s

Distribution System

PT. Siemens Indonesia Rev.: 01

Exchanging Withdrawable Part and Contact Arms of VCB


________________________________________________________________________

A. Safety Instructions

1. General Instructions

Independently of the safety instructions given in these manual instructions, the local laws,
ordinances, guidelines and standards for operation of electrical equipment as well as for
labor, health and environmental protection apply.

The Five Safety Rules of Electrical Engineering must generally be observed during
operation of the products and components described in these operating instructions:

• Isolate
• Secure against reclosing
• Verify safe isolation from supply
• Earth and short-circuit
• Cover or barrier adjacent live parts

To work on switchgear where covers have to be removed, personal protective equipment


has to be worn for protection against hot gases exhausting in case of internal arc.
To select the protective equipment, the national standards and specifications of the
corresponding authorities and professional associations must absolutely be observed.
The protective equipment consists of:

• Protective clothing
• Safety shoes
• Gloves
• Helmet and face protection

2. Qualified Personnel

Qualified personnel in accordance with these instructions are persons who are familiar
with maintenance and operation of the product and have appropriate qualifications for their
work. Furthermore, qualified personnel must have the following training and instruction or
authorization:

 Training and instruction or authorization to switch on, switch off, earth and identify
power circuits and equipment / systems as per the relevant safety standards
 Training and instruction regarding the applicable specifications for the prevention of
accidents and the care and use of appropriate safety equipment
 Training in first aid and behavior in the event of possible accidents

SI DS QM&GCC AIS&SD JKT Page 1 of 27 Aug 2021


s
Distribution System

PT. Siemens Indonesia Rev.: 01

Exchanging Withdrawable Part and Contact Arms of VCB


________________________________________________________________________

B. Parts / Components, Materials and Tools required for Installation

Tools / auxiliary means required to perform installation work

1. Manual Torque (20-120Nm)


2. Shock 24 (1/2”)
3. Shock 17 (1/2”)
4. Pin Removal
5. Adapter 100mm (1/2”)
6. Spanner 10-11
7. Crimping Tool for Amphenol Pin
8. Cutting Plier

8
2
5
3
4

Materials required

- Contact Pin Amphenol (Spare)

SI DS QM&GCC AIS&SD JKT Page 2 of 27 Aug 2021


s
Distribution System

PT. Siemens Indonesia Rev.: 01

Exchanging Withdrawable Part and Contact Arms of VCB


________________________________________________________________________

C. Step by Step Instruction

Step 1.

Switch-Off the Circuit Breaker which will be rectified.

Please refer to NXAIR Operating Instruction 110-0134.9


For further detail information

SI DS QM&GCC AIS&SD JKT Page 3 of 27 Aug 2021


s
Distribution System

PT. Siemens Indonesia Rev.: 01

Exchanging Withdrawable Part and Contact Arms of VCB


________________________________________________________________________

Step 2.

Rack the withdrawable circuit-breaker / circuit-breaker truck to test position.

SI DS QM&GCC AIS&SD JKT Page 4 of 27 Aug 2021


s
Distribution System

PT. Siemens Indonesia Rev.: 01

Exchanging Withdrawable Part and Contact Arms of VCB


________________________________________________________________________

SI DS QM&GCC AIS&SD JKT Page 5 of 27 Aug 2021


s
Distribution System

PT. Siemens Indonesia Rev.: 01

Exchanging Withdrawable Part and Contact Arms of VCB


________________________________________________________________________

Step 3.

Open the high-voltage door.

SI DS QM&GCC AIS&SD JKT Page 6 of 27 Aug 2021


s
Distribution System

PT. Siemens Indonesia Rev.: 01

Exchanging Withdrawable Part and Contact Arms of VCB


________________________________________________________________________

Step 4.

Remove the low-voltage connector.

SI DS QM&GCC AIS&SD JKT Page 7 of 27 Aug 2021


s
Distribution System

PT. Siemens Indonesia Rev.: 01

Exchanging Withdrawable Part and Contact Arms of VCB


________________________________________________________________________

Step 5.

Take the withdrawable circuit-breaker out of the panel.

SI DS QM&GCC AIS&SD JKT Page 8 of 27 Aug 2021


s
Distribution System

PT. Siemens Indonesia Rev.: 01

Exchanging Withdrawable Part and Contact Arms of VCB


________________________________________________________________________

Position the service truck in front of the panel.

SI DS QM&GCC AIS&SD JKT Page 9 of 27 Aug 2021


s
Distribution System

PT. Siemens Indonesia Rev.: 01

Exchanging Withdrawable Part and Contact Arms of VCB


________________________________________________________________________

SI DS QM&GCC AIS&SD JKT Page 10 of 27 Aug 2021


s
Distribution System

PT. Siemens Indonesia Rev.: 01

Exchanging Withdrawable Part and Contact Arms of VCB


________________________________________________________________________

Unlock the withdrawable circuit-breaker from the panel.

SI DS QM&GCC AIS&SD JKT Page 11 of 27 Aug 2021


s
Distribution System

PT. Siemens Indonesia Rev.: 01

Exchanging Withdrawable Part and Contact Arms of VCB


________________________________________________________________________

SI DS QM&GCC AIS&SD JKT Page 12 of 27 Aug 2021


s
Distribution System

PT. Siemens Indonesia Rev.: 01

Exchanging Withdrawable Part and Contact Arms of VCB


________________________________________________________________________

Keep Withdrawable VCB stays on Service


Truck during dismantling and assembling work.

Note:
This is Service Truck used in factory.
Actual Service Truck delivered to site has
a different color.

Step 6.

Dismantle all Contact Arms from VCB.

Undo / loosen Hex. Screw using Shock no. 24


for dismantling the Tulip Contact.

Tulip Contact

Contact Arm

SI DS QM&GCC AIS&SD JKT Page 13 of 27 Aug 2021


s
Distribution System

PT. Siemens Indonesia Rev.: 01

Exchanging Withdrawable Part and Contact Arms of VCB


________________________________________________________________________

Remove Insert-Nut fixed on Contact Arm. Take a Screw M16 to push the insert-nut by
applying force using plastic hammer until insert-nut released from Contact Arm.
Purpose is to get access to Screw on inner side of Contact Arm.

Insert-Nut
released/removed

Releasing the Insert-Nut


Insert-Nut fixed
on Contact Arm

Undo/loosen Hex. Screw using Shock no. 24 for dismantling all 6 pcs of Contact Arm.

1
Contact Arm

5 5

2 2

1
Contact
Arm

Outside Screw Inner side Screw


Access from front hole of Contact Arm

SI DS QM&GCC AIS&SD JKT Page 14 of 27 Aug 2021


s
Distribution System

PT. Siemens Indonesia Rev.: 01

Exchanging Withdrawable Part and Contact Arms of VCB


________________________________________________________________________

Step 7.

Take out all wires come from Withdrawable (Cartridge).

Using Pin Removal Tool, take out pin wires which come from Cartridge on VCB Plug -X0.
Note: Take out only pin wires come from Cartridge as shown on schematic wiring below.

VCB Plug -X0


4

Pin Wires

SI DS QM&GCC AIS&SD JKT Page 15 of 27 Aug 2021


s
Distribution System

PT. Siemens Indonesia Rev.: 01

Exchanging Withdrawable Part and Contact Arms of VCB


________________________________________________________________________

Make sure the pin not broken/damage


during removal process. Replace with
new pin when necessary.

Put label/mark on wire has been


removed from VCB Plug -X0 according
to number identity shown on schematic
wiring.

Remove/cut cable ties marked on the


picture.

SI DS QM&GCC AIS&SD JKT Page 16 of 27 Aug 2021


s
Distribution System

PT. Siemens Indonesia Rev.: 01

Exchanging Withdrawable Part and Contact Arms of VCB


________________________________________________________________________

Step 8.

Dismantle interlocking part on Cartridge using Spanner no. 10-11 as shown in the
pictures.

Interlocking
part

Interlocking
part

Cartridge
Picture taken from the rear

Step 9.

Undo/loosen fixing screws (4 pcs) of VCB to Cartridge using Shock no. 17.

Cartridge
5

Service
Truck

1
SI DS QM&GCC AIS&SD JKT Page 17 of 27 Aug 2021
s
Distribution System

PT. Siemens Indonesia Rev.: 01

Exchanging Withdrawable Part and Contact Arms of VCB


________________________________________________________________________

Step 10.

Remove the existing VCB and replace with new supplied VCB.

1. Move the existing VCB from the Cartridge


using Lifting Crane or other lifting tool and put it
on the pallet.

2. Put the new supplied VCB onto the Cartridge


and fix it using screws (4 pcs) as illustrated in
Step 9.

NOTICE

To complete the installation of New VCB please follow the instruction in


reverse order from Step 9 until Step 6.

Pay attention on Tightening Torque value of the following:

- Fixing Screws of VCB on the Cartridge: 50 NM.


- Fixing Screws of Contact Arm on VCB Contact Pole: 110 NM.

Replacement of VCB is completed at this Stage


VCB can now be inserted into the panel for operation

SI DS QM&GCC AIS&SD JKT Page 18 of 27 Aug 2021


s
Distribution System

PT. Siemens Indonesia Rev.: 01

Exchanging Withdrawable Part and Contact Arms of VCB


________________________________________________________________________

Step 11.

Insert the withdrawable circuit-breaker in a panel.

SI DS QM&GCC AIS&SD JKT Page 19 of 27 Aug 2021


s
Distribution System

PT. Siemens Indonesia Rev.: 01

Exchanging Withdrawable Part and Contact Arms of VCB


________________________________________________________________________

SI DS QM&GCC AIS&SD JKT Page 20 of 27 Aug 2021


s
Distribution System

PT. Siemens Indonesia Rev.: 01

Exchanging Withdrawable Part and Contact Arms of VCB


________________________________________________________________________

SI DS QM&GCC AIS&SD JKT Page 21 of 27 Aug 2021


s
Distribution System

PT. Siemens Indonesia Rev.: 01

Exchanging Withdrawable Part and Contact Arms of VCB


________________________________________________________________________

SI DS QM&GCC AIS&SD JKT Page 22 of 27 Aug 2021


s
Distribution System

PT. Siemens Indonesia Rev.: 01

Exchanging Withdrawable Part and Contact Arms of VCB


________________________________________________________________________

Step 12.

Lock the low-voltage connector.

SI DS QM&GCC AIS&SD JKT Page 23 of 27 Aug 2021


s
Distribution System

PT. Siemens Indonesia Rev.: 01

Exchanging Withdrawable Part and Contact Arms of VCB


________________________________________________________________________

Step 13.

Close the high-voltage door.

SI DS QM&GCC AIS&SD JKT Page 24 of 27 Aug 2021


s
Distribution System

PT. Siemens Indonesia Rev.: 01

Exchanging Withdrawable Part and Contact Arms of VCB


________________________________________________________________________

Step 14.

Rack the withdrawable circuit-breaker / circuit-breaker truck to service position.

SI DS QM&GCC AIS&SD JKT Page 25 of 27 Aug 2021


s
Distribution System

PT. Siemens Indonesia Rev.: 01

Exchanging Withdrawable Part and Contact Arms of VCB


________________________________________________________________________

SI DS QM&GCC AIS&SD JKT Page 26 of 27 Aug 2021


s
Distribution System

PT. Siemens Indonesia Rev.: 01

Exchanging Withdrawable Part and Contact Arms of VCB


________________________________________________________________________

The VCB is now in Service Position


Ready to Switch ON the VCB for operation

D. Cleaning

When replacement work is done, do cleaning the object from dust and any dirt possibly
produced during installation/rectification using vacuum cleaner and cleaning agent.

E. Final Check and Function Test

Final check shall be observed to make sure the replacement work has been carried out
properly in accordance with provided Instruction.

Mechanical and electrical function test shall be performed according to the functionality of
what has been carried out.

NOTICE

Withdrawable Function Test:

Try to operate withdrawable VCB for Rack-Out (Test) and Rack-In


(Service) position to verify movement of withdrawable is GOOD.

CAUTION

VCB Function Test:

Function Test CLOSE and OPEN (ON/OFF) VCB must be done ONLY
with Withdrawable in Test Position (Rack-Out).

DO NOT Test CLOSE and OPEN VCB when withdrawable is in Service


Position (Rack-In).