Electrical Works
PRINT CITY:
MUDRICA:
GROUND FLOOR:
Check the step down power loss – with load and without load.
Measure the step down load in 428, 228, 520 and folding machine.
Check and Change all the AC connections through MCB and divide
into 3-Phase.
ST
1 FLOOR:
Bring the stabilizer from ground floor and fix it.
Fixing the step down for Folding machine.
2nd FLOOR:
Fix the wiring for Case making machine, UV machine
and Screen printing machines.
Water tank:
Water level controller repair/adjustment.
Extension of water pipe.
Remove all the excess wires and cables outside the building
and inside the building, 428 room etc.