PEMBUATAN JEMBATAN BETON UK P.8 x L. 4 x T. 3 METER 1 ( SATU ) UNIT p 8.

00
DI PT ASN l 4.00
Rp 359,214,759.00 t 3.00

URAIAN PEKERJAAN BQ p l t n Koef. luas volume pjg pembesian pjg besi / btg pjg besi / mtr jlh btg berat besi / btg jlh pembesian
m m m m2 m3 m m
1 PEKERJAAN PERSIAPAN
1.1 Pembersihan lokasi m2 96.00 12.00 8.00 96.00
1.2 Pengukuran dan pemasangan Bowplank m' 40.00 12.00 8.00 40.00
1.3 Bongkar Jembatan Lama Ls 1.00
Jumlah (1)
2 PEKERJAAN GALIAN DAN TIMBUNAN
2.1 Galian tanah m3 31.20 4.00 6.50 0.60 2.00 31.20
2.2 Urugan Kembali m3 23.40 23.40
2.3 Sirtu m3 4.46
Pondasi sayap 0.60 2.00 0.20 2.00 1.20 0.58
Pondasi Abutment 1.80 4.50 0.20 2.00 1.20 3.89
4.46
Jumlah (2)
3 PEKERJAAN BETON
3.1 Beton cor m3 77.58
Pondasi sayap (1:2:3) 0.60 2.00 0.60 4.00 2.88
dinding sayap (1:2:3) 0.60 2.00 3.00 2.00 7.20
balok diatas abutment (1:2:3) 1.40 0.25 0.85 2.00 0.60
balok Lantai (1:2:3) gelagar 8.85 0.40 0.85 5.00 15.05
balok anak (1:2:3) 1.40 0.15 0.55 7.00 0.81
lantai jembatan (1:2:3) 8.85 4.00 0.25 1.00 8.85
pembatas tepi (1:2:3) 8.85 0.15 0.20 2.00 0.53
plat injak (1:2:3) 1.10 4.00 0.20 2.00 1.76
balok plat injak (1:2:3) 0.40 4.00 0.40 2.00 1.28

3.1 Beton cor bertulang (Abutment)


Pondasi (1:2:3) 1.80 4.50 0.60 2.00 9.72
Dinding Abutment (1:2:3) 0.60 4.50 3.00 2.00 0.22 15.98

3 PEKERJAAN PASANGAN
3.2 Pekerjaan pasangan batu kali / batu padas m3 2.69
Tembok Pengarah (1:2:3) 2.00 0.40 0.70 4.00 2.24

Pembesian kg 6,735.27 6,735.27


Pondasi Abutment 4.50 1.80 0.60
H (Dia.12-20 cm) 10.30 2.00 11.00 226.60 12.00 18.88 10.82 204.32
V (Dia.12-20 cm) 4.90 2.00 24.50 240.10 12.00 20.01 10.82 216.49
Pondasi Sayap 2.00 0.60 0.60
H (Dia.12-20 cm) 5.30 4.00 5.00 106.00 12.00 8.83 10.82 95.58
V (Dia.12-20 cm) 2.50 4.00 12.00 120.00 12.00 10.00 10.82 108.20
Dinding Abutment (Dia. 12 mm) 4.50 1.80 3.00
H (Dia.12 -20 cm) 15.10 2.00 11.50 347.30 12.00 28.94 10.82 313.15
V (Dia.12-20 cm) 9.70 2.00 24.50 475.30 12.00 39.61 10.82 428.56
Dinding Sayap (Dia. 12 mm) 2.00 0.60 3.00
H (Dia.12-20 cm) 10.10 4.00 5.00 202.00 12.00 16.83 10.82 182.14
V (Dia.12-20 cm) 7.30 4.00 12.75 372.30 12.00 31.03 10.82 335.69
Balok Lantai 8.85 0.40 0.85
H (16 Dia. 19 mm) 9.05 5.00 15.00 678.75 12.00 56.56 26.76 1,513.61
V (Dia 10-20 cm) 2.60 5.00 67.37 875.87 12.00 72.99 10.82 789.75
Tromol (5 Dia. 19 mm) 98.50 5.00 492.50 12.00 41.04 26.76 1,098.28
Balok diatas abutment 1.40 0.25 0.85
H Dia. 12 - 8 4.60 2.00 12.00 110.40 12.00 9.20 10.82 99.54
V (Dia 12-20 cm) 2.30 2.00 9.00 41.40 12.00 3.45 10.82 37.33
Balok anak 1.40 0.15 0.55
H Dia. 12 - 8 4.00 7.00 8.00 224.00 12.00 18.67 10.82 201.97
V (Dia 12-20 cm) 1.50 7.00 9.00 94.50 12.00 7.88 10.82 85.21
Lantai jembatan 8.85 4.00 0.25
H (Dia.12-20 cm) 18.30 1.00 22.00 402.60 12.00 33.55 10.82 363.01
V (Dia.12-20 cm) 8.60 1.00 46.25 397.75 12.00 33.15 10.82 358.64
Pembatas tepi 8.85 0.15 0.20
H (Dia.8 mm) 18.20 2.00 3.67 133.59 12.00 11.13 4.81 53.55
V (Dia.8-15 cm) 0.80 2.00 6.00 9.60 12.00 0.80 4.81 3.85
Plat injak 1.50 4.00 0.20 2.00
H (Dia.10-20 cm) 3.50 2.00 22.00 154.00 12.00 12.83 7.52 96.51
V (Dia.8-20 cm) 8.50 2.00 22.00 374.00 12.00 31.17 4.81 149.91

Pembesian 0%
Besi Beton Dia.8 mm 207.31 0% 0.00 207.31
Besi Beton Dia.10 mm 886.25 0% 0.00 886.25
Besi Beton Dia.12 mm 3,029.83 0% 0.00 3,029.83
Besi Beton Dia.19 mm 1,513.61 0% 0.00 1,513.61
Besi Beton Dia.19 mm 1,098.28 0% 0.00 1,098.28
6,735.27 6,735.27 kg
Kawat beton 134.71 kg

3.3 Bekisting m² 139.16 139.16


Pondasi sayap 0.60 2.00 0.60 4.00 6.24
Dinding sayap 0.60 2.00 3.00 4.00 31.20
Pondasi Abutment 1.80 4.50 0.60 2.00 7.56
Dinding Abutment 0.60 4.50 3.00 2.00 30.60
Balok Lantai 8.85 0.40 0.85 5.00 39.31
Balok Diatas Abutment 1.40 0.25 0.85 2.00 2.80
Balok anak 1.40 0.15 0.55 12.00 10.23
Lantai jembatan 8.85 4.00 0.25 1.00 3.21
Pembatas tepi 8.85 0.15 0.20 2.00 3.60
Tembok Pengarah 1.50 4.00 0.20 4.00 4.40

3.4 Pipa PVC Ø 2'' Btg 2.00 2.00


Jumlah (3)
4 PEKERJAAN FINISHING
4.1 Acian m2 85.32 85.32
Dinding Abutment Sebelah Luar 1.80 4.50 2.00 16.20
Dinding sayap 5.20 3.00 4.00 62.40
Tembok Pengarah 2.80 0.60 4.00 6.72

4.2 Plasteran m2 6.72 6.72


Tembok Pengarah 2.80 0.60 4.00 6.72

4.3 Cat tembok m2 85.32 92.04

Jumlah (4)
5 PEKERJAAN PELENGKAP LAIN-LAIN
5.1 Biaya Photo Dokumentasi Lot 1.00
5.2 Sewa Mesin Pompa Air Unit 1.00
5.3 Uji Sampel Beton Bh 10.00
Jumlah (5)
PERKIRAAN HARGA
PEMBUATAN JEMBATAN BETON UK P.8 x L. 4 x T. 3 METER 1 ( SATU ) UNIT
DI PT ASN

Jumlah Harga Jumlah Harga Jumlah


No Uraian Pekerjaan Satuan Upah Harga
Rp Rp Rp
1 PEKERJAAN PERSIAPAN 1,404,600.00 2,126,660.00 3,531,260.00
2 PEKERJAAN GALIAN DAN TIMBUNAN 1,473,120.00 2,618,241.89 4,091,361.89
3 PEKERJAAN BETON 199,713,195.47 54,616,744.74 254,329,940.21
4 PEKERJAAN FINISHING 1,880,271.84 4,893,487.56 6,773,759.40
5 PEKERJAAN PELENGKAP LAIN-LAIN xxx 2,300,000.00 2,300,000.00
Jumlah Harga Bahan + Upah 204,471,187.31 66,555,134.19 271,026,321.50
Profit 27,102,632.15
Transport 25,488,000.00
Jumlah 323,616,953.65
Pembulatan 323,616,900.00
PPN 11 % 35,597,859.00
Jumlah seluruhnya 359,214,759.00
PERKIRAAN HARGA
PEMBUATAN JEMBATAN BETON UK P.8 x L. 4 x T. 3 METER 1 ( SATU ) UNIT
DI PT ASN

BAHAN SATUAN JUMLAH HARGA JUMLAH


NO URAIAN PEKERJAAN SATUAN VOLUME
SNI BAHAN (Rp) UPAH (Rp) BAHAN (Rp) UPAH (Rp) BIAYA (Rp)
a b c d e f (d x e) (d x f) (dxe) + (dxf)
1 PEKERJAAN PERSIAPAN
11 Pembersihan lokasi PA 6.8 m2 96.00 xxx 16,800.00 xxx 1,612,800.00 1,612,800.00
12 Pengukuran dan pemasangan Bowplank PA 6.4 m' 40.00 35,115.00 12,846.50 1,404,600.00 513,860.00 1,918,460.00
Jumlah (1) 1,404,600.00 2,126,660.00 3,531,260.00
2 PEKERJAAN GALIAN DAN TIMBUNAN
21 Galian tanah PT 6.2 m3 31.20 xxx 61,786.40 xxx 1,927,735.68 1,927,735.68
22 Urugan Kembali PT. 6.9 m3 23.40 xxx 23,077.60 xxx 540,015.84 540,015.84
23 Sirtu PT 6.13 m3 4.46 330,000.00 33,712.00 1,473,120.00 150,490.37 1,623,610.37
Jumlah (2) 1,473,120.00 2,618,241.89 4,091,361.89
3 PEKERJAAN BETON
31 Beton campuran 1Pc : 2Ps : 3 Kr PB 6.13 m3 77.58 1,151,100.00 386,466.50 89,307,172.62 29,983,694.23 119,290,866.85
32 Pasangan bt kali /bt padas 1Pc : 3Ps PB 6.5 m3 2.69 602,900.00 257,458.00 1,620,595.20 692,047.10 2,312,642.30
33 Besi beton Ø 8 mm Ls kg 207.31 13,000.00 xxx 2,694,980.47 xxx 2,694,980.47
34 Besi beton Ø 10 mm Ls kg 886.25 13,000.00 xxx 11,521,301.46 xxx 11,521,301.46
35 Besi beton Ø 12 mm Ls kg 3,029.83 13,000.00 xxx 39,387,730.42 xxx 39,387,730.42
36 Besi beton Ø 19 mm Ls kg 1,513.61 13,000.00 xxx 19,676,962.50 xxx 19,676,962.50
37 Besi beton ulir Ø 19 mm Ls kg 1,098.28 13,500.00 xxx 14,826,712.50 xxx 14,826,712.50
38 Kawat beton Ls kg 134.71 18,000.00 xxx 2,424,698.30 xxx 2,424,698.30
39 Upah pembesian PB 6.25 kg 6,869.98 xxx 1,803.89 xxx 12,392,685.56 12,392,685.56
3 10 Bekisting PB 6.31 m2 139.16 129,950.00 82,985.90 18,083,842.00 11,548,317.84 29,632,159.84
3 11 Pipa PVC Ø 2'' Ls btg 2.00 84,600.00 xxx 169,200.00 xxx 169,200.00
Jumlah (3) 199,713,195.47 54,616,744.74 254,329,940.21
4 PEKERJAAN FINISHING
41 Acian PPL 6.37 m2 85.32 6,804.00 31,632.60 580,517.28 2,698,893.43 3,279,410.71
42 Plasteran camp 1 Pc : 3 Ps PPL 6.3 m2 6.72 16,458.00 26,937.00 110,597.76 181,016.64 291,614.40
43 Cat tembok PC 6.14. m2 92.04 12,920.00 21,877.20 1,189,156.80 2,013,577.49 3,202,734.29
Jumlah (4) 1,880,271.84 4,893,487.56 6,773,759.40
5 PEKERJAAN PELENGKAP LAIN-LAIN
51 Biaya Photo Dokumentasi Ls lbr 30.00 xxx 5,000.00 xxx 150,000.00 150,000.00
52 Sewa Mesin Pompa Air Ls hk 1.00 xxx 150,000.00 xxx 150,000.00 150,000.00
53 Penyimpanan bahan ,material ( tenda/barak ) Ls lot 1.00 xxx 2,000,000.00 xxx 2,000,000.00 2,000,000.00
Jumlah (5) 2,300,000.00 2,300,000.00
ANALISA HARGA SATUAN
DASAH
HARGA SATUAN JUMLAH
NO URAIAN PEKERJAAN BAHAN UPAH BAHAN UPAH
(Rp) (Rp) (Rp) (Rp)
1 SNI PA 6.8 PEMBERSIHAN LOKASI / M2
0.1000 Hk Pekerja ***** 108,400.00 ***** 10,840.00
0.0500 Hk Mandor ***** 119,200.00 ***** 5,960.00
- 16,800.00
2 SNI PA 6.4 PEMASANGAN BOWPLANK / M'
0.0025 M3 Kayu Sembarang Keras (SK) 3,650,000.00 ***** 9,125.00 *****
0.0200 Kg Paku 22,000.00 ***** 440.00 *****
0.0070 M3 Kayu Papan 3/20 3,650,000.00 ***** 25,550.00 *****
0.0100 Hk Pekerja ***** 108,400.00 ***** 1,084.00
0.0050 Hk Mandor ***** 119,200.00 ***** 596.00
0.0750 Hk Tukang ***** 130,100.00 ***** 9,757.50
0.0100 Hk Kepala Tukang ***** 140,900.00 ***** 1,409.00
35,115.00 12,846.50
3 SNI PT 6.2 PEKERJAAN GALIAN TANAH / M3
0.5260 Hk Pekerja ***** 108,400.00 ***** 57,018.40
0.0400 Hk Mandor ***** 119,200.00 ***** 4,768.00
- 61,786.40
4 SNI PT 6.9 PEKERJAAN URUGAN KEMBALI / M3
0.1920 Hk Pekerja ***** 108,400.00 ***** 20,812.80
0.0190 Hk Mandor ***** 119,200.00 ***** 2,264.80
- 23,077.60
5 SNI PT 6.13 PEKERJAAN SIRTU / M3
1.2000 M3 Sirtu 275,000.00 ***** 330,000.00 *****
0.3000 Hk Pekerja ***** 108,400.00 ***** 32,520.00
0.0100 Hk Mandor ***** 119,200.00 ***** 1,192.00
` 330,000.00 33,712.00
6 SNI PB 6.13 PEKERJAAN BETON COR: 1 : 2 : 3 / M3
8.4000 Zak Semen @ 40 Kg 84,000.00 ***** 705,600.00 *****
0.5400 M3 Pasir 150,000.00 ***** 81,000.00 *****
0.8100 M3 Batu Kerikil pecah 450,000.00 ***** 364,500.00 *****
2.0000 Hk Pekerja ***** 108,400.00 ***** 216,800.00
1.0000 Hk Mandor ***** 119,200.00 ***** 119,200.00
0.3500 Hk Tukang ***** 130,100.00 ***** 45,535.00
0.0350 Hk Kepala Tukang ***** 140,900.00 ***** 4,931.50
1,151,100.00 386,466.50
7 SNI PB 6.5 PASANGAN BATU PADAS / BATU KALI 1 pc : 3 Ps / m3
4.0750 Zak Semen @ 40 Kg 84,000.00 ***** 342,300.00 *****
0.5200 M3 Pasir 150,000.00 ***** 78,000.00 *****
1.1000 M3 Batu Kali / padas 166,000.00 ***** 182,600.00 *****
1.5000 Hk Pekerja ***** 108,400.00 ***** 162,600.00
0.0700 Hk Mandor ***** 119,200.00 ***** 8,344.00
0.6000 Hk Tukang ***** 130,100.00 ***** 78,060.00
0.0600 Hk Kepala Tukang ***** 140,900.00 ***** 8,454.00
602,900.00 257,458.00
8 SNI PB 6.25 PEKERJAAN PEMBESIAN / KG
0.0070 Hk Pekerja ***** 108,400.00 ***** 758.80
0.0003 Hk Mandor ***** 119,200.00 ***** 35.76
0.0070 Hk Tukang ***** 130,100.00 ***** 910.70
0.0007 Hk Kepala Tukang ***** 140,900.00 ***** 98.63
1,803.89
9 SNI PB 6.31 PEMASANGAN BEKISTING / M2
0.0400 M3 Kayu Sembarang Keras (SK) 3,650,000.00 ***** 146,000.00 *****
0.4000 Kg Paku 22,000.00 ***** 8,800.00 *****
0.2000 ltr Minyak Bekisting 22,000.00 ***** 4,400.00 *****
0.0180 M3 Balok Kayu Sembarang 3,650,000.00 ***** 65,700.00 *****
0.3500 lbr Plywood tebal 9 mm 100,000.00 ***** 35,000.00 *****
0.3200 Hk Pekerja ***** 108,400.00 ***** 34,688.00
0.0060 Hk Mandor ***** 119,200.00 ***** 715.20
0.3300 Hk Tukang ***** 130,100.00 ***** 42,933.00
0.0330 Hk Kepala Tukang ***** 140,900.00 ***** 4,649.70
129,950.00 82,985.90
10 SNI PPL 6.37 PEKERJAAN ACIAN / M2
0.0810 Kg Semen @ 40 Kg 84,000.00 ***** 6,804.00 *****
0.1500 Hk Pekerja ***** 108,400.00 ***** 16,260.00
0.0080 Hk Mandor ***** 119,200.00 ***** 953.60
0.1000 Hk Tukang ***** 130,100.00 ***** 13,010.00
0.0100 Hk Kepala Tukang ***** 140,900.00 ***** 1,409.00
6,804.00 31,632.60
11 SNI PPL 6.3 PLESTERAN 1 pc : 3 ps TEBAL 15 MM / M2
0.1620 Zak Semen @ 40 Kg 84,000.00 ***** 13,608.00 *****
0.0190 M3 Pasir 150,000.00 ***** 2,850.00 *****
0.2000 Hk Pekerja ***** 108,400.00 ***** 21,680.00
0.0100 Hk Mandor ***** 119,200.00 ***** 1,192.00
0.0150 Hk Tukang ***** 130,100.00 ***** 1,951.50
0.0150 Hk Kepala Tukang ***** 140,900.00 ***** 2,113.50
16,458.00 26,937.00
12 SNI PC 6.14. PEKERJAAN CAT TEMBOK / M2
0.1200 Kg Cat Dasar 34,000.00 ***** 4,080.00 *****
0.2600 Kg Cat Tembok 34,000.00 ***** 8,840.00 *****
0.0400 Hk Pekerja ***** 108,400.00 ***** 4,336.00
0.0020 Hk Mandor ***** 119,200.00 ***** 238.40
0.1200 Hk Tukang ***** 130,100.00 ***** 15,612.00
0.0120 Hk Kepala Tukang ***** 140,900.00 ***** 1,690.80
12,920.00 21,877.20
13 SNI PA .6.13 PEKERJAAN MEMBONGKAR BETON / M3
6.6670 Hk Pekerja ***** 108,400.00 ***** 722,702.80
0.3330 Hk Mandor ***** 119,200.00 ***** 39,693.60
- 762,396.40
PERHITUNGAN TRANSPORT

MEDAN LOKASI
NO. URAIAN
TON TON
1 Sirtu 3 x 4.46 1.2 x 1.4 - 22.50
2 Pekerjaan Beton 1 : 2 : 3
Kerikil 3 x 77.58 0.81 x 1.45 - 273.37
Semen 3 x 77.58 8.4 x 40 kg - 78.20
Pasir 3 x 77.58 0.54 x 1.4 - 175.96
3 Besi Beton 3 6,869.98 Kg - 20.61

Jumlah - 570.64

Bahan Bangunan yang diambil dari Medan = 6.00 Ton


Daya angkut Truck Colt Diesel = 6 Ton
Medan - site 1 Trip =

Biaya angkut = 6.00 x Rp - = Rp. -


6

Bahan Bangunan yang diambil dari Sekitar Lokasi = 570.64 Ton


Kapasitas Truck 1 hari = 30 Ton
Sewa Truck Colt Diesel 1 hari = Rp 1,340,000

Biaya angkut 570.64 x Rp 1,340,000 = Rp. 25,488,687.77


30
Biaya Transport = Rp. 25,488,687.77
Dibulatkan = Rp. 25,488,000.00
DAFTAR HARGA BAHAN DAN UPAH

No. Uraian Harga Satuan Keterangan

I. DAFTAR SATUAN UPAH


1 Pekerja 108,400.00 / OH
2 Mandor 119,200.00 / OH
3 Tukang 130,100.00 / OH
4 Kepala Tukang 140,900.00 / OH

II. DAFTAR SATUAN BAHAN - BAHAN


1 Kayu sembarang keras 3,650,000.00 / m3
2 Paku 22,000.00 / kg
3 Tanah urug 95,000.00 / m3
4 Sirtu 275,000.00 / m3
5 Cat dasar 34,000.00 / kg
6 Cat tembok 34,000.00 / kg
7 Kertas pasir 5,000.00 / lbr
8 Kuas 4" 28,000.00 / bh
9 Semen @ 40 kg 84,000.00 / kg
10 Pasir 150,000.00 / m3
11 Batu kerikil pecah 450,000.00 / m3
11 Batu kerikil guli 360,000.00 / m3
13 Kawat beton 18,000.00 / kg
14 Besi beton polos 13,000.00 / btg
15 Besi beton ulir 13,500.00 / btg
16 Besi Siku 75.75.7 664,000.00 / btg
17 Pipa PVC Ø 2'' 84,600.00 / btg
18 Minyak Bekisting 22,000.00 / ltr
19 Balok Kayu 3,650,000.00 / m3
20 Plywood tebal 9 mm 100,000.00 / lbr
21 Biaya Photo Dokumentasi 5,000.00 / lbr
22 Sewa Mesin Pompa Air 150,000.00 / Hk
23 Penyimpanan bahan ,material ( tenda/barak ) 2,000,000.00 / Hk
24 Batu padas / batu belah 166,000.00 / m3
Dimensi Balok
Lebar balok = 40 cm
Tinggi balok = 85 cm
Tebal lantai = 25 cm
Selimut balok = 5 cm
d1 = 105 cm
d2

Tegangan Tulangan Bawah Beton

Tulangan
Tu Bawah Dia 19 = 4 = 0.113354
TU Tromol Dia 18 = 0 = 0
TU Tromol Dia 19 = 3 = 0.0850155
TU Bawah Tromol As1 = 0.1983695

Tulangan
Dia 19 = 2 = 0.056677
As2 = 0.056677

TU As 2

Tulangan
Dia 19 = 2 = 0.056677
As3 = 0.056677

TU As 3
a = (As x fy) / (0,85 x fc x lebar balok) = 0.0666788

Mn1 = As1 x fy x (d - 0,5xa) = 49.97


Mn2 = As2 x fy x (d - 0,15) = 14.26
Mn3 = As1 x fy x (d - 0,25) = 14.25

Mu = 36.154
Mn = 49.973
∅ Mn = 42.477

∅ Mn / Mu = 1.17
Tulangan
Diameter / Besi Beton Satuan Luas Satuan
10 mm 0.1 cm 0.00785 cm2
12 mm 0.12 cm 0.011304 cm2
14 mm 0.14 cm 0.015386 cm2
16 mm 0.16 cm 0.020096 cm2
18 mm 0.18 cm 0.025434
19 mm 0.19 cm 0.0283385

cm2
cm2
∅ Mn / Mu 1.17
cm2
cm2

cm2

cm2

cm < tebal lantai 25 cm, ok

ton meter fy
ton meter

ton meter
ton meter
ton meter

ok ( Tidak Kurang 1 = Aman)


fy = 240 Mpa = 2400 kg/cm2
= 2.4 ton/cm2

fc beton = 21 Mpa = 210 kg/cm2


= 0.21 ton/cm2
Beban Mati

Panjang balok = 8 m 1.17


Lebar balok = 0.4 m
Tinggi balok = 0.85 m
Tebal lantai = 0.25 m
Jarak antar as balok = 0.75 m
berat jenis beton = 2.4 ton/m3

Beban mati balok = beban merata = Qdl

Qdl balok = lebar balok x tinggi balok x berat jenis beton x panjang daerah pembagian beban

Qdl lantai = jarak antar as balok x tebal lantai x berat jenis beton

Qdl = Qdl balok + Qdl lantai = 1.266 ton/m

Mu DL = ( Q DL x panjang balok gelagar x panjang balok gelagar ) / 8


= 10.128 ton meter

Mu = (1,2 x Mu DL) + (1,6 x Mu LL) = 36.1536 ton meter

P DL = 5.064 ton
P LL = 12.5 ton
P = 26.0768 ton

Luas bidang sentuh = 0.12 m2


Tekanan = 217.306667 ton/m2 = 217306.667 kg/m2
Beban Hidup

Kendaraan Maksimal Tonnase =


Ban terberat menanggung beban =

Q LL = 7.5 ton

Mu LL = (Q LL x Panjang Balok Gelagar) / 4

= 15 ton meter
bagian beban = 0.816 ton/m

= 0.45 ton/m

= 22 kg/cm2
Excavator yang sangat efisien, memiliki berat kerja 20,5 Ton dan kapasitas bucket 1,00 m3.
Motor Grader 17,5 ton dozer Cat 22 ton Vibro roller 15 ton

25 ton
ban belakang = 7.5 ton
H = Tinggi Jembatan Bersih = 3m
Tp = Tebal Pondasi = 0.5 m
Lpt = Lebar pondasi total = 2.10
Lpd = Lebar pondasi depan = 1.00
Lpb = Lebar pondasi belakang = 0.50
Ta = Tebal Abutment = 0.60
Tdb = Tinggi Dudukan Balok = 0.85
Ldb = Lebar Dudukan Balok = 0.40
Kolom Chek Status

0.25 m Ok
2.10 m Ok
1.00 m Ok
0.80 m Ok
0.30 m Ok
BOBOT JEMBATAN
Uraian vol / satuan Berat Jenis
1 Beton campuran 1Pc : 2Ps : 3 Kr 77.58 m3 2.4 =
2 Pasangan bt kali /bt padas 1Pc : 3Ps 2.69 m3 2.4 =
3 Pembesian 6,869.98 kg =
=
Jlh
186.20 ton
6.45 ton
6.87 ton
199.52 ton