Download as pdf
Download as pdf
You are on page 1of 20
M AIIES A Trusted Partner in Business Across The Globe GVEA THE WFRASTRUCTURE CALCULATION OF PILE LOAD CAPACITY FOR AMRAIWADI STATION Contact No. : MEGA/DDC/ELEV-STNS/E-W/1/2014 LOA No. MEGA/DDC/ELEV-STNS/E-W/R1/2014-15/LOA/5155 DATED Feb 02, 2015 Detailed Design Consultancy for Elevated Metro Rail Stations Submitted to METRO LINK EXPRESS FOR GANDHINAGAR AND AHMEDABAD (MEGA) 803, 8 Floor, GNFC Info Tower S.G. Highway Ahmedabad - 380 015 INDIA Submitted by RITES LTD. Urban Transport (UT) Division Detailed Design Consultants to MEGA Bangalore - 560 001 Karnataka, INDIA FOR APPROVAL Submitted on Date: O8.03-QolS AMD -PC REPORT NO. nonasti nee- 0286 | Rey-R\ Name Designation Signature Date Originator Mr.Brij Raj Meena Structural eee 08.03.2016 Engineer Reviewer Mrs. SilambarasiM. ‘Structural 2 08.03.2016 Engineer Issuer / Approver Mr.ShameerBasha Team leader Pie 08.03.2016 REPORT NO: 220724/PC-AMD/STR/REP- 026/R-1 Issue and Revis VERSION DATE DESCRIPTION STATUS Rev-RO | 16.02.2016 Initial Submission For Client/Employer Approval Rev-RI 08.03.2016 Revision Due toGEC For Client/Employer Approval comments ‘This document is issued for the party which commissioned it and for specific purposes connected with the above- captioned project only. It should not be relied upon by any other party or used for any other purpose. We accept no responsibility for the consequences of this document being relied upon by any other party, or being used for any ‘other purpose, or containing any error or omission which is due to an error or omission in data supplied to us by ‘other parties This document contains confidential information and proprietary intellectual property. It should not be shown to other parties without consent from us and from the patty which commissioned it CALCULATION FOR PILE LOAD CAPACITY AT AMRAIWADI STATION Dated : += 08-03-2016 TABLE OF CONTENTS S.No. DESCRIPTION Page no. 1.0 INTRODUCTION i 2.0 DESIGN SUMMARY 2 3.0 ‘CALCULATION OF PILE LOAD CAPACITY BH No-02 BH No-04 34 56 BH No-05 78 BH No-06 9-10 | BHNo-08 11-12 WRITES Project: METRO LINK EXPRESS FOR GANDHINAGAR AND AHMEDABAD imedabad Metro Station Design bivn/bept or [/90R6Y fearon tetaton ro: Caine by_|7— te ie Copy mi Pl awd on hecked by [su Jona troduction ‘This report consists of calculation af pile load capacity for Rabal colony station based on the bore log deta provided by MEGA, input Data Bore log detalls provided by MEGA, lcodes Referred 19 18:2911 (Part 1/sec 2)-2010 1S: 6403-1981 Bore log details for reference 001 DESIGN SUMMARY Max oad onthe ple = 435tons (As per Design Report No, 220724/STR- ‘AM REP-008/REV.A8) Pile Capacity for Amraiwadi Station i Termination euno, | meyemneten, | caractrcronn ears a 35 "wench somata Recommended Cpacty of 200%m diameter bored ple 6435 tors 002 0u3 Detail Design Consultancy for Elevated Metro Rail Stations - Six Stations on E-W Corridor of ahmedabad Metro Rail Project for MEGA Geotechnical Capacity Calculation for Working Pile at Amraiwadi Station Location / BH No Bit Pile Diameter 120 mtr Existing Ground Level 0.00 mt. Existing GWT Level 750 mtr, Pile Cutoff Level 2.70 mtr, Pile Termination evel from EGU. 36.50 mtr Pile Termination Level from Cutoff Level 33.80 mr, Critical Depth for limiting Overburden Pressure 150 18.00 mt. FOS for skin ition 250 0S for end bearing 250 Soll properties and ef. Overburden stress ‘ayer | Depth oftayer —] Wekness oT] yan [TotlSuess] OWater | Suess | Umiine [Ese tavern) | vty | Prive’) | Pressure fri’) at] Pressure |, (em) iam Palin’ | bom of tetom ot aa er | BverPL | otioyer coy | (a fever | uma) T [000 | 270 [270 | 000 | 000 | 000 | ooo | 000 | 0.00 2 [270 | ~sso_[ a0 [183 [$12 | 000 | saz | saz | 256 3550] 750 [200 | 183 | 878 | 000 | a7 | a7 | 695 a | 750_| 1050 | 300_| 183 | 1427 | 300 | 4327 | tt27 | 1003 | 1050 [i350 | 300 [175 | 1952 | 600 | 1352 | 1352 | 1240 © [1350 | 1800 | as0__|199 | 2848 | 1050 | 17.98 | 1798_| 35.75, 7 [1800 [1950 150 [199 | 146 | 1200 | 1946 | 1798 | 1798 | 1950 | 7550 | 600 | 197 | 4328 | 1800 | 2528 | 1798 | 1798 3 | 25503150 [600 | 202 | 540 | 2400 | a0 | 1798 | 1798 103150 | 2600 | 4s0__| 205 | 6463 | 2850 | 3613 | 1798 | 17.98 aa_[ 3600 3650_| 050 | 205 | 6565 | 29.00 | 36.65 | 1798 | 17.98 a2] 3650 | as00_| 50 | 208 | e291 | 3750 | 45.1 | 1798 | 17.98 33[-a5.00| ~s000 | 5.00 | 210 | s3a1_| a2s0_| so.si | 1798 | 37.98 ‘Byer ] Depth ot ayer] Theimensof | Surtees | Cohesion | Angle ot | Angleot | Coell of [Adhesion] tan Layer(m) | arena | (Corcu) | intel | pie-sot | eartn | ractora a snattat | (wma) | icin | Friction | ressureK| om ayer) w |e 7 [000 [270 | 270 | 1018 | 000 | 2900 | 2900 | 100 | o0o | oss z [270 [550280 | 1056 [220 | 1200 | 1200 | 100 | 100 | oz 3 [sso 750_| 200_| 754 | 220 | 1200 | 1200 | 100 | 100 | 021 ‘a_|_750 | 4050 | 300 | an3i | 220 | 2200 | 1200 [100 [100 | 021 5 | 10501350 | 300 | 11st {150 | 17.00 | 17.00 | 100 | 1.00 | 031 6 | 1350_| 1800 | aso | 1696 | 1595 | 000 | o00 | 000 | oe | 000 7|-1800[-a9s0 [150] 565 [1595 | 000 | 000 | 000 | azs | 0.00 &[ 1950 | 2550 | 6.00 | 7267 | 1980 | 000 | 000 | 000 | 028 | 000 9 [2550] 3150 | 600 | 2262 | 7165 | 0.00 | 000 | 000 | 028 | 000 to—[ 31.50 | 3600_| 450 1696 | 2370 | 0.00 | 0.00 | 0.00 | 028 | 0.00 a1] 3600 | 3650 | 050 | 188 | 040 | 3400 | 3400 | 120 | 100 | 067 32 [3650 | 45.00 | 850 | 3204 | 2630 | 0.00 | 000 | 0.00 | 0.28 | 000 33 -4500| s0.00 | s.00 [eas | 630_| 6.00 | 00 | 0.00 | 028 | 0.00 Note: Inout the data ONLY at the cell with RED font 004 Detail Design Consultancy for Elevated Metro Ral Stations - Six Stations on E-W Corridor of, ‘Ahmedabad Metro Rall Project for MEGA Geotechnical Capacity Calculation for Working Pile at Amraiwadi Station Location / BH No: Bn Pile Diameter 1.20 mtr. ‘Cross Section Area of Pile 1.131 m? FOS for skin fition 250 FOS for end bearing 2.50 Tver anthof layer] Thekness [Shalt Ares [Gearing Capacity | UN Skin Fiction | URtnd [| Totaluit | ToualUt oftayer | ateach Factors Copactty(fon) | Bearing. capacity of capacity of Tromp te] [yet aT fimerementpeumetatne] aon” | Petter) J Pe Ton fo | om “ i [ooo [270| 270 | 1018 [000 |isa0|i780| 000 | 000 | 000 | 000 | 0.00 2 [270 [550] 280 | 1055 |940| 306 |179| 2897 | 28.97 | 4334 | 72a1 | 29.00 3 [sso [750| 200 | 754 9.40306 [179] 27.73 | 56.70 | 36.00 | 112.70 | 46.00 ‘4 [750 [i050] 3.00 | 111 |9.40[306 [179] 4899 | 10569 | 6461 | 170.30 | 69.00 5 [20.s0|3350| 3.00 | 111 |azsaao2 [375] seaa | 16553 | 10100 | 26653 | 107.00 & [2350|1600/ 450 | 1696 | 9.00 [0.00] 000] 75.76 | 201.29 | 16235 | 403.65 | 162.00 7 |18.00|3950|~ 1.50 | s.6s | 9.00 | 0.00 | 000 25.25 | 266.55 | 16235 | 42890 | 172.00 & [19.50|25:50| 6.00 | 22.62 | 9.00 | 0.00 | 0.00 | 125.40 | 39x95 | 20154 | 503.49 | 238.00, 3 [2550[3150] 6.00 | 22.62 [9.00] 0.00 | 0.00 137.12 | $2907 | 22037 | 749.44 | 300.00 40 [33.50|36.00] «50 | 16.96 [9.00] 0.00 | 0.00] 11258 | 6axes | 24128 | 982.88 | 35400 11_[36.00|3650] 0.50 | 1.88 |#2.92|3032[az90| 2.18 | 669.83 | 695.62 | 136545, 12_|36.50]45.00] ~e.50 | 32.08 | 9.00 | 0.00 | 0.00 | 235.97 | 905.61 | 267.70 | 1173.51 | 470.00 33_|45.00|50.00| 5.00 | 18.85 [3.00000] 000] 13881 | 10aae1 | 267.70 | 1312.32 | 525.00 Summary of Pile Capacity Calculation ‘The Geotechnical Capacity of Bored Pile (120mm dia) is 547 tones for 36.50 m long pile Below EGL Note: Input the data ONLY at the cell with RED font Introduce the layer at GWL and Pile Critical Depth level fr accurate estimation 005 Detail Design Consultancy for Elevated Metro Rail Stations - Six Stations on €-W Coreidor of Ahmedabad Metro Rall Project for MEGA Geotechnical Capacity Calculation for Working Pile at Amvaiwadi Station Location / 3H No: Pile Diameter Existing Ground Level Existing GWT Level Pile Cut-Off Level Pile Termination Level from EGL Pile Termination Level from Cutoff Level Critical Depth for limiting Overburden Pressure FOS for skin fiction FOS for end bearing Soil properties and eff. Overburden stress BH 1.20 mtr, 0,00 mt. 7.50 mt. 2.70 mtr. 28,00 mt. 25,30 mt ap 20.40 mtr, 250 250 Gye] Donat ae — | IRSA] Tomy OTTO] Wa] Eaves | Une [EMSiTe tavern) | ame) | Pell’) | Pressure [rus at| Pressure fo, cv fan Pat | bitom | Pater of Fe a aT le taser | terse otter T [000 | 270 [270 [000 | 000 | 0.00 | 000 | 0.00 | 0.00 77-27] 350] 280 [181 [sor | 000 | sor] so7_| 253 3_[-5s0_|750| 200 [ a8: [aes | 000 | a09 | 569 | 688 =| 750[ i080 300 | ter] taax [300 | aiaz [ane | 990 3] 10s0|~is0o | aso [1802322 [ 750 are | aaa | ese | 1s00~| aso] aso [201 [326 | i200 | 1926 | i826 | i689 7]1350_] 2040] 090} 201[-s307| a290_[ 2017 2017 | 19.72 3] 2040] 2550] 510] 194 | az97_| 1800 | 2697 [2017 | 20.7 3_][2550_| 27.00 | is0 | 194 [ase a9s0 | 2636 [2037 [2037 70] 77.00] 2800 | 200 [200 | azas_| 2080 | 2738 | 2037 | 2037 i [2800 [3450] 650] 203 e107 2700_[sao7_| 2017_| 2047 iz] 3450_| 39.00] 450-200 | voor_|a1s0_| 3857 | 2017 | 2037 33 3300 [ ~so0o| —an00_|-208_[ asi 250 | sooi | 20a7 | 2037 [aye] asin at ter | Heknessa? | Sore] Covation | Angieo™ | Angieo”] Coaih ot [hahenony aa Layerto) | area ot | (orca) | intel | pie-sot | earth | Factor fm start | (dma) | izion | Fretion | ressure | i | ayer) w | 0) T [000 | 270| 270] aoie [ooo | 2500 [2500 [200 | 000 | oss 2 ]_270 | sso] 280 | 4056 [000 | 2900 | 2900_[ 100 | 000] ass 3_]-550_|780—[ 200 |-7sa_[o00_| 29002900 i00 | 0.00 | oss @—|750|a050_| 300 | asx [000 | 3000 | 3000 | 100 | 000 | ose 3_[-a0s0_|1s00_[ #50 | i696 [000 | 30.00 3000 [100 | 000 | ose €—]_1500—|~1950[ a0] a696 | 2095] coo | 000 | ooo | 028 | 000 7_]1950_| 2040 | 090 | 339 | 17.35 | coo | 000 | 000 | 028 | 000 3 | 2040] 2550 50 | 1923 | 1735] 000] 000] 000 | 028 | 000 3 |-2550_|27.00_| 180] ss] 22.15 | 000 | 000 | ooo | 028 | 000 302700} 2800| 100-377-000 [~ss00 [3300215 | 000 | 04s ti} 2800 | 3450] 650] 2850 [000 [3300 | 3300 | t15 | 000 | os iz] 3450 | 3900] 450 1696 | 20a0_[ ooo [000 | 000_| 028 | 0.00 13_[_39.00 | sooo | a100_| #xa7_[-2580_| 000 [0000.00 | 028 | 0.00 Note: Input the data ONLY at the cell with RED font 006 Detail Design Consultancy for Elevated Metro Rall Stations - Six Stations on E-W Corridor of, [Ahmedabad Metro Rail Project for MEGA Geotechnical Capacity Calculation for Working Pile at Amraiwadi Station Location / BH No be Pile Diameter 4.20 mtr, Cross Section Area of Pile 1.431 mi? FOS for skin fiction 280 05 for end bearing 250 Taper Pein of ayer] Themes | Shan Ares | Seating Gapaeky | —URSun Frauen —] UkEnd Towuw | Tour ur oftayer | ateach Factors capacity (Tor) | Bearing [capacity ot fcapacty of io) | ayer capacity | Ple (on) |] Pe (Ter) romp Te] | eres AAT Tinrementeumutave] roo | Petron) Herron) fon) | om T [oo [270 | 270 | oie ze2e|i0.a5|2010) 000 | 000 | 000 | 000 | 0.00 2 [270] 550] 280 | 1056 |2826]16.25|2010| 1683 | 2483 | a21.27 | 13610 [$500 3 [550 [750 | 2.00 | 754 |2826|16.25|20.10| 28.75 [4357 | 190.27 | 233.84 | 9400 4750 [3050] 3.00 | 1131 |s0.14[1840|22.40| 64.66 | 10824 | 2saes | 3671 | 147.00 5 |ioso|1500] 450 | 1696 ]3014[isao]z200| 12653 | 234.76 | 333.64 | 568.40 | 228.00 6 7 = 8 75.00]1950| 450 | 16.96 | 9.00 | 0.00 | 000 | 99.51 | 33428 | 213.25 | 547.52 | 22000 1350|2040| 090 | 339 [3.00] 0.00[ 000] 16.48 | 350.76 | 176.60 | 527.36 | 21100 20402550] 540 | 9.23 [9.00 |000|000| 93.40 | aaats | 176.60 | 620.76 | 249.00 2550|27.00| 150 | 565 |9.00|000| 000] 3507 | 47323 | 225.46 | 704.69 | 282.00 10 |27.00)2800| 1.00 | 3.77 _[39.73|2734|37-78| 56.79 | S363 | 675.01 | 1231.08, a1_|28.00]2450| 6.50 | 2450 |39.73|27.24[37.78] 369.15 | 905.18 | 675.77 | 158036 | 633.00 42 ]2450]39.00| 450 | 16.96 | 9.00 | 0.00 | 0.00] 115.90 | 1021.08 | 24.36 | 1269.44 | 508.00, 43 |39.00|5000] 1100 | a1a7_|9.00 [0.00 | 0.00 | 299.57 | 1320.66 | 262.61 | 158327 | 634.00, ‘Summary of Pile Capacity Calculation “ The Geotechnical Capacity of Bored Pile (1200mm dia) Is 485 tones for 28.0 m long pile Below EGL Note: Input the data ONLY atthe cell with RED font Introduce the layer at GWL and Pile Critical Depth level fr accurate estimation 007 Detail Design Consultancy for Elevated Metro Rall Station - Six Stations on EW Corridor of Ahmedabad Metro Ral Project for MEGA Geotechnical Capacity Calculation for Working Pile at Amraiwadi Station Location / BH No: Pile Diameter isting Ground Level Existing GWT Level Pile Cut-off Level Pile Termination Level from EGL Pile Termination Level from Cut off Level Critical Depth for limiting Overburden Pressure FOS for skin fiction FOS for end bearing Soil properties and eff. Overburden stress Ha 1.20 mt 0.00 mt. 7.50 mtr, 2.70 mt, 35.00 mt. 32.30 mtr, 170 20.40 mtr. 250 250 ye | Denne layer [Tine | Yuq Tour Sven G Water] ATSve | Unting [eSe Layerim) | quae | Pete’) | Presue [pain at} Pressure |e, in’) mT tlm’ | bowom of | bottem of | at ie a tayer” | err. [ oriyer Wea} T [00 [270 [270 | ooo [000 | ooo | 000 | 000 | 000 2] 270 —5s0[ 280 | 176 [493 | 000 | 493_[ asa_| 246 3 _[550[—7s0_| 200 | 176 _[~aas_[ 000 | 94s | eas_[ 609 <_[-750| i380] 600_| 196 | 2021 [600 | aaa | aaa | 133 3 J 43s0 | 1950] —600_| i98_| 3208 | 1200 | 2009 | 2008 [3735 &_|1350[~2040 | 080[~a98_|33a7_| 1250 | 2087 | 2097 | 2053 7] 20402550] sao 195 | a3az | 1800 | 2582 | 2097 | 2097 [9550-3150] 600_| 201 | ~ssas_[ 2400 [sis [2097 | 2037 3_[-s1s0[ m0] 300 | 200| 1s [27.00 | 488 | 2057 | 2097 30 3as0_|_35.00_| 080 | 200] ezs8_[ 2750 | 3536 | 2097 | 2097 si} 35003900] 400 [193 | 70.60 [3x0 | 39.10 | 2097 | 2097 i2_[-2900_| «000_| 100 [193 7a58_[ 3250 | a003_[ 2097 | 2037 13] 4000_| 30.00 i000 202 | 92.73 | a250_| s023_| 2097 | 2097 [rarer creah | Seteee] Carson | rae | rele] COR aT | RR N | an Layer(n) | ateaot | (Corca) | inert | piso | tath | Factora From [To snatat | (wma) | Fvievon | ‘Freton | resure tm | foyer) cw | T [00 [ 270 [270] tore | 000 | a0 | 2600 | 100 | 000 | 049 Z_][270] 550] 280 | a0s6_| 140 [2600 | 2600 | 100 | 100 | 049 3_]-ss0_| 750] 200] ~7s4_| 80 [13.0 | 1300 [100] 078 | 02s. 4_[-150| 1380] e00 [2267 | sa0_| 1300 | 1300 | 100 | 078 | 023 s[-a350_| 1950] —e00 [2262 | 1610 [000 | 000 [~0.00_| 028 | .00 &_[-1950_[2040_| 030 [339 [2070 | 000_| 000 | 000_|~028_| 0.00 7 2040| 2550] —s10 | 49.28 | 20,70 | 0.00 | 0.00 | 000 | 028 | 0.00 3_]%550[-a1s0| 600 | 2262 | 2470 [000 | 000 | 000_| 0280.00 3] 3150_[ 3450 [300 | mai | 26.10 [000 | 000 [000] 028 | 000 70 [-2450_|-3500_| 050 | uae [110 | 3200_[ 3200 | 110 [100 | 042 i] 35.00 3900 | 400] i506 [110 [3200 s200_| 110 [1.00 | oz 2] 39.00_| 4000] 1.00| 377 | 2770_| 000 | 000 | 0.00 | 028 | 0.00 z3_|-a000_[-s000_| 1000 —[-3770-|_27.70| 0.00 | 0.00_| 0.00 | 028 | 000 Note; Input the data ONLY a the cell with RED font 008 Detail Design Consultancy for Elevated Metro Ral Stations - Six Stations on E-W Corridor of ‘Ahmedabad Metro Rail Project for MEGA ‘Geotechnical Capacity Calculation for Working Pile at Amraiwadi tation Pedometer 120 mi Cross Section Area of Pile 1.131 m? fosters ton 250 rostorend bese 230 Mie | sted | rawr Conses Ton) | Bening [aay of copay of compe] | erin aaa ee] pet | Me Ten Ye to) ot | aaa a ew ome] aoe oo | ame [a 3 arof sar oat | ase [peso] ieaifisae|a7ae | a7as | uaase_[ aero [5500 s[so}rar{omr |r| sas sas [aoe] as7s [raza ones | arzas [7000 + [aso |rss0] eat [ peer [53s [336 [aoe aaa | asa | Tans | aseas | aaa00 Sfessn[ioso| soo [are [s00f oon [on | aonsr[-aseer | aca.aa_[-sons5_[ 201.00 Sfissofzoa0[ oa [338 [500] 000 fom ase | aseae | 21070-[ soroe_[ 277.00 $faabfosso] —si0—[ ae 2s [5.00] ooo | 000 | anae_[-aer77 | wi070-| wear | 77200 + ass0[siaol soo [soar [sao[ooo [ooo ase -emnar [asus [ ws? [ 35100 + |aiso|seso]sa—| test sav om [aco | szes| voeas| sar | ara | 35000 wo 350 [ tas —[sas[ soe] soes|ana0[ Tae ro | a5723 | 199.9 aps foo | ast [3653| 3236] es] Dae | oroas | esse | asos7s | 7200 42 fosun[aooe| ta —[ 37 | S00 000 ooo | asze | opeas | patos | raaiae | $1300 1 feoos[soon[aeeo_[- 3770 san [ooo om [aaa [amtee | oates [isa | e000 ‘Summary of Pile Capacity Calculation / ff ‘The Geotechnical Capacity of Bored Pile (120mm dia) is 638 tones for 35.0 m long pile Below EGL Note: Input the data ONLY at the cell with RED font Introduce the layer at GWL and Pile Cltical Depth level for accurate estimation 009 Detail Design Consultancy for Elevated Metro Rall Stations Six Stations on E-W Corridor of Ahmedabad Metro Rail Project for MEGA Geotechnical Capacity Calculation for Working Pile at Amaiwadi Staton Location / BH No ns Pile Diameter 1.20 mt Existing Ground Level 0.00 mv. Existing GWT Level 6.50 mw. Pile Cutoff Level 2.70 me Pile Termination evel rom EGL 2020 mt. Pile Termination Level rom Cut off Level 2750 mw Critical Depth for limiting Overburden Pressure 160 19.20 mtr. FS for skin feton 250 FOS for end bearing 250 Soil properties and eff. Overburden stress ayer] Depth oflayer ——] Tricines of | Yung [TouSueR] GWater | ETSver] Unie [Ese tayecton) | qym' | Prim’) | Pressure [riya] Pressure Ire ran] 7 Pati’) | bottom of | Betton of fac sie cor lw wer | yet ttyer 1 [000 | 270 | 270 | oo) | ooo | ooo | 000 | 000 2—[- 270 [aso [280 | a75 [34s | 0.00 | 315 [3s 3 [-aso_[ 650 [200 [275 [66s | 0.00 | 665 | 665 4 [650 [900 | 250 | 175 | au0s [250 | esa | 93 Ss] 300 | a350| 450 | 185 [1935 | 700 | 1235 | 1235 6 | -1350_[-17s0-[ 400 | 18s | 2675 | 11.00 | 15.75 | 1575 | 1405 7 [1750 [1920 [170 [-i90 | 2998 | 1270 | 1728 | 17.28 | 1652 [19202020 | 100 [a9 _[ 2193 | 13.70 | 18.23 | 17.28 | 1728 32020 [2400 [300 [ass | 3938 | 1750 | nea [i728 | i7ze 30 [2400 [27.00] 300 | 2.00] 4538 | 2050 [2484 [1728 [i728 32 [2700 [3600] 800 | 1a | 6280 [2950 | 33.30_[ 1728 | 1728 32| 3600 | 42.00] 600 | 196 | 7456 [3580 | 3906 [1728 [ 17.28 33 [-az00 | -as.00_| 3.00] 2.02 | sose | 3850_[a2i2 | i7as [ara Tevet] bepinattayer | Taciness of | Surface] Cohesion | Angieo? | Angieot | Cool of [Acheson] tant tayer(m) | Areaat | (Ceorcu) | intel | pile-sot | arm | Factor Fone shateat | (va) | Friction | Frcion |ressurek) oy | tm aver’ w | oe 7 [000 [270 | a70[ aoie | 000 | 7600 | 600 | 100 | 000 | 049 2] 270 as0[ 180 [679 | 000 | 30.00 | 3000100 | 000 | oss. 3_[ 450 6s0_[ 200 [75a | 430 | 1300 | 1300 | 100 | oss | 02s @—[650_[ 900 | 250 | 942 | a30 | 1300 | 1300 | 100 | oss | 023 Ss |_300[a3s0_|4s0| 1696 | 0.00 | 31.00 | 300 | 105 | 0.00 | 060 [aso [3750 | 400 | 15.08 [0.00 | 33.00 _| 3300 | 115 | coo | 06s, 7 [47501920 | 170 | 641 | 0.00 | 3300 | 3300 | 115 | 0.00 | 065 [13.20 | 2020| 100] 377] oa0_[ 3200 | 3200 [110 | 100 | 062 ‘3 [-2020 | 28.00 | 3.80 | 1433 | 0.40 | 32.00 | 3200 | 120 | 1.00 | 062 30] 24.00 [77.00 | 300 | 11.31 | 2045 | 0.00 | 000 | 000 | 0.28 | 0.00 sa | 27.00 | 36.00] 3.00 | 393 | 0.00 | 3100 |3100 | 105 | 0.00 | 060 12 | 3600 42.00| 600 | 2262 | 2100 [000 [000 | 000 | 028 | 0.00 73 | #200 | 4500 [ 300 | sua] 030_| 1.00 | su00 | 105 | 100 | 0.460 Note: input the data ONLY atthe cell with RED font 010 Detail Design Consultancy for Elevated Metro Ral Stations - Six Stations on E-W Corridor of, [Ahmedabad Metro Rall Project for MEGA Geotechnical Capacity Calculation for Working Pile at Amraiwadi Station Location No os Pie lamer 120 Cross Section Area of Pile 1.131 m? Foster aintrcon 20 Fosfor end bang 230 Tom p Te] | Beri aaa ea} CSNY J PCT Je ron (om | m T [ooo [aro 270 | i018 |2280|m7i[i318[ 000 | a0 | 000 | 000 | 000 2 [270 [450 [180 | 679 |3014]18.40|22.40| 617 | 6a7_| 9215 | 9832 | 40.00 3 [aso [sso | 2.00 | 754 | 993335] 208] 4030 | 46.47 | 75.96 | 12243 | 49.00 4 [650 [900 250 | 942 [993] 335] 208] 5623 | 10270 | 3.00 | 185.7 | 75.00 5 [a0 |s350/ aso | 1696 |33.34)7138|2753] 11171 | a1aei | 333.8 | sa7.s9 | 22000 6 af 8 2 33.50]37.50| 4.00_| 1508 |39.73|2734|37.7a] 15823 | 37264 | 53443 | 907.07 | 363.00 27.50|39.20| 4.70 | 641 |39.73|2734|37.78] 78.08 | 451.68 | 98302 | 1034.70 | 41400 x00 | 377 [3653] 32.36]32.65] 4628 | 49797 | e925 | 1390.12 720.20|2400] 3.80 | 14.35 |3653]32.36|32.65| 175.68 | 673.85 | 69245 | 1366.00 | 547.00 10 [24.00 [27.00] 3.00 [ana [9.00 [000 | 000 | 64.76 | 73861 | 208.16 | 946.77 | 379.00 zi [27.00/36.00] 9.00 | 33.93 _|3334|21.28[27.53] 369.90 | 110851 | asa07 | 1562.58 | 626.00 42 [36.00 42.00] 6.00 | 22.62 | 9.00 | 000 | 0.00 133.00 | i2e151 | 213.75 | 1455.27 | 583.00 43 [#2.00[45.00[ 3.00 | 11.31 _|3334|7138|2753] 12669 | 136820 | 466.08 | 1835.08 | 735.00 ‘Summary of Pile Capacity Calculation eo ‘The Geotechnical Capacity of Bored Pile (1200mm dia) is 477 tones for 20.2 mlong pile Below EGL Note: Input the data ONLY a the cell with RED font introduce the layer at GWL and Pile Critical Depth level for accurate estimation oll Detail Design Consultancy for Elevated Metro Ral Stations - Six Stations on E-W Corridor of Ahmedabad Metro Rail Project for MEGA ‘Geotechnical Capacity Calculation for Working Pile at Amraiwadi Station Location / BH No: Pile Olameter Existing Ground Level Existing GWT Level Pile Cut-Off Level Pile Termination Level from EGL. Pile Termination Level from Cut off Level Critical Depth for limiting Overburden Pressure FOS for skin friction FOS for end bearing Soil properties and eff. Overburden stress prop He 120 0.00 750 270 20.40 17.70 wv 20.40 2.50 250 itr, mtr mtr a D rt. ‘ayer | Depthattayer —] Tikkness oP] —yaayJlotl Sven] OWater | BiiSves | Uniing [Estes tavern) | emt) | esttim’y | Pressure [pg meat] Pressure J pg (vin) fom altim’) | eottom of | bottom of | ase rl Tayer | bverPt | ot iayer ne) 00 | 270270 | 000 | 000 | 000 | 000 | 000 | 000 2] 270] 300 [930 | 152 | 046 | 000 | 046 | 046 | 023 3 [300] 600 | 300 | 152 | so2_| 000 | soz | soz | 274 ‘a [-600 | 750 [150 | aar_| 773 | 000 | 773 | 7.73_|_ 637 S| 750] i200 | 450__[ asi | asas | 450 | aia8 | a238 [955 6 [-1200[~a750[ 550 | 181 | 2583 | 1000 | 1583 | 1583 [1360 7_|-a7s0 [2040 | 290 |_188 | 3128 | 1290 | 1838 | 18.38 | 371 320402100 | 060 [287 | _sza7 | 1350_| 1697 | ass | sa38 3 [21.00 [2850750 | 202 | 4762 | 2100 | 2662 | 1838 | 16.36 i0[ 2850 3450_| 600 | 206 | sees | 27.00 | 3298 | 1838 | 1638 [3450 a0so_| 600 | 203 | 7216 | 3300 | 3936 | 1838 | 1638 az2| #050 ass0| 600] 206 | as2 | 3500 | 4552 | 1838 | 1838 33 | #650_[ sooo [350 | 208 | o180 | 4280 | 4930 | 1838 | 1038 Ter] Depth aftayer—] Trnknessot | Surface] Cohesion | Paglea? | Angleo? | casi of [Adhesion] tan Layec(ad | areaof | (Corcu) | intel | pie-sot | Earth | Factora on snattat | (uma) | Friction | Friction | ressureK ol m foyer’) w]e T [00 [270] 270] 1018 | 000 | 2600 | 2600 | 100 | 000 | 009 2 [270300 [030113 | 000 | 2600 | 2600 | 1.00 | 0.00 | 049. 3 [300600 | 300 | 1131 {090 | 27.00 | 17.00 | 100 [1.00 | 031 ‘@[-600 | 750] 150 | 565 | 590 | 600 | 600 | 100 | o75 | oa 5 [750 | 1200 [450 | 1696 | 590 | 6.00 | 600 | 100 | 07s | oat & [2200 | 1750_[ 550 | 2073 | 000 | 33.00_| 3300] 115 | ooo | 0.65 7_[-a7s0| 2040 | 290 | 1093 | 0.00 | 35.00 | 3500 | 125 | 000 | 0.70 3 [2040 [2100 | 060 | 226 | 0.00 | 35.00 | 3500 | 125 | 000 | 0.70 3 | 21.00 [2850] 750 | 2827 | 2015 | 000 | 0.00 | 000 | 028 | 0.00 io [2850 | 3450 | 6.00 | 2262 [72.80 | 000 | 000 | 000 | 0.28 | 0.00 tr [3450 | aa50 | 600 | 2262 | 285 | 000 | 000 | 000 | 028 | 0.00 a2 [40.50 | a6s0| 600 | 2262 | 2580 | 000 | 000 | 000 | 028 | 0.00 i3_[-asso[s000 | 350] 1319 | 26.75 | 000 | 000 | coo | 028 | 0.00 Note: Input the data ONLY at the cell with RED font 01 2 Detail Design Consultancy for Elevated Metro Rall Stations - ix Stations on €-W Corridor of Ahmedabad Metro Rail Project for MEGA Geotechnical Capacity Caleulation for Working Pile at Amraiwadi Station Lacan / ws aepacetr 120 ow Cross Section Area of Pile 1.231 m? Fos ora eon 2st fos trend bear i= TPS SE RR RESTOR ORT ORE TOTO ToT Ge Pater] rao” | Gmcnyten | aevne Josey st[ ceca apa] | met aa aac Tne) Casco fee wor | T [ooo ]270| 270 | tose [2xso]izifisis| ooo | 000 | 000 | ooo | 000 2 [270 [300030 | 113 |2260)i2.2i[i3z8[ 013 | 013 | 1989 | 7002_| 9.00, 3 [3.00] 600] 3.00 | iuai_[izs2[as2[a7s| 1968 | 1976 [ease | 6431 | 2600 4 [600 [750/150 | sos |6ss|a7s[oso| resi | 4358 | e183 | 1041 | 45.00 5 [750 [32.00] 450 | 1696 [sa6]175[o60| 9210 | 14068 | 69.05 | 209.72 | 8400 6 7 3 3 '2.00|17.50] 550 | 20.73 |39.73|27.34|37-78| 21065 | 35133 | S351 | ee7.26 | 355.00 290 | 1053 |46.12|32,30] 48.03] 16370 | $15.02 | 753.60 | 1268.63 20.40 |21.00] 0.60 | 2.26 |a6.12|3.20|48.03] 3639 | 551.42 | 75654 | 1307.96 | $2400 23.00 2850] 750] 28.27 | 3.00 | 0.00 | 0.00 | 159.52 | 71094 | 205.20 | 916.04 | 367.00 70 [2.503450] 6.00 | 22.62 | 9.00 [0.00 [0.00 | 14440 | #5535 | 23208 | 1087.47 | 435.00 ti [34504050] 6.00 22.62 | 9.00 | 0.00 [0.00 | 157.39 | 1012.73 | 252.98 | 1265.67 | 507.00 42 [40504650] 6.00 | 22.62 | 9.00] 000 [0.00 | 363.40 | a176a3 | 26261 | 1438.75 | 576.00 1 _[4650[s0.00f 350 | i319 9.00] 0.00 [000] 9883 | 127496 | 272.28 | 1547.26 | 619.00 ( ‘The Geotechnical Capacity of Bored Pile (120mm dia) is 508 tones for 20.40 m long pile Below EGL ‘Summary of Pile Capacity Calculation Note: Input the data ONLY a the cell with RED font Introduce the layer at GWL and Pile Critical Depth level for accurate estimation vl3 Detail Design Consultancy for Elevated Metro Rall Stations - Six Stations on E-W Corridor of Ahmedabad Metro Rall Project for MEGA Geotechnical Capacity Calculation for Working Pile at Amralwadi Station Location /BH No: ans Pile Diameter 1.20 mer. Enistng Ground Level 0.00 mtr, Existing GWT Level 7.00 mte Pile Cut-OF Level 2:70 mtr Pile Termination Level from &GL 38.50 mtr, Pile Termination Level from Cut of Level 35.80 mi. Critical Depth fr limiting Overburden Pressure 150 18.00 mer FOS or sin friction 250 FOS for end bearing 250 Soil properties and ef. Overburden stress ayer | Depth ayer —[tanestoP | Yang foursweny Gwar | Hse | Unine [eave] tavern | aymty | eetunt | Pressure fp ein at] Pressure [Pg in’) me atu) | boomet | am at acme wover | verPt | rtayer tm | om mer | yay | T [000 [270 [270000 [000 | 000 | 000 | 0.00 | 0.00 Z| 2707.90 | #30 [268 [727 | 0.00_|727_[7.27_| 3063, 3] 700—[ 750 | 050 see [air [oso | 761 | 7.61_| 740 4 [750] 1050 | 300 | 186 | i369 [350 | 1039 | 1019 | 290. 5] -1050[ 16.50 | 600 | 186 | 2aas [950 | 1535 | 1535 [ ta77 @_[-a6s0| 17.50 | 100 [286 | 26.71 | 1050 [36.21 | 16.21 | 15,78 7 | -a7s0| 18.00 | 050 [195 | 2769 | 11.00 | 1669 | 16.69 | 26.45 3 [1800 | 1950 150[ 195 | s0s1 | 1250 | 18.1 | 16.69 | 16.69 ‘3 [19.50] 25.50 [600] 1.99 | «255 | 1680 | 2405 | 16.69 | 16.69 3o—[-25s0 [77.00 [150 [199 | 4558 | 20.00 | 25.54 | 16.69 | 16.59, ai [-2700~] 3450 [750 203_| 6076 | 2750 | 3326 | 1669 | 16.09 a2 3450 | 38s0_| 00 | 200 [68.76 | si50_| 3726 | 16.69 | 16.69 is] 3850] 4550 8.00 [2.08 | #5.40_| 39.50 | 45.90 | 16.69 | 16.69 ia_[ #650 | s000[ 350] 205 | szet_| 4300 | a9ei | 16.69 | 16.69 [eer Depth oftayer | Thickness of | surface | Cohesion | Angeot | Angleot | Coe'l.of [Adhesion] tond’ Layerim) | acest | (Corcul | tera! | ple-sai | “cath | Factor am shattat | m2) | Fricion | Fron | Pressure tor | tm layer) w | oe 7 [000270 | 270 | soas | 000 | 2600 | 2600 | 100 | 000 | O48 2—[~270—[ 700 | 430 [1621 | 000 | 29.0_| 29.00 [1.00 | 000 | 055 3 ]_700 [750 [050 | 188 | 000 | 29.00 | 29.00 | 100 | 000 | 05 4-750] ~1050[ 300 | us [1935 | 000 | o00 [0.00 | 028 | 000 5 [-ioso | 1650_| 6.00_[ 2262 | 040 | 79.00 | 29.00 | 100 | 100 | 05s 61650 | 1750 | 100 | 377 | 1935 | 0.00 | 000 [000 [028 | 000 7 [1750 [-18.00|—o50| 188 | 040 | 29.00 | 25.00 | 100 | 100 | 055 3 | 1800 [150] 1s0| ses] 040 {29.00 [ 2300 | 100 | 100 | 0s 319502550 600 | 262 | 7145 [000 | 000 | 0.00 | 028 | 000 30] 2550 | 27.00 [150] 565 | 0.40 | 2900 | 29.00 | 100 | 1.00 | 055 tr] 27.00] 34s0[ 750 | 28.27 [ 2430 [000 | 000 | 0.00 | 0.28 | 000. t2_| 3450] 38.50 [400 | 1508 [ 2455 | 0.00 | 000 | 0.00 | 0.28 | 0.00 i3[-3850| 4650 | 800] 30.6 | 2455 | 0.00 | 0.00 | 0.00 | 0.28 | 0.00 34[-4650| 50.00] 350] 1339 | 2510 [000 | 000 | 000 | 0.28 | 0.00 Note: Input the data ONLY a the cell with RED font Detail Design Consultancy for Elevated Metro Ral Stations - Six Stations on E-W Corridor of ‘Ahmedabad Metro Rail Project for MEGA Geotechnical Capacity Calculation for Working Pile at Amralwadi Station Location / BH No: ens Pile Diameter 1.20 mtr. Cross Section Area of Pile 1131 mi? FOS for skin frctlon 250 FOS for end besring 250 Tayer [Baath layer] Thickness | Shatt ves | Gearing Capacity | —URSknFition | Utena Tout | Toalut oftayer | ateach Factors Capacity (Ton) | Bearing [capac off capac | Fomp te]! | vert a 1, | interment [eumulative] “ton Phe Ton) ) Pile Ton) (on) | to T [ooo[aro| 270 | 1018 [aso]t22ifisis| 000 | 000 | ovo | 000 | 000 2 [270 7.00| 430 | 1621 |28.26| 16.85|20.10] 32.65 | 32.65 | e155 | 19420 | 78.00 3[700]750| aso | 188 |26.26]16.85]20.10[ 7.77 | 4042 | 16812 | 20855 | 84.00 ‘@[7s0[2050| 3.00 | az31 [9.00] 000 | 000] 61.26 | 10170 | 19696 | 29866 | 12000 5 ]10.50]1650| 6.00 | 22.62 |26.26]16.85]20 10] 169.19 | 270.88 | 330.74 | 601.63 | 241.00 6 |16s0]17.50| 100 | 377 [900] 000[ ooo 2043 | 29131 | 19696 | 48827 | 19600 7_[1750| 38.00] 050 1.88 [28.26] 16.85]20.10| 17.94 | 309.25 | 357i | e667 | 267.00 3 ]19.00]19.50] 150 | 565 _|28.26| 16.5] 0.10| s4s7_| 363.82 | 357.01 | 72123 | 28900, 3 |1950]2550] 600 | 2.62 | 300] 000| 00a] 13585 | as967 | 21833 | 71801 | 288.00, 30 ]25:50]27.00] 1.50 | 565 |28.26]16.85]20.10| 4.57 | 55424 | 357.96 | 91220 | 365.00 i 750] 28.27 | 9.00 | 0.00 | 0.00 | 192.38 | 746.62 | 24734 | 903.96 2 ‘400 | 35.08 | .00 | 0.90 0.00| 10366 | #5028 | 219.80 | 1100.16 33 ]38.50]46.50] @00 | 30.16 | 900 0.00| 0.00 207.31 | 1057.9 | 249.9 | 1307.48 | 523.00 14 |46.50]50.00| 350 | 1319 [900,000] 000| 92.73 | 1150.32 | 25543 | 1405.81 | 56300 Summary of Pile Capacity Calculation ‘The Geotechnical Capacity of Bored Pile (1200mm. Note: Input the date ONLY atthe cell with RED font Introduce the layer t GWL and Pile Critical Depth level for accurate estimation vid ed TRAFFIC ¢ PIER/ 4004 DIRECTION PILE CAP b PIER / PILE CAP / ALIGNMENT a Ince [-@ ves (recta 2 | 7 Porro | © | 8-220 x @ 57-020 ae toh © 912 @ OCT ra @ Z| PLE CUT-OFF LWA. @ 5 co ti te PILE @ | ote-nes at toocre . ConcneTE(uts) © | om-tes ar ssocsc the Sie sl EF _@ | a ES muccar | @ | aaat-oas | g ® aati 620 et ® 2 TNOS 2-812 AT 150C/C_ | rv Q 2 AT 150C/C DETAILS OF PILE DEPTH —-@) FES AT CRD NOS | Dea) 4] 418 AT 1800 ¢/¢ ROAD TOP LL +. SCHEDULE OF REINFORCEMENT RC DETAILS OF PILE gem woe OX @ mame @- Sid te A stage pep 2008 section SECTION EE SECTION FoF SECTION 6-6 REVISION CONTROL DEA | consctn rroee ecee Aon & ATES HERO LINK EXPRESS GANDHINAGAR AND AHMEDABAD, NNO OBJECTION FOR McA 5 oraunuowsTRtoT (SHEET 2072 RCDETALS OF PER a DRAWING NAMETTITLE ISSUE RECORD evsen sven | CONSTRUCTION PILE & PILE CAP DRAWINGS FOR AMRANWADI STATION + | rzcere | Starcom, RIC DETAILS (7 PILE GROUP} (GOOD FOR GonsTRUGTION [7 orave | ous P80} a © [For arrRovat [DRAWING NO. [SHEET NO.: 2012 TENDER DRAWINGS ev na | ome | oesonenon 220724/AMOISTROIO DESIGN DEVELOPMENT jowse an issue ev ba SDE CDE EAM | PO OY. PD. lonraneoey| cuconeoer [aPoRoveoay| weveDey [SCALE DATE: 22.02 2016 PRELIMINARY DESIGN (QUALITY ASSURANCE)

You might also like