DT: 18-10-2023.

LIST OF ELECTRIAL WORKS TO BE DONE:

PRINT CITY:

 Check the meter reading Before and After.


 Fixing the Capacitor.

MUDRICA:

 GROUND FLOOR:
 Check the step down power loss – with load and without load.
 Measure the step down load in 428, 228, 520 and folding machine.
 Check and Change all the AC connections through MCB and divide
into 3-Phase.
ST
 1 FLOOR:
 Bring the stabilizer from ground floor and fix it.
 Fixing the step down for Folding machine.
 2nd FLOOR:
 Fix the wiring for Case making machine, UV machine
and Screen printing machines.
 Water tank:
 Water level controller repair/adjustment.
 Extension of water pipe.
 Remove all the excess wires and cables outside the building
and inside the building, 428 room etc.