Download as pdf or txt
Download as pdf or txt
You are on page 1of 2

OM CONSTRUCTION Doc No.: OMCONST/IMS/QMS-0002/Ver 1.

Page 1 of 2

CONCRETE POUR CARD

Project Site:-

Contractor Name & W.O. No: - Date:

Location of work:-

Drawing No. : - Rev. No. :

Level:-

Concrete Details:
Grade of Concrete:

Volume of concrete:

Concrete Mix Proportion: W/C Ratio:

Coarse Aggregate Source: Fine Aggregate Brand/Grade of Cement & Brand of


Source: Batch Mark : Admixture :
Water
(litre/m3)
…mm Chips ….mm Chips Sand (kg/m3) Cement (Kg/m3) Admixture
(kg/m3) (kg/m3) (litre/m3)

Supply of concrete by: OM CONSTRUCTION/ Procured RMC*/ Contractor

* Above table need not be filled

Cement Consumption for Slurry:

Pour Details:
Date of Pour: Weather Condition:

Starting time of Pouring: Method of Pouring:

Closing time of Pouring: Method of Mixing:

No.s of Cube to be taken:

Average Slump at the time of Concreting:

Extra Reinforcement (if any):

No. of Laps: Dia/Nos of Dowels:

No’s /Dia of Chair Bar: Length of Chair:

Shape of Chair:

Cover Block: (Yes/No)


OM CONSTRUCTION Doc No.: OMCONST/IMS/QMS-0002/Ver 1.0

Rev. 01
Page 2 of 2

OM CONSTRUCTION
Project:

CONCRETE POUR CARD

Check list attached: (Yes/No)

Form work Reinforcement Concreting


(Yes/No) (Yes/No) (Yes/No)

Electrical Work

Conduit Placement (if any)

EIC (Civil) EIC (Electrical) Contractor’s representative

QCI

You might also like