ROYAL MANSION, NAGAON Doc No.

QC-

PROJECT-ROYAL MANSION, NAGAON

Check list for: REINFORCEMENT FOR CONCRETE WORK

Location: Pour DATE OF INSPECTION

segment
Column No.-
Drawing No. :
Rev.
ITEM DESCRIPTION YES NO REMARKS

1 Re-bar strength and ductility


(grade) are as per design
and specifications (supported
by Test Reports).
2 Hooks and bends are provided
appropriately as per
specificaton
3 Rebar is free from any crack or
injuries defect
4 Size (Length and Diameter)
of re-bar are as per
drawing
5 Number of re-bar are as per
design.
6 Are the tie wires tight and
closed cut?
7 Splice length is accurate.
8 Clear cover is set properly.
9 Re-bar is cleaned from all
loose scale, dirt, and paint
oil, grease or other foreign
substance
10 Location of splice is at the
middle of column.
11 Tie spacing is maintained
properly.
12 Closer tie spacing near splice
zone is as per design.
13 Inner tie is provided as per
design.
14 Not more that 50% rod are
spliced at any section
15 Are the dimension of columns
as per drawing and design?

Signature of Site Engineer Signature of Project Manager