REKAP DATA SURVEY BAHAN (AWAL)

No URAIAN SATUAN HPS 2021 HSPK 2022 HPS 2022 KET

MEDIAN MEAN
BAHAN 1 RIT = 3 m³ (4 Bucket)
1 Pick Up = 4 - 5 m³
1 Truck = 5 - 7 m³
1 Pasir Beton (Kasar)/Pasir Pasang (sedang) m³ 180,000.00 280,000.00 204,000.00 180,000.00 204,000.00
Pasir Pasang (sedang)
2 Pasir Urug m³ 153,000.00 167,000.00 153,000.00
3 Sirtu m³ 137,500.00 223,000.00 137,500.00 200,000.00 200,000.00
4 Tanah Urug m³ 74,200.00 150,000.00 88,000.00 87,500.00 88,000.00
5 Filler Kg 1,100.00 3,000.00 1,200.00
6 Batu Gunung/Belah/Kali m³ 202,800.00 302,000.00 203,000.00 202,500.00 203,000.00
7 Semen/PC (50Kg) Zak 57,000.00 68,000.00 60,000.00
* Semen 3 Roda Zak 62,000.00 62,500.00 62,000.00
* Semen Conch Zak 57,000.00 59,000.00 57,000.00
* Semen Gresik Zak 61,000.00 61,000.00 61,000.00
8 Paku Rupa-Rupa/Baut/Beugel Kg 21,000.00 29,000.00 25,500.00
* Paku 2" - 4" Kg 23,000.00 25,000.00 23,000.00
* Paku 1 1/4" Kg 26,000.00 26,000.00 26,000.00
* Paku 1 1/2" Kg 26,000.00 26,000.00 26,000.00
* Paku 1 3/4" Kg 27,000.00 27,000.00 27,000.00
9 Besi Beton Kg 11,450.00 14,000.00 14,000.00 13,897.82 14,093.00
8" (7,8 mm) Kg
10" (9,8 mm) Kg Besi : Panjang 12 m/batang
12" (11,8 mm) Kg Harga per batang
Besi Ulir 13" Kg
Besi Ulir 16" Kg
Besi Ulir 10" Kg
Besi Ulir 19" Kg
Besi Ulir 22" Kg
Besi Ulir 25" Kg
10 Pipa Galvanis 3" Batang 292,000.00 154,000.00 153,625.00 154,000.00
11 Pipa Galvanis 1,5" Batang 129,000.00 81,000.00 80,375.00 81,000.00
12 Kawat Beton Kg 22,000.00 35,000.00 24,000.00 25,000.00 24,000.00
13 Koral m³ 187,500.00 275,000.00 187,500.00
14 Split/Kerikil m³ 201,300.00 275,000.00 230,000.00 230,000.00 230,000.00
Agregat Halus LPA m³ 225,000.00 200,000.00 200,000.00 200,000.00
15 Bronjong Kawat Pabrikasi Lapisan Seng Tebal
* Ukuran 2 x 1 x 0,5 m (Mesh 8 x 10 cm dan D=2.70 mm) Buah 357,500.00 433,000.00 398,200.00 398,200.00 398,200.00
* Ukuran 3 x 1 x 0,5 m (Mesh 8 x 10 cm dan D=2.70 mm) Buah 511,500.00 611,740.00 570,900.00 570,900.00 570,900.00
* Ukuran 2 x 1 x 1 m (Mesh 8 x 10 cm dan D=2.70 mm) Buah 511,500.00 656,000.00 570,900.00 570,900.00 570,900.00
* Ukuran 2 x 1 x 1 m (Mesh 8 x 10 cm dan D=3.00 mm) Buah 449,400.00 754,300.00 701,800.00 701,800.00 701,800.00
* Ukuran 3 x 1 x 0,5 m (Mesh 8 x 10 cm dan D=3.00 mm) Buah 397,700.00 754,300.00 701,800.00 701,800.00 701,800.00
* Ukuran 2 x 1 x 0,5 m (Mesh 8 x 10 cm dan D=3.00 mm) Buah 435,500.00 527,920.00 485,100.00 485,100.00 485,100.00
REKAP DATA SURVEY UPAH

PT.
CV. Andari
Harga Rata2 CV. Mentari Dutasatrya
No URAIAN SATUAN UMP 2022 HPS 2020 HPS 2021 HSPK 2022 HPS 2022 Utama KET
Survey Timur (Mahar) Adhipersada
(Nunung)
(Inchi)

MEDIAN MEAN 1 2 3
UPAH
1 Pekerja/Buruh/Pekerja Kasar Hari 116,258.93 117,400 115,300 130,000 120,000 120,000 122,500 120,000 125,000 125,000 110,000
2 Tukang Kayu, Batu, Besi, Las, dan Cat Hari 116,258.93 137,400 138,900 175,000 159,700 159,700 157,500 159,630 175,000 165,000 148,500
3 Mandor Hari 116,258.93 168,100 182,100 210,000 178,800 182,100 175,000 178,750 175,000 175,000 165,000
4 Operator Hari 116,258.93 204,300 233,600 300,000 223,800 233,600 235,000 223,750 250,000 250,000 220,000
5 Pembantu Operator Hari 116,258.93 135,000 136,700 147,000 153,800 153,800 150,000 153,750 150,000 150,000 165,000
6 Sopir/Driver Hari 116,258.93 142,400 166,200 192,000 193,800 193,800 195,000 193,750 225,000 235,000 165,000
7 Pembantu Sopir/Driver Hari 116,258.93 121,300 121,700 126,000 137,500 137,500 137,500 137,500 150,000
8 Mekanik Hari 116,258.93 179,200 175,700 293,000 330,000 330,000 330,000 330,000 330,000
9 Pembantu Mekanik Hari 116,258.93 122,300 136,600 136,000 220,000 220,000 220,000 220,000 220,000
10 Kepala Tukang Kayu, Batu, Besi, Las, dan
Hari 116,258.93 166,800 175,800 225,000 193,800 193,800 195,000 193,750 160,000 170,000 220,000
Cat

UPAH MINIMUM PROPINSI 2022 2,906,473.32 Berdasarkan SK Gubernur Kalsel No. 188.44/0741/KUM/2021, Tanggal 19 Nopember 2021
25 HARI KERJA 116,258.93 PEMBANTU SOPIR 113,000
HPS UPAH TA. 2022
DINAS PEKERJAAN UMUM DAN PENATAAN RUANG KOTA BANJARBARU

No URAIAN SATUAN HPS 2021 HSPK 2022 HPS 2022

1 2 3 4 5 6
UPAH

1 Pekerja/Buruh/Pekerja Kasar OH 115,300 130,000 120,000

2 Tukang Kayu, Batu, Besi, Las, dan Cat OH 138,900 175,000 159,700

3 Mandor OH 182,100 210,000 182,100

4 Operator OH 233,600 300,000 233,600

5 Pembantu Operator OH 136,700 147,000 147,000

6 Sopir/Driver OH 166,200 192,000 192,000

7 Pembantu Sopir/Driver OH 121,700 126,000 126,000

8 Mekanik OH 175,700 293,000 293,000

9 Pembantu Mekanik OH 136,600 136,000 136,000

10 Kepala Tukang Kayu, Batu, Besi, Las, dan Cat OH 175,800 225,000 193,800
HPS BAHAN TA. 2022
DINAS PEKERJAAN UMUM DAN PENATAAN RUANG KOTA BANJARBARU

No URAIAN SATUAN HPS 2021 HSPK 2022 HPS 2022 KETERANGAN

1 2 3 4 5 6 7
BAHAN

1 Pasir Beton (Kasar)/Pasir Pasang (sedang) m³ 180,000.00 280,000.00 204,000.00

2 Pasir Urug m³ 153,000.00 167,000.00 153,000.00

3 Sirtu m³ 137,500.00 223,000.00 137,500.00

4 Tanah Urug m³ 74,200.00 150,000.00 88,000.00

* Harga 1 Zak Semen dibagi 50 Kg


5 Filler Kg 1,100.00 3,000.00 1,200.00 (Semen Merk Gresik)

6 Batu Gunung/Belah/Kali m³ 202,800.00 302,000.00 203,000.00

7 Semen/PC (50Kg) Zak 57,000.00 68,000.00 60,000.00

8 Paku Rupa-Rupa/Baut/Beugel Kg 21,000.00 29,000.00 25,500.00

9 Besi Beton Kg 11,450.00 14,000.00 14,000.00

10 Pipa Galvanis 3" Batang - 292,000.00 154,000.00

11 Pipa Galvanis 1,5" Batang - 129,000.00 81,000.00

12 Kawat Beton Kg 22,000.00 35,000.00 24,000.00

13 Koral m³ 187,500.00 275,000.00 230,000.00


No URAIAN SATUAN HPS 2021 HSPK 2022 HPS 2022 KETERANGAN

1 2 3 4 5 6 7

14 Split/Kerikil m³ 201,300.00 275,000.00 230,000.00

15 Bronjong Kawat Pabrikasi Lapisan Seng Tebal


* Ukuran 2 x 1 x 0,5 m (Mesh 8 x 10 cm dan D=2.70 mm) Buah 357,500.00 433,000.00 398,200.00
* Ukuran 3 x 1 x 0,5 m (Mesh 8 x 10 cm dan D=2.70 mm) Buah 511,500.00 611,740.00 570,900.00
* Ukuran 2 x 1 x 1 m (Mesh 8 x 10 cm dan D=2.70 mm) Buah 511,500.00 656,000.00 570,900.00
* Ukuran 2 x 1 x 1 m (Mesh 8 x 10 cm dan D=3.00 mm) Buah 449,400.00 754,300.00 701,800.00
* Ukuran 3 x 1 x 0,5 m (Mesh 8 x 10 cm dan D=3.00 mm) Buah 397,700.00 754,300.00 701,800.00
* Ukuran 2 x 1 x 0,5 m (Mesh 8 x 10 cm dan D=3.00 mm) Buah 435,500.00 527,920.00 485,100.00

16 Solar Non Subsidi


* Dexlite Liter 9,700.00 10,000.00 9,700.00

17 Aspal Cair Kg 12,300.00 20,000.00 13,000.00

18 Aspal Emulsi Liter 11,550.00 18,000.00 13,600.00

19 Anti Stripping Agent/Aditif Aspal Kg 68,500.00 123,000.00 68,800.00

20 Ready Mix
B-0 m³ 796,700.00 1,110,000.00 835,200.00
K-100 m³ 823,400.00 1,172,000.00 857,700.00
K-125 m³ 846,700.00 1,126,000.00 876,700.00
K-150 m³ 883,400.00 1,238,000.00 918,400.00
K-175 m³ 910,000.00 1,350,000.00 996,200.00
K-200 m³ 943,400.00 1,463,000.00 1,030,400.00
K-225 m³ 983,400.00 1,575,000.00 1,104,900.00
K-250 m³ 1,036,700.00 1,678,000.00 1,154,400.00
No URAIAN SATUAN HPS 2021 HSPK 2022 HPS 2022 KETERANGAN

1 2 3 4 5 6 7
K-275 m³ 1,073,400.00 1,801,000.00 1,210,400.00
K-300 m³ 1,111,700.00 1,913,000.00 1,251,100.00
K-350 m³ 1,233,400.00 2,879,000.00 1,332,200.00
K-400 m³ 956,700.00 2,973,000.00 1,503,000.00
K-500 m³ 1,056,700.00 3,206,000.00 1,619,500.00

21 Woven MD High (Geotextile) m2 10,000.00 46,000.00 10,000.00

22 Galam, d = 8/10 m 4,000.00 6,000.00 4,000.00


Galam, d = 10/12 m 4,000.00 6,000.00 5,000.00