Download as xlsx, pdf, or txt
Download as xlsx, pdf, or txt
You are on page 1of 7

Product no : 182

Date: 21/09/2022
Batch no: 2370773

Time (Hrs) TDR Temp Inlet RH Outlet RH


25 66 68.8 81
0
2 65 72 80

25 70.6 70.6 83
2
2 87.2 73 85

Time
TDR 25 (32 TDR 2 (31
Required
side) side)
for drying:

19.5 19.5
Date:- 3/11/2022
Product No.:- 182
Batch No.:- 2440195

Time TDR No. VM Temp Damper valves opening Time TDR No. VM Temp
0 135 74.38 59 I=100% O=50% 0 2 74.45 44.5
2 135 100 I=100% O=50% 2 2 60
4 135 108.2 I=100% O=50% 4 2 68.4
6 135 112 I=100% O=50% 6 2 94.3
8 135 4.37 115 I=100% O=50% 8 2 33.78 112
10 135 114.5 I=100% O=50% 10 2 117
12 135 2.96 115 I=100% O=50% 12 2 115
14 135 115 I=100% O=50% 14 2 115
16 135 0.3 115 I=100% O=50% 16 2 115
18 2 115
Crushing Time = 8.25 hrs 20 2 115
Total Time = 16 hrs 22 2 115
24 2 115
TDR 135 :- TDR with scrubber line
TDR 02 :- TDR not having scrubber line Crushing Time = 14 hrs
Total Time = 24 hrs

120 120

110 110

100
100
90
90
80
80
70
70
60
100
100
90
90
80
80
70
70
60
60 50

50 40
0 2 4 6 8 10 12 14 16 18 0 5 10 15 20 25

TDR No. date crushing total time VM batch No.


21 31/10/22 18.5 22.5 0.67 430197
22 31/10/22 19 22 0.53 430197
26 ### 13 20 0.6 440196
Damper valves opening
I=100% O=100%
I=100% O=100%
I=100% O=100%
I=100% O=75%
I=100% O=75%
I=100% O=75%
I=100% O=75%
I=100% O=75%
I=100% O=75%
I=100% O=75%
I=100% O=75%
I=100% O=75%
I=100% O=75%
15 20 25
TDR TRIAL
TDR No:- 137
Date:- 15/11/2022
Batch No:- 450121 standard drying time = 20 hrs
Product No:- 182
Damper Openings

Time Running Time Temperature VM Inlet


0:30 0 50 64.23 100
1:30 1 100 100
2:30 2 106 100
3:30 3 110 100
4:30 4 114 100
5:30 5 114.2 100
6:30 6 114.6 100
7:30 7 115.4 100
8:30 8 116 100
9:30 9 115 8.2 100
10:30 10 114 100
11:30 11 115 75
12:30 12 114.5 75
13:30 13 117 75
14:30 14 115 75
14:45 14.25 115 0.3 75
time = 20 hrs

Damper Openings

Outlet
100
100
100
100
100
100
100
75
75
75
75
50
50
50
50
50

You might also like