PT PLN NUSANTARA POWER No. Dok.

:
INTEGRATED MANAGEMENT SYSTEM Tgl. Terbit :
FORM UJI Revisi :
VISUAL INSPECTION Halaman : 1
Site : PLTU Paiton Manufaktur : ABB Tahun QP No. FU No.
Unit : 2 Inspeksi : SE 2023 OEM Doc. No.
Reheater R10 - Elevasi 1

kondisi shielding tube R10 horizontal dan screen tube relatif masih
baik, terlihat bekas semburan sootblower (thickness normal)
alignment tube terlihat mulai mengalami deformasi

terlihat tube T3-T5 terdapat bekas semburan sootblower,


P33 T3: 2,56 mm (dilakukan retubing)
P36 T3: 2,96 mm (dilakukan pemasangan shielding)
P39 T3: 2,88 mm (dilakukan pemasangan shielding)
P42 T3: 2,51 mm (dilakukan retubing)

RECOMMENDATION ACCEPTED/REJECTED
(by Quality Control) retubing dan pemasangan shielding
Measuring Tool: Camera, Marker

Description Tested/measured by Coordinator Inspection Supervisor Witness


Name Mufid Ali Bahtiar Afrialdi Rio P S

Signature

Date 08-Oct-23 08-Oct-23


PT PLN NUSANTARA POWER No. Dok. :
INTEGRATED MANAGEMENT SYSTEM Tgl. Terbit :
FORM UJI Revisi :
VISUAL INSPECTION Halaman : 1
Site : PLTU Paiton Manufaktur : ABB Tahun QP No. FU No.
Unit : 2 Inspeksi : SE 2023 OEM Doc. No.
Reheater R10 - Elevasi 2

alignment tube terlihat mulai mengalami deformasi

terlihat beberapa sabuk panel mulai mengalami kerusakan


RECOMMENDATION ACCEPTED/REJECTED
(by Quality Control) perencanaan penataan panel
Measuring Tool: Camera, Marker

Description Tested/measured by Coordinator Inspection Supervisor Witness


Name Mufid Ali Bahtiar Afrialdi Rio P S

Signature

Date 08-Oct-23 08-Oct-23


PT PLN NUSANTARA POWER No. Dok. :
INTEGRATED MANAGEMENT SYSTEM Tgl. Terbit :
FORM UJI Revisi :
VISUAL INSPECTION Halaman : 1
Site : PLTU Paiton Manufaktur : ABB Tahun QP No. FU No.
Unit : 2 Inspeksi : SE 2023 OEM Doc. No.
Reheater R10 - Elevasi 3

alignment tube terlihat relatif masih baik

terlihat beberapa tube sisi horizontal (over head) dan


vertical/area elbow mengalami erosi karena terkena sootblower

erosi area vertical/elbow:


- P1 T2: 4,21 mm
- P2 T2: 4,77 mm
- P3 T2: 4,75 mm
- P5 T2: 4,71 mm
- P8 T2: 4,90 mm
- P12 T1: repair overlay
- P44 T2: 3,90 mm (dilakukan
pemasangan shielding)

rekap lengkap di halaman


selanjutnya

RECOMMENDATION ACCEPTED/REJECTED
(by Quality Control) retubing dan pemasangan shielding
Measuring Tool: Camera, Marker

Description Tested/measured by Coordinator Inspection Supervisor Witness


Name Mufid Ali Bahtiar Afrialdi Rio P S

Signature

Date 08-Oct-23 08-Oct-23


PT PLN NUSANTARA POWER No. Dok. :
INTEGRATED MANAGEMENT SYSTEM Tgl. Terbit :
FORM UJI Revisi :
VISUAL INSPECTION Halaman : 1
Site : PLTU Paiton Manufaktur : ABB Tahun QP No. FU No.
Unit : 2 Inspeksi : SE 2023 OEM Doc. No.
Rekap Temuan Visual R11

tube erosi area over head:


- P1 T3: 4,32 mm (dilakukan pemasangan shielding)
- P3 T4: 3,83 mm (dilakukan pemasangan shielding)
- P4 T4: 2,48 mm (retubing)
- P5 T3: 3,34 mm (retubing)
- P6 T3: 4,26 mm (dilakukan pemasangan shielding)
- P8 T3: 4,73 mm (dilakukan pemasangan shielding)
- P9 T3: 4,47 mm (dilakukan pemasangan shielding)
- P10 T3: 4,34 mm (dilakukan pemasangan shielding)
- P11 T4: 2,06 mm (retubing)
- P12 T3: 4,26 mm (dilakukan pemasangan shielding)
- P12 T4: 2,10 mm (retubing) tube erosi area vertical/elbow:
- P14 T3: 3,36 mm (retubing) - P1 T2: 4,21 mm
- P14 T4: 3,29 mm (dilakukan pemasangan shielding) - P2 T2: 4,77 mm
- P15 T3: 4,68 mm (dilakukan pemasangan shielding) - P3 T2: 4,75 mm
- P16 T3: repair overlay - P5 T2: 4,71 mm
- P17 T4: 1,88 mm (retubing) - P8 T2: 4,90 mm
- P27 T3: 2,63 mm (retubing) - P12 T1: repair overlay
- P32 T4: repair overlay - P44 T2: 3,90 mm (dilakukan pemasangan shielding)
- P33 T3: 2,35 mm (retubing)
- P38 T4: 3,32 mm (dilakukan pemasangan shielding)
- P39 T4: 1,44 mm (retubing)
- P42 T3: 4,42 mm (dilakukan pemasangan shielding)
- P44 T4: 3,82 mm (dilakukan pemasangan shielding)

tube erosi area elbow:


- P33 T3: 2,56 mm (dilakukan retubing)
- P36 T3: 2,96 mm (dilakukan pemasangan shielding)
- P39 T3: 2,88 mm (dilakukan pemasangan shielding)
- P42 T3: 2,51 mm (dilakukan retubing)

RECOMMENDATION ACCEPTED/REJECTED
(by Quality Control)
Measuring Tool: Camera, Marker

Description Tested/measured by Coordinator Inspection Supervisor Witness


Name Mufid Ali Bahtiar Afrialdi Rio P S

Signature

Date 08-Oct-23 08-Oct-23