231024.DDTT.thông Tin KCN Nam Cấm.en.Nguyễn Bá Hoàng Anh

You might also like

Download as docx, pdf, or txt
Download as docx, pdf, or txt
You are on page 1of 4

Tin, bài đăng trên Cổng Thông tin Đầu tư vào Công nghiệp Việt Nam

http://investvietnam.gov.vn/
Ngày cập nhật: 24/10/2023
Chuyên mục: Địa điểm đầu tư
Ngôn ngữ: Tiếng Anh
Cộng tác viên:
Tên tin, bài: Thông tin chung về Khu công nghiệp Nam Cấm
GENERAL INFORMATION ABOUT NAM CAM INDUSTRIAL PARK

MAIN
TT DETAILS
INFORMATION

General introduction
1
of the IP

2 General information - Name of the IP (Vietnamese, English):


about IP Vietnamese: Khu công nghiệp Nam Cấm
English: Nam Cam Industrial Zone
- Address:
Area A: On the border of Nghi Long, Nghi Thuan ward,
Nghi Loc district, Nghe An
Area B: On the border of Nghi Xa and Nghi Long ward,
Nghi Loc district, Nghe An
Area C: On the border of Nghi Xa and Nghi Quang ward,
Nghi Loc district, Nghe An
Area D: On the border of Nghi Thuan and Nghi Long ward,
Nghi Loc district, Nghe An
- Phone:
- Fax:
- Email:
- Website:
- Operation start time:
- Operating time (if any): 50 years
- Investment fund:
- Priority areas to attract investment:
✔ Zone A: Steel rolling, metallurgy; Mechanical
manufacture; Automobile assembly; Processing of
Agricultural and Forest Product; Processing
consumer goods and products for export.
✔ Zone B: Brewery Manufacture

✔ Zone C: heavy industry with high pollutant level


such as: Fertilizer processing and chemical industry;
Processing products to wood, leather; Mechanical
manufacture ; Mineral processing; Building material
manufacture,..
- Information on the Investor:
Area A, B, C:

1
+ Company Name: Nghe An Industrial Zone Development
Company
+ Address: No. 16, Le Hoan Street, Hung Phuc Ward, Vinh
City, Nghe An province
+ Phone: (84-238) 860 0299
+ Fax: (84-238) 3597 985
Area D:
+ Company Name: Tuan Loc Construction Investment JSC
+ Address: 362/14 Ung Van Khiem, Ward 25, Binh Thanh
District, Ho Chi Minh City
+ Phone: (84-28) 6258 5039
+ Fax:
- Contact Name:
Area A, B, C: Mr. Sy
Area D: Mr. Son
- Position:
Area A, B, C: Dong Nam Economic Zone Management
Board
- Phone:
Contact Person of
3 - Mobile:
the IP
Area A, B, C: (84) 913 357 897
Area D: (84) 966 66837
- Email:
Area A, B, C: tvsykktdn@gmail.com
Area D: info@xaydungtuanloc.com
(Please provide the precise contact information for foreign
enterprises)
Short description about the location of the IP (max 30
words):
Soil conditions:
Elevation above sea level (MSL):
Geographical and Weather condition:
4 Topographical Distance to the nearest big city (km):
location Distance to Central Province (km): 18km
Distance to nearest airport (km): 12km
Distance to the nearest railway station (km): 2km
Distance to the nearest river port (km):
Distance to the nearest sea port (km): 8km
5 The infrastructure Main road system (width, number of
lanes):
Traffic System
Internal road system (width, number of
lanes):
National Power System (110KV,
Power Supply 220KV ...):
System backup generator:
Water Supply Water volume (m3/day):
Standard:
Wastewater
Maximum treatment capacity (m3/day):
treatment plant
Current treatment capacity (m3/day):
Waste treatment Standard:
plant Maximum treatment capacity
2
(tons/day):
Current treatment capacity (tons/day):
Fire Alarm
System
Communications
Other information
- The total area (m2 or hectare):
Area A: 416.3 ha
Area B: 122.7 ha
Area C: 154.7 ha
Area D: 1220.9 ha
- The area available for rent (m2 or hectare):
+ Free area:
Total area and
6 + Factory area: 174 ha
condition
+ Offices:
- Minimum rental area (m2): 30,000 m2
- The rate of occupancy % (as of end of 2022):
- Area A: 97.91% (15 projects)
- Area B: 87.58% (15 projects)
- Area C: 100% (38 projects)
- Area D: 1% (1 project)
Rent cost: 0.45USD/m2/year (for all
area)
Land lease
Minimum lease term:
Minimum leasing area:
Rent cost:
Minimum lease term:
Factory
Minimum leasing area:
Factory for sale:
2,071 VND (~ 0.09 USD) /m2/year (for
Management fee
Area C)
Cost
Peak hours: 0.13 USD/KWh
7 (VAT included) Electricity Normal hours: 0.08 USD/KWh
Idle hours: 0.05 USD/KWh
(In USD or VND) Other information:
Water cost: 11,400 VND (~0.51
Water USD)/m3 (for all area)
Other information:
Treatment cost (m3): 9,568 VND (~0.45
USD)/m3 (for all area)
Wastewater
Input processing standards:
treatment cost
Output processing standards:
Cost of disposal (tons):
Garbage disposal
Input processing standards:
fee
Output processing standards:
Incentive on the enterprise income tax:
Incentive on the import tax:
8 Incentive
Incentive on VAT:
Other incentives:
9 Suggestion
3
Cộng tác viên Biên tập viên

Nguyễn Hồng Nhung Nguyễn Bá Hải

You might also like