Professional Documents
Culture Documents
VT - S13 Dan Screen Tube
VT - S13 Dan Screen Tube
:
INTEGRATED MANAGEMENT SYSTEM Tgl. Terbit :
FORM UJI Revisi :
VISUAL INSPECTION Halaman : 1
Site : PLTU Paiton Manufaktur : ABB Tahun QP No. FU No.
Unit : 2 Inspeksi : SE 2023 OEM Doc. No.
S13 - Elevasi Sootblower 1
terlihat bekas semburan sootblower pada tube S13 dan furnace screen tube
RECOMMENDATION ACCEPTED/REJECTED
(by Quality Control)
Measuring Tool: Camera, Marker
Signature
RECOMMENDATION ACCEPTED/REJECTED
(by Quality Control)
Measuring Tool: Camera, Marker
Signature
alignment tube relatif masih baik terlihat sabuk tube mengalami kerusakan
RECOMMENDATION ACCEPTED/REJECTED
(by Quality Control)
Measuring Tool: Camera, Marker
Signature
RECOMMENDATION ACCEPTED/REJECTED
(by Quality Control)
Measuring Tool: Camera, Marker
Signature
RECOMMENDATION ACCEPTED/REJECTED
(by Quality Control)
Measuring Tool: Camera, Marker
Signature
RECOMMENDATION ACCEPTED/REJECTED
(by Quality Control)
Measuring Tool: Camera, Marker
Signature
banyak ditemukan tube S13 dan furnace screen tube mengalami erosi karena terkena
sootblower, beberapa ditemukan thickness sudah mengalami penurunan yang signifikan
tube S13 elevasi 4 yang mengalami erosi dan di bawah MWT (5,69 mm),
dilakukan retubing dan sekalian dipasang shielding:
- T63 : 5,48 mm
- T96 : 5,67 mm
- T116 : 5,59 mm
Signature
RECOMMENDATION ACCEPTED/REJECTED
(by Quality Control)
Measuring Tool: Camera, Marker
Signature
RECOMMENDATION ACCEPTED/REJECTED
(by Quality Control)
Measuring Tool: Camera, Marker
Signature