Download as pdf or txt
Download as pdf or txt
You are on page 1of 6

PT PLN NUSANTARA POWER No. Dok.

:
INTEGRATED MANAGEMENT SYSTEM Tgl. Terbit :
FORM UJI Revisi :
VISUAL INSPECTION Halaman : 1
Site : PLTU Paiton Manufaktur : ABB Tahun QP No. FU No.
Unit : 2 Inspeksi : SE 2023 OEM Doc. No.
LTSH S21 - Elevasi Sootblower 1

alignment tube terlihat masih dalam kondisi relatif baik

shielding panel P51 dan 52 perlu dilakukan reposisi

bekas semburan sootblower pada tube sisi


belakang, tidak terlihat mengalami erosi

RECOMMENDATION ACCEPTED/REJECTED
(by Quality Control) penataan panel dan sabuk
Measuring Tool: Camera, Marker

Description Tested/measured by Coordinator Inspection Supervisor Witness


Name Mufid Ali Bahtiar Afrialdi Rio P S

Signature

Date 08-Oct-23 08-Oct-23


PT PLN NUSANTARA POWER No. Dok. :
INTEGRATED MANAGEMENT SYSTEM Tgl. Terbit :
FORM UJI Revisi :
VISUAL INSPECTION Halaman : 1
Site : PLTU Paiton Manufaktur : ABB Tahun QP No. FU No.
Unit : 2 Inspeksi : SE 2023 OEM Doc. No.
LTSH S21 - Elevasi Sootblower 2

alignment tube terlihat masih dalam kondisi relatif baik

slaging pada tube panel sisi timur (sekitar P1-P35)


terlihat lebih tebal dibanding panel sisi tengah-barat

sabuk panel tube terlihat mengalami kerusakan (berpotensi rubbing dengan


tube), panel area sisi timur cenderung lebih parah dibanding sisi tengah-barat
RECOMMENDATION ACCEPTED/REJECTED
(by Quality Control) penataan panel dan sabuk
Measuring Tool: Camera, Marker

Description Tested/measured by Coordinator Inspection Supervisor Witness


Name Mufid Ali Bahtiar Afrialdi Rio P S

Signature

Date 08-Oct-23 08-Oct-23


PT PLN NUSANTARA POWER No. Dok. :
INTEGRATED MANAGEMENT SYSTEM Tgl. Terbit :
FORM UJI Revisi :
VISUAL INSPECTION Halaman : 1
Site : PLTU Paiton Manufaktur : ABB Tahun QP No. FU No.
Unit : 2 Inspeksi : SE 2023 OEM Doc. No.
LTSH S21 - Elevasi Sootblower 3

alignment tube terlihat masih dalam kondisi relatif baik

slaging pada tube panel sisi timur (sekitar P1-P35) terlihat lebih tebal dibanding panel sisi tengah

thickness 5,76
thickness 5,28

tube sekitar opening sootblower sisi timur mengalami erosi


bekas semburan sootblower pada tube sisi
karena terkena sootblower, dilakukan repair overlay
belakang, tidak terlihat adanya erosi yang parah

RECOMMENDATION ACCEPTED/REJECTED
(by Quality Control) dilakukan repair overlay pada tube area opening sootblower sisi timur
Measuring Tool: Camera, Marker

Description Tested/measured by Coordinator Inspection Supervisor Witness


Name Mufid Ali Bahtiar Afrialdi Rio P S

Signature

Date 08-Oct-23 08-Oct-23


PT PLN NUSANTARA POWER No. Dok. :
INTEGRATED MANAGEMENT SYSTEM Tgl. Terbit :
FORM UJI Revisi :
VISUAL INSPECTION Halaman : 1
Site : PLTU Paiton Manufaktur : ABB Tahun QP No. FU No.
Unit : 2 Inspeksi : SE 2023 OEM Doc. No.
LTSH S21 - Elevasi Sootblower 4

tube area roof terlihat bekas terkena


sootblower, tidak terlihat adanya erosi

wall sisi barat area sekitar opening IK


sootblower mengalami erosi, thickness 6,19 mm

wall sisi timur area sekitar opening


IK sootblower mengalami erosi,
thickness terendah 7,07 mm

shielding panel P66 T2 perlu dilakukan reposisi

beberapa tube LTSH sisi belakang (T2, T3, T4, T5) mengalami erosi
RECOMMENDATION ACCEPTED/REJECTED
(by Quality Control)
Measuring Tool: Camera, Marker

Description Tested/measured by Coordinator Inspection Supervisor Witness


Name Mufid Ali Bahtiar Afrialdi Rio P S

Signature

Date 08-Oct-23 08-Oct-23


PT PLN NUSANTARA POWER No. Dok. :
INTEGRATED MANAGEMENT SYSTEM Tgl. Terbit :
FORM UJI Revisi :
VISUAL INSPECTION Halaman : 1
Site : PLTU Paiton Manufaktur : ABB Tahun QP No. FU No.
Unit : 2 Inspeksi : SE 2023 OEM Doc. No.
LTSH S21 - Elevasi Sootblower 4

Rekap hasil temuan tube erosi di LTSH S21 elevasi sootblower 4

keterangan: tube di bawah MWT


tidak dapat dilakukan thickness
permukaan tube kasar

retubing: P2 T3
P44 T2
P48 T2
P92 T3

RECOMMENDATION ACCEPTED/REJECTED
(by Quality Control) dilakukan retubing dan sekaligus dipasang shielding
Measuring Tool: Camera, Marker

Description Tested/measured by Coordinator Inspection Supervisor Witness


Name Mufid Ali Bahtiar Afrialdi Rio P S

Signature

Date 06-Oct-23 06-Oct-23


PT PLN NUSANTARA POWER No. Dok. :
INTEGRATED MANAGEMENT SYSTEM Tgl. Terbit :
FORM UJI Revisi :
VISUAL INSPECTION Halaman : 1
Site : PLTU Paiton Manufaktur : ABB Tahun QP No. FU No.
Unit : 2 Inspeksi : SE 2023 OEM Doc. No.
REKAP TEMUAN AREA S21

elevasi 4
lokasi temuan
retubing tube S21
- P2 T3
- P44 T2
- P48 T2
- P92 T3

- reposisi shielding P66 T2


elevasi 3

tube sekitar opening sootblower sisi timur mengalami erosi,


thickness: 5,28 mm dan 5,76 mm, dilakukan repair overlay

elevasi 2

penataan panel tube dan sabuk

elevasi 1

reposisi shielding panel P51 dan P52

RECOMMENDATION ACCEPTED/REJECTED
(by Quality Control)
Measuring Tool: Camera, Marker

Description Tested/measured by Coordinator Inspection Supervisor Witness


Name Mufid Ali Bahtiar Afrialdi Rio P S

Signature

Date 06-Oct-23 06-Oct-23