ITEM

DESCRIPTION UNIT QTY U.PRICE TOTAL P.


No.
A. SUB STRUCTURE
1. EXCAVATION & EARTHWORKS
Excavate for site clearing to a depth of 20cm to
1.1 remove top soil m² 299.00
Bulk excavation to reduce level in ordinary soil
to a depth not exceeding 200cm starting from
1.2 natural ground level m³ 897.00
Bulk excavation to reduce level in ordinary soil
to a depth not exceeding 400cm starting from
1.3 200cm . m³ 358.80
Trench excavation for peripheral stone masonry
foundation to a depth of 1000 mm including 100
1.4 mm working allowance for each side. m³
Selected granular material fill form borrow pot
and well compacted in layers not exceeding 20
cm at dry density and optimum moisture
content. The degree of compaction and the
1.5 material should be approved by the engineer.

a) Around Masonery wall & footing pad M3 89.70


Load and cart away surplus excavated material
to a suitable damping area allowed by the
1.6 municipality not more than 5 km from the site. m³ 1,315.60
250mm thick sound basaltic ir equivalent stone
hard-core finished and blinded with crushed
1.7 stone. m² 247.25
Total carried to summary
2. CONCRETE WORKS
50 mm thick lean concrete class C-5 with a
2.1 minimum cement content of 150 Kg/m3
80 19,780
A) Under Footing Pad & masonry M2 247.25
Reinforced concrete in class C-25 (with a 28-
day 150mm cube crushing strength of 25 Mpa),
cast into formworks and vibrated around rod
reinforcement bars are measured separately.) in:
"type of cement to be ordinary Portland
2.2 cement(OPC)"

a) In Mat foundation M3 160.71

b) In foundation columns M3 10.40

c) In 10 cm basement floor slab M2 239.45

d) beams & lintels,Shear wall M3 78.74


e) Stair case and landing M3 2.76
Provide, cut and fix in position wooden or metal
formwork that should be strong enough to resist
the pressure of fresh concrete and painted with
approved type of mould oil before any
2.4 placement of concrete is carried out.
420 79,674
a) In Mat foundation M2 189.70
420 36,796.2
b) In foundation columns M2 87.61
420 7,484.4
c) beams & lintels M2 17.82
420 138,600
d) Shear Wall M2 330.00
420 10,836
e) Stair case and landing M2 25.80
Total carried to summary 1,174,109

ITE
M DESCRIPTION UNIT QTY U.PRICE TOTAL P.
No.
S-400 Reinforcement steel bars according to
structural drawing.
Price includes cutting, bending, placing in
2.5 position and tying wires.
9.50 10,026.68
a) dia. 8 mm deformed bar Kg 1,055.44
9.50 12,893.87
b) dia. 10 mm deformed bar Kg 1,357.25
9.50 123,351.23
12,984.3
c) dia. 12 mm deformed bar Kg 4
9.50 21,635.02
d) dia. 14 mm deformed bar Kg 2,277.37
9.50 68,258.55
e) dia. 16 mm deformed bar Kg 7,185.11
9.50 158,916.95
16,728.1
f) dia. 20 mm deformed bar Kg 0
Total carried to summary 395,082.30

Sub Structure (A)


B. SUPER STRUCTURE
1. CONCRETE WORKS
1.1 Reinforced concrete in class C-25 (with a 28-
day 150 mm cube crushing strength of 25 mpa),
cast into formworks and vibrated around rod
reinforcement bars. (formwork & reinforcement
bars are measured separately.) in: "Type of
cement to be ordinary Portland cement (OPC)"
In:-
420 54,117
a) elevation columns M3 128.85
420 25,687.2
b) 27cm thick Flat slab M2 61.16
c) beams & lintels M3
420 12,881.4
d) stair case & landing M3 30.67
Provide, cut and fix in position wooden or metal
that should be strong enough to resist the
pressure of fresh concrete and painted with
approved type of mold oil before any placement
1.3 of concrete is carried out.
420 400,806
a) elevation columns M2 954.30
420 1,123,815
b) 27cm thick Flat slab M2 2,675.75
420 229,139.4
c) Shear Wall and lift M2 545.57
420 92,030.4
d) stair case & landing M2 219.12
S-300 Reinforcement steel bars according to
structural drawing.
Price includes cutting, bending, placing in
1.4 position and tying wires.
a) dia. 6 mm deformed bar Kg
9.50 3,283.48
b) dia. 8 mm deformed bar Kg 345.63
9.50 58,497.77
c) dia. 10 mm deformed bar Kg 6,157.66
9.50 709,518.2
74,686.1
d) dia. 12 mm deformed bar Kg 3
9.50 185,245.6
19,499.5
e) dia. 14 mm deformed bar Kg 4
9.50 132,220.6
13,917.9
f) dia. 16 mm deformed bar Kg 6
9.50 85,343.44
e) dia. 20 mm deformed bar Kg 8,983.52
Total carried to summary 1,174,109

Supper Structure (B)

Grand Total (A+B)