PT PLN Nusantara Power Integrated Management System Form Uji Visual Inspection
PT PLN Nusantara Power Integrated Management System Form Uji Visual Inspection
PT PLN Nusantara Power Integrated Management System Form Uji Visual Inspection
:
INTEGRATED MANAGEMENT SYSTEM Tgl. Terbit :
FORM UJI Revisi :
VISUAL INSPECTION Halaman : 1
Site : PLTU Paiton Manufaktur : ABB Tahun QP No. FU No.
Unit : 2 Inspeksi : SE 2023 OEM Doc. No.
Reheater R10 - Elevasi 1
kondisi shielding tube R10 horizontal dan screen tube relatif masih
baik, terlihat bekas semburan sootblower (thickness normal)
alignment tube terlihat mulai mengalami deformasi
RECOMMENDATION ACCEPTED/REJECTED
(by Quality Control) retubing dan pemasangan shielding
Measuring Tool: Camera, Marker
Signature
Signature
RECOMMENDATION ACCEPTED/REJECTED
(by Quality Control) retubing dan pemasangan shielding
Measuring Tool: Camera, Marker
Signature
RECOMMENDATION ACCEPTED/REJECTED
(by Quality Control)
Measuring Tool: Camera, Marker
Signature