenAvailable [ ][ ] 1MX101
507VD
#1 Regeneration pump outlet
pressure gauge
4550VA2TFC
OpenAvailable [ ][ ] 1MX101
443LP
#1 Regeneration pump outlet
pressure gauge root valve
4551VA2TFC
OpenOpen [ ][ ] 1MX101
956VD
#2 Regeneration pump inlet
and Outlet valve
4552VA2TFC
OpenInlet valve, Open [ ][ ] 1MX101
504VD
Outlet Valve, Open [ ] 2TFC514VD
Open#2 Regeneration pump
[ ] 4553VA 1MX101
outlet check valve
Available [ ] 2TFC508VD
Open#2 Regeneration pump
[ ] 4554VA 1MX101
outlet pressure gauge
Available [ ] 2TFC444LP
1ATE201AR2
Remote operationOpen [ ][ ] 1MX101
TFC957VD
Page 40 of 278
Karachi Nuclear Power Waste Water Neutralizationing, S2TFCWDP004
Plant Unit-2 Recycling and DischargeingLoading
and Unloading Of Bulk Chemicals
PK237SOP24183K06145PC Agent Rev. 0
Operator
Operation Steps Check Identification Remarks
location
Remote
operationRegenerative pump [ ] 1ATE202AR 1MX101
outlet header flowmeter
1ATE203AR2
Remote operationAvailable [ ][ ] 1MX101
TFC442MD
Remote
operationRegenerative pump
[ ] 1ATE301AR 1MX101
outlet header flowmeter root
valve #1
1ATE302AR2
Remote operationOpen [ ][ ] 1MX101
TFC958VD
Remote
operationRegenerative pump
[ ] 1ATE303AR 1MX101
outlet header flowmeter root
valve #2
1ATE304AR2
Remote operationOpen [ ][ ] 1MX101
TFC959VD
Remote operationAlignment
Check and Operation of [ ] 1ATE401AR 1MX101
Demineralized water tank
Demineralized water tank
Available [ ] 2TFC441BA
Demineralized water Tank
level meter
Available [ ] 2TFC441MN
Remote operation [ ] 1ATE401CR 1MX301
Remote operation [ ] 1ATE402CR 1MX301
Remote operation [ ] 1ATE302CR 1MX301
Operator
Operation Steps Check Identification Remarks
location
Demineralized water tank
inlet and outlet valve
Inlet valve, Available [ ] 2TFC516VD
Outlet valve, Open [ ] 2TFC500VD
Cooler of #1 mix bed water sample
Close the following valve
211RF9WDP 1MX101Y
AvailableClose [ ][ ]
610VK BDT
Pressure relief valve of #1 mix bed
water sample Open the following
valve
2184VL9WD 1MX101Y
AvailableOpen [ ][ ]
P611VR BDT
Isolation valve 1 of #1 mix bed water
sample Close the following valve
2183VL9WD 1MX101Y
OpenClose [ ][ ]
P612VTE BDT
Isolation valve 2 of #1 mix bed water
sample Open the following valve
2190VL9WD 1MX101Y
OpenOpen [ ][ ]
P613VR BDT
Safety valve of #1 mix bed water
[ ] 9WDP614VR YBDT
sampleOpen
2185VL9WD 1MX101Y
AvailableOpen [ ][ ]
P615VR BDT
Blowdown valve of #1 mix bed water
[ ] 9WDP616VR YBDT
sampleOpen
Closed 1#CO2 Absorber [] 2189VL 1MX101
Pressure gauge of #1 mix bed water
[ ] 9WDP601DS YBDT
sampleAvailable
Available Close the following valve [] 213LP 1MX101
Conductivity meters of #1 mix bed
[ ] 9WDP620VK YBDT
water sampleClose
AvailableOpen the following valve [] 211MG 1MX101
Page 42 of 278
Karachi Nuclear Power Waste Water Neutralizationing, S2TFCWDP004
Plant Unit-2 Recycling and DischargeingLoading
and Unloading Of Bulk Chemicals
PK237SOP24183K06145PC Agent Rev. 0
Operator
Operation Steps Check Identification Remarks
location
211LG9WDP 1MX101Y
AvailableOpen [ ][ ]
621VR BDT
Isolation valve of #1 mix bed water
sample conductivity metersClose the
following valve
2186VL9WD 1MX101Y
OpenClose [ ][ ]
P622VTE BDT
Flow meter of #1 mix bed water
sample conductivity metersOpen the
following valve
211LD9WDP 1MX101Y
AvailableOpen [ ][ ]
623VR BDT
#1 mix bed water sample Na
[ ] 9WDP624VR YBDT
metersOpen
212MG9WDP 1MX101Y
AvailableOpen [ ][ ]
625VR BDT
212LG9WDP 1MX101Y
AvailableOpen [ ][ ]
626VR BDT
Isolation valve of #1 mix bed water
sample Na meter2#CO2 Absorber
2187VL9WD 1MX101Y
OpenAvailable [ ][ ]
P602DS BDT
Flow meter of #1 mix bed water
sample Na meterClose the following
valve
212LD9WDP 1MX101Y
AvailableClose [ ][ ]
6010VR BDT
#1 mix bed water sample Si 9WDP60417
[ ] YBDT
meterClose VR
AvailableUnloading alkali pump outlet
[] 204MG 1MX101
check valve
Isolation valve of #1 mix bed water 9WDP60318
[ ] YBDT
sample Si meterAvailable VR
OpenOpen the following valve [] 2188VL 1MX101
Page 43 of 278
Karachi Nuclear Power Waste Water Neutralizationing, S2TFCWDP004
Plant Unit-2 Recycling and DischargeingLoading
and Unloading Of Bulk Chemicals
PK237SOP24183K06145PC Agent Rev. 0
Operator
Operation Steps Check Identification Remarks
location
Flow meter of #1 mix bed water 9WDP60219
[ ] YBDT
sample Si meterOpen VR
1# Concentrated alkali storage tank
level meter
Available [ ] 9WDP601MN YBDT
2# Concentrated alkali storage tank
level meter
Available [ ] 9WDP602MN YBDT
POWER SSUPPLY
#1 Waste water pump power
switchUnloading acid pump
power supply switch
Page 44 of 278
Karachi Nuclear Power Waste Water Neutralizationing, S2TFCWDP004
Plant Unit-2 Recycling and DischargeingLoading
and Unloading Of Bulk Chemicals
PK237SOP24183K06145PC Agent Rev. 0
Operator
Operation Steps Check Identification Remarks
location
Closed [] 2101EO 1MX101
Available [] 211RF 1MX101
Available [] 2184VL 1MX101
Open [] 2183VL 1MX101
Open [] 2190VL 1MX101
Available [] 2185VL 1MX101
Closed [] 2189VL 1MX101
Available [] 213LP 1MX101
Available [] 211MG 1MX101
Available [] 211LG 1MX101
Open [] 2186VL 1MX101
Available [] 211LD 1MX101
Available [] 212MG 1MX101
Available [] 212LG 1MX101
Open [] 2187VL 1MX101
Available [] 212LD 1MX101
Available [] 204MG 1MX101
Open [] 2188VL 1MX101
Available [] 213LD 1MX101
Closed [] 2201EO 1MX101
Available [] 221RF 1MX101
Available [] 2284VL 1MX101
Open [] 2283VL 1MX101
Open [] 2290VL 1MX101
Available [] 2285VL 1MX101
Closed [] 2289VL 1MX101
Available [] 223LP 1MX101
Available [] 221MG 1MX101
Available [] 221LG 1MX101
Open [] 2286VL 1MX101
Available [] 221LD 1MX101
Available [] 222MG 1MX101
Page 45 of 278
Karachi Nuclear Power Waste Water Neutralizationing, S2TFCWDP004
Plant Unit-2 Recycling and DischargeingLoading
and Unloading Of Bulk Chemicals
PK237SOP24183K06145PC Agent Rev. 0
Operator
Operation Steps Check Identification Remarks
location
Available [] 222LG 1MX101
Open [] 2287VL 1MX101
Available [] 222LD 1MX101
Open [] 2288VL 1MX101
Available [] 223LD 1MX101
Closed [] 2301EO 1MX101
Available [] 231RF 1MX101
Available [] 2384VL 1MX101
Open [] 2383VL 1MX101
Open [] 2390VL 1MX101
Available [] 2385VL 1MX101
Closed [] 2389VL 1MX101
Available [] 233LP 1MX101
Available [] 231MG 1MX101
Available [] 231LG 1MX101
Open [] 2386VL 1MX101
Available [] 231LD 1MX101
Available [] 232MG 1MX101
Available [] 232LG 1MX101
Open [] 2387VL 1MX101
Available [] 232LD 1MX101
Open [] 2388VL 1MX101
Available [] 233LD 1MX101
Closed [] 2401EO 1MX101
Available [] 241RF 1MX101
Available [] 2484VL 1MX101
Open [] 2483VL 1MX101
Open [] 2490VL 1MX101
Available [] 2485VL 1MX101
Shut down [] 2489VL 1MX101
Available [] 243LP 1MX101
Available [] 241MG 1MX101
Page 46 of 278
Karachi Nuclear Power Waste Water Neutralizationing, S2TFCWDP004
Plant Unit-2 Recycling and DischargeingLoading
and Unloading Of Bulk Chemicals
PK237SOP24183K06145PC Agent Rev. 0
Operator
Operation Steps Check Identification Remarks
location
Available [] 241LG 1MX101
Open [] 2486VL 1MX101
Available [] 241LD 1MX101
Available [] 242MG 1MX101
Available [] 242LG 1MX101
Open [] 2487VL 1MX101
Available [] 242LD 1MX101
Open [] 2488VL 1MX101
Available [] 243LD 1MX101
Closed [] 2501EO 1MX101
Available [] 251RF 1MX101
Available [] 2584VL 1MX101
Open [] 2583VL 1MX101
Open [] 2590VL 1MX101
Available [] 2585VL 1MX101
Closed [] 2589VL 1MX101
Available [] 253LP 1MX101
Available [] 251MG 1MX101
Available [] 251LG 1MX101
Open [] 2586VL 1MX101
Available [] 251LD 1MX101
Available [] 252MG 1MX101
Available [] 252LG 1MX101
Open [] 2587VL 1MX101
Available [] 252LD 1MX101
Open [] 2588VL 1MX101
Available [] 253LD 1MX101
Open [] 2091VL 1MX301
2TFC4
Closed (or Energized)
71PO
Page 47 of 278
Karachi Nuclear Power Waste Water Neutralizationing, S2TFCWDP004
Plant Unit-2 Recycling and DischargeingLoading
and Unloading Of Bulk Chemicals
PK237SOP24183K06145PC Agent Rev. 0
Operator
Operation Steps Check Identification Remarks
location
1MX101
Closed [] 2101VL
Closed [] 2102VL 1MX101
Closed [] 2104VA 1MX101
Closed [] 2105VA 1MX101
Closed [] 2106VA 1MX101
Closed [] 2118VL 1MX101
Closed [] 2126VL 1MX101
Closed [] 2127VL 1MX101
Closed [] 2128VL 1MX101
Closed [] 2129VL 1MX101
Closed [] 2133VL 1MX101
Closed [] 2134VK 1MX101
Open [] 2131VL 1MX101
Open [] 2132VL 1MX101
Open [] 2182VL 1MX101
Available [] 211MD 1MX101
Available [] 2173VL 1MX101
Open [] 2171VL 1MX101
Open [] 2172VL 1MX101
Available [] 211MP 1MX101
Open [] 2174VL 1MX101
Available [] 211LP 1MX101
Open [] 2175VL 1MX101
Available [] 212LP 1MX101
Open [] 2179VL 1MX101
Available [] 212MPd 1MX101
Available [] 2178VL 1MX101
Open [] 2176VL 1MX101
Page 48 of 278
Karachi Nuclear Power Waste Water Neutralizationing, S2TFCWDP004
Plant Unit-2 Recycling and DischargeingLoading
and Unloading Of Bulk Chemicals
PK237SOP24183K06145PC Agent Rev. 0
Operator
Operation Steps Check Identification Remarks
location
Open [] 2177VL 1MX101
Available [] 201CW 1MX101
Available [] 211SPd 1MX101
Open [] 2180VL 1MX101
Open [] 2181VL 1MX101
#2 Waste water pump power
switch
2TFC4
Closed (or Energized)
72PO
Page 49 of 278
Karachi Nuclear Power Waste Water Neutralizationing, S2TFCWDP004
Plant Unit-2 Recycling and DischargeingLoading
and Unloading Of Bulk Chemicals
PK237SOP24183K06145PC Agent Rev. 0
Operator
Operation Steps Check Identification Remarks
location
Page 50 of 278
Karachi Nuclear Power Waste Water Neutralizationing, S2TFCWDP004
Plant Unit-2 Recycling and DischargeingLoading
and Unloading Of Bulk Chemicals
PK237SOP24183K06145PC Agent Rev. 0
Operator
Operation Steps Check Identification Remarks
location
Open [] 2277VL 1MX101
Available [] 202CW 1MX101
Available [] 221SPd 1MX101
Open [] 2280VL 1MX101
Open [] 2281VL 1MX101
Page 51 of 278
Karachi Nuclear Power Waste Water Neutralizationing, S2TFCWDP004
Plant Unit-2 Recycling and DischargeingLoading
and Unloading Of Bulk Chemicals
PK237SOP24183K06145PC Agent Rev. 0
Operator
Operation Steps Check Identification Remarks
location
Closed [] 2301VL 1MX101
Closed [] 2302VL 1MX101
Closed [] 2304VA 1MX101
Closed [] 2305VA 1MX101
Closed [] 2306VA 1MX101
Closed [] 2318VL 1MX101
Closed [] 2326VL 1MX101
Closed [] 2327VL 1MX101
Closed [] 2328VL 1MX101
Closed [] 2329VL 1MX101
Closed [] 2333VL 1MX101
Closed [] 2334VK 1MX101
Open [] 2331VL 1MX101
Open [] 2332VL 1MX101
Open [] 2382VL 1MX101
Available [] 231MD 1MX101
Available [] 2373VL 1MX101
Open [] 2371VL 1MX101
Open [] 2372VL 1MX101
Available [] 231MP 1MX101
Open [] 2374VL 1MX101
Available [] 231LP 1MX101
Open [] 2375VL 1MX101
Available [] 232LP 1MX101
Open [] 2379VL 1MX101
Available [] 232MPd 1MX101
Available [] 2378VL 1MX101
Open [] 2376VL 1MX101
Open [] 2377VL 1MX101
Available [] 203CW 1MX101
Available [] 231SPd 1MX101
Open [] 2380VL 1MX101
Page 52 of 278
Karachi Nuclear Power Waste Water Neutralizationing, S2TFCWDP004
Plant Unit-2 Recycling and DischargeingLoading
and Unloading Of Bulk Chemicals
PK237SOP24183K06145PC Agent Rev. 0
Operator
Operation Steps Check Identification Remarks
location
Open [] 2381VL 1MX101
Page 53 of 278
Karachi Nuclear Power Waste Water Neutralizationing, S2TFCWDP004
Plant Unit-2 Recycling and DischargeingLoading
and Unloading Of Bulk Chemicals
PK237SOP24183K06145PC Agent Rev. 0
Operator
Operation Steps Check Identification Remarks
location
Available 204DE 1MX101
Closed [] 2401VL 1MX101
Page 54 of 278
Karachi Nuclear Power Waste Water Neutralizationing, S2TFCWDP004
Plant Unit-2 Recycling and DischargeingLoading
and Unloading Of Bulk Chemicals
PK237SOP24183K06145PC Agent Rev. 0
Operator
Operation Steps Check Identification Remarks
location
Page 55 of 278
Karachi Nuclear Power Waste Water Neutralizationing, S2TFCWDP004
Plant Unit-2 Recycling and DischargeingLoading
and Unloading Of Bulk Chemicals
PK237SOP24183K06145PC Agent Rev. 0
Operator
Operation Steps Check Identification Remarks
location
Page 56 of 278
Karachi Nuclear Power Waste Water Neutralizationing, S2TFCWDP004
Plant Unit-2 Recycling and DischargeingLoading
and Unloading Of Bulk Chemicals
PK237SOP24183K06145PC Agent Rev. 0
Operator
Operation Steps Check Identification Remarks
location
Open [] 2576VL 1MX101
Open [] 2577VL 1MX101
Available [] 205CW 1MX101
Available [] 251SPd 1MX101
Open [] 2580VL 1MX101
Open [] 2581VL 1MX101
Page 57 of 278
Karachi Nuclear Power Waste Water Neutralizationing, S2TFCWDP004
Plant Unit-2 Recycling and DischargeingLoading
and Unloading Of Bulk Chemicals
PK237SOP24183K06145PC Agent Rev. 0
Operator
Operation Steps Check Identification Remarks
location
Page 58 of 278
Karachi Nuclear Power Waste Water Neutralizationing, S2TFCWDP004
Plant Unit-2 Recycling and DischargeingLoading
and Unloading Of Bulk Chemicals
PK237SOP24183K06145PC Agent Rev. 0
Operator
Operation Steps Check Identification Remarks
location
Closed [ ] 3214VA 1MX101
Closed [ ] 3215VL 1MX101
Closed [ ] 3216VL 1MX101
Closed [ ] 3207VR 1MX101
Closed [ ] 3227VK 1MX101
Closed [ ] 3217VL 1MX101
Closed [ ] 3225VL 1MX101
Closed [ ] 3172VL 1MX101
Available [ ] 321LP 1MX101
Open [ ] 3271VL 1MX101
321LG、321
Available 1MX101
[ ] MG
Open [ ] 3271VK 1MX101
Closed [ ] 3201EF 1MX101
Page 59 of 278
Karachi Nuclear Power Waste Water Neutralizationing, S2TFCWDP004
Plant Unit-2 Recycling and DischargeingLoading
and Unloading Of Bulk Chemicals
PK237SOP24183K06145PC Agent Rev. 0
Operator
Operation Steps Check Identification Remarks
location
Open [ ] 3371VL 1MX101
331LG、321
Available 1MX101
[ ] MG
Open [ ] 3371VK 1MX101
Closed [ ] 3301EF 1MX101
Operator
Operation Steps Check Identification Remarks
location
Closed [ ] 3133VL 1MX101
Page 61 of 278
Karachi Nuclear Power Waste Water Neutralizationing, S2TFCWDP004
Plant Unit-2 Recycling and DischargeingLoading
and Unloading Of Bulk Chemicals
PK237SOP24183K06145PC Agent Rev. 0
Operator
Operation Steps Check Identification Remarks
location
Open [ ] 3071VL 1MX101
Open [ ] 3072VL 1MX101
Available [ ] 4413VD 1MX101
Available [ ] 4423VD 1MX101
Closed [ ] 4415VD 1MX101
Available [ ] 441MD 1MX101
Open [ ] 4477VL 1MX101
Open [ ] 4478VL 1MX101
Available [ ] 441SP 1MX101
Open [ ] 4475VL 1MX101
Available [ ] 4421VD 1MX101
Available [ ] 441PO 1MX101
Available [ ] 441LP 1MX101
Available [ ] 4402VD 1MX101
Open [ ] 4401VD 1MX101
Open [ ] 4403VD 1MX101
Open [ ] 4471VL 1MX101
Available [ ] 442PO 1MX101
Available [ ] 442LP 1MX101
Available [ ] 4405VD 1MX101
Open [ ] 4404VD 1MX101
Open [ ] 4406VD 1MX101
Open [ ] 4472VL 1MX101
Page 62 of 278
Karachi Nuclear Power Waste Water Neutralizationing, S2TFCWDP004
Plant Unit-2 Recycling and DischargeingLoading
and Unloading Of Bulk Chemicals
PK237SOP24183K06145PC Agent Rev. 0
Operator
Operation Steps Check Identification Remarks
location
Available [ ] 421MD 1MP303
Open [ ] 4276VL 1MP303
Open [ ] 4275VL 1MP303
Available [ ] 4131VD 1MP303
Open [ ] 4130VD 1MP303
Closed [ ] 4204VD 1MP303
Available [ ] 4231VD 1MX303
Closed [ ] 4205VD 1MP303
Available [ ] 431CW 1MX101
Closed [ ] 4302VD 1MX101
Closed [ ] 4303VD 1MX101
Available [ ] 4201VD 1MP303
Available [ ] 4304VD 1MP303
Open [ ] 4301VD 1MP303
Open [ ] 4230VD 1MP303
Available [ ] 4206VD 1MP303
Available [ ] 431LP 1MX101
Open [ ] 4371VL 1MX101
Available [ ] 431SN 1MX101
Available [ ] 431LT 1MX101
Available [ ] 421KT 1MX101
Available [ ] 431KT 1MX101
Available [ ] 431RE 1MX101
Available [ ] 432RE 1MX101
Available [ ] 433RE 1MX101
Available [ ] 434RE 1MX101
Available [ ] 4422VD 1MX101
Available [ ] 443PO 1MX101
Open [ ] 4407VD 1MX101
Open [ ] 4409VD 1MX101
Available [ ] 4408VD 1MX101
Available [ ] 443LP 1MX101
Page 63 of 278
Karachi Nuclear Power Waste Water Neutralizationing, S2TFCWDP004
Plant Unit-2 Recycling and DischargeingLoading
and Unloading Of Bulk Chemicals
PK237SOP24183K06145PC Agent Rev. 0
Operator
Operation Steps Check Identification Remarks
location
Open [ ] 4473VL 1MX101
Available [ ] 444PO 1MX101
Open [ ] 4410VD 1MX101
Open [ ] 4412VD 1MX101
Available [ ] 4411VD 1MX101
Available [ ] 444LP 1MX101
Open [ ] 4474VL 1MX101
Available [ ] 442SP 1MX101
Open [ ] 4476VL 1MX101
Page 64 of 278
Karachi Nuclear Power Waste Water Neutralizationing, S2TFCWDP004
Plant Unit-2 Recycling and DischargeingLoading
and Unloading Of Bulk Chemicals
PK237SOP24183K06145PC Agent Rev. 0
Operator
Operation Steps Check Identification Remarks
location
Open [ ] 4604VA 1MX101
Available [ ] 463ZV 1MX101
Available [ ] 4613VA 1MX101
Available [ ] 463LP 1MX101
Open [ ] 4602VA 1MX101
Available [ ] 4605VA 1MX101
Open [ ] 4606VA 1MX101
Page 65 of 278
Karachi Nuclear Power Waste Water Neutralizationing, S2TFCWDP004
Plant Unit-2 Recycling and DischargeingLoading
and Unloading Of Bulk Chemicals
PK237SOP24183K06145PC Agent Rev. 0
Operator
Operation Steps Check Identification Remarks
location
2TFC4
Closed (or energized)
41PO
Open#2 Flushing pump power
4713VK 1MX101
switch
2TFC4
Closed (or energized)
42PO
Open#1 Regeneration pump
4714VK 1MX101
Power switch
2TFC4
Closed (or energized)
43PO
#2 Regeneration pump Power switch
Page 66 of 278
Karachi Nuclear Power Waste Water Neutralizationing, S2TFCWDP004
Plant Unit-2 Recycling and DischargeingLoading
and Unloading Of Bulk Chemicals
PK237SOP24183K06145PC Agent Rev. 0
Operator
Operation Steps Check Identification Remarks
location
Page 67 of 278
Karachi Nuclear Power Waste Water Neutralizationing, S2TFCWDP004
Plant Unit-2 Recycling and DischargeingLoading
and Unloading Of Bulk Chemicals
PK237SOP24183K06145PC Agent Rev. 0
Operator
Operation Steps Check Identification Remarks
location
Available [ ] 411LG 1MP303
Available [ ] 411EJ 1MP303
Closed [ ] 4101VR 1MP303
Closed [ ] 4104VR 1MP303
Closed [ ] 4103VR 1MP303
Available [ ] 4127VR 1MX101
Open [ ] 4121VR 1MP303
Closed [ ] 4141VR 1MP303
Available [ ] 4123VR 1MP303
Closed [ ] 4107VR 1MP303
Closed [ ] 4108VR 1MP303
Open [ ] 4127VR 1MX101
Closed [ ] 4709VR 1MX101
Closed [ ] 4711VR 1MX101
2TFC4
Closed (or energized)
31RE
Page 68 of 278
Karachi Nuclear Power Waste Water Neutralizationing, S2TFCWDP004
Plant Unit-2 Recycling and DischargeingLoading
and Unloading Of Bulk Chemicals
PK237SOP24183K06145PC Agent Rev. 0
Operator
Operation Steps Check Identification Remarks
location
Page 69 of 278
Karachi Nuclear Power Waste Water Neutralizationing, S2TFCWDP004
Plant Unit-2 Recycling and DischargeingLoading
and Unloading Of Bulk Chemicals
PK237SOP24183K06145PC Agent Rev. 0
Operator
Operation Steps Check Identification Remarks
location
Page 70 of 278
Karachi Nuclear Power Waste Water Neutralizationing, S2TFCWDP004
Plant Unit-2 Recycling and DischargeingLoading
and Unloading Of Bulk Chemicals
PK237SOP24183K06145PC Agent Rev. 0
Operator
Operation Steps Check Identification Remarks
location
2TFC4
Closed (or energized)
32RE
Hot water tank #3 electric heater
power switch
2TFC4
Closed (or energized)
33RE
Hot water tank #4 electric heater
power switch
2TFC4
Closed (or energized)
34RE
Available, opening state [ ] 0SDA501PO YB
Unloading alkali pump power supply
switch
Available, opening state [ ] 0SDA601PO YB
913VD close [ ] 913VD YA005
901AD available [ ] 901AD YA005
Page 71 of 278
Karachi Nuclear Power Waste Water Neutralizationing, S2TFCWDP004
Plant Unit-2 Recycling and DischargeingLoading
and Unloading Of Bulk Chemicals
PK237SOP24183K06145PC Agent Rev. 0
4. START UP
Operation
Operation Steps Check Identification Remarks
Location
* During the resin transfer operation
of condensate polishing devices,
there is risk of the secondary
circuit losing water!
* During the resin regeneration,
there is risk of acid burning!
* Be particularly rigorous during the
operation to prevent mis operating
valves (or point operating the
wrong valves)
UNEUTRALIZATION DISCHARGE
OPERATION OF #1 WASTE
WATER POND.NLOADING ACID
OPERATION (31%
HYDROCHLORIC ACID)
4.1 Output operation of high-speed
mix bed ineffective
resin
Output operation of # 1 high-speed
mix bed ineffective resin
On the "# 1 unit condensate
mix bed unit" control screen,
click the "#1 high-speed mix
bed" icon, and click the “Start”
button of “Resin output” on the
popped-up "#1 high-speed mix
bed operation" screen. The [ ]
dialog box “Transfer #1 high-
speed mix bed resin to SPT
separation tower?” appears,
click "Yes" button. The PLC will
transfer the resin according to
the set step sequence:
Open [ ] 2104VA 1MX101
Page 72 of 278
Karachi Nuclear Power Waste Water Neutralizationing, S2TFCWDP004
Plant Unit-2 Recycling and DischargeingLoading
and Unloading Of Bulk Chemicals
PK237SOP24183K06145PC Agent Rev. 0
Operation
Operation Steps Check Identification Remarks
Location
After #1 High-speed mix bed
relieving the pressure
Closed [ ] 2104VA 1MX101
Startup one flushing water pump
(441PO or 442PO)
441PO
Startup [ ] Or 1MX101
442PO
Startup [ ] 442PO 1MX101
Gas transporting (about 120
seconds)
Open [ ] 3030VK 1MX101
Open [ ] 3119VK 1MX101
Page 73 of 278
Karachi Nuclear Power Waste Water Neutralizationing, S2TFCWDP004
Plant Unit-2 Recycling and DischargeingLoading
and Unloading Of Bulk Chemicals
PK237SOP24183K06145PC Agent Rev. 0
Operation
Operation Steps Check Identification Remarks
Location
Open [ ] 3101VL 1MX101
Open [ ] 2023VL 1MX101
Open [ ] 2030VL 1MX101
VOn the "# 2 unit wastewater,
demineralized water unit"
control screen, click the icon
"# 1 wastewater pond " and
click the startup button of "
wastewater neutralization " on
the popped-up "# 1
wastewater pond operation "
screen, PLC will start
neutralization and discharging
[ 501BA
the wastewater of #1 YB
] 、502B
wastewater pond according to
A
the following steps:erify the
capacity margin of 1 #, 2 #
concentrated acid storage
tank is sufficient, tanks can
contain 10 tons of
hydrochloric acid (a car),
namely 1 #, 2 # concentrated
acid storage tank level should
≤1.4 meters.
V# 1 Wastewater pond stops
receiving waste
water: when #1 wastewater pond
level ≥4.0m, PLC control program
will automatically open #2
[ ]
wastewater pond inlet valve, and
close # 1 wastewater pond inlet
valve.erify unloading acid pump inlet
fitting in good condition, are
available.
Open [ ] 2127VL 1MX101
Open [ ] 2118VL 1MX101
Open [ ] 2029VA 1MX101
Page 74 of 278
Karachi Nuclear Power Waste Water Neutralizationing, S2TFCWDP004
Plant Unit-2 Recycling and DischargeingLoading
and Unloading Of Bulk Chemicals
PK237SOP24183K06145PC Agent Rev. 0
Operation
Operation Steps Check Identification Remarks
Location
Gas-water mix transporting
(about 60 seconds)
120 seconds after the resin gas
transporting
Open [ ] 2129VL 1MX301
Water transporting (about 300
seconds)
60 seconds after the gas-water
mix transporting
Closed [ ] 2029VA 1MX101
Closed [ ] 2118VL 1MX101
Open [ ] 2126VL 1MX101
Open [ ] 2025VL 1MX101
300 seconds after the water
transporting
Closed [ ] 2126VL 1MX101
Closed [ ] 2025VL 1MX101
Closed [ ] 2127VL 1MX101
Closed [ ] 2129VL 1MX101
Pipe flushing (about 180
seconds)
Operation
Operation Steps Check Identification Remarks
Location
#1 high-speed mix bed pressure
Operation
Operation Steps Check Identification Remarks
Location
Open [ ] 3030VK 1MX101
Open [ ] 3119VK 1MX101
Open [ ] 3101VL 1MX101
Open [ ] 2023VL 1MX101
Open [ ] 2030VL 1MX101
Open [ ] 2227VL 1MX101
Open [ ] 2218VL 1MX101
Open [ ] 2029VA 1MX101
Gas-water mix transporting
(about 60 seconds)
transporting
mix transporting
Page 77 of 278
Karachi Nuclear Power Waste Water Neutralizationing, S2TFCWDP004
Plant Unit-2 Recycling and DischargeingLoading
and Unloading Of Bulk Chemicals
PK237SOP24183K06145PC Agent Rev. 0
Operation
Operation Steps Check Identification Remarks
Location
120 seconds after the
resin gas transporting
Open [ ] 2129VL 1MX301
Water transporting (about
300 seconds)
60 seconds after the gas-
water mix transporting
Closed [ ] 2029VA 1MX101
Operation
Operation Steps Check Identification Remarks
Location
Page 79 of 278
Karachi Nuclear Power Waste Water Neutralizationing, S2TFCWDP004
Plant Unit-2 Recycling and DischargeingLoading
and Unloading Of Bulk Chemicals
PK237SOP24183K06145PC Agent Rev. 0
Operation
Operation Steps Check Identification Remarks
Location
Output operation of #3 high-speed
mix bed ineffective resinOn
the "# 1 unit condensate mix
bed unit" control screen, click
the "#2 high-speed mix bed"
icon, and click the “Start”
button of “Resin output” on
the popped-up "#2 high-
[ ]
speed mix bed operation"
screen. The dialog box
“Transfer #2 high-speed mix
bed resin to SPT separation
tower?” appears, click "Yes"
button. The PLC will transfer
the resin according to the set
step sequence:
On the "# 1 unit condensate
mix bed unit" control
screen, click the "#3 high-
speed mix bed" icon, and
click the “Start” button of
“Resin output” on the
popped-up "#3 high-speed
mix bed operation" screen.
[ ][ ] 2204VA 1MX101
The dialog box “Transfer #3
high-speed mix bed resin to
SPT separation tower?”
appears, click "Yes" button.
The PLC will transfer the
resin according to the set
step sequence:
Open
Pressure relieving of #3 high-
[ ] 2TFC641VK
speed mix bedOpen
[2.]
[3.] 2204V [4.] 1M
1. Closed [ 2.[5.]
A X101
]
Page 80 of 278
Karachi Nuclear Power Waste Water Neutralizationing, S2TFCWDP004
Plant Unit-2 Recycling and DischargeingLoading
and Unloading Of Bulk Chemicals
PK237SOP24183K06145PC Agent Rev. 0
Operation
Operation Steps Check Identification Remarks
Location
Open 2304VA441P 1MX1011
[ ][ ]
Startup O MX101
After #3 High-speed mix bed
relieving the pressure [ ] 442PO 1MX101
Startup
ClosedGas
transporting (about 120 [ ] 2304VA 1MX101
seconds)
Startup one flushing water
[ ]
pump (441PO or 442PO)
Startup 441PO3030V 1MX1011
[ ][ ]
Open K MX101
Startup 442PO3119V 1MX1011
[ ][ ]
Open K MX101
Gas transporting (about 120
[ ] 3101VL 1MX101
seconds) Open
Open [ ] 2023VL 1MX101
Page 81 of 278
Karachi Nuclear Power Waste Water Neutralizationing, S2TFCWDP004
Plant Unit-2 Recycling and DischargeingLoading
and Unloading Of Bulk Chemicals
PK237SOP24183K06145PC Agent Rev. 0
Operation
Operation Steps Check Identification Remarks
Location
Open60
seconds after the gas- [ ] 2327VL 1MX101
water mix transporting
Open 2318VL2029V 1MX1011
[ ][ ]
Closed A MX101
Open 2029VA2218V 1MX1011
[ ][ ]
Closed L MX101
Gas-water mix transporting
(about 60 seconds) [ ] 2226VL 1MX101
Open
120 seconds after the resin
gas transporting [ ] 2025VL 1MX101
Open
Open300 seconds
after the water [ ] 2329VL 1MX301
transporting
Water transporting (about 300
[ ] 2226VL 1MX101
seconds) Closed
60 seconds after the gas-water
mix transporting [ ] 2025VL 1MX101
Closed
Closed 2029VA2227V 1MX1011
[ ][ ]
Closed L MX101
Closed 2318VL2229V 1MX1011
[ ][ ]
Closed L MX101
Open Pipe
flushing (about 180 [ ] 2326VL 1MX101
seconds)
Open 2025VL2019V 1MX1011
[ ][ ]
Open L MX101
300 seconds after the water
transporting180 seconds
after the pipe flushing
Page 82 of 278
Karachi Nuclear Power Waste Water Neutralizationing, S2TFCWDP004
Plant Unit-2 Recycling and DischargeingLoading
and Unloading Of Bulk Chemicals
PK237SOP24183K06145PC Agent Rev. 0
Operation
Operation Steps Check Identification Remarks
Location
2326VL2019V 1MX1011
ClosedClosed [ ][ ]
L MX101
2025VL2030V 1MX1011
ClosedClosed [ ][ ]
L MX101
2327VL2023V 1MX1011
ClosedClosed [ ][ ]
L MX101
Closed [ ] 3101VL 1MX101
Closed [ ] 3119VK 1MX101
Closed 2329VL441P 1MX1011
[ ][ ]
Shutdown O MX101
Pipe flushing (about 180
seconds) [ ] 442PO 1MX101
Shutdown
Open [ ] 2204VA 1MX101
Open60
seconds after the [ ] 2019VL 1MX101
exhausting
180 seconds after the pipe
flushing [ ] 2204VA 1MX101
Closed
2019VL3114V 1MX1011
Closed Open [ ][ ]
A MX101
Closed60 seconds after the
[ ] 2030VL 1MX101
exhausting
2023VL3114V 1MX1011
Closed Closed [ ][ ]
A MX101
303
0 1
Closed
V
K
Closed [ ] 3101VL 1MX101
Closed Output
operation of #3 high-speed [ ] 3119VK 1MX101
mix bed ineffective resin
Page 83 of 278
Karachi Nuclear Power Waste Water Neutralizationing, S2TFCWDP004
Plant Unit-2 Recycling and DischargeingLoading
and Unloading Of Bulk Chemicals
PK237SOP24183K06145PC Agent Rev. 0
Operation
Operation Steps Check Identification Remarks
Location
Shutdown flushing water
pumpOn the "# 1 unit
condensate mix bed unit"
control screen, click the
"#3 high-speed mix bed"
icon, and click the “Start”
button of “Resin output”
on the popped-up "#3
high-speed mix bed
[ ]
operation" screen. The
dialog box “Transfer #3
high-speed mix bed resin
to SPT separation
tower?” appears, click
"Yes" button. The PLC
will transfer the resin
according to the set step
sequence:
ShutdownPr
essure relieving of #3 [ ] 441PO 1MX101
high-speed mix bed
Shutdown 442PO2304V 1MX1011
[ ][ ]
Open A MX101
#3 high-speed mix bed
pressure relieving and
gas exhaustingAfter #3
High-speed mix bed
relieving the pressure
Closed [ ] 2304VA 1MX101
Open 2304VA441P 1MX1011
[ ][ ]
Startup O MX101
60 seconds after the
exhausting [ ] 442PO 1MX101
Startup
ClosedGas
transporting (about 120 [ ] 2304VA 1MX101
seconds)
Page 84 of 278
Karachi Nuclear Power Waste Water Neutralizationing, S2TFCWDP004
Plant Unit-2 Recycling and DischargeingLoading
and Unloading Of Bulk Chemicals
PK237SOP24183K06145PC Agent Rev. 0
Operation
Operation Steps Check Identification Remarks
Location
Separation tower pressure
relieving and gas
exhausting 3030VK
1MX101Y
OpenFurther verify 1 #, 2 [ ][ ] 501MN、502M
B
# concentrated acid N
storage tank level gauge
available.
OpenVerif
y motor insulation of 3119VK501P 1MX101Y
[ ][ ]
unloading acid pump O B
qualified(≥0.5MΩ)
Open
OpenVerify acid sent by [ ][ ][ 3114VA3101V 1MX1011
transport tankers is ] L MX101
(31% hydrochloric acid)
60 seconds after the
exhaustingFurther verify
[ ] 500VR YB
concentrated acid inlet
valve is closed
Closed
OpenSend personnel
[ ][ ][ 3114VA2023V 1MX1011
connected temporary pipe
] L MX101
between tankers and
unloading acid pump
OpenConfirm that
temporary unloading acid piping
[ ][ ] 2030VL 1MX101
didn’t connect to the wrong position,
and firm!
Closed [ ] 3030VK 1MX101
Open [ ] 2327VL 1MX101
Open [ ] 2318VL 1MX101
Open [ ] 2029VA 1MX101
Page 85 of 278
Karachi Nuclear Power Waste Water Neutralizationing, S2TFCWDP004
Plant Unit-2 Recycling and DischargeingLoading
and Unloading Of Bulk Chemicals
PK237SOP24183K06145PC Agent Rev. 0
Operation
Operation Steps Check Identification Remarks
Location
Output operation of #4 high-speed
mix bed ineffective
resinGas-water mix
transporting (about 60
seconds)
On the "# 1 unit
condensate mix bed unit"
control screen, click the
"#4 high-speed mix bed"
icon, and click the “Start”
button of “Resin output”
on the popped-up "#4
high-speed mix bed
operation" screen. The
dialog box “Transfer #4 [ ]
high-speed mix bed resin
to SPT separation tower?”
appears, click "Yes"
button. The PLC will
transfer the resin
according to the set step
sequence:120 seconds
after the resin gas
transporting
1M
[ 2329V
Open X3
] L
01
Water transporting
(about 300 seconds)
60 seconds after the gas-water mix
transporting
1
M
202 X
Closed
9VA 1
0
1
Page 86 of 278
Karachi Nuclear Power Waste Water Neutralizationing, S2TFCWDP004
Plant Unit-2 Recycling and DischargeingLoading
and Unloading Of Bulk Chemicals
PK237SOP24183K06145PC Agent Rev. 0
Operation
Operation Steps Check Identification Remarks
Location
1
M
23
X
Closed 18
1
VL
0
1
Open 2404VA2326V 1MX1011
[ ][ ]
Open L MX101
1
20 M
25 X
Open
VL 1
Open unloading acid [ ]
50 0
pump inlet valve
0V 1
R Y
Closed300
outlet valve
Page 87 of 278
Karachi Nuclear Power Waste Water Neutralizationing, S2TFCWDP004
Plant Unit-2 Recycling and DischargeingLoading
and Unloading Of Bulk Chemicals
PK237SOP24183K06145PC Agent Rev. 0
Operation
Operation Steps Check Identification Remarks
Location
The risk of
spraying
acid
present in
the exhaust
process
steps, the
process
Startup one flushing water needs to
pump (441PO or 442PO) regulate
[ ][ ][
Closed Send personnel 2326VL 1MX101 traffic flow
]
slightly open the unloading to matches
acid valve of acid tanker with
unloading
acid pump
the acid
sent
personnel
take a
notice of
safety!
1
M
X
Startup 44 1
Closed After confirm 1P 0
unloading acid pump inlet [ ] O2 1
pipe filled with acid, 02 1
temporary unloading acid 5V M
joint no leakage L X
1
0
1
Startup
Closed Send personnel to [ ][ ][ 442PO2327V 1MX1011
open unloading acid valve of ] L MX101
the tanker
Page 88 of 278
Karachi Nuclear Power Waste Water Neutralizationing, S2TFCWDP004
Plant Unit-2 Recycling and DischargeingLoading
and Unloading Of Bulk Chemicals
PK237SOP24183K06145PC Agent Rev. 0
Operation
Operation Steps Check Identification Remarks
Location
Gas transporting (about
120 seconds)
Closed Close the 2025VL0SDA 1MX101Y
[ ][ ]
unloading acid pump 501PO B
power supply switch, set
to "Local" position
Closed Start 2327VL501P 1MX101Y
[ ][ ]
unloading acid pump O B
1
M
X
30 1
30 0
Open VK 1
[ ]
Closed 20 1
25 M
VL X
1
0
1
If abnormal,
Open should be
Closed Verify unloading acid pump [ ][ ][ 3030VK2327V 1MX1011 shutdown
outlet pressure is normal (about ] L501LP MX101YB unloading
0.20MPa) acid pump
promptly
3101VL2TFC
OpenClosed [ ][ ] 1MX101
634VK
3101V 1M
OpenClosed L2TFC X1
631EF 01
OpenVerify unloading
Page 89 of 278
Karachi Nuclear Power Waste Water Neutralizationing, S2TFCWDP004
Plant Unit-2 Recycling and DischargeingLoading
and Unloading Of Bulk Chemicals
PK237SOP24183K06145PC Agent Rev. 0
Operation
Operation Steps Check Identification Remarks
Location
OpenNeutralization
Page 90 of 278
Karachi Nuclear Power Waste Water Neutralizationing, S2TFCWDP004
Plant Unit-2 Recycling and DischargeingLoading
and Unloading Of Bulk Chemicals
PK237SOP24183K06145PC Agent Rev. 0
Operation
Operation Steps Check Identification Remarks
Location
# 2 Wastewater pond
stops receiving waste
water: when #2
wastewater pond level
≥4.0m, PLC control
program will automatically
open #1 wastewater pond
inlet valve, and close # 2
wastewater pond inlet
valve.Close unloading
acid pump outlet valveOn
the "# 2 unit wastewater,
demineralized water unit"
control screen, click the
icon "# 2 wastewater pond
51
" and click the startup
7V Y
button of " wastewater
R B
neutralization " on the
[ ] 50 Y
popped-up "# 2wastewater
[ ] 0V B
pond operation " screen,
R5 Y
PLC will start
01 B
neutralization and
PO
discharging the
wastewater of #2
wastewater pond
according to the following
steps:.Close unloading
acid pump inlet
valveWhen unloading the
acid pump outlet pressure
indicator dropped to "0",
the acid tank unload
completed, or 1 #, 2 #
concentrated acid storage
tank level is higher than
the 1.8m, shutdown
unloading acid pump
Page 91 of 278
Karachi Nuclear Power Waste Water Neutralizationing, S2TFCWDP004
Plant Unit-2 Recycling and DischargeingLoading
and Unloading Of Bulk Chemicals
PK237SOP24183K06145PC Agent Rev. 0
Operation
Operation Steps Check Identification Remarks
Location
Ope
nClosedSend personnel
removal the temporary
unloading acid pipeline
between tanker and unloading
acid the pump, and rinse
venue# 2 Wastewater pond
stops receiving waste [
2427VL2TFC
water: when #2 wastewater ] 1MX101Y
641VK
pond level ≥4.0m, PLC control ] BYB
517VR500VR
program will automatically [ ][ ]
open #1 wastewater pond
inlet valve, and close # 2
wastewater pond inlet
valve.Close unloading acid
pump outlet valveClose
unloading acid pump inlet
valve
Before
removing the
temporary
unloading
acid pipeline,
OpenOpen should be
Disconnect the unloading acid reminded to
pump power supply switch send acid
Closed 2418VL2TFC Staff: there is
[ ][ ][
Send personnel removal the 631VK0SDA5 1MX101Y residual acid
][ ][ ]
temporary unloading acid 01PO2TFC64 BYB in pipe
[ ]
pipeline between tanker and 1VK517VR between
unloading acid the pump, and acid car and
rinse venueClose unloading unload acid
acid pump outlet valve pump
inlet ,.and
take a
notice of
safety burns
by acid!
Page 92 of 278
Karachi Nuclear Power Waste Water Neutralizationing, S2TFCWDP004
Plant Unit-2 Recycling and DischargeingLoading
and Unloading Of Bulk Chemicals
PK237SOP24183K06145PC Agent Rev. 0
Operation
Operation Steps Check Identification Remarks
Location
Before
remov
ing
the
tempo
rary
unloa
ding
acid
pipelin
e,
should
be
remin
ded to
Wastewater re-circulation stirr
send
ing Make a good acid
acid
unloading operation records.
Staff:
Open Disconnect the [
2TFC there
unloading acid pump power ][
631VK is
supply switchSend personnel ][ YB
0SDA residu
removal the temporary ]
501PO al acid
unloading acid pipeline ]
in pipe
between tanker and unloading
betwe
acid the pump, and rinse
en
venue
acid
car
and
unloa
d acid
pump
inlet ,.
and
take a
notice
of
safety
burns
by
Page 93 of 278
Karachi Nuclear Power Waste Water Neutralizationing, S2TFCWDP004
Plant Unit-2 Recycling and DischargeingLoading
and Unloading Of Bulk Chemicals
PK237SOP24183K06145PC Agent Rev. 0
Operation
Operation Steps Check Identification Remarks
Location
Open #2 waste water pond
recirculation valve Unloading
alkali operation (32% Alkali)W
[
astewater re-circulation stirrin 0SDA
] YB
g Make a good acid unloading 501PO
]
operation records. Disconnect
the unloading acid pump
power supply switch
OpenOpenVerify the
capacity margin of 1 #, 2 #
concentrated alkali storage
tank is sufficient, tanks can
contain 10 tons of hydrochloric
2029VA2TFC
alkali (a car), namely 1 #, 2 #
[ ][ ] 644VK 1MX101Y
concentrated alkali storage
[ ][ ] 601BA、602B B
tank level should ≤1.4 meters.
A
Open #2 waste water pond
recirculation valve
Unloading alkali operation (32%
Alkali) Make a good acid
unloading operation records.
Gas-water mix transporting
(about 60 seconds) Startup
#2 waste water pump Verify
unloading alkali pump inlet
fitting in good condition, are
available. Open Verify the
capacity margin of 1 #, 2 # 2TFC644VK
[ ]
concentrated alkali storage 601BA、602B YB
[ ]
tank is sufficient, tanks can A
contain 10 tons of
hydrochloric alkali (a car),
namely 1 #, 2 # concentrated
alkali storage tank level
should ≤1.4 meters.Unloading
alkali operation (32% Alkali)
Page 94 of 278
Karachi Nuclear Power Waste Water Neutralizationing, S2TFCWDP004
Plant Unit-2 Recycling and DischargeingLoading
and Unloading Of Bulk Chemicals
PK237SOP24183K06145PC Agent Rev. 0
Operation
Operation Steps Check Identification Remarks
Location
120 seconds after the resin
gas transportingstartup Verify
the safety shower, eyewash
near the mouth of unloading
alkali is available ground rinse
water is available. Startup #2
waste water pump Verify
unloading alkali pump inlet
2TFC472PO
fitting in good condition, are
[ ][ ] 601BA、602B YB
available.Verify the capacity
A
margin of 1 #, 2 #
concentrated alkali storage
tank is sufficient, tanks can
contain 10 tons of
hydrochloric alkali (a car),
namely 1 #, 2 # concentrated
alkali storage tank level
should ≤1.4 meters.
OpenMeasuring
waste water PH valuesFurther
verify 1 #, 2 # concentrated
alkali storage tank level gauge
available. Startup Verify the [ ][ ] 2429VL
1MX301Y
safety shower, eyewash near [ ] 601MN、602M
B
the mouth of unloading alkali is [ ][ ] N2TFC472PO
available ground rinse water is
available.Verify unloading
alkali pump inlet fitting in good
condition, are available.
Page 95 of 278
Karachi Nuclear Power Waste Water Neutralizationing, S2TFCWDP004
Plant Unit-2 Recycling and DischargeingLoading
and Unloading Of Bulk Chemicals
PK237SOP24183K06145PC Agent Rev. 0
Operation
Operation Steps Check Identification Remarks
Location
Water transporting (about 300
seconds)OpenVerify motor
pump
qualified(≥0.5MΩ)Measuri
ng waste water PH
2TFC641EF6
valuesFurther verify 1 #, 2 # [ ]
01PO
[ ] YBYB
concentrated alkali storage 601MN、602M
[ ][ ]
N
tank level gauge
is available.
Page 96 of 278
Karachi Nuclear Power Waste Water Neutralizationing, S2TFCWDP004
Plant Unit-2 Recycling and DischargeingLoading
and Unloading Of Bulk Chemicals
PK237SOP24183K06145PC Agent Rev. 0
Operation
Operation Steps Check Identification Remarks
Location
60 seconds after the gas-
water mix
transportingClosedVerify
verify 1 #, 2 # concentrated
gauge available.
ClosedAdd
caustic for neutralization
Further verify concentrated
2029VA600V
alkali inlet valve is closed [ ][ ]
R 1MX101Y
Verify alkali sent by transport [ ]
2TFC BYB
tankers is (31% hydrochloric [ ][ ]
631EF601PO
alkali)Verify motor insulation
of unloading alkali pump
qualified(≥0.5MΩ)
Page 97 of 278
Karachi Nuclear Power Waste Water Neutralizationing, S2TFCWDP004
Plant Unit-2 Recycling and DischargeingLoading
and Unloading Of Bulk Chemicals
PK237SOP24183K06145PC Agent Rev. 0
Operation
Operation Steps Check Identification Remarks
Location
Closed 20
minutes after waste water
recirculation, if waste water
neutralization discharge PH
≤6.0, then: Send personnel
connected temporary pipe
between tankers and [ ][ ][ 2418VL600V 1MX101Y
unloading alkali pump Add ] R B
caustic for Neutralization
Further verify concentrated
alkali inlet valve is
closedVerify alkali sent by
transport tankers is (31%
hydrochloric alkali)
OpenOpenCo
nfirm that temporary
unloading alkali piping didn’t
connect to the wrong position,
and firm! 20 minutes after
waste water recirculation, if
waste water neutralization [ ][ ][ 2426VL2TFC 1MX101Y
discharge PH ≤6.0, then: ] 628VR600VR B
Send personnel connected
temporary pipe between
tankers and unloading alkali
pump Further verify
concentrated alkali inlet valve
is closed
Page 98 of 278
Karachi Nuclear Power Waste Water Neutralizationing, S2TFCWDP004
Plant Unit-2 Recycling and DischargeingLoading
and Unloading Of Bulk Chemicals
PK237SOP24183K06145PC Agent Rev. 0
Operation
Operation Steps Check Identification Remarks
Location
Open 30
seconds after adding caustic
Open unloading alkali pump
inlet valve Open Confirm that
2025VL600V
temporary unloading alkali [ ][ ]
R 1MX101Y
piping didn’t connect to the [ ]
2TFC B
wrong position, and firm!Send [ ][ ]
628VR
personnel connected
temporary pipe between
tankers and unloading alkali
pump
300 seconds after the water
transportingClosedOpen
unloading alkali pump outlet
valve 30 seconds after adding
[ ] 2TFC628VR6
caustic Open unloading alkali YBYB
[ ][ ] 17VR600VR
pump inlet valveConfirm that
temporary unloading alkali
piping didn’t connect to the
wrong position, and firm!
Closed
Recirculate waste water for
15 minutes Send personnel
slightly open the unloading 2426VL2TFC
[ ][ ] 1MX101Y
alkali valve of alkali tanker 628VR
[ ][ ] BYB
ClosedOpen unloading alkali 617VR600VR
pump outlet valveOpen
unloading alkali pump inlet
valve
Page 99 of 278
Karachi Nuclear Power Waste Water Neutralizationing, S2TFCWDP004
Plant Unit-2 Recycling and DischargeingLoading
and Unloading Of Bulk Chemicals
PK237SOP24183K06145PC Agent Rev. 0
Operation
Operation Steps Check Identification Remarks
Location
The risk of
spraying
alkali
Closed If the present in
PH value of water ≤ 6.0, the exhaust
repeat 5.2.4.1 ~ 5.2.4.3 steps process
until PH value is between 6.0 steps, the
and 9.0. After confirm process
unloading alkali pump inlet needs to
pipe filled with alkali, regulate
[ ][ ][ 2025VL617V 1MX101Y
temporary unloading alkali traffic flow
] R B
joint no leakage Recirculate to matches
waste water for 15 with
minutesSend personnel unloading
slightly open the unloading alkali pump
alkali valve of alkali tanker the alkali
Open unloading alkali pump sent
outlet valve personnel
take a
notice of
safety!
Operation
Operation Steps Check Identification Remarks
Location
The risk of
spraying
alkali
present in
the exhaust
ClosedAdd acid for
process
neutralizationSend personnel to
steps, the
open unloading alkali valve of the
process
tanker If the PH value of water ≤
needs to
6.0, repeat 5.2.4.1 ~ 5.2.4.3 steps
regulate
until PH value is between 6.0 and [ ][ ][
2427VL 1MX101 traffic flow
9.0. After confirm unloading alkali ][ ]
to matches
pump inlet pipe filled with alkali,
with
temporary unloading alkali joint no
unloading
leakageSend personnel slightly open
alkali pump
the unloading alkali valve of alkali
the alkali
tanker
sent
personnel
take a
notice of
safety!
Closed 20
minutes after waste
water recirculation, if
waste water
neutralization discharge
PH ≥ 9.0 then:Add acid
for neutralizationSend
[ ][ ][
personnel to open 2429VL 1MX101
]
unloading alkali valve of
the tanker After confirm
unloading alkali pump
inlet pipe filled with
alkali, temporary
unloading alkali joint no
leakage
Operation
Operation Steps Check Identification Remarks
Location
Pipe flushing (about 180 seconds)
Open #2 waste water pond acid inlet
valve Close the unloading alkali pump
power supply switch, set to "Local"
position 20 minutes after waste water [ ][ ] 0SDA601PO YB
recirculation, if waste water
neutralization discharge PH ≥ 9.0
then:Send personnel to open
unloading alkali valve of the tanker
OpenStart unloading alkali
pump Open #2 waste water
2TFC630VR6
pond acid inlet valve Close the [ ][ ][
01PO0SDA60 YBYB
unloading alkali pump power ]
1PO
supply switch, set to "Local"
position
Open 30
seconds after acid
additionVerify unloading
alkali pump outlet
pressure is normal 2019VL601LP
(about [ ][ ][ 2TFC630VR6 1MX101Y
0.20MPa)OpenStart ][ ][ ] 01PO0SDA60 BYBYB
unloading alkali 1PO
pumpClose the
unloading alkali pump
power supply switch, set
to "Local" position
180 seconds after the pipe
flushingClosedVerify
If abnormal,
unloading alkali pump outlet
should be
pipe no leakage 30 seconds
[ ][ ][ 2TFC630VR6 shutdown
after acid additionVerify YBYB
][ ] 01LP601PO unloading
unloading alkali pump outlet
alkali pump
pressure is normal (about
promptly
0.20MPa)Start unloading
alkali pump
Closed If the PH value [ ] 2 1 I
Operation
Operation Steps Check Identification Remarks
Location
of water ≥ 9.0, repeat [ ][ ] 0 M f
5.1.5.1 ~ 5.1.5.3 steps 1 X a
until PH is between 6.0 9 1 b
and 9.0.When unloading V 0 n
the alkali pump outlet L 1 o
pressure indicator 6 Y r
dropped to "0", the alkali 0 B m
tank unload completed, 1 Y a
or 1 #, 2 # concentrated P B l
alkali storage tank level O ,
is higher than the 1.8m, 2 s
shutdown unloading T h
alkali pumpClosedVerify F o
unloading alkali pump C u
outlet pipe no 6 l
leakageVerify unloading 3 d
alkali pump outlet 0
pressure is normal V b
(about 0.20MPa) R e
6
0 s
1 h
L u
P t
d
o
w
n
u
n
l
o
a
d
i
n
g
Operation
Operation Steps Check Identification Remarks
Location
a
l
k
a
l
i
p
u
m
p
p
r
o
m
p
t
l
y
Operation
Operation Steps Check Identification Remarks
Location
ClosedWaste water
DischargingClose
unloading alkali pump
inlet valve If the PH
value of water ≥ 9.0,
repeat 5.1.5.1 ~ 5.1.5.3
steps until PH is
between 6.0 and
9.0.When unloading the
alkali pump outlet [ ][ ][ 2030VL600V 1MX101Y
pressure indicator ][ ][ ] R601PO BYB
dropped to "0", the alkali
tank unload completed,
or 1 #, 2 # concentrated
alkali storage tank level
is higher than the 1.8m,
shutdown unloading
alkali pumpVerify
unloading alkali pump
outlet pipe no leakage
Closed After waste water
neutralization, if PH value is
between 6.0 and 9.0 then:Close
unloading alkali pump outlet
valveWaste water
DischargingClose unloading
alkali pump inlet valveWhen 2023VL617V
[ ][ ][ 1MX101Y
unloading the alkali pump outlet R600VR601P
][ ] BYBYB
pressure indicator dropped to O
"0", the alkali tank unload
completed, or 1 #, 2 #
concentrated alkali storage tank
level is higher than the 1.8m,
shutdown unloading alkali
pump
Operation
Operation Steps Check Identification Remarks
Location
OpenSend personnel removal the
temporary unloading alkali pipeline
between tanker and unloading alkali
the pump, and rinse venue After
[ ][ ][ 2TFC643VK6
waste water neutralization, if PH YBYB
][ ] 17VR600VR
value is between 6.0 and 9.0
then:Close unloading alkali pump
outlet valveClose unloading alkali
pump inlet valve
Before
removing the
temporary
unloading
alkali
pipeline,
ClosedClosedDisc
should be
onnect the unloading alkali
reminded to
pump power supply
send alkali
switchOpenSend personnel 3101VL2TFC
[ ][ ][ Staff: there is
removal the temporary 644VK0SDA6 1MX101Y
][ ][ ] residual
unloading alkali pipeline 01PO2TFC64 BYB
[ ] alkali in pipe
between tanker and unloading 3VK617VR
between
alkali the pump, and rinse
alkali car
venueClose unloading alkali
and unload
pump outlet valve
alkali pump
inlet ,.and
take a
notice of
safety burns
by alkali!
Operation
Operation Steps Check Identification Remarks
Location
Before
removing the
temporary
unloading
Closed When alkali
waste water pond level is pipeline,
lower than 0.5 m.Make a should be
good alkali unloading reminded to
operation send alkali
records.ClosedDisconnect the 3119VK2TFC Staff: there is
[ ][ ][ 1MX101Y
unloading alkali pump power 644VK0SDA6 residual
][ ][ ] B
supply switchSend personnel 01PO alkali in pipe
removal the temporary between
unloading alkali pipeline alkali car
between tanker and unloading and unload
alkali the pump, and rinse alkali pump
venue inlet ,.and
take a
notice of
safety burns
by alkali!
ShutdownAmmonia cylinder
loading and unloading
operations When waste water
2TFC4
pond level is lower than 0.5
72PO0
m.Make a good alkali YB
SDA6
unloading operation
01PO
records.Disconnect the
unloading alkali pump power
supply switch
Operation
Operation Steps Check Identification Remarks
Location
2
T
F
C
6
4
3
V
K
ClosedFurther verify 9
one of liquid ammonia 0
tank 901BA, 902BA has 1
been B
empty.ShutdownAmmo [ ][ ][ ] A
nia cylinder loading and 、
unloading 9
operationsMake a good 0
alkali unloading 2
operation records. B
A
2
T
F
C
4
7
2
P
O
Operation
Operation Steps Check Identification Remarks
Location
Shutdown flushing water
pumpClosedFurther verify
liquid outlet angle valve of
ammonia tank is closed 2TFC641EF
strict.ClosedFurther verify one [ ][ ][ 2TFC643VK
YA005
of liquid ammonia tank ] 901BA、902B
901BA, 902BA has been A
empty.Ammonia cylinder
loading and unloading
operations
ShutdownVerif
y 1 # ammonia cylinder outlet 441PO 1M
angle valve is closed strict 901BA X1
ClosedFurther verify liquid 2TFC6 01
outlet angle valve of ammonia 41EF YA
tank is closed strict.Further 901BA 005
verify one of liquid ammonia 、902B YA
tank 901BA, 902BA has been A 005
empty.
ShutdownVerify 2 #
ammonia cylinder outlet angle
valve is closed strict Verify 1 #
ammonia cylinder outlet angle [ ][ ][ 442PO901BA 1MX101YA
valve is closed strict Further ] 901BA 005YA005
verify liquid outlet angle valve
of ammonia tank is closed
strict.
#4 high-speed mix bed pressure
relieving and gas exhaustingCheck
and confirm that there is no leak case
and aging for the connecting pipes [ ][ ][ YA005YA0
901BA901BA
Verify 2 # ammonia cylinder outlet ] 05YA005
angle valve is closed strict Verify 1 #
ammonia cylinder outlet angle valve
is closed strict
Operation
Operation Steps Check Identification Remarks
Location
Remove empty ammonia
cylindersCheck and confirm that there
is no leak case and aging for the [ ][ ][ YA005YA0
901BA
connecting pipes Verify 2 # ammonia ] 05
cylinder outlet angle valve is closed
strict
OpenIf 1 # ammonia
cylinder (901BA) is empty: Use
wrench to remove slipknot behind 1#
ammonia cylinder outlet angle valve,
remove hose and fittings associated [ ][ ][ 1MX101YA
2404VA901BA
with 1 # ammonia cylinder ][ ] 005YA005
(901BA) .Remove empty ammonia
cylindersCheck and confirm that there
is no leak case and aging for the
connecting pipes
60 seconds after the exhaustingIf 2 #
ammonia cylinder (902BA) is empty:
Use wrench to remove slipknot
behind 2# ammonia cylinder outlet
angle valve, remove hose and fittings
associated with 2 # ammonia cylinder
[ ][ ][ YA005YA0
.If 1 # ammonia cylinder (901BA) is 902BA901BA
] 05
empty: Use wrench to remove
slipknot behind 1# ammonia cylinder
outlet angle valve, remove hose and
fittings associated with 1 # ammonia
cylinder (901BA) .Remove empty
ammonia cylinders
Operation
Operation Steps Check Identification Remarks
Location
ClosedUse a forklift to
transport empty liquid ammonia tank
to chemical warehouse If 2 #
ammonia cylinder (902BA) is empty:
Use wrench to remove slipknot
behind 2# ammonia cylinder outlet
angle valve, remove hose and fittings [ ][ ][ 2404VA902B 1MX101YA
associated with 2 # ammonia cylinder ][ ] A901BA 005YA005
.If 1 # ammonia cylinder (901BA) is
empty: Use wrench to remove
slipknot behind 1# ammonia cylinder
outlet angle valve, remove hose and
fittings associated with 1 # ammonia
cylinder (901BA) .
Special note:
Due to degree
of the road go
into
Separation tower pressure relieving Fangjiashan
and gas exhaustingTake requisition, plant is large,
use a forklift to receive 3 to 5 bottles to avoid the
full of liquid ammonia cylinder (small falling during
cylinders, about 70Kg / bottle) from a tra liquid
chemical warehouse.Use a forklift to ammonia tank
transport empty liquid ammonia tank [ ][ ][ nsport, should
902BA YA005
to chemical warehouse If 2 # ] pad a suitable
ammonia cylinder (902BA) is empty: square
Use wrench to remove slipknot wooden
behind 2# ammonia cylinder outlet between front
angle valve, remove hose and fittings fork of the
associated with 2 # ammonia cylinder forklift and c
. liquid
ammonia tank
fixed cylinder
with a rope .
Operation
Operation Steps Check Identification Remarks
Location
Special note:
recipients
should
confirm the
collar of liquid
ammonia tank
is full,
confirmed the
appearance
of liquid
ammonia
tank, apron
pad, the liquid
Use a forklift to transported full of
angle valve
liquid ammonia tank to the
without
desalination hall , then reuse bottles
injurySpecial
transported by private car to
note: Due to
ammonia bottle room, and fixed on
degree of the
the bracketTake requisition, use a [ ][ ][
YA005 road go into
forklift to receive 3 to 5 bottles full of ]
Fangjiashan
liquid ammonia cylinder (small
plant is large,
cylinders, about 70Kg / bottle) from a
to avoid the
chemical warehouse.Use a forklift to
falling during
transport empty liquid ammonia tank
tra liquid
to chemical warehouse
ammonia tank
nsport, should
pad a suitable
square
wooden
between front
fork of the
forklift and c
liquid
ammonia tank
fixed cylinder
with a rope .
Operation
Operation Steps Check Identification Remarks
Location
Special note:
recipients
OpenConnected hose
should
and fittings of liquid ammonia tank
confirm the
outlet Use a forklift to transported full
collar of liquid
of liquid ammonia tank to the
ammonia tank
desalination hall , then reuse bottles
is full,
transported by private car to [ ][ ][ 1MX101YA
3114VA confirmed the
ammonia bottle room, and fixed on ] 005
appearance
the bracketTake requisition, use a
of liquid
forklift to receive 3 to 5 bottles full of
ammonia
liquid ammonia cylinder (small
tank, apron
cylinders, about 70Kg / bottle) from a
pad, the liquid
chemical warehouse.
angle valve
without injury
60 seconds after the exhaustingIf you
install 1 # ammonia cylinder (901BA):
connected hose and fittings which
connected to 1 # ammonia cylinder
(901BA) with cylinder 1# ammonia.an
outlet angle valve Connected hose
YA005YA0
and fittings of liquid ammonia tank [ ][ ] 901BA
05
outlet Use a forklift to transported full
of liquid ammonia tank to the
desalination hall , then reuse bottles
transported by private car to
ammonia bottle room, and fixed on
the bracket
Operation
Operation Steps Check Identification Remarks
Location
ClosedIf you install 2
# ammonia cylinder (902BA):
connected hose and fittings which
connected to 2 # ammonia cylinder
(902BA) with cylinder 2# ammonia.an
outlet angle valveIf you install 1 #
[ ][ ][ 3114VA902BA 1MX101YA
ammonia cylinder (901BA):
] 901BA 005YA005
connected hose and fittings which
connected to 1 # ammonia cylinder
(901BA) with cylinder 1# ammonia.an
outlet angle valve Connected hose
and fittings of liquid ammonia tank
outlet
Take a good record of ammonia
cylinder loading and unloading
operations.If you install 2 # ammonia
cylinder (902BA): connected hose
and fittings which connected to 2 #
ammonia cylinder (902BA) with
YA005YA0
cylinder 2# ammonia.an outlet angle [ ][ ] 902BA901BA
05
valveIf you install 1 # ammonia
cylinder (901BA): connected hose
and fittings which connected to 1 #
ammonia cylinder (901BA) with
cylinder 1# ammonia.an outlet angle
valve
ClosedCoagulant,
antiscalant agent, reducer agents,
and other RO cleaning drugs loading
and unloading operations.Take a
good record of ammonia cylinder
3030VK902B 1MX101Y
loading and unloading operations.If [ ][ ]
A A005
you install 2 # ammonia cylinder
(902BA): connected hose and fittings
which connected to 2 # ammonia
cylinder (902BA) with cylinder 2#
ammonia.an outlet angle valve
Operation
Operation Steps Check Identification Remarks
Location
When the amount of coagulant,
antiscalant agent, reducer agents and
other RO cleaning drugs are less
than normal amount of two
months ,then submit material
procurement application.Coagulant, [ ]
antiscalant agent, reducer agents,
and other RO cleaning drugs loading
and unloading operations.Take a
good record of ammonia cylinder
loading and unloading operations.
OUTPUT OPERATION OF #5
HIGH-SPEED MIX BED
INEFFECTIVE RESINWHEN THE
AMOUNT OF COAGULANT,
ANTISCALANT AGENT REDUCER
AGENTS, AND OTHER RO
CLEANING DRUGS IS LESS THAN
NORMAL AMOUNT OF 10 DAYS,
DRIVE THE TRUCK TO COLLECT
THE REQUIRED CHEMICAL IN
MATERIALS STORAGE.WHEN
THE AMOUNT OF COAGULANT, [ ][ ]
ANTISCALANT AGENT, REDUCER
AGENTS AND OTHER RO
CLEANING DRUGS ARE LESS
THAN NORMAL AMOUNT OF
TWO MONTHS ,THEN SUBMIT
MATERIAL PROCUREMENT
APPLICATION.COAGULANT,
ANTISCALANT AGENT, REDUCER
AGENTS, AND OTHER RO
CLEANING DRUGS LOADING AND
UNLOADING OPERATIONS.
Operation
Operation Steps Check Identification Remarks
Location
On the "# 1 unit condensate mix bed
unit" control screen, click the "#5
high-speed mix bed" icon, and click
the “Start” button of “Resin output” on
the popped-up "#5 high-speed mix
bed operation" screen. The dialog
box “Transfer #5 high-speed mix bed
resin to SPT separation tower?”
appears, click "Yes" button. The PLC
will transfer the resin according to the
set step sequence:Materials shipped
to the YA building, according to
variety of materials, batch [ ][ ]
classification stored in the chemicals [ ][ ]
warehouse of YA building.When the
amount of coagulant, antiscalant
agent reducer agents, and other RO
cleaning drugs is less than normal
amount of 10 days, drive the truck to
collect the required chemical in
materials storage.When the amount
of coagulant, antiscalant agent,
reducer agents and other RO
cleaning drugs are less than normal
amount of two months ,then submit
material procurement application.
Operation
Operation Steps Check Identification Remarks
Location
Pressure relieving of #5 high-speed
mix bedPrepare materials for the
storage of eye-catching logo, logo
items should contain the name,
material effective period and storage
time.Materials shipped to the YA
building, according to variety of
materials, batch classification stored [ ][ ][
in the chemicals warehouse of YA ]
building.When the amount of
coagulant, antiscalant agent reducer
agents, and other RO cleaning drugs
is less than normal amount of 10
days, drive the truck to collect the
required chemical in materials
storage.
Make a good operating record
storage of chemicals.Prepare
materials for the storage of eye-
catching logo, logo items should
contain the name, material effective [ ][ ][
period and storage time.Materials ]
shipped to the YA building, according
to variety of materials, batch
classification stored in the chemicals
warehouse of YA building.
OpenMake a good
operating record storage of
chemicals.Prepare materials for the
[ ][ ][
storage of eye-catching logo, logo 2504VA 1MX101
]
items should contain the name,
material effective period and storage
time.
After #5 High-speed mix bed relieving
the pressureMake a good operating [ ]
record storage of chemicals.
Closed [ ] 2504VA 1MX101
Operation
Operation Steps Check Identification Remarks
Location
Startup one flushing water pump
[ ]
(441PO or 442PO)
Startup [ ] 441PO 1MX101
Startup [ ] 442PO 1MX101
#4 high-speed mix bed pressure
relieving and gas exhausting
Open [ ] 2404VA 1MX101
60 seconds after the exhausting
Operation
Operation Steps Check Identification Remarks
Location
#5 high-speed mix bed
pressure relieving and gas
exhausting
Open [ ] 2504VA 1MX101
Startup one flushing water pump
[ ]
(441PO or 442PO)
Startup [ ] 441PO 1MX101
Startup [ ] 442PO 1MX101
Gas transporting (about 120 seconds)
Open [ ] 3030VK 1MX101
Open [ ] 3119VK 1MX101
Open [ ] 3101VL 1MX101
Open [ ] 2023VL 1MX101
Open [ ] 2030VL 1MX101
Open [ ] 2527VL 1MX101
Open [ ] 2518VL 1MX101
Open [ ] 2029VA 1MX101
Gas-water mix transporting (about 60
seconds)
120 seconds after the resin gas
transporting e
Open [ ] 2529VL 1MX301
Water transporting (about 300
seconds)
60 seconds after the gas-water mix
transporting
Closed [ ] 2029VA 1MX101
Closed [ ] 2518VL 1MX101
Open [ ] 2526VL 1MX101
Open [ ] 2025VL 1MX101
300 seconds after the water
transporting
Closed [ ] 2526VL 1MX101
Closed [ ] 2025VL 1MX101
Page 119 of 278
Karachi Nuclear Power Waste Water Neutralizationing, S2TFCWDP004
Plant Unit-2 Recycling and DischargeingLoading
and Unloading Of Bulk Chemicals
PK237SOP24183K06145PC Agent Rev. 0
Operation
Operation Steps Check Identification Remarks
Location
Closed [ ] 2527VL 1MX101
Closed [ ] 2529VL 1MX101
Pipe flushing (about 180 seconds)
Open [ ] 2019VL 1MX101
180 seconds after the pipe flushing
Closed [ ] 2019VL 1MX101
Closed [ ] 2030VL 1MX101
Closed [ ] 2023VL 1MX101
Closed [ ] 3101VL 1MX101
Closed [ ] 3119VK 1MX101
Shutdown flushing water pump
Shutdown [ ] 441PO 1MX101
Shutdown [ ] 442PO 1MX101
#5 high-speed mix bed pressure
relieving and gas exhausting
Open [ ] 2504VA 1MX101
60 seconds after the exhausting
Closed [ ] 2504VA 1MX101
Separation tower pressure relieving
and gas exhausting
Open [ ] 3114VA 1MX101
60 seconds after the exhausting
Closed [ ] 3114VA 1MX101
Operation
Operation Steps Check Identification Remarks
Location
On the "# 1 unit condensate mix bed
unit" control screen, click the "#1
high-speed mix bed" icon, and click
the “Start” button of “Resin input” on
the popped-up "#1 high-speed mix
bed operation" screen. The dialog
box “Transfer RST storage tower
resin to #1 high-speed mix bed”
appears, click "Yes" button. The PLC
will transfer the resin according to the
set step sequence:
Startup one flushing water pump
[ ]
(441PO or 442PO)
Startup [ ] 441PO 1MX101
Startup [ ] 442PO 1MX101
Water transporting (about 300
seconds)
Open [ ] 2027VK 1MX101
Open [ ] 2118VL 1MX101
Open [ ] 2126VL 1MX101
Open [ ] 2026VL 1MX101
Open [ ] 2024VL 1MX101
Open [ ] 3402VL 1MX101
Open [ ] 3415VL 1MX101
Gas-water mix transporting (about
120 seconds)
120 seconds after the resin water
transporting
Closed [ ] 3415VL 1MX101
Open [ ] 3412VA 1MX101
Open [ ] 3416VL 1MX101
Water transporting (about 300
seconds)
Operation
Operation Steps Check Identification Remarks
Location
120 seconds after the resin gas
transporting
Operation
Operation Steps Check Identification Remarks
Location
Open [ ] 2106VA 1MX101
Open [ ] 2105VA 1MX101
Closed [ ] 3014VA 1MX101
Closed [ ] 3015VA 1MX101
120 seconds after the resin mixing
flushing
Operation
Operation Steps Check Identification Remarks
Location
Open [ ] 2128VL 1MX101
120 seconds after #1 mix bed
increasing pressure (about 120
seconds)
Closed [ ] 2128VL 1MX101
Mix bed resin mixing and storage
tower is full of water
Open [ ] 3414VA 1MX101
Open [ ] 3415VL 1MX101
Tuning fork switch 301SE acts after
the mix bed resin mixing and storage
tower is full of water
Closed [ ] 3414VA 1MX101
Closed [ ] 3415VL 1MX101
Shutdown flushing water pump
Shutdown [ ] 441PO 1MX101
Shutdown [ ] 442PO 1MX101
#1 mix bed cycling cleaning
Open [ ] 2101VL 1MX101
Startup recirculation pump
Startup [ ] 201PO 1MX101
600 seconds after #1 mix bed self-
cycling cleaning
Open [ ] 2101EO 1MX101
600 seconds after #1 mix bed again
self-cycling cleaning
Shutdown [ ] 201PO 1MX101
Closed [ ] 2018VL 1MX101
[ ] 3014VA 1MX301
Closed [ ] 2118VL 1MX101
Closed [ ] 2101VL 1MX101
Closed [ ] 2101EO 1MX101
Operation
Operation Steps Check Identification Remarks
Location
Input operation of #2 high-speed
mix bed ineffective resin
On the "# 1 unit condensate mix bed
unit" control screen, click the "#2
high-speed mix bed" icon, and click
the “Start” button of “Resin input” on
the popped-up "#2 high-speed mix
bed operation" screen. The dialog
box “Transfer RST storage tower
resin to #2 high-speed mix bed?”
appears, click "Yes" button. The PLC
will transfer the resin according to the
set step sequence:
Startup one flushing water pump
[ ]
(441PO or 442PO)
Startup [ ] 441PO 1MX101
Startup [ ] 442PO 1MX101
Water transporting (about 300
seconds)
Operation
Operation Steps Check Identification Remarks
Location
Water transporting (about 300
seconds)
120 seconds after the resin gas
transporting
Closed [ ] 3412VA 1MX101
Open [ ] 3415VL 1MX101
300 seconds after the water
transporting
Closed [ ] 3415VL 1MX101
Closed [ ] 3416VL 1MX101
Closed [ ] 3402VL 1MX101
Pipe flushing (about 240 seconds))
Open [ ] 3019VL 1MX101
120 seconds after the pipe flushing
Open [ ] 2025VL 1MX301
120 seconds after the continued pipe
flushing
Closed [ ] 3019VL 1MX101
Closed [ ] 2024VL 1MX101
Closed [ ] 2025VL 1MX101
Closed [ ] 2226VL 1MX101
Closed [ ] 2026VL 1MX101
Water discharging (about 120 second
s)
Open [ ] 2204VA 1MX101
120 seconds after discharging water
Closed [ ] 2027VK 1MX101
Closed [ ] 2218VL 1MX101
Startup two Roots fans
(461ZV、462ZV or 463ZV)
Startup [ ] 461ZV 1MX101
Startup [ ] 462ZV 1MX101
Startup [ ] 463ZV 1MX101
Operation
Operation Steps Check Identification Remarks
Location
Resin mixing (about 120 seconds)
Open [ ] 2206VA 1MX101
Open [ ] 2205VA 1MX101
Closed [ ] 3014VA 1MX101
Closed [ ] 3015VA 1MX101
120 seconds after the resin mixing
flushing
Closed [ ] 2205VA 1MX101
Closed [ ] 2206VA 1MX101
Open [ ] 3014VA 1MX301
Open [ ] 3015VA 1MX301
Shutdown Roots fan (461ZV、462ZV
or 463ZV)
Shutdown [ ] 461ZV 1MX101
Shutdown [ ] 462ZV 1MX101
Shutdown [ ] 463ZV 1MX101
#2 mix bed is full of water
Open [ ] 2226VL 1MX101
Open [ ] 2025VL 1MX101
Tuning fork switch 201SE acts after
the # 1 mix bed is full of water
Closed [ ] 2204VA 1MX101
#2 mix bed washing (about 120
seconds)
Open [ ] 2027VK 1MX101
Open [ ] 2218VL 1MX101
120 seconds after the resin washing
Closed [ ] 2027VK 1MX101
Closed [ ] 2226VL 1MX101
Closed [ ] 2025VL 1MX101
#2 mix bed increasing pressure
(about 120 seconds)
Open [ ] 2018VL 1MX101
Operation
Operation Steps Check Identification Remarks
Location
Open [ ] 2228VL 1MX101
120 seconds after #2 mix bed
increasing pressure (about 120
seconds)
Closed [ ] 2228VL 1MX101
Mix bed resin mixing and storage
tower is full of water
Open [ ] 3414VA 1MX101
Open [ ] 3415VL 1MX101
Tuning fork switch 301SE acts after
the mix bed resin mixing and storage
tower is full of water
Closed [ ] 3414VA 1MX101
Closed [ ] 3415VL 1MX101
Shutdown flushing water pump
Shutdown [ ] 441PO 1MX101
Shutdown [ ] 442PO 1MX101
#2 mix bed cycling cleaning
Open [ ] 2201VL 1MX101
Startup recirculation pump
Startup [ ] 201PO 1MX101
600 seconds after #2 mix bed self-
cycling cleaning
Open [ ] 2201EO 1MX101
600 seconds after #2 mix bed again
self-cycling cleaning
Shutdown [ ] 201PO 1MX101
Closed [ ] 2018VL 1MX101
Closed [ ] 2218VL 1MX101
Closed [ ] 2201VL 1MX101
Closed [ ] 2201EO 1MX101
Input operation of #3 high-speed mix
bed ineffective resin
Operation
Operation Steps Check Identification Remarks
Location
On the "# 1 unit condensate mix bed
unit" control screen, click the "#3
high-speed mix bed" icon, and click
the “Start” button of “Resin input” on
the popped-up "#3 high-speed mix
bed operation" screen. The dialog
box “Transfer RST storage tower
resin to #3 high-speed mix bed?”
appears, click "Yes" button. The PLC
will transfer the resin according to the
set step sequence:
Startup one flushing water pump
(441PO or 442PO)
Startup [ ] 441PO 1MX101
Startup [ ] 442PO 1MX101
Water transporting (about 300
seconds)
Open [ ] 2027VK 1MX101
Open [ ] 2318VL 1MX101
Open [ ] 2326VL 1MX101
Open [ ] 2026VL 1MX101
Open [ ] 2024VL 1MX101
Open [ ] 3402VL 1MX101
Open [ ] 3415VL 1MX101
Gas-water mix transporting (about
120 seconds)
300 seconds after the resin water
transporting
Closed [ ] 3415VL 1MX101
Open [ ] 3412VA 1MX101
Open [ ] 3416VL 1MX101
Water transporting (about 300
seconds)
120 seconds after the resin gas
transporting
Operation
Operation Steps Check Identification Remarks
Location
Closed [ ] 3412VA 1MX101
Open [ ] 3415VL 1MX101
300 seconds after the water
transporting
Closed [ ] 3415VL 1MX101
Closed [ ] 3416VL 1MX101
Closed [ ] 3402VL 1MX101
Pipe flushing (about 240 seconds)
Open [ ] 3019VL 1MX101
120 seconds after the pipe flushing
Open [ ] 2025VL 1MX301
120 seconds after the continued pipe
flushing
Closed [ ] 3019VL 1MX101
Closed [ ] 2024VL 1MX101
Closed [ ] 2025VL 1MX101
Closed [ ] 2326VL 1MX101
Closed [ ] 2026VL 1MX101
Water discharging (about 120 second
s)
Open [ ] 2304VA 1MX101
120 seconds after discharging water
Closed [ ] 2027VK 1MX101
Closed [ ] 2318VL 1MX101
Startup two Roots fans
(461ZV、462ZV or 463ZV)
Startup [ ] 461ZV 1MX101
Startup [ ] 462ZV 1MX101
Startup [ ] 463ZV 1MX101
Resin mixing (about 120 seconds)
Open [ ] 2306VA 1MX101
Open [ ] 2305VA 1MX101
Closed [ ] 3014VA 1MX101
Operation
Operation Steps Check Identification Remarks
Location
Closed [ ] 3015VA 1MX101
120 seconds after the resin mixing
flushing
Closed [ ] 2305VA 1MX101
Closed [ ] 2306VA 1MX101
Open [ ] 3014VA 1MX301
Open [ ] 3015VA 1MX301
Shut down Roots fan (461ZV、462ZV
or 463ZV)
Shutdown [ ] 461ZV 1MX101
Shutdown [ ] 462ZV 1MX101
Shutdown [ ] 463ZV 1MX101
#3 mix bed is full of water
Open [ ] 2326VL 1MX101
Open [ ] 2025VL 1MX101
Tuning fork switch 201SE acts after
the # 1 mix bed is full of water
Closed [ ] 2304VA 1MX101
#3 mix bed washing (about 120
seconds)
Open [ ] 2027VK 1MX101
Open [ ] 2318VL 1MX101
120 seconds after the resin washing
Closed [ ] 2027VK 1MX101
Closed [ ] 2326VL 1MX101
Closed [ ] 2025VL 1MX101
#3 mix bed increasing pressure
(about 120 seconds)
Open [ ] 2018VL 1MX101
Open [ ] 2328VL 1MX101
120 seconds after #3 mix bed
increasing pressure (about 120
seconds)
Operation
Operation Steps Check Identification Remarks
Location
Closed [ ] 2328VL 1MX101
Mix bed resin mixing and storage
tower is full of water
Open [ ] 3414VA 1MX101
Open [ ] 3415VL 1MX101
Tuning fork switch 301SE acts after
the mix bed resin mixing and storage
tower is full of water
Closed [ ] 3414VA 1MX101
Closed [ ] 3415VL 1MX101
Shutdown flushing water pump
Shutdown [ ] 441PO 1MX101
Shutdown [ ] 442PO 1MX101
#3 mix bed cycling cleaning
Open [ ] 2301VL 1MX101
Startup recirculation pump
Startup [ ] 201PO 1MX101
600 seconds after #3 mix bed self-
cycling cleaning
Operation
Operation Steps Check Identification Remarks
Location
On the "# 1 unit condensate mix bed
unit" control screen, click the "#4
high-speed mix bed" icon, and click
the “Start” button of “Resin input” on
the popped-up "#4 high-speed mix
bed operation" screen. The dialog
box “Transfer RST storage tower
resin to #4 high-speed mix bed?”
appears, click "Yes" button. The PLC
will transfer the resin according to the
set step sequence:
Startup one flushing water pump
(441PO or 442PO)
Startup [ ] 441PO 1MX101
Startup [ ] 442PO 1MX101
Water transporting (about 300
seconds)
Open [ ] 2027VK 1MX101
Open [ ] 2418VL 1MX101
Open [ ] 2426VL 1MX101
Open [ ] 2026VL 1MX101
Open [ ] 2024VL 1MX101
Open [ ] 3402VL 1MX101
Open [ ] 3415VL 1MX101
Gas-water mix transporting (about
120 seconds)
300 seconds after the resin water
transporting
Closed [ ] 3415VL 1MX101
Open [ ] 3412VA 1MX101
Open [ ] 3416VL 1MX101
Water transporting (about 300
seconds)
120 seconds after the resin gas
transporting
Operation
Operation Steps Check Identification Remarks
Location
Closed [ ] 3412VA 1MX101
Open [ ] 3415VL 1MX101
300 seconds after the water
transporting
Closed [ ] 3415VL 1MX101
Closed [ ] 3416VL 1MX101
Closed [ ] 3402VL 1MX101
Pipe flushing (about 240 seconds)
Open [ ] 3019VL 1MX101
120 seconds after the pipe flushing
Open [ ] 2025VL 1MX301
120 seconds after the continued pipe
flushing
Closed [ ] 3019VL 1MX101
Closed [ ] 2024VL 1MX101
Closed [ ] 2025VL 1MX101
Closed [ ] 2426VL 1MX101
Closed [ ] 2026VL 1MX101
Water discharging (about 120 second
s)
Open [ ] 2404VA 1MX101
120 seconds after discharging water
Closed [ ] 2027VK 1MX101
Closed [ ] 2418VL 1MX101
Startup two Roots fans
(461ZV、462ZV or 463ZV)
Startup [ ] 461ZV 1MX101
Startup [ ] 462ZV 1MX101
Startup [ ] 463ZV 1MX101
Resin mixing (about 120 seconds)
Open [ ] 2406VA 1MX101
Open [ ] 2405VA 1MX101
Closed [ ] 3014VA 1MX101
Operation
Operation Steps Check Identification Remarks
Location
Closed [ ] 3015VA 1MX101
120 seconds after the resin mixing
flushing
Closed [ ] 2405VA 1MX101
Closed [ ] 2406VA 1MX101
Open [ ] 3014VA 1MX301
Open [ ] 3015VA 1MX301
Shutdown Roots fan (461ZV、462ZV
or 463ZV)
Shutdown [ ] 461ZV 1MX101
Shutdown [ ] 462ZV 1MX101
Shutdown [ ] 463ZV 1MX101
#4 mix bed is full of water
Open [ ] 2426VL 1MX101
Open [ ] 2025VL 1MX101
Tuning fork switch 201SE acts after
the # 1 mix bed is full of water
Closed [ ] 2404VA 1MX101
#4 mix bed washing (about 120
seconds)
Open [ ] 2027VK 1MX101
Open [ ] 2418VL 1MX101
120 seconds after the resin washing
Closed [ ] 2027VK 1MX101
Closed [ ] 2426VL 1MX101
Closed [ ] 2025VL 1MX101
#4 mix bed increasing pressure
(about 120 seconds)
Open [ ] 2018VL 1MX101
Open [ ] 2428VL 1MX101
120 seconds after #4 mix bed
increasing pressure (about 120
seconds)
Operation
Operation Steps Check Identification Remarks
Location
Closed [ ] 2428VL 1MX101
Mix bed resin mixing and storage
tower is full of water
Open [ ] 3414VA 1MX101
Open [ ] 3415VL 1MX101
Tuning fork switch 301SE acts after
the mix bed resin mixing and storage
tower is full of water
Closed [ ] 3414VA 1MX101
Closed [ ] 3415VL 1MX101
Shutdown flushing water pump
Shutdown [ ] 441PO 1MX101
Shutdown [ ] 442PO 1MX101
#4 mix bed cycling cleaning
Open [ ] 2401VL 1MX101
Startup recirculation pump
Startup [ ] 201PO 1MX101
600 seconds after #4 mix bed self-
cycling cleaning
Open [ ] 2401EO 1MX101
600 seconds after #4 mix bed again
self-cycling cleaning
Shutdown [ ] 201PO 1MX101
Closed [ ] 2018VL 1MX101
Closed [ ] 2418VL 1MX101
Closed [ ] 2401VL 1MX101
Closed [ ] 2401EO 1MX101
Input operation of #5 high-speed
mix bed ineffective resin
Operation
Operation Steps Check Identification Remarks
Location
On the "# 1 unit condensate mix bed
unit" control screen, click the "#5
high-speed mix bed" icon, and click
the “Start” button of “Resin input” on
the popped-up "#5 high-speed mix
bed operation" screen. The dialog
box “Transfer RST storage tower
resin to #5 high-speed mix bed?”
appears, click "Yes" button. The PLC
will transfer the resin according to
the set step sequence:
Startup one flushing water pump
(441PO or 442PO)
Startup [ ] 441PO 1MX101
Startup [ ] 442PO 1MX101
Water transporting (about 300
seconds)
Operation
Operation Steps Check Identification Remarks
Location
120 seconds after the resin gas
transporting
Closed [ ] 3412VA 1MX101
Open [ ] 3415VL 1MX101
300 seconds after the water
transporting
Closed [ ] 3415VL 1MX101
Closed [ ] 3416VL 1MX101
Closed [ ] 3402VL 1MX101
Pipe flushing (about 240 seconds)
Operation
Operation Steps Check Identification Remarks
Location
Resin mixing (about 120 secon
ds)
Open [ ] 2506VA 1MX101
Open [ ] 2505VA 1MX101
Closed [ ] 3014VA 1MX101
Closed [ ] 3015VA 1MX101
120 seconds after the resin
mixing flushing
Closed [ ] 2505VA 1MX101
Closed [ ] 2506VA 1MX101
Open [ ] 3014VA 1MX301
Open [ ] 3015VA 1MX301
Shut down Roots fan
( 461ZV、462ZV or 463ZV)
Shutdown [ ] 461ZV 1MX101
Shutdown [ ] 462ZV 1MX101
Shutdown [ ] 463ZV 1MX101
#5 mix bed is full of water
Open [ ] 2526VL 1MX101
Open [ ] 2025VL 1MX101
Tuning fork switch 201SE acts
after the # 1 mix bed is full of
water
Closed [ ] 2504VA 1MX101
#5 mix bed washing (about
120 seconds)
Open [ ] 2027VK 1MX101
Open [ ] 2518VL 1MX101
120 seconds after the
resin washing
Closed [ ] 2027VK 1MX101
Closed [ ] 2526VL 1MX101
Closed [ ] 2025VL 1MX101
Operation
Operation Steps Check Identification Remarks
Location
#5 mix bed increasing pressure
(about 120 seconds)
Open [ ] 2018VL 1MX101
Open [ ] 2528VL 1MX101
120 seconds after #5 mix bed
increasing pressure (about
120 seconds)
Closed [ ] 2528VL 1MX101
Mix bed resin mixing and
storage tower is full of water
Open [ ] 3414VA 1MX101
Open [ ] 3415VL 1MX101
Tuning fork switch 301SE acts
after the mix bed resin mixing
and storage tower is full of
water
Closed [ ] 3414VA 1MX101
Closed [ ] 3415VL 1MX101
Shutdown flushing water pump
Shutdown [ ] 441PO 1MX101
Shutdown [ ] 442PO 1MX101
#5 mix bed cycling cleaning
Open [ ] 2501VL 1MX101
Startup recirculation pump
Startup [ ] 201PO 1MX101
600 seconds after #5 mix bed
self-cycling cleaning
Open [ ] 2501EO 1MX101
600 seconds after #5 mix bed
again self-cycling cleaning
Shutdown [ ] 201PO 1MX101
Closed [ ] 2018VL 1MX101
Closed [ ] 2518VL 1MX101
Closed [ ] 2501VL 1MX101
Operation
Operation Steps Check Identification Remarks
Location
Closed [ ] 2501EO 1MX101
4.3 Regeneration operation of
high-speed mix bed
ineffective resin
The scrubbing, stratification
and transportation of the
separation tower resin
Verification and setting of
separation tower
backwash layer
parameters
On the "# 1 unit mix bed
regeneration unit" control
screen, click the "SPT
separation tower" icon, and
click the “Time seeting”
button on the popped-up
"SPT separation tower [ ]
operation" screen. On the
pop-up "SPT separation
tower time setting" screen,
respectively, set the following
parameters of regeneration
step sequence:
Repeated scrubbing times
[ ]
Set to 4 times.
Water filling 1" time
[ ]
Set to 300 seconds.
Draining 1" time
[ ]
Set to 180 Seconds.
Air scrubbing 1" time
[ ]
Set to 600 Seconds.
Draining 2" time
[ ]
Set to 180 Seconds.
Primary separation 1" time
[ ]
Set to 60 Seconds.
Operation
Operation Steps Check Identification Remarks
Location
Primary separation 2" time
[ ]
Set to 1200 Seconds.
Primary separation 3" time
[ ]
Set to 600 Seconds.
Primary separation 4" time
[ ]
Set to 300 Seconds
Primary separation 5" time
[ ]
Set to 300 Seconds
Waiting time of resin output"
[ ]
Set to 300 Seconds.
Anion resin output Time
[ ]
Set to 600 Seconds.
Secondary separation Time
[ ]
Set to 600 Seconds.
Cation resin output Time
[ ]
Set to 900 Seconds.
Pipe flushing" Time
[ ]
Set to 300 Seconds.
Anion tower water-filling time
[ ]
Set to 300 Seconds.
Cation tower water-filling time
[ ]
Set to 300 Seconds
Operation
Operation Steps Check Identification Remarks
Location
Startup [ ] 442PO 1MX101
Startup 1 Roots
fan ( 461ZV 、 462ZV or
463ZV)
Startup [ ] 461ZV 1MX101
Startup [ ] 462ZV 1MX101
Startup [ ] 463ZV 1MX101
Operation
Operation Steps Check Identification Remarks
Location
Repeat the above scrubbing
process (" water filling"
"draining" " water filling ") 4 [ ]
times, and the scrubbing
ends.
Closed [ ] 3114VA 1MX101
Shut down Roots fan
Shutdown [ ] 461ZV 1MX101
Shutdown [ ] 462ZV 1MX101
Shutdown [ ] 463ZV 1MX101
Shutdown the flushing water
pump (441PO or 442PO)
Shutdown [ ] 441PO 1MX101
Shutdown [ ] 442PO 1MX101
Operation
Operation Steps Check Identification Remarks
Location
60 seconds later, adjust the
opening of the separating
tower backwash regulating
441MD 1MX101
valve in order to adjust the
backwash water flow to 70
m3/h.
Adjust the opening [ ] 3001VL 1MX101
Then 1200 seconds later,
adjust the opening of the
separating tower backwash
441MD 1MX101
regulating valve in order to
adjust the backwash water
flow to 45 m3/h.
Adjust the opening [ ] 3001VL 1MX101
Then 300 seconds later, adjust
the opening of the separating
tower backwash regulating
441MD 1MX101
valve in order to adjust the
backwash water flow to 25
m3/h.
Adjust the opening [ ] 3001VL 1MX101
Then 300 seconds later 441MD 1MX101
Closed [ ] 3001VL 1MX101
Then 300 seconds later
Closed [ ] 3103VL 1MX101
Closed [ ] 3104VK 1MX101
Shutdown flushing water pump
(441PO or 442PO)
Shutdown [ ] 441PO 1MX101
Shutdown [ ] 442PO 1MX101
Output anion resin
Operation
Operation Steps Check Identification Remarks
Location
On the "#1 unit mix bed
regeneration unit" screen,
click the "Start" button of
"primary separation ". The
PLC will perform the anion
resin output of separation
tower according to the
following steps:
Startup one flushing water
[ ]
pump (441PO or 442PO)
Startup [ ] 441PO 1MX101
Startup [ ] 442PO 1MX101
Open [ ] 3214VA 1MX101
* Anion
Open [ ] 3215VL 1MX101 tower is full
of water
After the tuning fork switch
(301SE) acts
Closed [ ] 3215VL 1MX101
Closed [ ] 3214VA 1MX101
* Transport
Open [ ] 3210VK 1MX101
anion resin
Open [ ] 3126VL 1MX101
Open [ ] 3110VL 1MX101
600 seconds after the anion
resin output
Open [ ] 3103VL 1MX101
600 seconds after delaying
* Transport
Closed [ ] 3110VL 1MX101
anion resin
Closed [ ] 3103VL 1MX101
Closed [ ] 3126VL 1MX101
Closed [ ] 3210VK 1MX101
Operation
Operation Steps Check Identification Remarks
Location
* Re-
Open [ ] 3104VK 1MX101
stratification
Open [ ] 3103VL 1MX101
Operation
Operation Steps Check Identification Remarks
Location
900 seconds after the cation
resin output, and after the
resin interface photoelectric
switch 311SM acts
Closed [ ] 3102VL 1MX101
Operation
Operation Steps Check Identification Remarks
Location
Closed [ ] 3301VL 1MX101
Open [ ] 3119VK 1MX101
Open [ ] 3101VL 1MX101
Open [ ] 3130VL 1MX101
300 seconds after the resin
pipe flushing
Closed [ ] 3019VL 1MX101
Closed [ ] 3101VL 1MX101
Closed [ ] 3130VL 1MX101
Closed [ ] 3119VK 1MX101
Closed [ ] 3030VK 1MX101
Shutdown the flushing pump
Shutdown [ ] 441PO 1MX101
Shutdown [ ] 442PO 1MX101
Regeneration operation of
mix bed anion resin
Parameters setting of ART anion
regeneration tower
Operation
Operation Steps Check Identification Remarks
Location
On the "# 1 unit mix bed
of the regeneration
step sequence:
Operation
Operation Steps Check Identification Remarks
Location
replacement time
[ ]
Set to 2700 seconds.
fast flushing 1 time
[ ]
Set to 2700 seconds.
draining 2 time
[ ]
Set to 180 seconds.
air scrubbing 2 time
[ ]
Set to 600 seconds.
pressure increasing 2 time
[ ]
Set to 60 seconds.
side draining 2 time
[ ]
Set to 60 seconds
bottom draining 2 time
[ ]
Set to 60 seconds.
water filling 2 time
[ ]
Set to 600 seconds.
fast flushing " time
[ ]
Set to 1200 seconds.
Anion resin repeated scrubbing
On "ART anion tower
operation" screen, click the
"Start" button of "Repeated
scrubbing". The PLC
perform the repeated
scrubbing of the resin in
ART anion tower:
Startup one flushing water
[ ]
pump (441PO or 442PO)
Startup [ ] 441PO 1MX101
Startup [ ] 442PO 1MX101
Startup one Roots fan
(461ZV, 462ZV or 463ZV)
Startup [ ] 461ZV 1MX101
Startup [ ] 462ZV 1MX101
Startup [ ] 463ZV 1MX101
Operation
Operation Steps Check Identification Remarks
Location
Open [ ] 3030VK 1MX101
Open [ ] 3214VA 1MX101
Open [ ] 3227VK 1MX101 * Draining 1
180 seconds after the
draining
Closed [ ] 3227VK 1MX101
Open [ ] 3211VA 1MX101
* Scrubbing
Closed [ ] 3014VA 1MX101
1
Closed [ ] 3015VA 1MX101
Open [ ] 3216VL 1MX101
600 seconds after the
scrubbing
Closed [ ] 3211VA 1MX101
Open [ ] 3014VA 1MX101
* Scrubbing
1
Open [ ] 3015VA 1MX101
Operation
Operation Steps Check Identification Remarks
Location
* Water-
Open [ ] 3216VL 1MX101
filling
600 seconds after the water
filling
Closed [ ] 3216VL 1MX101
Closed [ ] 3214VA 1MX101
Repeat the above scrubbing
process ("draining 1"
"scrubbing 1" "pressure
increasing 1" "fast draining""
water filling") 10 times, and
the scrubbing ends.
Shut down Roots fan
Shutdown [ ] 461ZV 1MX101
Shutdown [ ] 462ZV 1MX101
Shutdown [ ] 463ZV 1MX101
* Full of
Open [ ] 3214VA 1MX101
water
Operation
Operation Steps Check Identification Remarks
Location
Closed [ ] 3215VL 1MX101
Operation
Operation Steps Check Identification Remarks
Location
Open [ ] 3210VK 1MX101
Open [ ] 3207VR 1MX101
* Pre-
Open [ ] 4204VD 1MX101
injection
The regeneration flow should
[ ] 421MD 1MX101
be between 25 ~ 28m3 / h
The regeneration water
temperature should be [ ] 421KT 1MX101
between 35 ~ 40 ℃
The vacuum pressure of
alikali inlet of alkali ejector
[ ] 421EJ
should be less than -
0.05MPa.
minutes after the pre-
injection
Open [ ] 4201VR 1MX101
* Alkali
Alkali concentration of
recycling solution should be entering
3.5% ~ 5.5% regeneration
Operation
Operation Steps Check Identification Remarks
Location
45 minutes after the
*
replacement of the anion
Replacement
regeneration tower
Closed [ ] 4204VD 1MX101
Closed [ ] 3207VR 1MX101
Shutdown one regeneration
pump (443PO or 444PO)
Shutdown [ ] 443PO 1MX101
Shutdown [ ] 444PO 1MX101
Startup one flushing water
pump (441PO or 442PO)
Startup [ ] 441PO 1MX101
Startup [ ] 442PO 1MX101
Startup one Roots fan
(461ZV, 462ZV or 463ZV)
Startup [ ] 461ZV 1MX101
Startup [ ] 462ZV 1MX101
Startup [ ] 463ZV 1MX101
Operation
Operation Steps Check Identification Remarks
Location
600 seconds after the scrubbing
Closed [ ] 3211VA 1MX101
Open [ ] 3014VA 1MX101
Open [ ] 3015VA 1MX101
Closed [ ] 3216VL 1MX101
Closed [ ] 3214VA 1MX101
* Pressure
increasing 2
Open [ ] 3212VA 1MX101
60 seconds after the pressure
increasing and keeping
Closed [ ] 3212VA 1MX101
* Fast
Open [ ] 3210VK 1MX101
draining 2
60 seconds after the draining
Closed [ ] 3210VK 1MX101
Operation
Operation Steps Check Identification Remarks
Location
Repeat the above scrubbing
process ("draining 2" -
"scrubbing 2" - "pressure
[ ]
increasing 2" - "fast draining
2"-" water filling 2") 4 times, and
the scrubbing ends.
Shutdown Roots fan
Shutdown [ ] 461ZV 1MX101
[ ] 3327VK 1MX101
Shutdown [ ] 462ZV 1MX101
Shutdown [ ] 463ZV 1MX101
Operation
Operation Steps Check Identification Remarks
Location
Closed [ ] 3201EF 1MX101
Closed [ ] 3031VK
Shutdown flushing water pump
Shutdown [ ] 441PO 1MX101
Shutdown [ ] 442PO 1MX101
Regeneration operation of mix bed
cation resin
Operation
Operation Steps Check Identification Remarks
Location
bottom draining 1 time
[ ]
Set to 60 seconds.
alkali entering time
[ ]
Set to 3600 seconds.
replacement time
[ ]
Set to 2700 seconds.
fast flushing 1" time
[ ]
Set to 2700 seconds.
draining 2 time
[ ]
Set to 180 seconds.
air scrubbing 2 time
[ ]
Set to 600 seconds.
pressure increasing 2 time
[ ]
Set to 60 seconds.
side draining 2 time
[ ]
Set to 60 seconds.
bottom draining 2 time
[ ]
Set to 60 seconds.
water filling 2 time
[ ]
Set to 600 seconds.
fast flushing 2 time
[ ]
Set to 1200 seconds.
Cation resin repeated scrubbing
On "CRT cation tower operation"
screen, click the "Start" button
of "Repeated scrubbing". The
[ ]
PLC perform the repeated
scrubbing of the resin in CRT
cation tower
Startup one flushing water pump
[ ]
(441PO or 442PO)
Startup [ ] 441PO 1MX101
Startup [ ] 442PO 1MX101
Startup one Roots fan (461ZV,
462ZV or 463ZV)
Operation
Operation Steps Check Identification Remarks
Location
Startup [ ] 461ZV 1MX101
Startup [ ] 462ZV 1MX101
Startup [ ] 463ZV 1MX101
Open [ ] 3030VK 1MX101
Open [ ] 3314VA 1MX101 * Draining 1
Open [ ] 3327VK 1MX101 * Draining 1
180 seconds after the draining
Closed [ ] 3327VK 1MX101
Open [ ] 3311VA 1MX101
Closed [ ] 3014VA 1MX101
Closed [ ] 3015VA 1MX101
Open [ ] 3316VL 1MX101
* Scrubbing
600 seconds after the scrubbing
1
Closed [ ] 3311VA 1MX101
Open [ ] 3014VA 1MX101
Open [ ] 3015VA 1MX101
Closed [ ] 3316VL 1MX101
Closed [ ] 3314VA 1MX101
Open [ ] 3312VA 1MX101
60 seconds after the pressure * Pressure
increasing and keeping increasing 1
Closed [ ] 3312VA 1MX101
Open [ ] 3327VK 1MX101
Open [ ] 3310VK 1MX101
* Fast
60 seconds after the draining
draining
Closed [ ] 3310VK 1MX101
Closed [ ] 3327VK 1MX101
Open [ ] 3314VA 1MX101
* Water-
Open [ ] 3316VL 1MX101
filling
600 seconds after the water filling
Operation
Operation Steps Check Identification Remarks
Location
Closed [ ] 3316VL 1MX101
Closed [ ] 3314VA 1MX101
* Full of
Open [ ] 3314VA 1MX101
water
Operation
Operation Steps Check Identification Remarks
Location
regeneration
Operation
Operation Steps Check Identification Remarks
Location
The regeneration flow (411MD)
should be between 25 ~ 28m3 / [ ] 411MD 1MX101
h
* Pre-
Closed [ ] 3310VK 1MX101
injection
The vacuum pressure of acid inlet of
acid ejector should be less than [ ] 411EJ 1MP303
-0.05MPa.
Operation
Operation Steps Check Identification Remarks
Location
Shutdown one regeneration pump
[ ]
(443PO or 444PO)
Shutdown [ ] 443PO 1MX101
Shutdown [ ] 444PO 1MX101
Startup one flushing water pump
[ ]
(441PO or 442PO)
Startup [ ] 441PO 1MX101
Startup [ ] 442PO 1MX101
Startup one Roots fan (461ZV,
462ZV or 463ZV)
Startup [ ] 461ZV 1MX101
Startup [ ] 462ZV 1MX101
Startup [ ] 463ZV 1MX101
Open [ ] 3315VL 1MX101
20 minutes after the washing of * Fast
cation regeneration tower flushing 1
Closed [ ] 3315VL 1MX101
Closed [ ] 3310VK 1MX101
Open [ ] 3314VA 1MX101
Open [ ] 3327VK 1MX101 * Draining 2
180 seconds after the draining
Closed [ ] 3327VK 1MX101
Operation
Operation Steps Check Identification Remarks
Location
Closed [ ] 3314VA 1MX101
Open [ ] 3312VA 1MX101
60 seconds after the pressure * Pressure
increasing and keeping increasing 2
Closed [ ] 3312VA 1MX101
Open [ ] 3327VK 1MX101
Open [ ] 3310VK 1MX101
* Fast
60 seconds after the draining
draining 2
Closed [ ] 3310VK 1MX101
Closed [ ] 3327VK 1MX101
Operation
Operation Steps Check Identification Remarks
Location
Closed [ ] 3314VA 1MX101
5 minutes after the washing
of cation tower
Open [ ] 3301EF 1MX101
When the conductivity of *Fast
recycling water is less than flushing 2
10 us/cm
Open [ ] 3031VK 1MX101
Closed [ ] 3030VK 1MX101
15minutes after the washing
of cation tower
Closed [ ] 3315VL 1MX101
Closed [ ] 3310VK 1MX101
Closed [ ] 3301EF 1MX101
Closed [ ] 3031VK
Shutdown flushing water pum
p
Shutdown [ ] 441PO 1MX101
Shutdown [ ] 442PO 1MX101
Strengthened cleaning
regenerated resin
On the "#1 unit mix bed
regeneration unit" screen,
click the "resin cleaning"
button. The PLC will clean
the resin of the ART anion
regeneration tower and the
CRT cation regeneration
tower according to the
following set step sequence:
Open [ ] 3031VK 1MX101
Startup one flushing water
pump (441PO or 442PO)
Startup [ ] 441PO 1MX101
Page 167 of 278
Karachi Nuclear Power Waste Water Neutralizationing, S2TFCWDP004
Plant Unit-2 Recycling and DischargeingLoading
and Unloading Of Bulk Chemicals
PK237SOP24183K06145PC Agent Rev. 0
Operation
Operation Steps Check Identification Remarks
Location
Startup [ ] 442PO 1MX101
Open [ ] 3227VK 1MX101
Open [ ] 3327VK 1MX101
Open [ ] 3216VL 1MX101
Open [ ] 3316VL 1MX101
Open [ ] 3071EF 1MX101
120 minutes after the anion
tower resin cleaning
[ ] 3316VL 1MX101
Closed [ ] 3227VK 1MX101
Closed [ ] 3216VL 1MX101
120 minutes after the cation
tower resin cleaning
Closed [ ] 3327VK 1MX101
Closed [ ] 3316VL 1MX101
Closed [ ] 3071EF 1MX101
Open [ ] 3314VA 1MX101
Open [ ] 3315VA 1MX101
The cation tower is full of
water until the level switch
(301SE) acts
Open [ ] 3310VK 1MX101
Closed [ ] 3314VA 1MX101
Open [ ] 3301EF 1MX101
10 minutes after the cation
tower washing
Closed [ ] 3315VL 1MX101
Closed [ ] 3310VK 1MX101
Closed [ ] 3301EF 1MX101
Open [ ] 3214VA 1MX101
Open [ ] 3215VA 1MX101
Operation
Operation Steps Check Identification Remarks
Location
The anion tower is full of
water until the level switch
(301SE) acts
Open [ ] 3210VK 1MX101
Closed [ ] 3214VA 1MX101
Open [ ] 3201EF 1MX101
10 minutes after the anion
tower washing
Closed [ ] 3215VL 1MX101
Closed [ ] 3210VK 1MX101
Closed [ ] 3201EF 1MX101
Shutdown flushing water pum
p
Shutdown [ ] 441PO 1MX101
Shutdown [ ] 442PO 1MX101
Closed [ ] 3031VK 1MX101
Output the cation and anion
towers regenerated resin to
the storage tower
Setting of cation tower resin
output parameters
Operation
Operation Steps Check Identification Remarks
Location
Operation
Operation Steps Check Identification Remarks
Location
Open [ ] 3302VL 1MX101
Open [ ] 3316VL 1MX101
Open [ ] 3315VL 1MX101
120 seconds after the water
delivery
Closed [ ] 3315VL 1MX101
Open [ ] 3312VA 1MX101
120 seconds after the gas
delivery
Closed [ ] 3312VA 1MX101
120 seconds after the gas-
water mixed delivery
Closed [ ] 3316VL 1MX101
Open [ ] 3315VL 1MX101
300 seconds after the pipe
flushing
Closed [ ] 3302VL 1MX101
Closed [ ] 3410VK 1MX101
Closed [ ] 3401VL 1MX101
output parameters
Operation
Operation Steps Check Identification Remarks
Location
On the "# 1 unit mix bed
regeneration unit" control
screen, click the "ART anion
regeneration tower" icon,
and click the "Time setting"
button on the popped-up
"ART anion tower
operation" screen. On the
popped-up "ART anion
tower time setting" screen,
respectively, set the
following parameters of the
regeneration
step sequence:
Hydraulic delivery time
[ ]
Set to 180 seconds
Moisture delivery time
[ ]
Set to 600 seconds
Pipe flushing time
[ ]
Set to 60 seconds
Anion tower full water time
[ ]
Set to 60 seconds
Anion tower resin outputted to the
storage tower
Operation
Operation Steps Check Identification Remarks
Location
Startup [ ] 441PO 1MX101
Startup [ ] 442PO 1MX101
Open [ ] 3414VA 1MX101
Open [ ] 3415VL 1MX101
The RST storage tower is full
of water until the level
switch (301SE) acts
Closed [ ] 3414VA 1MX101
Closed [ ] 3415VL 1MX101
Open [ ] 3410VK 1MX101
Open [ ] 3401VL 1MX101
Open [ ] 3202VL 1MX101
Open [ ] 3216VL 1MX101
Open [ ] 3215VL 1MX101
120 seconds after the water
delivery
Closed [ ] 3215VL 1MX101
Open [ ] 3212VA 1MX101
120 seconds after the gas
delivery
Closed [ ] 3212VA 1MX101
120 seconds after the gas-
water mixed delivery
Closed [ ] 3216VL 1MX101
Open [ ] 3215VL 1MX101
300 seconds after the pipe
flushing
Closed [ ] 3202VL 1MX101
Closed [ ] 3410VK 1MX101
Closed [ ] 3401VL 1MX101
Open [ ] 3214VA 1MX101
The ART anion tower is full of
water until the level switch
(301SE) acts
Page 173 of 278
Karachi Nuclear Power Waste Water Neutralizationing, S2TFCWDP004
Plant Unit-2 Recycling and DischargeingLoading
and Unloading Of Bulk Chemicals
PK237SOP24183K06145PC Agent Rev. 0
Operation
Operation Steps Check Identification Remarks
Location
Closed [ ] 3214VA 1MX101
Closed [ ] 3215VL 1MX101
Shutdown flushing water pum
p
Stop [ ] 441PO 1MX101
Stop [ ] 442PO 1MX101
Closed [ ] 3031VK 1MX101
Mix operation of the resin in the
RST storage tower
Settings of the RST storage tower
Operation
Operation Steps Check Identification Remarks
Location
RSTstorage tower resin mixing
Operation
Operation Steps Check Identification Remarks
Location
Open [ ] 3014VA 1MX101
Open [ ] 3015VA 1MX101
Shutdown Roots fan (461ZV,
462ZV or 463ZV)
Shutdown [ ] 461ZV 1MX101
Shutdown [ ] 462ZV 1MX101
Shutdown [ ] 463ZV 1MX101
5. SHUT DOWN
Operation
Operation Steps Check Identification Remarks
Location
Under normal condition, do not
perform the shutdown
operation during
programmable control process
of the resin transferring and
regeneration. If the pipelines,
equipment, or programs fault
during the operation, and the
given task (the resin input,
output, and regeneration)
cannot be continued to
perform, shall manually click
the “Stop” buttons on
corresponding control screens
to abort the program
execution, so that the device
status can be
reset.SHUTDOWN
OPERATION OF #1 WASTE
WATER POND
NEUTRALIZATION NO
5.1 Shutdown operation of
high-speed mix bed resin
outputOn the "#1 unit
wastewater, demineralized
water, unit" control screen,
click the icon "#1 wastewater
pond " and click the
“shutdown” button of "
wastewater neutralization " on
the popped-up "#1 wastewater
pond operation " screen, PLC
will shutdown neutralization
and discharging the
wastewater of #1 wastewater
pond according to the
following steps:
Operation
Operation Steps Check Identification Remarks
Location
Shutdown operation of # 1 high-
speed mix bed resin [ ] 2TFC471PO
outputShutdown
On the "# 1 unit condensate Mix
bed unit" control screen, click
the "#1 High-speed mix bed "
icon, and click the “Stop” button
of the “Resin output” on the
popped-up "#1 High-speed mix
bed operation" screen. The
dialog box "Stop transferring the
#1 High-speed mix bed resin to []
the SPT separetion tower?"
appears, click "Yes" button. The
PLC will shut down the flushing
water pumps and close the
related valves according to the
pre-set step sequence. The
program will return to "0" to
reset.Close the following valves
Closed [ ] 2TFC627VR
Shutdown flushing water
[ ] 2TFC629VR
pumpsClosed
441PO2TFC
ShutdownClosed [ ][ ] 1MX101
633VK
442PO2TFC
ShutdownClosed [ ][ ] 1MX101
634VK
Close the following valvesClosed [ ] 2TFC631EF
ClosedSHUTDOWN
OPERATION OF #2 WASTE
[] 2029VA 1MX101
WATER POND
NEUTRALIZATION
ClosedOn the "#1 [] 2019VL 1MX101
unit wastewater,
demineralized
water, recycling
water unit" control
Page 178 of 278
Karachi Nuclear Power Waste Water Neutralizationing, S2TFCWDP004
Plant Unit-2 Recycling and DischargeingLoading
and Unloading Of Bulk Chemicals
PK237SOP24183K06145PC Agent Rev. 0
Operation
Operation Steps Check Identification Remarks
Location
screen, click the
icon "#2
wastewater pond "
and click the
“shutdown” button
of " wastewater
neutralization " on
the popped-up "#2
wastewater pond
operation " screen,
PLC will shutdown
neutralization and
discharging the
wastewater of #2
wastewater pond
according to the
following steps:
2025VL2TF
ClosedShutdown [ ][ ] 1MX101
C472PO
ClosedClose the
[] 2030VL 1MX101
following valves
2TFC628
Closed [ ]
VR
2104VA2TF
ClosedClosed [ ][ ] 1MX101
C630VR
2118VL2TF
ClosedClosed [ ][ ] 1MX101
C643VK
Closed [ ] 2TFC644VK
Closed [ ] 2TFC641EF
Closed [] 2126VL 1MX101
Closed [] 2127VL 1MX101
Closed [] 2129VL 1MX101
Closed [] 2023VL 1MX101
Closed [] 3101VL 1MX101
Closed [] 3119VK 1MX101
Closed [] 3114VA 1MX101
Page 179 of 278
Karachi Nuclear Power Waste Water Neutralizationing, S2TFCWDP004
Plant Unit-2 Recycling and DischargeingLoading
and Unloading Of Bulk Chemicals
PK237SOP24183K06145PC Agent Rev. 0
Operation
Operation Steps Check Identification Remarks
Location
Closed [] 3030VK 1MX101
The PLC control program "Resin
output" will return to "0" to reset: the [] 1MP302
"Startup" control button is available.
Operation
Operation Steps Check Identification Remarks
Location
Closed [] 2227VL 1MX101
Closed [] 2229VL 1MX101
Closed [] 2023VL 1MX101
Closed [] 3101VL 1MX101
Closed [] 3119VK 1MX101
Closed [] 3114VA 1MX101
Closed [] 3030VK 1MX101
The PLC control program
"Resin output" will return to "0"
[] 1MP302
to reset: the "Startup" control
button is available.
Operation
Operation Steps Check Identification Remarks
Location
Closed [] 2019VL 1MX101
Closed [] 2025VL 1MX101
Closed [] 2030VL 1MX101
Closed [] 2304VA 1MX101
Closed [] 2318VL 1MX101
Closed [] 2326VL 1MX101
Closed [] 2327VL 1MX101
Closed [] 2329VL 1MX101
Closed [] 2023VL 1MX101
Closed [] 3101VL 1MX101
Closed [] 3119VK 1MX101
Closed [] 3114VA 1MX101
Closed [] 3030VK 1MX101
The PLC control program
"Resin output" will return to "0"
[] 1MP302
to reset: the "Startup" control
button is available.
Operation
Operation Steps Check Identification Remarks
Location
pre-set step sequence. The
program will return to "0" to
reset.
Shutdown flushing water pumps
Shutdown [] 441PO 1MX101
Shutdown [] 442PO 1MX101
Close the following valves
Closed [] 2029VA 1MX101
Closed [] 2019VL 1MX101
Closed [] 2025VL 1MX101
Closed [] 2030VL 1MX101
Closed [] 2404VA 1MX101
Closed [] 2418VL 1MX101
Closed [] 2426VL 1MX101
Closed [] 2427VL 1MX101
Closed [] 2429VL 1MX101
Closed [] 2023VL 1MX101
Closed [] 3101VL 1MX101
Closed [] 3119VK 1MX101
Closed [] 3114VA 1MX101
Closed [] 3030VK 1MX101
The PLC control program
"Resin output" will return to "0"
[] 1MP302
to reset: the "Startup" control
button is available.
Shutdown operation of #5 high-speed
mix bed resin output
On the "# 1 unit condensate Mix []
bed unit" control screen, click the
"#5 High-speed mix bed " icon, and
click the “Stop” button of the “Resin
output” on the popped-up "#5 High-
speed mix bed operation" screen.
Operation
Operation Steps Check Identification Remarks
Location
The dialog box "Stop transferring
the #5 High-speed mix bed resin to
the SPT separetion tower?"
appears, click "Yes" button. The
PLC will shut down the flushing
water pumps and close the related
valves according to the pre-set step
sequence. The program will return
to "0" to reset.
6. Shutdown
Identifi
Operation / check Position Remarks
cation
Operation
Operation Steps Check Identification Remarks
Location
Closed [] 2526VL 1MX101
Operation
Operation Steps Check Identification Remarks
Location
popped-up "#1 mix bed
operation" screen. The dialog
box: "Stop transferring the RST
storage tower resin to #1 high-
speed mix bed?" appears, click
"Yes" button. The PLC will,
according to the following pre-
set steps, shutdown flushing
water pumps, shutdown Roots
pumps, and close related
valves. The program will return
"0" to reset.
3 6. Shutdown 4
6
I
d
e
n
t
i
7Positi 8Rema
5 Operation / check f 9
on rks
i
c
a
t
i
o
n
Operation
Operation Steps Check Identification Remarks
Location
Shutdown [] 442PO 1MX101
Operation
Operation Steps Check Identification Remarks
Location
Closed [] 2105VA 1MX101
6. Shutdown
Identifi
Operation / check Position Remarks
cation
12
Operation
Operation Steps Check Identification Remarks
Location
speed mix bed ineffective resin
regeneration
On the "# 1 unit condensate
cation bed unit" control screen,
click the "#2 high-speed mix bed"
icon and click the "Stop" button
of "resin input" on the popped-up
"#2 mix bed operation" screen.
The dialog box: "Stop
transferring the RST storage
tower resin to #2 high-speed mix []
bed?" appears, click "Yes"
button. The PLC will, according
to the following pre-set steps,
shutdown flushing water pumps,
shutdownshut down Roots
pumps, and close related valves.
The program will return "0" to
reset.
13
Operation
Operation Steps Check Identification Remarks
Location
Shutdown Roots fans
6. Shutdown
Identifi
Operation / check Position Remarks
cation
Operation
Operation Steps Check Identification Remarks
Location
17
Operation
Operation Steps Check Identification Remarks
Location
tower resin to #3 high-speed mix
bed?" appears, click "Yes"
button. The PLC will, according
to the following pre-set steps,
shutdown flushing water pumps,
shut down Roots pumps, and
close related valves. The
program will return "0" to reset.
18
19 6. Shutdown 20
22
I
d
e
n
t
i 23 24
21 Operation / check f Positio Remar 25
i n ks
c
a
t
i
o
n
Operation
Operation Steps Check Identification Remarks
Location
Operation
Operation Steps Check Identification Remarks
Location
Closed [] 2106VA 1MX101
6. Shutdown
Identifi
Operation / check Position Remarks
cation
29
Operation
Operation Steps Check Identification Remarks
Location
Shutdown operation of #4 high-
speed mix bed ineffective resin
regeneration
Operation
Operation Steps Check Identification Remarks
Location
6. Shutdown
IDE
NTIF REMARK
Operation / check POSITION
ICAT S
ION
Operation
Operation Steps Check Identification Remarks
Location
Operation
Operation Steps Check Identification Remarks
Location
Operation
Operation Steps Check Identification Remarks
Location
6. Shutdown
IDE
NTIF REMARK
Operation / check POSITION
ICAT S
ION
Operation
Operation Steps Check Identification Remarks
Location
Operation
Operation Steps Check Identification Remarks
Location
Operation
Operation Steps Check Identification Remarks
Location
6. Shutdown
IDE
NTIF REMARK
Operation / check POSITION
ICAT S
ION
Operation
Operation Steps Check Identification Remarks
Location
5.3[5.10] Shutdown operation
of high-speed mix bed
ineffective resin regeneration
Shutdown operation of the SPT
separation tower
If the regeneration program is
performing the resin
scrubbing operation: on the
"SPT separation tower
operation" screen, click the
"Stop" button of "Repeated
scrubbing". The PLC will,
according to the following pre-
set steps, stop the scrubbing
operation of the resin in SPT
separation tower, shutdown
flushing water pumps,
shutdown Roots pumps, and
close related valves. The
program will return to "0" to
reset.
Operation
Operation Steps Check Identification Remarks
Location
Operation
Operation Steps Check Identification Remarks
Location
6. Shutdown
IDE
NTIF REMARK
Operation / check POSITION
ICAT S
ION
Operation
Operation Steps Check Identification Remarks
Location
operation: on the "SPT
separation tower operation"
screen, click the "Stop" button
of "Primary separation". The
PLC will, according to the
following pre-set steps, stop
the backwashing stratification
operation of the SPT
separation tower, shutdown
flushing water pumps, and
close related valves. The
program will return to "0" to
reset.
Operation
Operation Steps Check Identification Remarks
Location
6. Shutdown
IDE
NTIF REMARK
Operation / check POSITION
ICAT S
ION
If the regeneration program
is performing the anion resin
output operation: on the
"SPT separation tower
operation" screen, click the
"Stop" button of "Anion resin
output". The PLC will,
according to the following
pre-set steps, stop the anion
Page 207 of 278
Karachi Nuclear Power Waste Water Neutralizationing, S2TFCWDP004
Plant Unit-2 Recycling and DischargeingLoading
and Unloading Of Bulk Chemicals
PK237SOP24183K06145PC Agent Rev. 0
Operation
Operation Steps Check Identification Remarks
Location
resin output operation of the
SPT separation tower,
shutdown flushing water
pumps, and close related
valves. The program will
return to "0" to reset.
Operation
Operation Steps Check Identification Remarks
Location
Operation
Operation Steps Check Identification Remarks
Location
return to "0" to reset.
6. Shutdown
IDE
NTIF REMARK
Operation / check POSITION
ICAT S
ION
Operation
Operation Steps Check Identification Remarks
Location
Operation
Operation Steps Check Identification Remarks
Location
6. Shutdown
IDE
NTIF REMARK
Operation / check POSITION
ICAT S
ION
Operation
Operation Steps Check Identification Remarks
Location
Operation
Operation Steps Check Identification Remarks
Location
Operation
Operation Steps Check Identification Remarks
Location
valves. The program will
return to "0" to reset.
6. Shutdown
IDE
NTIF REMARK
Operation / check POSITION
ICAT S
ION
[] 463ZV 1MX101
Shutdown
Page 215 of 278
Karachi Nuclear Power Waste Water Neutralizationing, S2TFCWDP004
Plant Unit-2 Recycling and DischargeingLoading
and Unloading Of Bulk Chemicals
PK237SOP24183K06145PC Agent Rev. 0
Operation
Operation Steps Check Identification Remarks
Location
Operation
Operation Steps Check Identification Remarks
Location
6. Shutdown
IDE
NTIF REMARK
Operation / check POSITION
ICAT S
ION
Operation
Operation Steps Check Identification Remarks
Location
If the regeneration program is
performing the anion resin
output to RST operation: on
the "ART anion tower
operation" screen, click the
"Stop" button of "Anion resin
output". The PLC will,
according to the following pre-
set steps, stop the anion resin
output operation of the ART
anion tower, shutdown
flushing water pumps, and
close related valves. The
program will return to "0" to
reset.
Operation
Operation Steps Check Identification Remarks
Location
[] 1MP302
The PLC control program of
"Anion resin output" of ART
anion tower will return to "0"
Operation
Operation Steps Check Identification Remarks
Location
6. Shutdown
IDE
NTIF REMARK
Operation / check POSITION
ICAT S
ION
If the regeneration program
is performing the CRT cation
tower resin scrubbing
operation: on the "CRT
cation tower operation"
screen, click the "Stop"
button of "Repeated
scrubbing". The PLC will,
according to the following
pre-set steps, stop the
scrubbing operation of the
resin in CRT cation tower,
shutdown flushing water
pumps, shutdown Roots
pumps, and close related
valves. The program will
return to "0" to reset.
Operation
Operation Steps Check Identification Remarks
Location
Operation
Operation Steps Check Identification Remarks
Location
Operation
Operation Steps Check Identification Remarks
Location
click the "Stop" button of
"Acid entering regeneration".
The PLC will, according to
the following pre-set steps,
stop acid entering
regeneration operation of the
CRT cation tower, shutdown
regeneration pumps, flushing
water pumps and Roots
pumps, and close related
valves. The program will
return to "0" to reset.
Operation
Operation Steps Check Identification Remarks
Location
Operation
Operation Steps Check Identification Remarks
Location
Operation
Operation Steps Check Identification Remarks
Location
output". The PLC will,
according to the following pre-
set steps, stop the cation
resin output operation of the
CRT cation tower, shutdown
flushing water pumps, and
close related valves. The
program will return to "0" to
reset.
Operation
Operation Steps Check Identification Remarks
Location
Operation
Operation Steps Check Identification Remarks
Location
performing the resin
strengthened cleaning
operation of the ART anion
tower and the CRT cation
tower: on the "1 # unit mix
bed regeneration unit"
screen, click the "Stop"
button of the "Resin
cleaning". The PLC will,
according to the following
pre-set steps, stop the
resin cleaning operation of
the CRT cation tower,
shutdown flushing water
pumps, and close related
valves. The program will
return to "0" to reset.
Operation
Operation Steps Check Identification Remarks
Location
1MP302
The PLC control program of [
"Resin cleaning" of CRT ]
cation tower will return to "0"
Operation
Operation Steps Check Identification Remarks
Location
Operation
Operation Steps Check Identification Remarks
Location
Operation
Operation Steps Check Identification Remarks
Location
6. IN-SERVICE INSPECTION
Operation
Operation Steps Check Identification Remarks
Location
6.1 High-speed mix bedWaste water
Ranged
neutralization discharge units 1#
[ ] 501MN/LN YB from 0.3 to
Concentrated acid storage tank
1.8 m
level meter m
#1 High-speed mix bed#1 waste ≤4.5mRang
2TFC471MN5
water pond level 2# Concentrated [ ][ ] YB ed from 0.3
02MN/LN
acid storage tank level meter m to 1.8 m
At the terminal phase of resin * There
output, the residual resin at should be
the bottom of #1 High-speed 201DE2TFC47 almost no
[ ][ ] [ 1MX101Y
mix bed#2 waste water pond 2MN601MN/ residual
] B
level 1# Concentrated alkali LN resin≤4.5mR
storage tank level meter anged from
m 0.3 to 1.8 m
After the resin input, the resin
layer height of #1 High-speed * 1.10 m
201DE
mix bed.Waste water pump [ ][ ] [ 1MX101Y Ranged
2TFC470MG6
outlet PH value 2# ] B from 0.3 to
02MN/LN
Concentrated alkali storage 1.8 m
tank level meter m
After the resin input, the
outlet water anion
conductivity after the #1 High- 211MG2TFC4 <0.30μs /
[ ][ ] 1MX101
speed mix bed self-cycling 71LP cm ≤0.3MPa
cleaning# 1 waste water
pump outlet pressure
# 1 waste water pump outlet [ 2TFC4
≤0.3MPa
pressure ] 72LP
#2 High-speed mix bed#1, #2
waste water pond inlet valve switch
status
Operation
Operation Steps Check Identification Remarks
Location
At the terminal phase of resin * There
output, the residual resin at 202DE2TFC63 should be
[ ][ ] 1MX101
the bottom of #2 High-speed 1VK almost no
mix bed residual
resinOne is
After the resin input, the resin open and the
202DE other is
layer height of #2 High-speed [ ][ ] 1MX101
2TFC641VK closed
mix bed.
* 1.10 m
After the resin input, the
outlet water anion
<0.30μs /
conductivity after the #2 High- [] 221MG 1MX101
cm
speed mix bed ter theater of
self-cycling cleaning
Operation
Operation Steps Check Identification Remarks
Location
After the resin input, the resin
layer height of #4 High-speed [] 204DE 1MX101 * 1.10 m
mix bed.
After the resin input, the
outlet water anion
<0.30μs /
conductivity after the #4 High- [] 241MG 1MX101
cm
speed mix bed ter theater of
self-cycling cleaning
Operation
Operation Steps Check Identification Remarks
Location
After the input of the spt
separation resin, the total
[] 301CW 1MX101 * 3.60 m
height of the separation tower
resin layer
* There
After the output of the ART
should be
anion regeneration tower
[] 302CW 1MX101 almost no
resin, the residual resin at the
residual
bottom of the tower
resin
After the input of the ART
anion regeneration tower
[] 302CW 1MX101 * 1.80 m
resin, the height of the resin
layer in the towe.
* There
After the output of the CRT
should be
cation regeneration tower
[] 303CW 1MX101 almost no
resin, the residual resin at the
residual
bottom of the tower
resin
After the input of the CRT
cation regeneration tower
[] 303CW 1MX101 * 1.50 m
resin, the height of the resin
layer in the towe.
Operation
Operation Steps Check Identification Remarks
Location
After the resin regeneration of
the CRT cation regeneration
tower is over, the outlet water [] 331LG 1MX101
conductivity after the washing
of regeneration tower resin
* There
After the output of the RST
should be
storage tower resin, the
[] 304CW 1MX101 almost no
residual resin at the bottom of
residual
the tower
resin
After the input of the RST
storage tower resin, the
[] 303CW 1MX101 * 1.50 m
height of the resin layer in the
towe.
After the resin regeneration of
the RST storage tower is
over, the outlet water [] 331LG 1MX101
conductivity after the washing
of regeneration tower resin
Operation
Operation Steps Check Identification Remarks
Location
* Acid
concentratio
Acid concentration of mix bed n during the
[] 411MG 1MP303
ejector outlet regeneration
: 3.5% ~
5.5%
Mix bed alkali metering box
[] 425MN 1MP303 <1.50 m
level
* Alkali
concentratio
Alakli concentration of mix n during the
[] 421MG 1MP303
bed ejector outlet regeneration
: 3.5% ~
5.5%
#1 wastewater neutralizaiton
[] 471MN 1MX101
pond level
#2 wastewater neutralizaiton
[] 472MN 1MX101
pond level
Parameters setting
Operation
Operation Steps Check Identification Remarks
Location
Operation
Operation Steps Check Identification Remarks
Location
Operation
Operation Steps Check Identification Remarks
Location
Ope
[ ] 3414VA 1MX101
n
Ope
[ ] 3415VL 1MX101
n
The
RST
stora
ge
towe
r is
full
of
wate
r
until
the
tunin
g
fork
switc
h
301S
E
acts
Clos
[ ] 3414VA 1MX101
ed
Clos
[ ] 3415VL 1MX101
ed
Page 242 of 278
Karachi Nuclear Power Waste Water Neutralizationing, S2TFCWDP004
Plant Unit-2 Recycling and DischargeingLoading
and Unloading Of Bulk Chemicals
PK237SOP24183K06145PC Agent Rev. 0
Operation
Operation Steps Check Identification Remarks
Location
Shut
dow
n flu
shin
g wa
ter p
ump
s
Shut
[ ] 441PO 1MX101
dow
n
Shut
[ ] 442PO 1MX101
dow
n
8. INCIDENTS
Operation
Operation Steps Check Identification Remarks
Location
Operation
Operation Steps Check Identification Remarks
Location
Operation
Operation Steps Check Identification Remarks
Location
Conductivity meter electrodes are
contaminated;Field ambulance. Due to
hydrochloric acid with strong corrosive
characteristic, and it can produce
chemical burns to the human body, the
volatile hydrogen chloride gas have a
strong irritant and corrosive effect to
respiratory; therefore, if sprayed or
[ ]
splashed by hydrochloric acid, must
rinse with plenty of water immediately ,
then clean with 0.5% sodium
bicarbonate solution, while leaving the
leakage site. If splashed in the eyes,
you must rinse with plenty of water
immediately and sent to the infirmary
for treatment.
Operation
Operation Steps Check Identification Remarks
Location
Operation
Operation Steps Check Identification Remarks
Location
Operation
Operation Steps Check Identification Remarks
Location
Operation
Operation Steps Check Identification Remarks
Location
Operation
Operation Steps Check Identification Remarks
Location
Operation
Operation Steps Check Identification Remarks
Location
Operation
Operation Steps Check Identification Remarks
Location
Operation
Operation Steps Check Identification Remarks
Location
Operation
Operation Steps Check Identification Remarks
Location
Operation
Operation Steps Check Identification Remarks
Location
Operation
Operation Steps Check Identification Remarks
Location
Operation
Operation Steps Check Identification Remarks
Location
If the reason is that the anion
tower is mixed with cation resin
or the cation tower is mixed with
anion resin, then the resin should
be sent back to the SPT
separation tower for re-
stratification, and adjust the
operating parameters of the SPT
separation tower or the heights
[ ]
of the anion-cation resin in the
tower. Report the defect
repairment if necessary, and
perform maintenance treatments
for photoelectric switch or PLC
control program. PH meter
electrodes are aging or
damaged;Leaking for and liquid
ammonia cylinder damaged;
If the reason is that the resin
surface is contaminated by oil or
other organic substance, shall
cooperate with the mechanical
maintenance personnel (connect
to temporary pipeline) to perform
alkali treatment to the resin, and
[ ]
then perform times amount of
acid entering regeneration to the
resin. If is still useless, shall
consider of replacing the resin.
PH meter secondary meter fault
Leak for liquid ammonia cylinder
outlet valve blocked laxly;
PH meter and PLC data
[
communication fault;Leak for
liquid ammonia tank outlet hose
]
connection damaged;
Operation
Operation Steps Check Identification Remarks
Location
Abnormality HandlingDisposal of
ammonia leak
Operation
Operation Steps Check Identification Remarks
Location
On the "#1 unit wastewater,
demineralized water unit" control
screen, click the icon "#1 unit
wastewater ". On the popped-up
"#1 unit wastewater operation"
screen, click the stop button, the
PLC will stop the neutralization Pause
and discharging of # 1 [ ][ ] 2TFC471PS wastewater
wastewater pond;At the same neutralization
time, reported to the master,
phone the fire brigade: 119
(extension) alarm, then
according program to reports to
the relevant departments and
leadership;
On the "#1 unit wastewater,
demineralized water unit" control
screen, click the icon "#2 unit
wastewater ". On the popped-up
"#2 unit wastewater operation" Pause
screen, click the stop button, the [ ][ ] 2TFC471PS wastewater
PLC will stop the neutralization neutralization
and discharging of # 2
wastewater pond;Cut off the fire
source, if necessary, cut off the
power in the pollution region;
Call the MCR, notify chemical
analysts to manually detect the
wastewater pump outlet pH for
manual comparation;Open the [ ]
nearest water source, including
Open outdoor fire water ,and
then spray ammonia leak points;
Operation
Operation Steps Check Identification Remarks
Location
Report the emergency defect
and cooperate with maintenance
personnel to remove it.In
permitted conditions, emergency [ ]
personnel wearing dedicated gas
masks and gloves to enter local
to inspect the reasons;
In permitted conditions, taken measures
to cut off the gas supply, or after the
[ ]
dilution of residual ammonia in pipeline,
drained by the discharge pipe;
Do not use sparking tools and motor
vehicles in the leakage area, severe
[ ]
should prohibit the use of
communication tools;
Poisoning should immediately rushed
ventilation, emergency rescue and [ ]
notify the hospital.
Disposal of liquid ammonia tank leak
Ammonia cylinders are produced by
specialized manufacturers before it is in
service, and it had been tested
rigorously by security department, so
the possibility of leakage is little, should
be taken notice to avoid a violent crash [ ]
at the scene, loading and unloading of
the ammonia cylinder handling
transportation, there must be a rubber
cushion rings in cylinder, no exposure
cylinders.
Operation
Operation Steps Check Identification Remarks
Location
Liquid ammonia tank treatment: the
possible reason make ammonia tank
outlet valves leaks is the filler of the
valve wear. Disposal is to wear full
protective clothing with breathing [ ]
apparatus, strictly close the outlet valve
with the fire water. If it still leaks, water
would need to remain until the leak is
completed.
Connecting pipe leakage process: the
pipeline behind the cylinders ammonia
leak , you must first strictly close
ammonia cylinder outlet valve, and then [ ]
deal with the leak at the connection, if
still leaks, it is required for long-term fire
water spray.
Precautions
When operator received liquid ammonia
tank, check cylinder attachment is
[ ]
intact, if there is damage to the valve
port, the connection is loose;
Ammonia cylinder pipeline connection
is completed, gently open outlet valve,
[ ]
use PH test paper (alkaline) to measure
all the joints leaks;
Strict management of liquid ammonia
tank: ammonia bottle belong to mobile
high-pressure device, ammonia bottle
must be technology checked once
every three years, if it used 12 years
should be scrapped. When found
[ ]
sidewall cracks or local corrosion, it is
deeper 10% than the nominal wall
thickness, and found scarring,
depression, drum kits, scars and heavy
leather and so on, should be prohibited
using.
Page 262 of 278
Karachi Nuclear Power Waste Water Neutralizationing, S2TFCWDP004
Plant Unit-2 Recycling and DischargeingLoading
and Unloading Of Bulk Chemicals
PK237SOP24183K06145PC Agent Rev. 0
Operation
Operation Steps Check Identification Remarks
Location
Local protection equipment
configuration: there are fire water,
protective clothing, breathing
[ ]
apparatus, protective gloves, ammonia
special gas masks, emergency
medicine and other nearby.
Ammonia leak on human health
hazards
Pathways: inhalation, frostbite. [ ]
Health hazard: Inhale low
concentrations will have a stimulating
effect on the mucous membranes, if
[ ]
concentrations is high, it may cause
histolysis necrosis, and it cause
chemical pneumonia and burns.
Acute poisoning: mild manifestations is
skin, mucous membrane irritation, there
is rhinitis, laryngitis, bronchitis; may
occurs corneal and skin burns. Severe
occurs laryngeal edema, glottis narrow
airway mucosal cell shedding, airway
obstruction to make suffocation, as well [ ]
as possible occurs toxic pulmonary
edema and liver damage. Ammonia can
cause breathing to stop. If splashed in
the eyes, can cause lens opacity,
corneal perforation, and even
blindness.
Ammonia poisoning patients aid
measures
Remove victim to fresh air. [ ]
Call emergency medical service center. [ ]
If breathing has stopped, administer
artificial respiration. If inhaled or
[ ]
ingested ammonia, please do not take
mouth resuscitation.
Operation
Operation Steps Check Identification Remarks
Location
If breathing is difficult ,then carry out
[ ]
oxygen.
Removed and isolate contaminated
clothing and shoes, and wash with [ ]
water 20 minutes or more.
Keep the patient warm and quiet. [ ]
Closely observe of the patient's
[ ]
condition.
First aid dip ammonia
Eyes: Do not rub, opened the eye lids ,
can be rinse with the flow of water or
2% boric acid solution and quickly close [ ]
and open eyes, so that the water filled
the whole eye.
For the nose, throat, drops 2% of boric
acid solution to nasal, and gargle with
boric acid solution, you can drink a lot [ ]
of 0.5% of citric acid or vinegar, avoid
ammonia proliferate in vivo.
For the skin, you should take off your
clothes, pants, shoes if it stained with
ammonia, rinse the affected area with
[ ]
water and 2% boric acid solution, ,
burned skin should be exposed to the
air and coated with drugs.
The above personnel shall be promptly
[ ]
sent to hospital for treatment.
10. ANNEXURE
ANNEXURE I
HAZARDOUS CHEMICAL CHARACTERISTICS TABLE
1) Ammonia
Ammonia,
Name Ammonia Aliases English name Ammonia
ammonia
Molecular Melting
Formula NH3 17.03 -77.7℃
Weight point
- The
0.771 Vapor 1013kpa
Boiling Point 33.35 relative
(Liquid) Pressure (26) ℃
Physical ℃ density
and The 0.597
Explosive 16%- Ignition
chemical relative (Vapo 651 ℃
limit 25% point
properties density r)
Appearance
Colorless, poisonous gas with strong pungent stench
Odor
Soluble in water to form ammonium hydroxide,
Solubility
dissolved in ether and other organic solvents.
Stability: Easy liquefaction, in temperature changes conditions,
coefficient of volume change a lot, in case of high fever, explode
within the container.
Stability
Hazard: Flammable, but only in case of fire is shown in a limited area,
and hazard
the case of the presence of oil or fuel combustion can enhance risk;
contact with liquid ammonia can cause severe burns. Solution is
corrosive.
In the Workplace air, allowable concentration exposed a short time:
(mg/m3)30
Maximum allowable exhaust emissions ( kg/h ) 4.9 ( 15m ) -
75(60m)
Environme Odor pollution factory sector standard
3
ntal values(mg/m )1.0(A),1.5,2.0
Standards (2nd new, now) , 4.0 ( 3rd new ) , 5.0 ( 3rd existing ) , Surface
water(With NH3-N meter, mg / L) 0.15 (class I), 0.5 (Ⅱ type), 1.0 ( Ⅲ
class), 1.5 (Ⅳ class), 2.0 (Ⅴ class)
Sewage maximum allowable emission concentration :( to NH3-N
meter, mg / L) 15 (a), 25 (two)
Acute toxicity:
Low concentrations of inhalation tolerance:20ppm
man oral median lethal concentration (LCL0):5000ppm·5min
Rat oral median lethal concentration (LC50):350×10-6
Toxicologic Rat inhaled median lethal concentration (LCL0):2000mg/m3·4h
al Acute poisoning:
Information For the skin, mucous membranes and eyes, it is corrosive. Mildly
occurred tear, sore throat, cough, edema; moderate symptoms
intensified, difficulty breathing; severe can occur toxic pulmonary
edema, severe cough, a lot of pink frothy sputum, coma, shock; high
concentrations of ammonia can cause breathing reflex stop.
108. Vapor
Boiling 30.66
6(20 Pressu
Point (21℃)
%) re
Appearan Colorless or slightly yellow fuming liquid ,with a pungent
ce Odor sour.
Miscible with water, soluble in alcohol and ether. Easily
Solubility
volatile at room temperature.
Respirato
Contact the smoke, wear filter respirators; Emergency
ry
rescue, should wear positive pressure self-contained
protectio
breathing apparatus.
n
Eye
protectio Wear chemical safety glasses.
n
Body
Protectio Wear rubber acid protective clothing.
n
Hand
Protectio Wear rubber acid gloves.
n
Workspace no smoking, eating and drinking. shower After
Other
working.
Inhale mist should escape the scene immediately, place to
First aid rest and keep warm; after skin contact should be stripped
measure of contaminated clothing, rinse quickly with water; if
s swallowed, then rinse, do not induce vomiting and give
medical care.
Rapid withdrawal from air leakage personnel to a safe
area, emergency personnel should wear positive pressure
self-contained breathing apparatus. Wear anti-acid. Sand,
Emergency dry lime or soda ash mixed to deal with small leak, also
Leakage
measures can be with water washing and then discharged into the
disposal
wastewater treatment system; large spills should build a
causeway or trenching to collect, transfer it to the tank by
pump, and the residue was safe disposal by shipped to
recycling waste disposal sites.
Take an alkaline substance such as sodium bicarbonate,
Fire sodium carbonate, calcium hydroxide to neutralize. Also
Methods can spray a lot of water to fight the blaze. Firefighters
should wear oxygen masks and full protective clothing.
None
Sodium hydroxide
Sodium
English Sodium
Name hydroxide Aliases liquid alkali
name hydroxide
solution
Molecular Melting
Formula NaOH 40.01 318.4℃
Weight point
The
Boiling Vapor 0.13kPa
Physical and 1390℃ relative 2.12
Point Pressure (739℃)
chemical density
properties Appearance
Colorless, oily liquid.
Odor
Soluble in water, ethanol, glycerol. Dissolution
Solubility
process releases large amounts of heat.
Hazard: alkali, reacts with the acid and emit a lot of heat, the case
Stability and of the moisture ,reacts with aluminum, zinc and tin and release
hazard hydrogen; reacts with water, emit a lot of heat, can maket
combustible material on fire, aqueous solution with corrosive .
Acute toxicity:
Rabbit oral minimum lethal dose(LDLO):500mg/kg
Mice inhaled median lethal concentration(LC50):40ppm·h
Toxicological With a strong stimulation and corrosive. Dust irritate the throat
Information and respiratory tract; direct contact with skin and eyes can cause
burns; swallowed can cause gastrointestinal burns, mucosal
erosion, bleeding and shock.
Aquatic Toxicity: MTL 125ppm·96h(Mosquito fish).
Fire
Water, sand saves, prevent rain splash cause burns.
Methods
3) Sodium Bisulfite
Sodium English
Name Aliases Sodium bisulfite Sulfurousacid
bisulfite name
Molecular Melting
Formula NaHSO3 104.05 /℃
Weight point
The
Boiling Vapor /kPa
Physical /℃ relative 1.37
Point Pressure (℃)
and density
chemical Appearance Appearance is white to light yellow crystal or powder
properties Odor form, there is a strong pungent odor S02
Insoluble in ethanol, soluble in water, acidic aqueous
Solubility solution. Long place in air will oxidize into sodium
hydroxide sulfate, heat or acid will produce S02 gas.
There is a irritation for the skin, eyes, respiratory tract, which can
cause allergic reactions. Can cause damage to the cornea, leading to
Health
blindness. Can cause asthma; large number of oral cause nausea,
Hazards
abdominal pain, diarrhea, circulatory failure, central nervous system
depression.
1. Respiratory protection: the dust concentrations in the air exceeding
standard, must wear self-absorption filter respirators. Emergency
rescue or evacuation, air respirators should be worn.
2. Eye protection: Wear chemical safety glasses.
Protection 3. Physical protection: wear rubber acid suit.
4. Hand protection: Wear rubber acid gloves.
5. Other protection: Workplace no smoking, eating and drinking, wash
hands before eating. After work, take a shower. Maintain good health
habits.
1.ADI 0 ~ 0.7mg / kg (SO2 meter; including 502 and sulfites; FAO /
WHO, 2001).
Toxicity
2.LD50 115mg / kg (rat, oral).
3.GRAS (FDA, §182.3739,2000).
Closed operation, local exhaust ventilation. Prevent dust released into
the air workshop. The operator must go through specialized training,
strict adherence to rules. Proposed operators wear self-absorption filter
Handling
respirators, wearing chemical protective safety glasses, wear rubber
Precautions
acid suit, wear rubber acid gloves. Avoid generating dust. Avoid contact
with oxidizing agents, acids, alkalis. Equipped with spill response
equipment. There may be harmful residues in empty containers.
Emergency Isolation leak contaminated areas, restricting entrance-exit.
Page 275 of 278
Karachi Nuclear Power Waste Water Neutralizationing, S2TFCWDP004
Plant Unit-2 Recycling and DischargeingLoading
and Unloading Of Bulk Chemicals
PK237SOP24183K06145PC Agent Rev. 0
ANNEXURE II
EQUIPMENT MAIN PARAMETER TABLE
Function: bulk chemicals are produced for use demineralized water.
V P T
Pharmacy tank Remarks
M 3
Bar ℃
0SDA501BA 20.0 Atm 40
0SDA502BA 20.0 Atm 40
0SDA601BA 20.0 Atm 40
0SDA602BA 20.0 Atm 40
Threshold Function
Sensors
VH H L VL
0SDA501MN 1.80 m 0.30 m
0SDA502MN 1.80 m 0.30 m
0SDA601MN 1.80 m 0.30 m
0SDA602MN 1.80 m 0.30 m