Professional Documents
Culture Documents
Appraisal
Appraisal
1. Carried out E-1315 A/B Exchanger cleaning job without taking shut down of
the plant.
2. Carried out E-2103 A/B Exchanger cleaning job without taking shutdown of
CDR plant.
3. Achieved Highest ever CO2 production 12000 Nm3/hr. from CDR plant.
4. Carried out RG Boiler E-1206 A/B online De-dusting without taking shut
down of the plant on 09/12/2021.
5. Successful Replacement of LP RECOVERY old condenser E1522 by new one.
1.3 ANY POINT(S) YOU WOULD LIKE TO SHARE (IT MAY RELATE TO YOUR JOB OR
OUTSIDE YOUR JOB) (100 WORDS)
1) Awareness about SOP and hazards should be done to all concerned persons.
2) To provide fire water spray line near P1501 A/B and P1521 A/B area with I/V
at safe location.
3) A record of change in controlling / operating system should be maintained
and should be available for all concerned persons. And discussion should be
done about them in technical classes.
4) Personal protective equipment should be provided to all concerned persons
as per requirement.
5) Technical papers should be provided to enhance knowledge. Equipment
should be organized time to time for all including contract persons.