PPROJ-1354 CIVIL TRMT-22 REV-0 MAB Response
PPROJ-1354 CIVIL TRMT-22 REV-0 MAB Response
Project Name MBC Group - Al Narjis Studio complex RFP Revision No PROJ-1354/CIVIL/TRMT-22/REV-0
- Phase 1
17-Sep-2023
Client Name MBC FZ LLC Submission Date
Manufacturer / Supplier /
Slno Sheet No Description Type Copies Action Code
Specication
B primer of primary structure
1 24017 PAINTING SYSTEM (STEEL STRUCTURE) TDS/ DOCS AIC - OASIS 1 C for cat walk paint
CONSULTANT'S REVIEW COMMENTS : Approval of the above does not relieve the contractor from his contractual obligations CONSULTANT'S RECEIVED :
1- as per description of the paint system as per attached above table that main steel applied with only primer are totally wrong,it still have fire coat and top coat. . NAME : Mahmoud Sharaf
2- contractor to be sure that all of used paints are compatibility between each other , primer , fire proof , top coat ,
3- for primary steel , prefer to use red color if its available to be matching with project specs. TITLE : PM
4- for primary steel final approval subjected to provide 1 piece of sample steel 60*60 cm applied with 3 coats, primer , fire coat , top coat
to be divided to three part , 60x60 cm applied with primer , 40x40cm applied with primer + fire coat , 20x20 cm applied with primer + fire coat + top coat .
5- the proposed system of cat walk paint are rejected since its out of vendor list which mentioned hemple or Berger paints DATE :
NAME : Rami -AL-Ahmad POSITION: Structural Eng. DATE : 4/10/2023 SIGNATURE: SIGNATURE :
ACTION CODE
A - APPROVED AS SUBMITTED. C - REVISED AND RE-SUBMITTAL REQUIRED.
B - APPROVED WITH COMMENTS. D - DISAPPROVED. SEE ATTACHED SHEET.
Page No: 1 of 1