Capital PEC Report Project ID: 200000696
Project Name CUTRAL CO 637MW GRASSROOT CHIHUIDO I HYDRO POWER STATION PEC Activity Diagram
Umbrella Project Name CHIHUIDO HYDROELECTRIC COMPLEX Umbrella Project Count
Umbrella Project Summary
Industry Code 01 Power Project Type Grassroot
TIV (USD) 2,400,000,000 TIV (ARS) 451,500,000,000
SIC Code 4911 Electric Services [Public Sector Power Generation
Utilities]
SIC Product 4911*0010 State Owned Power Generation
Market Trends ESG - Renewable Power
Status Active Last Update 04-Oct-2022 Initial Release 30-Jun-2009
Restart Verified: 01-Oct-2021
Environmental Land (L) Water (W) Construction Labor Preference Non-Union
Operations Labor Preference Unconfirmed
Project Capacity Planned 637 MW of Electricity
Plant Owner Secretaria de Infraestructura y Plant Parent Ministerio del Interior, Obras Publicas y Vivienda
Politica Hidrica
Plant Name Represa Hidroelectrica Chihuido Unit Name Chihuido I 03 Chihuido I 02 Chihuido I 01
I Chihuido I 04
Plant ID 1085356
Location On the Neuquen River - 60 km Phone +54 115 071 9849
east of Las Lajas
City/State Cutral Co, Neuquen 8322 Zone/County AG*01, Neuquen
Argentina
Project Responsibility Project Company Project Contact
Project Manager Secretaria de Infraestructura y Politica Hidrica Alejandro Hoc
25 de Mayo, 101 Project Manager
Buenos Aires, Buenos Aires 1002 [Tel.] +54 011 434 98557 / [Alt.] +54 011 434
98557
Argentina [E-Mail] ahoc@mininterior.gob.ar (!)
Consultant Emhidro SEP Elias Sapag
Carlos H. Rodriguez 1265 General Manager
Neuquen, Neuquen 0000 [Tel.] +54 299 448 1494
Argentina [E-Mail] esapag@emhidro.com.ar
Consultant Emhidro SEP Ricardo Cazeneuve
Carlos H. Rodriguez 1265 Executive Vice President
Neuquen, Neuquen 0000 [Tel.] +54 299 448 1494
Argentina [E-Mail] rcazeneuve@emhidro.com.ar
EPC UTE Helport-Panedile-Chediack-Eleprint-Hidroelectrica Ameghino- Cesar Carabelli
Isolux-Inter Rao
Bonpland 1745 Project Manager
Buenos Aires, Buenos Aires 1414 [Tel.] +54 114 899 6655
Argentina [E-Mail]
cesar.carabelli@corporacionamerica.com
Consultant Emhidro SEP Daniel Accattatis
Carlos H. Rodriguez 1265 Engineering Manager
Neuquen, Neuquen 00000 [Tel.] +54 115 071 9849
Argentina [E-Mail] daccattatis@emhidro.com.ar
EPC UTE Helport-Panedile-Chediack-Eleprint-Hidroelectrica Ameghino- Oscar Rodriguez Molina
Isolux-Inter Rao
Suipacha 1111 piso 26 Project Manager
Buenos Aires, Buenos Aires C1008AAW [Tel.] +54 115 071 9000
Argentina [E-Mail] ormolina@panedile.com.ar
EPC UTE Helport-Panedile-Chediack-Eleprint-Hidroelectrica Ameghino- Javier Chasco
Isolux-Inter Rao
Hipolito Yrigoyen 2020, Martinez Project Manager
San Isidro, Buenos Aires B1640HFP [Tel.] +54 114 717 8300
Argentina [E-Mail] javier.chasco@chediack.com.ar
PEC® Timing P2 PEC® Activity Owner Review of Issue
Project Probability Low (0-69%)
Scope Subsecretaria de Recursos Hidricos de la Nacion with Emhidro SEP and Consorcio Helport-Panedile-Chediack-Eleprint-
Hidroelectrica Ameghino conduct Owner Review of Issue for Grassroot 637MW Hydroelectric Power Station. DETAILS:
Construct 105 mts high x 1100 mts peremeter Concrete Face Rockfill Dam (CFRD) and construct Powerhouse at the Right
Margin of the Dam with (4) 159.25MW Power Machines 197m3/s 89.5m Vertical Francis Hydro Turbine Generator Sets
and Auxiliary Equipments and a 13.2/33/500KV Substation and 160Km 500kV Single-Circuit Overhad Tranmission Line to
supply local irrigational needs and Power for Local Grid. REQUIRES: Civil Site Preparation, Foundations, Buildings,
Pilings, CFRD, Intake, Wicket Gates, Wheel Gates, Deviation Channel, Head Tunnel, Tailrace, Powerhouse Structure,
Spillway, Concrete, Rebar, Hydro Turbines, Generators, Penstocks, Turbine Runners, Scrollcase, Cranes, Gates, SCADA,
Lube Oil System, Hydraulic System, Transformer, Brakers, Switchgear, Operator Consoles, Cables, Cable Trays, Motors,
Pumps, Control and Safety Valves, Fire Protection, Transmission Line, Substation, Interconnect Lines, Auxiliary Control
Systems, Safety System, Switchgear, Coatings, Insulation, Utilities, MCC, DCS, SCADA. ENVIRONMENTAL: (L)
Excavation, Dredging, Flood Control, Spill Containment; (W) Screens, Trashracks, Fish Protection.
Schedule Subsecretaria de Recursos Hidricos de la Nacion together with Emhidro SEP and Consorcio (Helport-Panedile-Isolux
Ingenieria) conducts Owner Review of Issue and awaits with Chihuido Complex Project to obtain Financing through 3Q23
(Sep). Then, Consorcio (Helport) expects to release RFQs and Bid Documents for Subcontractors, Auxiliary Equipment
and Consumables, as required, from 1Q26 (Jan). Construction Kick-Off estimated for 2Q26 (Jun). Project Completion
estimated for 1Q30 (Jan).
AFE 202309 Sub Bid Doc 202601 Completion 29-Jan-2030 Precision YEAR
Project Milestones
Equip RFQ 202601 Kick-Off 202606 Kickoff Slippage 196 Months Duration 44 Months
Bidding Companies - Listing may be partial and subject to change
Company Name Project Responsibility
Electroingenieria SA EPC
Industrias Metalurgicas Pescarmona SA EPC
LLC Inter RAO - Export Technology Provider
Engineering Civil Electrical Environmental Instrumentation Mechanical Structural Process
Contracting Civil Electrical Environmental Instrumentation Mechanical Structural General
[G/C]
Project Key Needs Civil/Site Structural Architectural Control Room
Instrumentation Electrical Mechanical HVAC Storage NDE
Piping/Fittings Insulation/Coatings Utilities Valves
Communications Transportation
Material Handling
Matter Phase Liquid
Energy Turbine Generator
Buy
Sell Electricity
Project Fuel Type Hydro
Plant Standard Contacts
Functional/Actual Title Contact Name/E-mail Telephone/On-site QC Date/LinkedIn ID
Engineering Manager Daniel Accattatis [Phn.] +54 299 448 1494 Oct-2022
daccattatis@emhidro.com.ar No

Historical Reports
Project Name Report Date TIV Phase
NEUQUEN CHIHUIDO I GRASSROOT 630 MW HYDRO POWER STATION 30-Jun-2009 1,000,000,000 USD Owner Review of Issue (P2 - 19)
CUTRAL CO CHIHUIDO I GRASSROOT 630 MW HYDRO POWER STATION 06-Jan-2010 1,559,000,000 USD Permitting (P2 - 18)
CUTRAL CO CHIHUIDO I GRASSROOT 630 MW HYDRO POWER STATION 18-Nov-2010 1,559,000,000 USD Permitting (P2 - 18)
CUTRAL CO CHIHUIDO I GRASSROOT 637 MW HYDRO POWER STATION 27-Apr-2011 1,800,000,000 USD Planning and Scheduling (E2 - 25)
CUTRAL CO GRASSROOT CHIHUIDO I 637MW HYDRO POWER STATION 31-Oct-2011 1,800,000,000 USD Planning and Scheduling (E2 - 25)
CUTRAL CO GRASSROOT CHIHUIDO I 637MW HYDRO POWER STATION 05-Apr-2012 1,800,000,000 USD Planning and Scheduling (E2 - 25)
CUTRAL CO GRASSROOT CHIHUIDO I 637MW HYDRO POWER STATION 31-Oct-2012 2,400,000,000 USD Owner Review of Issue (P2 - 19)
CUTRAL CO GRASSROOT CHIHUIDO I 637MW HYDRO POWER STATION 26-Apr-2013 2,400,000,000 USD Owner Review of Issue (P2 - 19)
CUTRAL CO GRASSROOT CHIHUIDO I 637MW HYDRO POWER STATION 27-Jan-2014 2,400,000,000 USD Purchasing (E2 - 21)
CUTRAL CO GRASSROOT CHIHUIDO I 637MW HYDRO POWER STATION 15-Jul-2014 2,400,000,000 USD Purchasing (E2 - 21)
CUTRAL CO GRASSROOT CHIHUIDO I 637MW HYDRO POWER STATION 03-Oct-2014 2,400,000,000 USD Purchasing (E2 - 21)
CUTRAL CO GRASSROOT CHIHUIDO I 637MW HYDRO POWER STATION 30-Mar-2015 2,400,000,000 USD Purchasing (E2 - 21)
CUTRAL CO GRASSROOT CHIHUIDO I 637MW HYDRO POWER STATION 20-Nov-2015 2,400,000,000 USD Purchasing (E2 - 21)
CUTRAL CO GRASSROOT CHIHUIDO I 637MW HYDRO POWER STATION 11-Feb-2016 2,400,000,000 USD Purchasing (E2 - 21)
CUTRAL CO GRASSROOT CHIHUIDO I 637MW HYDRO POWER STATION 30-Mar-2016 2,400,000,000 USD Purchasing (E2 - 21)
CUTRAL CO GRASSROOT CHIHUIDO I 637MW HYDRO POWER STATION 22-Jul-2016 2,400,000,000 USD Purchasing (E2 - 21)
CUTRAL CO GRASSROOT CHIHUIDO I 637MW HYDRO POWER STATION 15-Dec-2016 2,400,000,000 USD Planning and Scheduling (E2 - 25)
CUTRAL CO GRASSROOT CHIHUIDO I 637MW HYDRO POWER STATION 21-Jan-2017 2,400,000,000 USD Owner Review of Issue (P2 - 19)
CUTRAL CO GRASSROOT CHIHUIDO I 637MW HYDRO POWER STATION 24-Nov-2017 2,400,000,000 USD Owner Review of Issue (P2 - 19)
CUTRAL CO 637MW GRASSROOT CHIHUIDO I HYDRO POWER STATION 27-Feb-2018 2,400,000,000 USD Owner Review of Issue (P2 - 19)
CUTRAL CO 637MW GRASSROOT CHIHUIDO I HYDRO POWER STATION 08-Jun-2018 2,400,000,000 USD Owner Review of Issue (P2 - 19)
CUTRAL CO 637MW GRASSROOT CHIHUIDO I HYDRO POWER STATION 11-Oct-2018 2,400,000,000 USD Owner Review of Issue (P2 - 19)
CUTRAL CO 637MW GRASSROOT CHIHUIDO I HYDRO POWER STATION 01-Oct-2021 2,400,000,000 USD Owner Review of Issue (P2 - 19)
CUTRAL CO 637MW GRASSROOT CHIHUIDO I HYDRO POWER STATION 04-Oct-2021 2,400,000,000 USD Owner Review of Issue (P2 - 19)
CUTRAL CO 637MW GRASSROOT CHIHUIDO I HYDRO POWER STATION 04-Oct-2022 2,400,000,000 USD Owner Review of Issue (P2 - 19)
© 2023 ALL RIGHTS RESERVED. Industrial Info Resources, Inc. - Sugar Land, TX - 800-762-3361
*Any data highlighted in red below is data that has been added or updated in the last release of the project
Capital PEC Report Project ID: 300184852
Project Name NEUQUEN 560MW GRASSROOT CERRO RAYOSO HYDRO POWER PLANT PEC Activity Diagram
Industry Code 01 Power Project Type Grassroot
TIV (USD) 1,500,000,000 TIV (ARS) 282,200,000,000
SIC Code 4931 Electricity/Steam [IPP] Sector Power Generation
SIC Product 4931*0003 Nonutility Owned Power Generation
Market Trends ESG - Renewable Power, Impacted by COVID-19
Status Active Last Update 11-Apr-2022 Initial Release 07-Oct-2014
Environmental Land (L) Water (W) Construction Labor Preference Unconfirmed
Operations Labor Preference Unconfirmed
Project Capacity Planned 570 MW of Electricity
Plant Owner Emhidro SEP Plant Parent Emhidro SEP
Plant Name Central Hidroelectrica Cerro Unit Name Cerro Rayoso 03 Cerro Rayoso 01 Cerro Rayoso
Rayoso 02 Cerro Rayoso 04
Plant ID 3133238
Location On Neuquen River,Cerro Rayoso Phone +54 299 448 1494
City/State Neuquen, Neuquen 8309 Zone/County AG*01, Neuquen
Argentina
Project Responsibility Project Company Project Contact
Project Manager Emhidro SEP Daniel Accattatis
Carlos H. Rodriguez 1265 Civil Engineer
Neuquen, Neuquen Q8302LFM [Tel.] +54 299 448 1494 / [Alt.] +54 299 448 1494
/ [Alt.] +54 929 957 24381
Argentina [E-Mail] daccattatis@emhidro.com.ar
Project Executive Emhidro SEP Ricardo Cazeneuve
Carlos H. Rodriguez 1265 Executive Vice President
Neuquen, Neuquen Q8302LFM [Tel.] +54 299 448 1494 / [Alt.] +54 299 448 1494
Argentina [E-Mail] rcazeneuve@emhidro.com.ar
Project Director Emhidro SEP Elias Sapag
Carlos H. Rodriguez 1265 General Manager
Neuquen, Neuquen Q8302LFM [Tel.] +54 299 448 1494 / [Alt.] +54 299 448 1494
Argentina [E-Mail] esapag@emhidro.com.ar
Project Executive Secretaria de Gobierno de Energia Jorge Hugo Marcolini
Hipólito Yrigoyen 250 Subsecretary of Hydro Energy Projects
Buenos Aires, Buenos Aires C1086AAB [Tel.] +54 114 349 7505 / [Alt.] +54 114 349 8006
Argentina [E-Mail]
PEC® Timing P2 PEC® Activity Owner Review of Issue
Project Probability Low (0-69%)
Scope Emhidro conducts Owner Review of Issue for Grassroot 560MW Cerro Rayoso Hydroelectric Power Station. DETAILS:
Construct an Earth-Filled 140m Dam plus (2) 240MW and (2) 40MW Francis Hydro Turbines and Generators to supply
Renewable Energy to the Local Grid. REQUIRES: Access Roads, Civil Camps, Foundations, Pilings, Earth-Filled Dam,
Concrete Diversion, Tunnels, Spillway, Powerhouse Structure, Steel Penstocks, Intake Structure, Francis Hydro Turbine
Generators, Cranes, Gates, Sump Pumps, Motors, Valves, Inlet and Outlet Headers, MCC, DCS, SCADA, Operator
Consoles, Cables, Cable Trays, Communications, HVAC, Transformers, Breakers, Switchgear, Transmission Line and
Switching Station, Hoists, Rigging, Elevators, Cranes & Heavy Rigging, Support Structures, Fire Suppression and Safety
Systems, Filtration System, Security. ENVIRONMENTAL: (L) Excavation, Roads, Dredging, Cofferdam, Trenching, Spill
Containment; (W) Trash Racks, Marine Life Mitigation.
Schedule Emhidro conducts Owner Review of Issue while seeks Financial Closure through 1Q23 (Mar). Emhidro releases RFPs for
EPC Contractor and Long Lead Items 3Q23 (Sep). Then, selected EPC releases RFQs and Bid Documents for Specialty
Subcontractors and Consumables as required 1Q24 (Feb). Construction Kickoff expected 2Q24 (Apr). Project Completion
set for 1Q29 (Mar).
Details Apr-2020 Project delayed due to COVID-19 Pandemic
AFE 202303 Sub Bid Doc 202402 Completion 30-Mar-2029 Precision YEAR
Project Milestones
Long-Lead 202309 Equip RFQ 202402 Kick-Off 202404 Kickoff Slippage 87 Months Duration 60 Months
Engineering Civil Electrical Environmental HVAC Instrumentation Mechanical Structural
Contracting Civil Electrical Environmental HVAC Instrumentation Mechanical Structural General
[G/C]
Project Key Needs Civil/Site Structural Control Room Heat Transfer
Instrumentation Electrical Mechanical HVAC Storage NDE
Piping/Fittings Insulation/Coatings Utilities Valves Pumps
Communications Transportation
Material Handling
Matter Phase Liquid
Energy Turbine Generator
Buy
Sell Electricity
Project Fuel Type Hydro
Plant Standard Contacts
Functional/Actual Title Contact Name/E-mail Telephone/On-site QC Date/LinkedIn ID
Plant Manager Daniel Accattatis [Phn.] +54 299 448 1494 / [Alt.] +54 929 957 24381 Apr-2022
Civil Engineer daccattatis@emhidro.com.ar No

Historical Reports
Project Name Report Date TIV Phase
NEUQUEN GRASSROOT 472MW CERRO RAYOSO HYDRO POWER PLANT 07-Oct-2014 245,000,000 USD Project Scope (P1 - 03)
NEUQUEN GRASSROOT 472MW CERRO RAYOSO HYDRO POWER PLANT 10-Jun-2015 245,000,000 USD Project Scope (P1 - 03)
NEUQUEN GRASSROOT 472MW CERRO RAYOSO HYDRO POWER PLANT 06-Jun-2016 245,000,000 USD Preliminary Design (P1 - 07)
NEUQUEN GRASSROOT 570MW CERRO RAYOSO HYDRO POWER PLANT 21-Mar-2017 420,000,000 USD Preliminary Design (P1 - 07)
NEUQUEN GRASSROOT 560MW CERRO RAYOSO HYDRO POWER PLANT 23-Mar-2018 420,000,000 USD Preliminary Design (P1 - 07)
NEUQUEN 560MW GRASSROOT CERRO RAYOSO HYDRO POWER PLANT 15-Feb-2019 420,000,000 USD Permitting (P2 - 18)
NEUQUEN 560MW GRASSROOT CERRO RAYOSO HYDRO POWER PLANT 31-Jul-2019 1,500,000,000 USD Permitting (P2 - 18)
NEUQUEN 560MW GRASSROOT CERRO RAYOSO HYDRO POWER PLANT 13-Apr-2020 1,500,000,000 USD Owner Review of Issue (P2 - 19)
NEUQUEN 560MW GRASSROOT CERRO RAYOSO HYDRO POWER PLANT 04-Feb-2021 1,500,000,000 USD Owner Review of Issue (P2 - 19)
NEUQUEN 560MW GRASSROOT CERRO RAYOSO HYDRO POWER PLANT 21-Aug-2021 1,500,000,000 USD Owner Review of Issue (P2 - 19)
NEUQUEN 560MW GRASSROOT CERRO RAYOSO HYDRO POWER PLANT 11-Apr-2022 1,500,000,000 USD Owner Review of Issue (P2 - 19)
© 2023 ALL RIGHTS RESERVED. Industrial Info Resources, Inc. - Sugar Land, TX - 800-762-3361
*Any data highlighted in red below is data that has been added or updated in the last release of the project
Capital PEC Report Project ID: 300292503
Project Name ITUZAINGO MARKET PULP MILL 60MW BIOMASS-FIRED POWER UNIT ADDITION PEC Activity Diagram
Industry Code 09 Pulp, Paper & Wood Project Type Unit Addition
TIV (USD) 300,000,000 TIV (ARS) 56,440,000,000
SIC Code 4931 Electricity/Steam [IPP] Sector Power Generation
SIC Product 4931*0004 Industrial Owned Power Generation
Market Trends ESG - Renewable Power
Status Active Last Update 12-Apr-2022 Initial Release 26-Jul-2016
Environmental Water (W) Construction Labor Preference Unconfirmed
Operations Labor Preference Unconfirmed

Plant Owner Agroforestal Obera SRL Plant Parent Agroforestal Obera SRL
Plant Name Ituzaingo Market Pulp and Kraft Unit Name Ituzaingo 01
Paper
Plant ID 3202627
Location Ruta Nacional 12 - Villa Phone +54 937 553 20161
Olivari,Parque Industrial
Ituzaingo
City/State Ituzaingo, Corrientes 3486 Zone/County AG*01, Corrientes
Argentina
Project Responsibility Project Company Project Contact
Project Director Agroforestal Obera SRL Gustavo Cetrangolo
Area Industrial Lote G3 Fraccion D1 Engineering Director & Partner
Ituzaingo, Corrientes 3302 [Tel.] +54 937 553 20161
Argentina [E-Mail] gcetrang@fibertel.com.ar
Project Director Agroforestal Obera SRL Mario Plotz Ferrazzi
Ruta Nacional 120, Lote G3, Fraccion D1 Manging Partner
Ituzaingo, Corrientes 3302 [Tel.] +54 937 553 20161
Argentina [E-Mail] plotzmario@aforestalobera.com.ar
Project Manager Forestal Las Marias SA Stuart Navajas
Ruta Nacional 14 Km 739 - Establecimiento Las Marias Owner
Gobernador Ingeniero Valentin Virasoro, Corrientes 3342 [Tel.] +54 375 648 1827
Argentina [E-Mail] forestal@cableat.net
Design Engineering AFRY Management Consulting Limited Fernando Correa
Genova 17, Sexta Planta Project Manager
Madrid, Madrid 28004 [Tel.] +34 615 457 290
Spain [E-Mail] fernando.correa@poyry.com
Design Engineering AFRY Management Consulting Limited David Powlson
Genova 17, Sexta Planta Director
Madrid, Madrid 28004 [Tel.] +34 615 457 290
Spain [E-Mail] david.powlson@poyry.com
Project Financing China State Construction Engineering Corporation Banyun Zhi
CSCEC Mansion,No.15 Sanlihe Road Project Manager
Beijing, Beijing Shi 100037 [Tel.] +86 108 808 3288
China [E-Mail] zhibanyuan@cscec.com
PEC® Timing P2 PEC® Activity Owner Review of Issue
Project Probability Low (0-69%)
Scope Agroforestal Obera SRL with Grupo Bermejo, Forestal Las Marias SA (Project Partners), Poyry Management Consulting
(UK) Ltd (Feasibility Studies and Project Design) and China State Construction Engineering (Construction) conducts
Review of Issue (Financing) for Market Pulp Mill 60MW Biomass-Fired Power Unit Addition. DETAILS: At Planned 200,000
T/yr Unbleached Market Pulp and 300,000 T/yr Kraftliner Paper Mill, install (1) 60MW Steam Turbine and Generator to
provide Energy for Internal Production Processes. REQUIRES: Site Preparation, Building, Equipment Pads, Steam
Turbine/Generator, Condenser, Compressor (Air), Steam Piping (SS and Carbon), Tanks, Heat Exchangers, Bins, Pumps,
Screens, Air Heater, Fans, Motors, Drives, Loaders, Steam Lines, Pumps, Utilities, Switchgear, Controls (DCS) plus
Electrical Distribution. ENVIRONMENTAL: (W) Wastewater Treatment System Tie-Ins.
Schedule Agroforestal Obera SRL with Grupo Bermejo, Forestal Las Marias SA (Project Partners), Poyry Management Consulting
(UK) Ltd (Feasibility Studies and Project Design) and China State Construction Engineering (Construction) continues with
Review Issue (Financing) thru 4Q22 (Dec) and expects to obtain AFE by 2Q23 (Apr). Agroforestal Obera SRL selects
Long-Lead Equipment Providers 2Q23 (Jun) and releases RFQs and Bid Documents for Auxiliary Equipment Providers
and Subcontractors 3Q23 (Aug) as needed. Estimated Construction Kick-Off 1Q24 (Jan). Project Completion 4Q24 (Nov).
AFE 202304 Sub Bid Doc 202308 Completion 25-Nov-2024 Precision YEAR
Project Milestones
Long-Lead 202306 Equip RFQ 202308 Kick-Off 202401 Kickoff Slippage 66 Months Duration 11 Months
Engineering Electrical Instrumentation Mechanical Process
Contracting Electrical Instrumentation Mechanical Structural General
[G/C]
Project Key Needs Civil/Site Structural Control Room Process Equip Heat
Transfer
Instrumentation Electrical Mechanical HVAC
Piping/Fittings Insulation/Coatings Environmental Utilities Valves Pumps
Communications
Material Handling
Matter Phase Liquid Solid Vapor
Energy IEP Turbine Generator
Buy
Sell
Project Fuel Type Biomass
Plant Standard Contacts
Functional/Actual Title Contact Name/E-mail Telephone/On-site QC Date/LinkedIn ID
Plant Manager Gustavo Cetrangolo [Phn.] +54 937 553 20161 / [Alt.] +54 911 402 77960 Apr-2022
Engineering Director
gcetrang@fibertel.com.ar
No
& Partner

Historical Reports
Project Name Report Date TIV Phase
ITUZAINGO MARKET PULP AND KRAFT PAPER MILL 30MW BIOMASS-FIRED UNIT ADDITION 26-Jul-2016 300,000,000 USD Capital Estimating (P1 - 12)
ITUZAINGO MARKET PULP AND KRAFT PAPER MILL 30MW BIOMASS-FIRED UNIT ADDITION 23-Nov-2016 300,000,000 USD Permitting (P2 - 18)
ITUZAINGO MARKET PULP AND KRAFT PAPER MILL 30MW BIOMASS-FIRED UNIT ADDITION 13-Oct-2017 300,000,000 USD Permitting (P2 - 18)
ITUZAINGO MARKET PULP AND KRAFT PAPER MILL 30/40MW BIOMASS-FIRED UNIT ADDITION 22-Dec-2017 300,000,000 USD Permitting (P2 - 18)
ITUZAINGO MARKET PULP MILL 30-60MW BIOMASS-FIRED UNIT POWER ADDITION 29-Mar-2018 300,000,000 USD Permitting (P2 - 18)
ITUZAINGO MARKET PULP MILL 30-60MW BIOMASS-FIRED UNIT POWER ADDITION 24-Oct-2018 300,000,000 USD Permitting (P2 - 18)
ITUZAINGO MARKET PULP MILL 60MW BIOMASS-FIRED POWER UNIT ADDITION 21-Nov-2018 300,000,000 USD Permitting (P2 - 18)
ITUZAINGO MARKET PULP MILL 60MW BIOMASS-FIRED POWER UNIT ADDITION 05-Jun-2019 300,000,000 USD Permitting (P2 - 18)
ITUZAINGO MARKET PULP MILL 60MW BIOMASS-FIRED POWER UNIT ADDITION 31-Jul-2019 300,000,000 USD Detailed Design (P1 - 09)
ITUZAINGO MARKET PULP MILL 60MW BIOMASS-FIRED POWER UNIT ADDITION 31-Jan-2020 300,000,000 USD AFE Submittal (P1 - 17)
ITUZAINGO MARKET PULP MILL 60MW BIOMASS-FIRED POWER UNIT ADDITION 22-Apr-2020 300,000,000 USD Owner Review of Issue (P2 -
ITUZAINGO MARKET PULP MILL 60MW BIOMASS-FIRED POWER UNIT ADDITION 05-May-2020 300,000,000 USD Owner Review of Issue (P2 -
ITUZAINGO MARKET PULP MILL 60MW BIOMASS-FIRED POWER UNIT ADDITION 08-Apr-2021 300,000,000 USD Owner Review of Issue (P2 -
ITUZAINGO MARKET PULP MILL 60MW BIOMASS-FIRED POWER UNIT ADDITION 12-Apr-2022 300,000,000 USD Owner Review of Issue (P2 -
© 2023 ALL RIGHTS RESERVED. Industrial Info Resources, Inc. - Sugar Land, TX - 800-762-3361
*Any data highlighted in red below is data that has been added or updated in the last release of the project
Capital PEC Report Project ID: 300311776
Project Name SAN JUAN 100MW GRASSROOT ULLUM X SOLAR PHOTOVOLTAIC (PV) POWER PLANT PEC Activity Diagram
Industry Code 01 Power Project Type Grassroot
TIV (USD) 200,000,000 TIV (ARS) 37,620,000,000
SIC Code 4931 Electricity/Steam [IPP] Sector Power Generation
SIC Product 4931*0003 Nonutility Owned Power Generation
Market Trends ESG - Renewable Power
Status Active Last Update 25-Jan-2023 Initial Release 27-Oct-2016
Environmental Land (L) Construction Labor Preference Unconfirmed
Operations Labor Preference Unconfirmed
Project Capacity Planned 100 MW of Electricity
Plant Owner Latinoamericana de Energia SA Plant Parent Latinoamericana de Energia SA
Plant Name Parque Fotovoltaico Ullum X Unit Name Ullum X 01
Plant ID 3217378
Location Ullum zone Phone +54 230 437 4850
City/State Ullum, San Juan 5409 Argentina Zone/County AG*01, San Juan
Project Responsibility Project Company Project Contact
Project Director Latinoamericana de Energia SA Marcelo Rodriguez
Gallo 1140 3ro B Engineering Manager
Buenos Aires, Capital Federal 1172 [Tel.] +54 230 437 4850 / [Alt.] +54 230 437 4850
Argentina [E-Mail] mrodriguez@grupolatinoamericana.net
Project Executive Latinoamericana de Energia SA Esteban Rodriguez
Gallo, 1140 - 3ro. B Engineering Manager
Buenos Aires, Buenos Aires 1629 [Tel.] +54 230 437 4850 / [Alt.] +54 230 437 4850
/ [Alt.] +54 911 549 492 476
Argentina [E-Mail] erodriguez@grupolatinoamericana.net
Procurement - Purchasing Latinoamericana de Energia SA Serafin Seoane
Gallo 1140 3ro B Purchasing Manager
Buenos Aires, Capital Federal 1172 [Tel.] +54 230 437 4850 / [Alt.] +54 230 437 4850
Argentina [E-Mail] sseoane@grupolatinoamericana.net
PEC® Timing P2 PEC® Activity Owner Review of Issue
Project Probability Low (0-69%)
Scope Latinoamericana de Energia SA conducts Review of Issue for Grassroot 100MW Ullum X Solar Photovoltaic Power Plant.
DETAILS: Construct 100MW Ullum X Solar Power Plant utilizing GCL Polycrystalline Static Solar Modules to provide
Renewable Energy to local Grid. REQUIRES: Pre-cast Concrete Foundations, Pilings, Fixed Tilt Mounting System with
Support Structures, Pedestals, Beams and Rails, DC and AC Overhead & Underground Electrical Collection & Gathering
System, Solar Panel Wiring, Fiber Optic Data Cables, Junction Boxes, Surge Protective Devices, Terminations, Stress
Cones, 3-phase Step-up Pad-Mounted Transformers, Conduit System, Cables, Cable Trays, Trenching, and Installation,
Power Inverters, MCC and DCS Control Panels, SCADA Monitoring System, Transmission Line, Terminal Blocks,
Contactors, Relays, Capacitors, Splices, Bus Duct Equipment and Buses, Anchors, Medal Shielding, Waterproof
Enclosures, Insulators and Connectors, Disconnects, Circuit Breakers, High Voltage Switchgear, Combiners &
Recombiner Boxes, Instrumentation & Metering, Flood Lighting, Fire Protection System (Detection and Suppression),
Fencing and Security System, Remote Terminal Units (RTU), Uninterrupted Power Supply (UPS) System, Batteries,
Prefabricated Operations & Maintenance Building, Operator Consoles, Transportation and Heavy Rigging Equipment.
ENVIRONMENTAL: (L) Excavation Road, Access Road, Landscaping plus Spill Containment.
Schedule Latinoamericana de Energia SA conducts Review of Issue through 2Q23 (May) while evaluates country economic situation
and seeks for Capital Approval through 2Q23 (Jun). If approved Latinoamericana de Energia SA releases RFPs to select
Technology Provider, RFQs and Bid Documents for Equipment and Materials, as required from 3Q23 (Jul). Construction
Kickoff estimated 4Q23 (Dec). Completion estimated 2Q25 (Jun).
AFE 202306 Sub Bid Doc 202309 Completion 29-Jun-2025 Precision QUARTER
Project Milestones
Long-Lead 202307 Equip RFQ 202309 Kick-Off 202312 Kickoff Slippage 78 Months Duration 19 Months
Bidding Companies - Listing may be partial and subject to change
Company Name Project Responsibility
GCL-Poly Energy Holdings Limited Technology Provider
Engineering Civil Electrical Instrumentation Mechanical Structural
Contracting Civil Electrical Environmental Instrumentation Mechanical Structural General
[G/C]
Project Key Needs Civil/Site Structural Architectural Control Room
Instrumentation Electrical Mechanical Storage NDE
Piping/Fittings Insulation/Coatings Utilities
Communications Transportation
Material Handling
Matter Phase
Energy Generator
Buy
Sell Electricity
Project Fuel Type Solar
Plant Standard Contacts
Functional/Actual Title Contact Name/E-mail Telephone/On-site QC Date/LinkedIn ID
Plant Manager Marcelo Rodriguez [Phn.] +54 230 437 4850 Jan-2023
Project Director mrodriguez@grupolatinoamericana.net No

Historical Reports
Project Name Report Date TIV Phase
SAN JUAN GRASSROOT 100MW ULLUM X PV SOLAR POWER PLANT 27-Oct-2016 200,000,000 USD Owner Review of Issue (P2 - 19)
SAN JUAN GRASSROOT 100MW ULLUM X PV SOLAR POWER PLANT 03-Mar-2017 200,000,000 USD Owner Review of Issue (P2 - 19)
SAN JUAN 100MW GRASSROOT ULLUM X PHOTOVOLTAIC SOLAR POWER PLANT 20-Oct-2017 200,000,000 USD Owner Review of Issue (P2 - 19)
SAN JUAN 100MW GRASSROOT ULLUM X PHOTOVOLTAIC SOLAR POWER PLANT 04-Jan-2018 200,000,000 USD Owner Review of Issue (P2 - 19)
SAN JUAN 100MW GRASSROOT ULLUM X PHOTOVOLTAIC SOLAR POWER PLANT 04-May-2018 200,000,000 USD Construction - Union (C1 - 35)
SAN JUAN 100MW GRASSROOT ULLUM X PHOTOVOLTAIC SOLAR POWER PLANT 02-Oct-2018 200,000,000 USD Construction - Union (C1 - 35)
SAN JUAN 100MW GRASSROOT ULLUM X SOLAR PHOTOVOLTAIC (PV) POWER PLANT 21-Dec-2018 200,000,000 USD Construction - Union (C1 - 35)
SAN JUAN 100MW GRASSROOT ULLUM X SOLAR PHOTOVOLTAIC (PV) POWER PLANT 28-Aug-2019 200,000,000 USD Construction - Union (C1 - 35)
SAN JUAN 100MW GRASSROOT ULLUM X SOLAR PHOTOVOLTAIC (PV) POWER PLANT 10-Jun-2020 200,000,000 USD Site Preparation (E2 - 26)
SAN JUAN 100MW GRASSROOT ULLUM X SOLAR PHOTOVOLTAIC (PV) POWER PLANT 11-Jun-2021 200,000,000 USD Site Preparation (E2 - 26)
SAN JUAN 100MW GRASSROOT ULLUM X SOLAR PHOTOVOLTAIC (PV) POWER PLANT 11-Jun-2022 200,000,000 USD Owner Review of Issue (P2 - 19)
SAN JUAN 100MW GRASSROOT ULLUM X SOLAR PHOTOVOLTAIC (PV) POWER PLANT 25-Jan-2023 200,000,000 USD Owner Review of Issue (P2 - 19)
© 2023 ALL RIGHTS RESERVED. Industrial Info Resources, Inc. - Sugar Land, TX - 800-762-3361
*Any data highlighted in red below is data that has been added or updated in the last release of the project
Capital PEC Report Project ID: 300422994
Project Name SAN JUAN 100MW GRASSROOT SAN FRANCISCO 2 SOLAR PHOTOVOLTAIC (PV) POWER PLANT
PEC Activity Diagram
Industry Code 01 Power Project Type Grassroot
TIV (USD) 150,000,000 TIV (ARS) 28,220,000,000
SIC Code 4931 Electricity/Steam [IPP] Sector Power Generation
SIC Product 4931*0003 Nonutility Owned Power Generation
Market Trends ESG - Renewable Power
Status Active Last Update 07-Jan-2023 Initial Release 27-Feb-2018
Environmental Land (L) Construction Labor Preference Unconfirmed
Operations Labor Preference Unconfirmed
Project Capacity Planned 100 MW of Electricity
Plant Owner Luft Energia Plant Parent Luft Energia
Plant Name Parque Fotovoltaico San Unit Name San Francisco 2 01
Francisco 2
Plant ID 3306198
Location San Juan zone Phone +54 115 173 7473
City/State San Juan, San Juan 5400 Zone/County AG*01, San Juan
Argentina
Project Responsibility Project Company Project Contact
Project Director Luft Energia Doris Capurro
Colón 160 Martínez, Pcia. de Bs. As. Project Manager
Buenos Aires, Buenos Aires 04150 [Tel.] +54 115 173 7473
Argentina [E-Mail] dcapurro@luftenergia.com
Project Manager Luft Energia Santiago Capurro
Colón 160 Martínez, Pcia. de Bs. As. Engineering Manager
Buenos Aires, Buenos Aires 04150 [Tel.] +54 115 173 7473 / [Alt.] +54 115 173 7473
Argentina [E-Mail] santiago@capurro.com.ar
Procurement - Purchasing Luft Energia Federico Dupuy
Colón 160 Martínez, Pcia. de Bs. As. Purchasing Manager
Buenos Aires, Buenos Aires 04150 [Tel.] +54 115 173 7473
Argentina [E-Mail] federico.dupuy@ebuono.com.ar
PEC® Timing P2 PEC® Activity Owner Review of Issue
Project Probability Low (0-69%)
Scope Luft Energia conducts Owner Review of Issue for a Grassroot 100MW San Francisco 2 Photovoltaic Power Plant.
DETAILS: Construct 100MW Solar Photovoltaic Power Plant using Polycrystalline Solar Panels mounted on Single-Axis
Trackers to provide renewable energy to local grid 220kV. REQUIRES: Pre-cast Concrete Foundations, Pilings, Pedestals,
Beams and Rails, DC and AC Overhead and Underground Electrical Collection and Gathering System, Solar Panel Wiring,
Fiber Optic Data Cables, Junction Boxes, Surge Protective Devices, Terminations, Stress Cones, 3-phase Step-up Pad-
Mounted Transformers, Conduit System, Cables, Cable Trays, Trenching and Installation, Power Inverters, MCC and DCS
Control Panels, SCADA Monitoring System, Transmission Line, Terminal Blocks, Contactors, Relays, Capacitors, Splices,
Bus Duct Equipment and Buses, Anchors, Medal Shielding, Waterproof Enclosures, Insulators and Connectors,
Disconnects, Circuit Breakers, High Voltage Switchgear, Combiners and Recombiner Boxes, Instrumentation and
Metering, Flood Lighting, Fire Protection System (Detection and Suppression), Fencing and Security System, Remote
Terminal Units (RTU), Uninterrupted Power Supply (UPS) System, Batteries, Prefabricated Operations and Maintenance
Building, Operator Consoles, Transportation and Heavy Rigging Equipment. ENVIRONMENTAL: (L) Excavation Road,
Access Road, Landscaping, Spill Containment.
Schedule Luft Energia conducts Owner Review of Issue while evaluates either the selling of the project or seeks Financial Closure
through Capital Approval through 4Q23 (Nov). Upon approval, the Owner releases RFPs for Long Lead and EPC
Contractor 1Q24 (Jan). Selected EPC contractor will release RFQs and Bid Documents from 1Q24 (Feb) Construction
Kickoff expected for 3Q24 (Jul) Project Completion set for 3Q25 (Jul).
AFE 202311 Sub Bid Doc 202402 Completion 29-Jul-2025 Precision MONTH
Project Milestones
Long-Lead 202401 Equip RFQ 202402 Kick-Off 202407 Kickoff Slippage 56 Months Duration 13 Months
Engineering Civil Electrical Instrumentation Mechanical Structural
Contracting Civil Electrical Environmental Instrumentation Mechanical Structural General
[G/C]
Project Key Needs Civil/Site Structural Architectural Control Room
Instrumentation Electrical Mechanical Storage NDE
Piping/Fittings Insulation/Coatings Utilities
Communications Transportation
Material Handling
Matter Phase
Energy Generator
Buy
Sell Electricity
Project Fuel Type Solar
Plant Standard Contacts
Functional/Actual Title Contact Name/E-mail Telephone/On-site QC Date/LinkedIn ID
Plant Manager Santiago Capurro [Phn.] +54 115 173 7473 Jan-2023
Engineering Manager santiago@capurro.com.ar No

Historical Reports
Project Name Report Date TIV Phase
SAN JUAN GRASSROOT 100MW SAN FRANCISCO 2 PHOTOVOLTAIC POWER PLANT 27-Feb-2018 150,000,000 USD Owner Review of Issue (P2
SAN JUAN 100MW GRASSROOT SAN FRANCISCO 2 SOLAR PHOTOVOLTAIC (PV) POWER PLANT 19-Feb-2019 150,000,000 USD Owner Review of Issue (P2
SAN JUAN 100MW GRASSROOT SAN FRANCISCO 2 SOLAR PHOTOVOLTAIC (PV) POWER PLANT 18-Feb-2020 150,000,000 USD Owner Review of Issue (P2
SAN JUAN 100MW GRASSROOT SAN FRANCISCO 2 SOLAR PHOTOVOLTAIC (PV) POWER PLANT 22-Aug-2020 150,000,000 USD Owner Review of Issue (P2
SAN JUAN 100MW GRASSROOT SAN FRANCISCO 2 SOLAR PHOTOVOLTAIC (PV) POWER PLANT 05-Jan-2021 150,000,000 USD Owner Review of Issue (P2
SAN JUAN 100MW GRASSROOT SAN FRANCISCO 2 SOLAR PHOTOVOLTAIC (PV) POWER PLANT 30-Jun-2021 150,000,000 USD Owner Review of Issue (P2
SAN JUAN 100MW GRASSROOT SAN FRANCISCO 2 SOLAR PHOTOVOLTAIC (PV) POWER PLANT 28-Jan-2022 150,000,000 USD Owner Review of Issue (P2
SAN JUAN 100MW GRASSROOT SAN FRANCISCO 2 SOLAR PHOTOVOLTAIC (PV) POWER PLANT 25-Jun-2022 150,000,000 USD Owner Review of Issue (P2
SAN JUAN 100MW GRASSROOT SAN FRANCISCO 2 SOLAR PHOTOVOLTAIC (PV) POWER PLANT 07-Jan-2023 150,000,000 USD Owner Review of Issue (P2
© 2023 ALL RIGHTS RESERVED. Industrial Info Resources, Inc. - Sugar Land, TX - 800-762-3361
*Any data highlighted in red below is data that has been added or updated in the last release of the project
Capital PEC Report Project ID: 300330597
Project Name JORGE CEPERNIC-NESTOR KIRCHNER TO RIO SANTA CRUZ SE 500KV TRANSMISSION LINE PEC Activity Diagram
Umbrella Project Name JORGE CEPERNIC-NESTOR KIRCHNER (EX LB-CC) HYDROELECTRIC COMPLEX Umbrella Project Count
Umbrella Project Summary Construct: 1310MW JORGE CEPERNIC-NESTOR KIRCHNER(EX CC-LB) HYDRO POWER JORGE CEPERNIC-
NESTOR KIRCHNER(EX CC-LB) TO RIO SANTA CRUZ SE 500KV TRANSMISSION LINE
Industry Code 01 Power Project Type Electricity
Transmission
TIV (USD) 120,000,000 TIV (ARS) 22,570,000,000
SIC Code 4939 Electric power transmission Sector Transmission &
or distribution Distribution
SIC Product 4939*0001 Electric power transmission
Market Trends Impacted by COVID-19
Status Active Last Update 05-Jul-2022 Initial Release 20-Jan-2017
Environmental Land (L) Construction Labor Preference Unconfirmed
Operations Labor Preference Unconfirmed
Project Capacity Planned 500 kV of Electricity Transmission
Plant Owner Energia Argentina SA Plant Parent Energia Argentina SA
Plant Name Complejo Hidro Kirchner- Unit Name
Cepernic (Ex LB-CC)
Plant ID 3001384
Location On the Santa Cruz River Phone +54 351 526 3100
City/State Santa Cruz, Santa Cruz 9405 Zone/County AG*01, Santa Cruz
Argentina
Project Responsibility Project Company Project Contact
Project Manager UTE Represas Patagonia Carlos Alvarez
Gobernador Gregores, 936 Project Engineering (Technical) Director
Calafate, Santa Cruz 9045 [Tel.] +54 115 171 3300
Argentina [E-Mail] calvarez@represaspatagonia.com.ar (!)
Compliance Hidrocuyo SA Hector Degarbo
Hipolito Yrigoyen 1174 Project Director, Commercial Manager and
Operations and Maintenance Manager
Buenos Aires, Buenos Aires 1086 [Tel.] +54 026 142 51290
Argentina [E-Mail]
Inspection/Validation/Startup UTE Represas Patagonia Mariano Musso
Cordoba Public Relations Manager
Cordoba, Cordoba 5000 [Tel.] +54 290 249 2635
Argentina [E-Mail] mmusso@eling.com.ar
Contractor Electroingenieria SA Osvaldo Musso
Av. La Voz del Interior, 8851, Frente Aeropuerto Ingeniero A. Taravella Engineering Manager
Cordoba, Cordoba 5151 [Tel.] +54 351 526 3100
Argentina [E-Mail] omusso@eling.com.ar
PEC® Timing E2 PEC® Activity Purchasing
Project Probability High (81-99%)
Scope UTE Represas Patagonia (Electroingenieria, Gezhouba and Hidrocuyo SA) conducts Purchasing for a 500kV Santa Cruz-
Piedrabuena Transmission Line. DETAILS: Construct (1) 173km 500kV Overhead Transmission Line from Planned Nestor
Kirchner-Jorge Cepernic Hydro Power Complex to Operational Rio Santa Cruz Transformer Station. REQUIRES: Civil Site
Preparation, Towers, Anchors, Concrete Foundations, Structural, Conductors, Connectors, Insulators, MCC, DCS,
Switchgear, Rollers, Spacers, Conductor Blocks, Swivels, Jumpers, Conductor Wiring, Transmission Circuits and
Networks, Protective Relays, Meters, Safety System, Fire Suppression System, Lightning Arresters, Disconnect Switches,
Sensors and Monitoring System, Busbars, Wiring and Electrical Connections, Feeder Disconnections, Ground Grid,
Voltage Regulators, Underground Cable, Fiber Optic Cable, Lubrication, Materials and Handling Equipment.
ENVIRONMENTAL: (L) Roads and Landscaping, Trenching.
Schedule UTE Represas Patagonia (Electroingenieria, Gezhouba and Hidrocuyo SA) expects to release RFQs and Bid Documents
for Equipment, Specialty Subcontractors and Consumables, as required from 3Q20 (Sep). Construction Kick-Off estimated
for 1Q23 (Feb). Project Completion expected for 3Q24 (Aug).
Details May-2020 Project delayed due to COVID-19 Pandemic
AFE 202002 Sub Bid Doc 202009 Completion 29-Aug-2024 Precision YEAR
Project Milestones
Equip RFQ 202009 Kick-Off 202302 Kickoff Slippage 43 Months Duration 19 Months
Engineering Civil Electrical Instrumentation
Contracting Civil Electrical Instrumentation General [G/C]
Project Key Needs Civil/Site Structural
Instrumentation Electrical
Piping/Fittings Insulation/Coatings Utilities
Communications Transportation
Matter Phase
Energy
Buy
Sell Electricity
Plant Standard Contacts
Functional/Actual Title Contact Name/E-mail Telephone/On-site QC Date/LinkedIn ID
Plant Manager Carlos Alvarez [Phn.] +54 115 171 3300 Feb-2023
Project Engineering
calvarez@represaspatagonia.com.ar (!) No
(Technical) Director
Engineering Manager Fernando Zarate [Phn.] +54 114 801 9325 Feb-2023
Condor Cliff/La
Barrancosa Project fzarate@ieasa.com.ar No
Manager

Historical Reports
Project Name Report Date TIV Phase
CONDOR CLIFF-LA BARRANCOSA TO RIO SANTA CRUZ SUBSTATION 500KV TRANSMISSION LINE 20-Jan-2017 20,000,000 USD Owner Review of Issue (P
CONDOR CLIFF-LA BARRANCOSA TO RIO SANTA CRUZ SUBSTATION 500KV TRANSMISSION LINE 05-Feb-2018 20,000,000 USD Owner Review of Issue (P
CONDOR CLIFF-LA BARRANCOSA TO RIO SANTA CRUZ SUBSTATION 500KV TRANSMISSION LINE 06-Aug-2018 20,000,000 USD Owner Review of Issue (P
CONDOR CLIFF-LA BARRANCOSA TO RIO SANTA CRUZ SUBSTATION 500KV TRANSMISSION LINE 28-Dec-2018 20,000,000 USD Owner Review of Issue (P
CONDOR CLIFF-LA BARRANCOSA TO RIO SANTA CRUZ SUBSTATION 500KV TRANSMISSION LINE 06-May-2019 20,000,000 USD Owner Review of Issue (P
CONDOR CLIFF-LA BARRANCOSA TO RIO SANTA CRUZ SUBSTATION 500KV TRANSMISSION LINE 06-May-2020 20,000,000 USD Owner Review of Issue (P
CONDOR CLIFF-LA BARRANCOSA TO RIO SANTA CRUZ SUBSTATION 500KV TRANSMISSION LINE 31-Aug-2020 120,000,000 USD Purchasing (E2 - 21)
CONDOR CLIFF-LA BARRANCOSA TO RIO SANTA CRUZ SUBSTATION 500KV TRANSMISSION LINE 21-Apr-2021 120,000,000 USD Purchasing (E2 - 21)
CONDOR CLIFF-LA BARRANCOSA TO RIO SANTA CRUZ SUBSTATION 500KV TRANSMISSION LINE 06-Oct-2021 120,000,000 USD Purchasing (E2 - 21)
JORGE CEPERNIC-NESTOR KIRCHNER TO RIO SANTA CRUZ SE 500KV TRANSMISSION LINE 08-Feb-2022 120,000,000 USD Purchasing (E2 - 21)
JORGE CEPERNIC-NESTOR KIRCHNER TO RIO SANTA CRUZ SE 500KV TRANSMISSION LINE 05-Jul-2022 120,000,000 USD Purchasing (E2 - 21)
© 2023 ALL RIGHTS RESERVED. Industrial Info Resources, Inc. - Sugar Land, TX - 800-762-3361
*Any data highlighted in red below is data that has been added or updated in the last release of the project
Capital PEC Report Project ID: 300784164
Project Name SAN LUIS 60MW GRASSROOT TOCOTA III PHOTOVOLTAIC POWER PLANT PEC Activity Diagram
Industry Code 01 Power Project Type Grassroot
TIV (USD) 60,000,000 TIV (ARS) 11,290,000,000
SIC Code 4931 Electricity/Steam [IPP] Sector Power Generation
SIC Product 4931*0003 Nonutility Owned Power Generation
Market Trends ESG - Renewable Power
Status Active Last Update 03-Jan-2023 Initial Release 29-Apr-2022
Environmental Land (L) Construction Labor Preference Unconfirmed
Operations Labor Preference Unconfirmed
Project Capacity Planned 60 MW of Electricity
Plant Owner Genneia SA (Ex-Emgasud) Plant Parent Genneia SA (Ex-Emgasud)
Plant Name Planta Fotovoltaica Tocota III Unit Name Tocota III 01
Plant ID 3503707
Location Near Tocota Phone +54 116 090 3200
City/State Iglesia, San Juan 5467 Argentina Zone/County AG*01, San Juan
Project Responsibility Project Company Project Contact
Project Director Genneia SA (Ex-Emgasud) Ignacio Castori
Nicolas Repetto 3676 3er piso, Complejo Olivos Building II Project Director
Vicente Lopez, Buenos Aires B1636CTJ [Tel.] +54 116 090 3200
Argentina [E-Mail] ignacio.castori@genneia.com.ar
Project Manager Genneia SA (Ex-Emgasud) Enrique Perez
Nicolas Repetto 3676 3er piso, Complejo Olivos Building II Project Manager
Vicente Lopez, Buenos Aires B1636CTJ [Tel.] +54 116 090 3200 / [Alt.] +54 911 665
12861 (Mobile)
Argentina [E-Mail] enrique.perezcardenas@genneia.com.ar
; [LinkedIn] enriqueperezcardenas
Project Executive Genneia SA (Ex-Emgasud) Matias Tozzini
Nicolas Repetto 3676 3er piso, Complejo Olivos Building II Project Manager
Vicente Lopez, Buenos Aires B1636CTJ [Tel.] +54 116 090 3200
Argentina [E-Mail] matias.tozzini@genneia.com.ar
Procurement - Purchasing Genneia SA (Ex-Emgasud) Luis Arias
Nicolas Repetto 3676 3er piso, Complejo Olivos Building II Purchasing Contract Mgr.
Vicente Lopez, Buenos Aires B1636CTJ [Tel.] +54 116 090 3200
Argentina [E-Mail] luis.arias@genneia.com.ar ; [LinkedIn]
luis-arias-238b0416
PEC® Timing E2 PEC® Activity Purchasing
Project Probability High (81-99%)
Scope Genneia SA conducts Purchasing for 60MW Tocota III Photovoltaic Power Plant. Details: Construct 60MW Grassroot Solar
Power Plant utilizing Bi-Facial Solar Panels mounted on Trackers to provide Renewable Energy to the National Grid.
REQUIRES: Pre-cast Concrete Foundations, Pilings, Pedestals, Beams and Rails, DC and AC Overhead & Underground
Electrical Collection & Gathering System, Solar Panel Wiring, Fiber Optic Data Cables, Junction Boxes, Surge Protective
Devices, Terminations, Stress Cones, 3-phase Step-up Pad-Mounted Transformers, Conduit System, Cables, Cable
Trays, Trenching, and Installation, Power Inverters, MCC and DCS Control Panels, SCADA Monitoring System,
Transmission Line, Terminal Blocks, Contactors, Relays, Capacitors, Splices, Bus Duct Equipment and Buses, Anchors,
Medal Shielding, Waterproof Enclosures, Insulators and Connectors, Disconnects, Circuit Breakers, High Voltage
Switchgear, Combiners & Recombiner Boxes, Instrumentation & Metering, Flood Lighting, Fire Protection System
(Detection and Suppression), Fencing and Security System, Remote Terminal Units (RTU), Uninterrupted Power Supply
(UPS) System, Batteries, Prefabricated Operations & Maintenance Building, Operator Consoles, Transportation and Heavy
Rigging Equipment. ENVIRONMENTAL: (L) Excavation Road, Access Road, Landscaping plus Spill Containment.
Schedule Genneia conducts releases RFQ and Bid Documents for Contractors & Equipment from 1Q23 (Jan). Construction Kick-Off
expected for 2Q23 (May). Project Completion 3Q24 (Jul).
AFE 202203 Sub Bid Doc 202301 Completion 29-Jul-2024 Precision QUARTER
Project Milestones
Long-Lead 202204 Equip RFQ 202301 Kick-Off 202305 Kickoff Slippage 0 Months Duration 15 Months
Engineering Civil Electrical Environmental Instrumentation Mechanical Structural
Contracting Civil Electrical Environmental Instrumentation Mechanical Structural General
[G/C]
Project Key Needs Civil/Site
Instrumentation Electrical Mechanical Storage
Piping/Fittings Insulation/Coatings Utilities
Communications Transportation
Matter Phase
Energy
Buy
Sell Electricity
Project Fuel Type Solar
Plant Standard Contacts
Functional/Actual Title Contact Name/E-mail Telephone/On-site QC Date/LinkedIn ID
Plant Manager Daniel Rodriguez [Phn.] +54 116 090 3200 x1274 Jan-2023
Project Director daniel.rodriguez@genneia.com.ar No

Historical Reports
Project Name Report Date TIV Phase
SAN LUIS 60MW GRASSROOT TOCOTA III PHOTOVOLTAIC POWER PLANT 29-Apr-2022 60,000,000 USD Purchasing (E2 - 21)
SAN LUIS 60MW GRASSROOT TOCOTA III PHOTOVOLTAIC POWER PLANT 09-Aug-2022 60,000,000 USD Purchasing (E2 - 21)
SAN LUIS 60MW GRASSROOT TOCOTA III PHOTOVOLTAIC POWER PLANT 03-Jan-2023 60,000,000 USD Purchasing (E2 - 21)
© 2023 ALL RIGHTS RESERVED. Industrial Info Resources, Inc. - Sugar Land, TX - 800-762-3361
*Any data highlighted in red below is data that has been added or updated in the last release of the project
Capital PEC Report Project ID: 300779447
Project Name TANDIL 100.8MW LA ELBITA GRASSROOT WINDFARM POWER PLANT PEC Activity Diagram
Industry Code 01 Power Project Type Grassroot
TIV (USD) 51,000,000 TIV (ARS) 9,594,000,000
SIC Code 4931 Electricity/Steam [IPP] Sector Power Generation
SIC Product 4931*0003 Nonutility Owned Power Generation
Market Trends ESG - Renewable Power
Status Active Last Update 03-Jan-2023 Initial Release 31-Mar-2022
Environmental Land (L) Construction Labor Preference Unconfirmed
Operations Labor Preference Unconfirmed
Project Capacity Planned 100.80 MW of Electricity
Plant Owner Genneia SA (Ex-Emgasud) Plant Parent Genneia SA (Ex-Emgasud)
Plant Name Parque Eolico La Elbita Unit Name La Elbita
Plant ID 3501416
Location 42 Km from Tandil Phone +54 116 090 3200
City/State Tandil, Buenos Aires 7000 Zone/County AG*01, Buenos Aires
Argentina
Project Responsibility Project Company Project Contact
Project Manager Genneia SA (Ex-Emgasud) Ignacio Castori
Nicolas Repetto 3676 3er piso, Complejo Olivos Building II Engineering Manager
Vicente Lopez, Buenos Aires B1636CTJ [Tel.] +54 116 090 3200
Argentina [E-Mail] ignacio.castori@genneia.com.ar
Project Executive Genneia SA (Ex-Emgasud) Daniel Rodriguez
Nicolás Repetto 3676, Complejo Olivos Building II 3er piso Project Director
Buenos Aires, Buenos Aires B1636CT [Tel.] +54 116 090 3200 x1274
Argentina [E-Mail] daniel.rodriguez@genneia.com.ar
Project Executive Genneia SA (Ex-Emgasud) Matias Tozzini
Nicolas Repetto 3676 3er piso, Complejo Olivos Building II Project Director
Vicente Lopez, Buenos Aires B1636CTJ [Tel.] +54 116 090 3200
Argentina [E-Mail]
Procurement - Purchasing Genneia SA (Ex-Emgasud) Aldo Coppola
Nicolas Repetto, 3676 - 3er piso, Complejo Olivos Building II Purchasing Manager
Vicente Lopez, Buenos Aires B1636CTJ [Tel.] +54 116 090 3200
Argentina [E-Mail] aldo.coppola@genneia.com.ar ;
[LinkedIn] aldo-coppola-a910312
PEC® Timing E2 PEC® Activity Purchasing
Project Probability High (81-99%)
Scope Genneia conducts Purchasing for the construction of Grassroot 100.8 MW La Elbita WindFarm. DETAILS: Construct
Grassroot 100.8 MW Windfarm using (24) 4.2MW Wind Turbine Generators to provide renewable energy to local grid.
REQUIRES: Foundations, Enclosed Structural Steel Towers, Breakers, Pad-mounted Transformers, Switchgear, Wind
Turbine Generator sets, Electrical Collection System, MCC, DCS, SCADA, UPS, Batteries, Lightning Arresters, Power
Converters, Sensors, Monitoring System, Fiber Optic Cable Installation & Testing, Communication Cables, Innerduct
Installation, Duct Banks, Stress Cones, Transmission Line, Interconnection Substation, Power Cables, Wind Turbine
Generator Grounding & Embedment, Plant Wiring, Turbine Wiring, Ground Resistance Testing, Overhead & Underground
Cable and Innerduct installation and Trenching, Aircraft Warning. ENVIRONMENTAL: (L) Excavation Roads, Turbine
Access Roads and MET Tower routes, Crane Paths, Truck Turnaround Area, Spill Containment, Landscaping, Temporary
Turbine Staging Area.
Schedule Genneia conducts Purchasing while receives proposals for Technology Provider, Services Contractors plus Equipment
and Consumables, as required 1Q23 (Jan). Construction Kick-Off expected for 2Q23 (May). Project Completion 3Q24
(Sep).
AFE 202206 Sub Bid Doc 202301 Completion 29-Sep-2024 Precision QUARTER
Project Milestones
Equip RFQ 202301 Kick-Off 202305 Kickoff Slippage 0 Months Duration 17 Months
Engineering Civil Electrical Environmental Instrumentation Mechanical Structural
Contracting Civil Electrical Instrumentation Mechanical Structural General
[G/C]
Project Key Needs Civil/Site Structural Control Room
Instrumentation Electrical Mechanical Storage
Piping/Fittings Insulation/Coatings Utilities Valves Pumps
Communications Transportation
Material Handling
Matter Phase
Energy Turbine Generator
Buy
Sell Electricity
Project Fuel Type Wind
Plant Standard Contacts
Functional/Actual Title Contact Name/E-mail Telephone/On-site QC Date/LinkedIn ID
Plant Manager Ignacio Castori [Phn.] +54 116 090 3200 Jan-2023
Engineering Manager ignacio.castori@genneia.com.ar No

Historical Reports
Project Name Report Date TIV Phase
TANDIL 100.8MW LA ELBITA GRASSROOT WINDFARM POWER PLANT 31-Mar-2022 51,000,000 USD Owner Review of Issue (P2 - 19)
TANDIL 100.8MW LA ELBITA GRASSROOT WINDFARM POWER PLANT 04-Aug-2022 51,000,000 USD Purchasing (E2 - 21)
TANDIL 100.8MW LA ELBITA GRASSROOT WINDFARM POWER PLANT 03-Jan-2023 51,000,000 USD Purchasing (E2 - 21)
© 2023 ALL RIGHTS RESERVED. Industrial Info Resources, Inc. - Sugar Land, TX - 800-762-3361
*Any data highlighted in red below is data that has been added or updated in the last release of the project
Capital PEC Report Project ID: 300593541
Project Name PUERTO ESPERANZA PULP MILL 40MW BIOMASS-FIRED POWER UNIT ADDITION PEC Activity Diagram
Industry Code 09 Pulp, Paper & Wood Project Type Unit Addition
TIV (USD) 50,000,000 TIV (ARS) 9,406,000,000
SIC Code 4931 Electricity/Steam [IPP] Sector Power Generation
SIC Product 4931*0004 Industrial Owned Power Generation
Market Trends ESG - Renewable Power
Status Active Last Update 06-Mar-2022 Initial Release 30-Mar-2020
Environmental Air (A) Water (W) Construction Labor Preference Unconfirmed
Operations Labor Preference Unconfirmed
Project Capacity Planned 50 MW of Electricity
Plant Owner Arauco Argentina SA Plant Parent Celulosa Arauco y Constitucion SA
Plant Name Puerto Esperanza Pulp Unit Name
Plant ID 3001254
Location Ruta Nacional 12 Km 1588 Phone +54 037 574 88000
City/State Puerto Esperanza, Misiones Zone/County AG*01, Misiones
3378 Argentina
Project Responsibility Project Company Project Contact
Project Director Celulosa Arauco y Constitucion SA Mario Eckholt
Ruta Nacional 12 Km 1588 Plant Manager
Puerto Esperanza, Misiones 3378 [Tel.] +54 037 574 88000
Argentina [E-Mail] mario.eckholt@arauco.com (!) ;
[LinkedIn] mario-eckholt-ricci-606a4a9
Project Manager Celulosa Arauco y Constitucion SA Fernando Chesini
Ruta Nacional 12 Km 1588 Mechanical Maint Manager
Puerto Esperanza, Misiones 3378 [Tel.] +54 037 574 88000
Argentina [E-Mail] fernando.chesini@arauco.com (!) ;
[LinkedIn] fernando-chesini-a838901a
Project Manager Celulosa Arauco y Constitucion SA Alejandro Rutilo
Ruta Nacional 12 Km 1588 Engineering Manager
Puerto Esperanza, Misiones 3378 [Tel.] +54 037 574 88000
Argentina [E-Mail] alejandro.rutilo@arauco.com (!) ;
[LinkedIn] alejandro-aníbal-rutilo-02801218
Technology Provider Siemens Argentina SA Sebastian Mariano Fernandez
Julian Segundo Aguero, 2830, Complejo Empresarial Urbana Project Manager
Munro, Buenos Aires B1605EBQ [Tel.] +54 115 432 6000
Argentina [E-Mail] sebastian.fernandez@siemens.com (!)
PEC® Timing E2 PEC® Activity Planning and Scheduling
Project Probability High (81-99%)
Scope Arauco Argentina SA, a Division of Celulosa Arauco y Constitucion SA, with Siemens Argentina SA (Technology Provider)
conducts Planning and Scheduling for Pulp Mill 40MW Biomass-Fired Power Unit Addition. DETAILS: At Existing 350,000
T/yr Bleached Pine Kraft Pulp Mill, construct (1) 40MW Steam Turbine/Generator plus Auxiliary Equipment/Systems to
replace Obsolete Unit No.1 40MW ABB Steam Turbine/Generator to increase Power Generation Capacity for Internal
Consumption and sell Excess Energy to the National Grid. REQUIRES: Pilings, Building, Steam Header, Cooling Systems,
Turbine/Generator (Purchased), Condenser, Pumps, Compressor (Air), Motors, Electrical Distribution, Operator Console,
Valves, Steam Piping, DCS plus Balance of Plant. ENVIRONMENTAL: (A) Emission Monitoring & Control Systems; (W)
Condensate Collection System.
Schedule Arauco Argentina SA, a Division of Celulosa Arauco y Constitucion SA, with Siemens Argentina SA (Technology Provider)
continues with Planning and Scheduling 4Q22 (Dec). Arauco Argentina SA releases further Bid Documents for
Subcontractors 1Q23 (Jan) as needed. Estimated Construction Kick-Off 1Q23 (Mar). Expected Project Completion 4Q23
(Dec).
AFE 202111 Sub Bid Doc 202201 Completion 25-Dec-2023 Precision YEAR
Project Milestones
Long-Lead 202203 Equip RFQ 202201 Kick-Off 202303 Kickoff Slippage 24 Months Duration 10 Months
Engineering Civil Electrical Environmental HVAC Instrumentation Mechanical Structural Process
Contracting Civil Electrical Environmental HVAC Instrumentation Mechanical Structural General
[G/C]
Project Key Needs Civil/Site Structural Control Room Process Equip Heat
Transfer
Instrumentation Electrical Mechanical HVAC Storage
Piping/Fittings Insulation/Coatings Environmental Utilities Valves Pumps
Communications Continuous Process
Material Handling
Matter Phase Liquid Solid Vapor
Energy IEP Turbine Generator Cogen
Buy
Sell
Project Fuel Type Biomass
Plant Standard Contacts
Functional/Actual Title Contact Name/E-mail Telephone/On-site QC Date/LinkedIn ID
Plant Manager Mario Eckholt [Phn.] +54 037 574 88000 Jun-2022
mario.eckholt@arauco.com (!) Yes mario-eckholt-ricci-606a4a9
Maintenance Manager Fernando Chesini [Phn.] +54 375 748 8000 x8526 Jun-2022
Mechanical Maint
fernando.chesini@arauco.com (!) Yes fernando-chesini-a838901a
Manager
Purchasing Manager Ramon Daniel Zdanovicz [Phn.] +54 037 574 88000 Jun-2022
ramon.zdanovicz@arauco.com Yes daniel-zdanovicz-6a112942
Engineering Manager Alejandro Rutilo [Phn.] +54 037 574 88000 Jun-2022
alejandro.rutilo@arauco.com (!) Yes alejandro-aníbal-rutilo-02801218
Environmental Manager Graciela Benitez [Phn.] +54 037 574 88000 Jun-2022
Environmental & Safety
graciela.benitez@arauco.com (!) Yes
Manager
Safety Manager Eliana Cabrera [Phn.] +54 037 574 88000 Jun-2022
eliana.cabrera@arauco.com (!) Yes
Utilities Manager Diego Almeida [Phn.] +54 037 574 88000 x8352 Jun-2022
Utilities Superintendent diego.almeida@arauco.com Yes diego-oscar-ramón-almeida-51412778
Human Resource Manager Emiliano Bazquez [Phn.] +54 037 574 88000 Jun-2022
Yes

Historical Reports
Project Name Report Date TIV Phase
PUERTO ESPERANZA PULP MILL 50MW BIOMASS-FIRED POWER UNIT ADDITION 30-Mar-2020 60,000,000 USD AFE Submittal (P1 - 17)
PUERTO ESPERANZA PULP MILL 50MW BIOMASS-FIRED POWER UNIT ADDITION 04-Sep-2020 60,000,000 USD AFE Submittal (P1 - 17)
PUERTO ESPERANZA PULP MILL 40MW BIOMASS-FIRED POWER UNIT ADDITION 30-Oct-2020 50,000,000 USD Detailed Design (P1 - 09)
PUERTO ESPERANZA PULP MILL 40MW BIOMASS-FIRED POWER UNIT ADDITION 30-Aug-2021 50,000,000 USD Detailed Design (P1 - 09)
PUERTO ESPERANZA PULP MILL 40MW BIOMASS-FIRED POWER UNIT ADDITION 04-Mar-2022 50,000,000 USD Detailed Design (P1 - 09)
PUERTO ESPERANZA PULP MILL 40MW BIOMASS-FIRED POWER UNIT ADDITION 06-Mar-2022 50,000,000 USD Planning and Scheduling (E2 - 25)
© 2023 ALL RIGHTS RESERVED. Industrial Info Resources, Inc. - Sugar Land, TX - 800-762-3361
*Any data highlighted in red below is data that has been added or updated in the last release of the project
Capital PEC Report Project ID: 300727768
Project Name ULLUM GRASSROOT 58MW SIERRAS DE ULLUM SOLAR PHOTOVOLTAIC POWER PLANT PEC Activity Diagram
Industry Code 01 Power Project Type Grassroot
TIV (USD) 40,600,000 TIV (ARS) 4,434,000,000
SIC Code 4931 Electricity/Steam [IPP] Sector Power Generation
SIC Product 4931*0003 Nonutility Owned Power Generation
Market Trends ESG - Renewable Power
Status Active Last Update 20-Apr-2022 Initial Release 22-Sep-2021
Environmental Land (L) Construction Labor Preference Unconfirmed
Operations Labor Preference Unconfirmed
Project Capacity Planned 58 MW of Electricity
Plant Owner Genneia SA (Ex-Emgasud) Plant Parent Genneia SA (Ex-Emgasud)
Plant Name Parque Solar Sierras de Ullum Unit Name Solar Ullum
Plant ID 3477245
Location Near Ullum Phone +54 116 090 3200
City/State Ullum, San Juan 5409 Argentina Zone/County AG*01, San Juan
Project Responsibility Project Company Project Contact
Project Manager Genneia SA (Ex-Emgasud) Ignacio Castori
Nicolas Repetto 3676 3er piso, Complejo Olivos Building II Engineering Manager
Vicente Lopez, Buenos Aires B1636CTJ [Tel.] +54 116 090 3200
Argentina [E-Mail] ignacio.castori@genneia.com.ar
Project Director Genneia SA (Ex-Emgasud) Matias Tozzini
Nicolas Repetto 3676 3er piso, Complejo Olivos Building II Project Director
Vicente Lopez, Buenos Aires B1636CTJ [Tel.] +54 116 090 3200
Argentina [E-Mail]
Contracts Administrator Genneia SA (Ex-Emgasud) Gustavo Castagnino
Nicolas Repetto 3676 3er piso, Complejo Olivos Building II Corporate Purchasing Director
Vicente Lopez, Buenos Aires B1636CTJ [Tel.] +54 116 090 3200
Argentina [E-Mail]
PEC® Timing E2 PEC® Activity Site Preparation
Project Probability High (81-99%)
Scope Genneia SA conducts Site Preparation for 58MW Sierras de Ullum Solar Photovoltaic Power Plant. Details: Construct
58MW Grassroot Solar Power Plant utilizing 590 Wp Bi Facial Solar Panels mounted on Trackers to provide Renewable
Energy to 132kV grid. REQUIRES: Pre-cast Concrete Foundations, Pilings, Pedestals, Beams and Rails, DC and AC
Overhead & Underground Electrical Collection & Gathering System, Solar Panel Wiring, Fiber Optic Data Cables, Junction
Boxes, Surge Protective Devices, Terminations, Stress Cones, 3-phase Step-up Pad-Mounted Transformers, Conduit
System, Cables, Cable Trays, Trenching, and Installation, Power Inverters, MCC and DCS Control Panels, SCADA
Monitoring System, Transmission Line, Terminal Blocks, Contactors, Relays, Capacitors, Splices, Bus Duct Equipment
and Buses, Anchors, Medal Shielding, Waterproof Enclosures, Insulators and Connectors, Disconnects, Circuit Breakers,
High Voltage Switchgear, Combiners & Recombiner Boxes, Instrumentation & Metering, Flood Lighting, Fire Protection
System (Detection and Suppression), Fencing and Security System, Remote Terminal Units (RTU), Uninterrupted Power
Supply (UPS) System, Batteries, Prefabricated Operations & Maintenance Building, Operator Consoles, Transportation
and Heavy Rigging Equipment. ENVIRONMENTAL: (L) Excavation Road, Access Road, Landscaping plus Spill
Containment.
Schedule Genneia SA conducts Site Preparation. Construction Kicked-Off 1Q22 (Mar). Completion estimated for 1Q23 (Mar).
AFE 202107 Sub Bid Doc 202111 Completion 30-Mar-2023 Precision QUARTER
Project Milestones
Equip RFQ 202111 Kick-Off 202203 Kickoff Slippage 3 Months Duration 13 Months
Engineering Civil Electrical Environmental Instrumentation Mechanical Structural
Contracting Civil Electrical Environmental Instrumentation Mechanical Structural General
[G/C]
Project Key Needs Civil/Site Structural Architectural Control Room
Instrumentation Electrical Mechanical Storage NDE
Piping/Fittings Insulation/Coatings Utilities
Communications Transportation
Matter Phase
Energy
Buy
Sell Electricity
Project Fuel Type Solar
Plant Standard Contacts
Functional/Actual Title Contact Name/E-mail Telephone/On-site QC Date/LinkedIn ID
Plant Manager Ignacio Castori [Phn.] +54 116 090 3200 Apr-2022
Engineering Manager ignacio.castori@genneia.com.ar No

Historical Reports
Project Name Report Date TIV Phase
ULLUM GRASSROOT 58MW SIERRAS DE ULLUM SOLAR PHOTOVOLTAIC POWER PLANT 22-Sep-2021 40,600,000 USD Purchasing (E2 - 21)
ULLUM GRASSROOT 58MW SIERRAS DE ULLUM SOLAR PHOTOVOLTAIC POWER PLANT 28-Jan-2022 40,600,000 USD Preliminary Engineering (E2 - 22)
ULLUM GRASSROOT 58MW SIERRAS DE ULLUM SOLAR PHOTOVOLTAIC POWER PLANT 20-Apr-2022 40,600,000 USD Site Preparation (E2 - 26)
© 2023 ALL RIGHTS RESERVED. Industrial Info Resources, Inc. - Sugar Land, TX - 800-762-3361
*Any data highlighted in red below is data that has been added or updated in the last release of the project
Capital PEC Report Project ID: 300815817
Project Name LA RIOJA 58MW GRASSROOT VILLA UNION PHOTOVOLTAIC POWER PLANT PEC Activity Diagram
Industry Code 01 Power Project Type Grassroot
TIV (USD) 40,000,000 TIV (ARS) 7,525,000,000
SIC Code 4931 Electricity/Steam [IPP] Sector Power Generation
SIC Product 4931*0003 Nonutility Owned Power Generation
Market Trends ESG - Renewable Power
Status Active Last Update 05-Dec-2022 Initial Release 26-Aug-2022
Environmental Land (L) Construction Labor Preference Unconfirmed
Operations Labor Preference Unconfirmed
Project Capacity Planned 58 MW of Electricity
Plant Owner 360 Energy SA Plant Parent 360 Energy SA
Plant Name Parque Fotovoltaico Villa Union Unit Name Villa Union 01
Plant ID 3519280
Location Near Villa Union Phone +54 230 438 4555
City/State Villa Union, La Rioja 5350 Zone/County AG*01, La Rioja
Argentina
Project Responsibility Project Company Project Contact
Project Manager 360 Energy SA Manuel Moreno
R. Caamaño 1060 Edificio Work Piso 3, Villa Rosa Project Manager
Pilar, Buenos Aires 1631 [Tel.] +54 230 438 4555
Argentina [E-Mail] manuel.moreno@360energy.com.ar ;
[LinkedIn] manuel-moreno-navarro-bb472816b
Procurement - Purchasing 360 Energy SA Juan Baratta
R. Caamaño 1060 Edificio Work Piso 3, Villa Rosa Purchasing Manager
Pilar, Buenos Aires 1631 [Tel.] +54 230 438 4555
Argentina [E-Mail] juan.baratta@360energy.com.ar ;
[LinkedIn] juan-baratta-5761546b
Project Executive 360 Energy SA Claudio Cortina
R. Caamano, 1060 - Edificio Work W301, Villa Rosa Engineering Manager
Pilar, Buenos Aires 1631 [Tel.] +54 230 438 4555
Argentina [E-Mail] claudio.cortina@360energy.com.ar (!)
PEC® Timing E2 PEC® Activity Purchasing
Project Probability High (81-99%)
Scope 360 Energy SA conducts Purchasing for the construction of Grassroot 58MW Villa Union Power Plant. DETAILS: Construct
58MW Solar Photovoltaic Plant using Polycrystalline Solar Panels to provide renewable energy to local grid as part of
MATER auction. REQUIRES: Pre-cast Concrete Foundations, Pilings, Pedestals, Beams and Rails, DC and AC Overhead
and Underground Electrical Collection and Gathering System, Solar Panel Wiring, Fiber Optic Data Cables, Junction
Boxes, Surge Protective Devices, Terminations, Stress Cones, 3-phase Step-up Pad-Mounted Transformers, Conduit
System, Cables, Cable Trays, Trenching and Installation, Power Inverters, MCC and DCS Control Panels, SCADA
Monitoring System, Transmission Line, Terminal Blocks, Contactors, Relays, Capacitors, Splices, Bus Duct Equipment
and Buses, Anchors, Medal Shielding, Waterproof Enclosures, Insulators and Connectors, Disconnects, Circuit Breakers,
High Voltage Switchgear, Combiners and Recombiner Boxes, Instrumentation and Metering, Flood Lighting, Fire
Protection System (Detection and Suppression), Fencing and Security System, Remote Terminal Units (RTU),
Uninterrupted Power Supply (UPS) System, Batteries, Prefabricated Operations and Maintenance Building, Operator
Consoles, Transportation and Heavy Rigging Equipment. ENVIRONMENTAL: (L) Excavation Road, Access Road,
Landscaping, Spill Containment.
Schedule 360 Energy SA conducts Purchasing and releases RFQ for Mounting Structures, Panels, Cables and Electrical
Components and Bid Documents for Contractors from 4Q22 (Dec). Construction Kickoff estimated 2Q23 (Jun). Project
Completion 2Q24 (Jun).
AFE 202210 Sub Bid Doc 202212 Completion 29-Jun-2024 Precision QUARTER
Project Milestones
Equip RFQ 202212 Kick-Off 202306 Kickoff Slippage 4 Months Duration 13 Months
Engineering Civil Electrical Environmental Instrumentation Mechanical Structural
Contracting Civil Electrical Environmental Instrumentation Mechanical Structural General
[G/C]
Project Key Needs Civil/Site Control Room
Instrumentation Electrical Mechanical HVAC Storage
Piping/Fittings Insulation/Coatings Utilities
Communications
Matter Phase
Energy
Buy
Sell Electricity
Project Fuel Type Solar
Plant Standard Contacts
Functional/Actual Title Contact Name/E-mail Telephone/On-site QC Date/LinkedIn ID
Plant Manager Manuel Moreno [Phn.] +54 230 438 4555 Dec-2022
Project Manager manuel.moreno@360energy.com.ar No manuel-moreno-navarro-bb472816b
Historical Reports
Project Name Report Date TIV Phase
LA RIOJA 58MW GRASSROOT VILLA UNION PHOTOVOLTAIC POWER PLANT 26-Aug-2022 40,000,000 USD Owner Review of Issue (P2 - 19)
LA RIOJA 58MW GRASSROOT VILLA UNION PHOTOVOLTAIC POWER PLANT 05-Dec-2022 40,000,000 USD Purchasing (E2 - 21)
© 2023 ALL RIGHTS RESERVED. Industrial Info Resources, Inc. - Sugar Land, TX - 800-762-3361
*Any data highlighted in red below is data that has been added or updated in the last release of the project
Capital PEC Report Project ID: 300386475
Project Name JOSEMARIA 252KM 220KV TRANSMISSION LINE ADDITION PEC Activity Diagram
Umbrella Project Name JOSEMARIA PROJECT Umbrella Project Count
Umbrella Project Summary .
Industry Code 08 Metals & Minerals Project Type Electricity
Transmission
TIV (USD) 38,000,000 TIV (ARS) 7,149,000,000
SIC Code 4939 Electric power transmission Sector Transmission &
or distribution Distribution
SIC Product 4939*0001 Electric power transmission
Status Active Last Update 06-Dec-2022 Initial Release 28-Sep-2017
Environmental Land (L) Construction Labor Preference Unconfirmed
Operations Labor Preference Unconfirmed

Plant Owner Desarrollo de Proyectos SA Plant Parent Lundin Group


Plant Name Josemaria Silver-Copper-Gold Unit Name
Mine & Concentrator
Plant ID 3134635
Location 190 Km Northwest from Jachal Phone +54 264 420 0820 x144
City/State San Jose De Jachal, San Juan Zone/County AG*01, San Juan
J5400 Argentina
Project Responsibility Project Company Project Contact
Project Manager Lundin Mining Corporation David Dicaire
150 King Street West Suite 2200 Josemaria Project VP
Toronto, Ontario M5H 1J9 [Tel.] +1 416 342 5560
Canada [E-Mail] david.dicaire@lundinmining.com ;
[LinkedIn] dave-dicaire-2aba7020
Inspection/Validation/Startup Lundin Mining Corporation Mark Turner
150 King Street West Suite 2200 Investor Relations Americas
Toronto, Ontario M5H 1J9 [Tel.] +1 416 342 5565
Canada [E-Mail] mark.turner@lundinmining.com
E&C Fluor Corporation Miguel Deleon
P O Box 5014 Project Director
Sugar Land, Texas 77487-5014 [Tel.] +1 281 263 1000
U.S.A. [E-Mail] miguel.deleon@fluor.com ; [LinkedIn]
miguel-deleon-1aa711121
PEC® Timing E2 PEC® Activity Preliminary Engineering
Project Probability High (81-99%)
Scope Lundin Mining Corporation with Fluor Canada Limited (E&C) perform Preliminary Engineering for Josemaria 252km 220kV
Transmission Line Addition. DETAILS: As Part of Josemaria Project, construct a 252 Km High-Voltage, 220kV single-
circuit Transmission Line to supply power to the planned Processing Plant (Proj 300386468) from Guanizuil Substation.
REQUIRES: Foundations, Structural Steel, Control Room, (2) 220/13.8kV Stepdown Transformers, 220/13.8kV
Substation, Switchgear, Controls (PLC), MCC's, Cooling System, Diesel Storage Tanks, Stringing Line, Switches,
Transmission Circuits & Networks, Towers, Voltage Regulators, Meters, Underground Cables, Switchgear, Conductors,
Conductor Lifting Hooks, Fiber Optic Cable, Breakers, Connectors, Buses, Ground Wires, Insulators, Protective Relays,
Batteries. ENVIRONMENTAL: (L) Road and Landscaping, Excavation, Trenching, Fuel Handling/Delivery System.
Schedule Lundin Mining Corporation with Fluor Canada Limited (E&C) conduct Preliminary Engineering 4Q22 (Dec) while evaluates
RFQs for remaining Long Lead Equipment and updates Technical Report through 3Q23. Lundin Mining Corporation
continues Early works and expects Construction Kick-Off 2Q24 (Apr). Project Completion 2Q26 (Apr).6 (Mar).
AFE 202110 Sub Bid Doc 202412 Completion 28-Apr-2026 Precision YEAR
Project Milestones
Long-Lead 202110 Equip RFQ 202206 Kick-Off 202404 Kickoff Slippage 58 Months Duration 25 Months
Engineering Civil Electrical Environmental HVAC Instrumentation Mechanical Structural Process
Contracting Civil Environmental HVAC Instrumentation Mechanical Structural General [G/C]
Project Key Needs Civil/Site Structural Architectural
Electrical Mechanical
Environmental
Communications Transportation
Material Handling
Matter Phase Solid
Energy
Buy Electricity Fuel
Sell
Plant Standard Contacts
Functional/Actual Title Contact Name/E-mail Telephone/On-site QC Date/LinkedIn ID
Plant Manager Mark Turner [Phn.] +1 416 342 5565 Dec-2022
Investor Relations
mark.turner@lundinmining.com No
Americas

Historical Reports
Project Name Report Date TIV Phase
CONSTELLATION JOSEMARIA - LOS HELADOS 250KM 220KV TRANSMISSION LINE ADDITION 28-Sep-2017 35,000,000 USD Economic Evaluation (P1 - 04)
CONSTELLATION JOSEMARIA - LOS HELADOS 250KM 220KV TRANSMISSION LINE ADDITION 26-Mar-2018 35,000,000 USD Economic Evaluation (P1 - 04)
CONSTELLATION JOSEMARIA - LOS HELADOS 250KM 220KV TRANSMISSION LINE ADDITION 06-Nov-2018 35,000,000 USD Economic Evaluation (P1 - 04)
JOSEMARIA 250KM 220KV TRANSMISSION LINE ADDITION 15-Oct-2019 38,500,000 USD Economic Evaluation (P1 - 04)
JOSEMARIA 250KM 220KV TRANSMISSION LINE ADDITION 06-Feb-2020 38,500,000 USD Economic Evaluation (P1 - 04)
JOSEMARIA 250KM 220KV TRANSMISSION LINE ADDITION 12-Aug-2020 38,000,000 USD Economic Evaluation (P1 - 04)
JOSEMARIA 252KM 220KV TRANSMISSION LINE ADDITION 05-Nov-2020 38,000,000 USD Economic Evaluation (P1 - 04)
JOSEMARIA 252KM 220KV TRANSMISSION LINE ADDITION 02-Jun-2021 38,000,000 USD Permitting (P2 - 18)
JOSEMARIA 252KM 220KV TRANSMISSION LINE ADDITION 09-Dec-2021 38,000,000 USD Permitting (P2 - 18)
JOSEMARIA 252KM 220KV TRANSMISSION LINE ADDITION 27-Apr-2022 38,000,000 USD Planning and Scheduling (E2 - 2
JOSEMARIA 252KM 220KV TRANSMISSION LINE ADDITION 06-Dec-2022 38,000,000 USD Preliminary Engineering (E2 - 22
© 2023 ALL RIGHTS RESERVED. Industrial Info Resources, Inc. - Sugar Land, TX - 800-762-3361
*Any data highlighted in red below is data that has been added or updated in the last release of the project
Capital PEC Report Project ID: 300770379
Project Name IGLESIA 100MW ZONDA PHASE II SOLAR PHOTOVOLTAIC PLANT EXPANSION PEC Activity Diagram
Industry Code 01 Power Project Type Plant Expansion
TIV (USD) 30,000,000 TIV (ARS) 5,644,000,000
SIC Code 4931 Electricity/Steam [IPP] Sector Power Generation
SIC Product 4931*0003 Nonutility Owned Power Generation
Market Trends ESG - Renewable Power
Status Active Last Update 04-Nov-2022 Initial Release 15-Mar-2022
Environmental Land (L) Construction Labor Preference Unconfirmed
Operations Labor Preference Unconfirmed
Project Capacity Installed 100 MW of Electricity
Planned 100 MW of Electricity
Plant Owner YPF Luz SA Plant Parent YPF SA
Plant Name Parque Fotovoltaico Zonda Unit Name Zonda 02
Plant ID 3478739
Location In Bella Vista Phone +54 115 441 5400
City/State Iglesia, San Juan 5460 Argentina Zone/County AG*01, San Juan
Project Responsibility Project Company Project Contact
Project Manager YPF Luz SA Maximo Recondo
Avenida Cordoba 111 Piso 14, Buenos Aires Project Manager
Buenos Aires, Buenos Aires C1054AAA [Tel.] +54 115 441 0083
Argentina [E-Mail] maximo.recondo@ypf.com
Project Manager YPF Luz SA Mariano Bottega
Avenida Cordoba 111 Piso 14, Buenos Aires Engineering Manager
Buenos Aires, Buenos Aires C1054AAA [Tel.] +54 115 441 5400
Argentina [E-Mail] mariano.bottega@ypf.com
Project Executive YPF Luz SA Pablo Adrian Benetti
Avenida Cordoba 111 Piso 14, Buenos Aires Project Manager
Buenos Aires, Buenos Aires C1054AAA [Tel.] +54 115 441 0000
Argentina [E-Mail] pablo.benetti@ypf.com
Planning & Scheduling YPF Luz SA Patricio Cipollone
Avenida Cordoba 111 Piso 14, Buenos Aires Project Coordinator
Buenos Aires, Buenos Aires C1054AAA [Tel.] +54 115 441 0000 x10185
Argentina [E-Mail] patricio.j.cipollone@ypf.com
PEC® Timing E2 PEC® Activity Purchasing
Project Probability High (81-99%)
Scope YPF Luz Energia Electrica SA conducts Purchasing of 100MW Zonda Photovoltaic Power Plant Expansion. Details:
Expand 100MW Solar Power Plant to provide Renewable Energy to local grid. REQUIRES: Pre-cast Concrete
Foundations, Pilings, Pedestals, Beams and Rails, DC and AC Overhead & Underground Electrical Collection & Gathering
System, Solar Panel Wiring, Fiber Optic Data Cables, Junction Boxes, Surge Protector Devices, Terminations, Stress
Cones, 3-phase Step-up Pad-Mounted Transformers, Conduit System, Cables, Cable Trays, Trenching, and Installation,
Power Inverters, MCC and DCS Control Panels, SCADA Monitoring System, Transmission Line, Terminal Blocks,
Contactors, Relays, Capacitors, Splices, Bus Duct Equipment and Buses, Anchors, Medal Shielding, Waterproof
Enclosures, Insulators and Connectors, Disconnects, Circuit Breakers, High Voltage Switchgear, Combiners &
Recombiner Boxes, Instrumentation & Metering, Flood Lighting, Fire Protection System (Detection and Suppression),
Fencing and Security System, Remote Terminal Units (RTU), Uninterrupted Power Supply (UPS) System, Batteries,
Prefabricated Operations & Maintenance Building, Operator Consoles, Transportation and Heavy Rigging Equipment.
ENVIRONMENTAL: (L) Excavation Road, Access Road, Landscaping plus Spill Containment.
Schedule YPF Luz Energia Electrica SA (YPF Luz) conducts Purchasing while selects Technology Provider and to select EPC
Contractor (Civil, Electrical and Mechanical Assembly) through 4Q22 (Nov). YPF Luz with selected EPC and Technology
Provider releases RFQs and Bid Documents for Specialty Subcontractors and Consumables from 1Q23 (Jan) Construction
Kick Off scheduled for 2Q23 (Apr). Completion estimated for 2Q24 (Apr).
AFE 202209 Sub Bid Doc 202301 Completion 29-Apr-2024 Precision QUARTER
Project Milestones
Long-Lead 202211 Equip RFQ 202301 Kick-Off 202304 Kickoff Slippage 8 Months Duration 13 Months
Engineering Civil Electrical Instrumentation Mechanical Structural
Contracting Civil Electrical Environmental Instrumentation Mechanical Structural General
[G/C]
Project Key Needs Civil/Site Control Room
Instrumentation Electrical Mechanical Storage NDE
Piping/Fittings Insulation/Coatings Utilities Valves Pumps
Communications Transportation
Matter Phase
Energy
Buy
Sell Electricity
Project Fuel Type Solar
Plant Standard Contacts
Functional/Actual Title Contact Name/E-mail Telephone/On-site QC Date/LinkedIn ID
Plant Manager Maximo Recondo [Phn.] +54 115 441 0083 Feb-2022
Project Manager maximo.recondo@ypf.com No

Historical Reports
Project Name Report Date TIV Phase
IGLESIA 100MW ZONDA PHASE II SOLAR PHOTOVOLTAIC PLANT EXPANSION 15-Mar-2022 30,000,000 USD Detailed Design (P1 - 09)
IGLESIA 100MW ZONDA PHASE II SOLAR PHOTOVOLTAIC PLANT EXPANSION 04-Jul-2022 30,000,000 USD Detailed Design (P1 - 09)
IGLESIA 100MW ZONDA PHASE II SOLAR PHOTOVOLTAIC PLANT EXPANSION 04-Nov-2022 30,000,000 USD Purchasing (E2 - 21)
© 2023 ALL RIGHTS RESERVED. Industrial Info Resources, Inc. - Sugar Land, TX - 800-762-3361
Capital PEC Report Project ID: 300846525
Project Name RIO NEGRO GRASSTOOT 133/32/13.2KV DINA HUAPI SUBSTATION PEC Activity Diagram
Industry Code 01 Power Project Type Electricity
Transmission
TIV (USD) 25,000,000 TIV (ARS) 4,703,000,000
SIC Code 4939 Electric power transmission Sector Transmission &
or distribution Distribution
SIC Product 4939*0001 Electric power transmission
Status Active Last Update 23-Dec-2022 Initial Release 23-Dec-2022
Environmental Land (L) Construction Labor Preference Unconfirmed
Operations Labor Preference Unconfirmed
Project Capacity Planned 132 kV of Electricity Transmission
Plant Owner Empresa de Energia Rio Negro Plant Parent Empresa de Energia Rio Negro SA
SA
Plant Name Estacion Transformadora Dina Unit Name
Huapi
Plant ID 3533650
Location Near Dina Huapi Phone +54 299 403 9150
City/State Dina Huapi, Rio Negro R8402 Zone/County AG*01, Pilcaniyeu
Argentina
Project Responsibility Project Company Project Contact
Project Manager Empresa de Energia Rio Negro SA Fernando Versino
Av. Sarmiento 2957 General Manager Operation
El Bolson, Rio Negro 8430 [Tel.] +54 294 449 3165
Argentina [E-Mail] fversino@edersa.com.ar
Project Manager Ente Provincial de Energia del Neuquen Francisco Zambon
La Rioja 385 Project Manager
Neuquen, Neuquen Q8300ALG [Tel.] +54 299 445 6618
Argentina [E-Mail] fzambon@epen.gov.ar
Planning & Scheduling Ente Provincial de Energia del Neuquen Mario Moya
La Rioja 385 Construction Manager
Neuquen, Neuquen Q8300ALG [Tel.] +54 299 445 6751
Argentina [E-Mail] mmoya@epen.gov.ar
PEC® Timing E1 PEC® Activity Capital Approval
Project Probability High (81-99%)
Scope Empresa de Energia Rio Negro SA with Ente Provincial de Energia del Neuquen (EPEN) reached Capital Approval for
132/33/13.2 kV Dina Huapi Substation. DETAILS: Construct 132/33/13.2 kV AIS Substation with (2) 132/33/13.2kV
Transformers plus Associated Equipment to improve Rio NegroTransport System. REQUIRES: Site preparation, Concrete
& Gravel Foundations, Steel Support Structure, Insulators, Transformers, Switchgear, Oiled Circuit Breakers, Steel Cable,
Distribution Circuits, Chain-Linked fence, MCC, DCS, SCADA, Voltage Regulators, Lightning Arresters, Ground Resistors,
Duct Runs, Frequency Chargers, Reclosers, Rectifiers, Control Panel, Control House, Surge Arresters, Shunt Reactors,
Capacitor Bank, Bus Support Insulators, Meters, Protective Relays, Manholes, Fenced Yards, Air-Insulated Electrical
Buses, Control Building, Water Tank, Fire Suppression System, Communication Equipment, Fiber Optic Ground Wire,
Insulator Bushings, Disconnect Switches, Converter Station, Wiring, Reclosers, Dead-End Structures, Disconnects,
Transformer Banks, Underground Distribution Feeders, Bus Structure, Air Circuit Breakers, Batteries, UPS, Conduits,
Coupling Capacitors, Suspension Insulators, Vacuum Circuit Breakers. ENVIRONMENTAL: (L) Excavation, Waste Oil
Disposal, Disturbance Monitoring Device, Trenching, Vegetation Removal.
Schedule Empresa de Energia Rio Negro SA with Ente Provincial de Energia del Neuquen (EPEN) reached Capital Approval 4Q22
(Oct) and expects releases RFQ and Bid Documents for EPC Contractor 1Q23 (Mar). Construction Kick-Off expected
3Q23 (Aug) Project Completion expected 4Q24 (Dec).
AFE 202210 Sub Bid Doc 202303 Completion 29-Dec-2024 Precision QUARTER
Project Milestones
Long-Lead 202303 Equip RFQ 202303 Kick-Off 202308 Kickoff Slippage 0 Months Duration 17 Months
Engineering Civil Electrical Instrumentation Structural
Contracting Civil Electrical Instrumentation Structural
Project Key Needs Civil/Site Control Room
Instrumentation Electrical Storage
Insulation/Coatings Utilities
Communications Transportation
Matter Phase
Energy
Buy
Sell Electricity
Plant Standard Contacts
Functional/Actual Title Contact Name/E-mail Telephone/On-site QC Date/LinkedIn ID
Plant Manager Fernando Versino [Phn.] +54 294 449 3165 Dec-2022
General Manager
fversino@edersa.com.ar No
Operation
© 2023 ALL RIGHTS RESERVED. Industrial Info Resources, Inc. - Sugar Land, TX - 800-762-3361
Capital PEC Report Project ID: 300847340
Project Name ENTRE RIOS 132/33/13.2 KV GRASSROOT VIALE SUBSTATION PEC Activity Diagram
Industry Code 01 Power Project Type Electricity
Transmission
TIV (USD) 25,000,000 TIV (ARS) 4,703,000,000
SIC Code 4939 Electric power transmission Sector Transmission &
or distribution Distribution
SIC Product 4939*0001 Electric power transmission
Status Active Last Update 28-Dec-2022 Initial Release 28-Dec-2022
Environmental Land (L) Construction Labor Preference Unconfirmed
Operations Labor Preference Unconfirmed
Project Capacity Planned 132 kV of Electricity Transmission
Plant Owner ENERSA Plant Parent ENERSA
Plant Name Estacion Transformadora Viale Unit Name
Plant ID 3533942
Location Near city of Viale Phone +54 343 420 4420
City/State Viale, Entre Rios E3109 Zone/County AG*01, Entre Rios
Argentina
Project Responsibility Project Company Project Contact
Project Manager ENERSA Oscar Bustamante
25 de Junio 101 Project Manager
Parana, Entre Rios E3100FGC [Tel.] +54 343 420 4420
Argentina [E-Mail] obustama@enersa.com.ar ; [LinkedIn]
oscar-bustamante-9969941a
Project Executive ENERSA Eduardo Perez
25 de Junio 101 Electrical Manager
Parana, Entre Rios E3100FGC [Tel.] +54 343 420 4420
Argentina [E-Mail] ing_eduardoperez@hotmail.com ;
[LinkedIn] eduardo-andres-perez-15163290
Planning & Scheduling ENERSA Walter Faure
25 de Junio 101 Transmission Manager
Parana, Entre Rios E3100 [Tel.] +54 343 420 4420
Argentina [E-Mail] walter_faure@hotmail.com
PEC® Timing E1 PEC® Activity Capital Approval
Project Probability High (81-99%)
Scope Energia de Entre Rios SA (ENERSA) reached Capital Approval for 132/33/13.2 kV Viale Substation. DETAILS: Construct
132/33/13.2 kV AIS Substation with (1) 132/33/13.2kV Transformers plus Associated Equipment to improve Entre Rios
Transport System. REQUIRES: Site preparation, Concrete & Gravel Foundations, Steel Support Structure, Insulators,
Transformers, Switchgear, Oiled Circuit Breakers, Steel Cable, Distribution Circuits, Chain-Linked fence, MCC, DCS,
SCADA, Voltage Regulators, Lightning Arresters, Ground Resistors, Duct Runs, Frequency Chargers, Reclosers,
Rectifiers, Control Panel, Control House, Surge Arresters, Shunt Reactors, Capacitor Bank, Bus Support Insulators,
Meters, Protective Relays, Manholes, Fenced Yards, Air-Insulated Electrical Buses, Control Building, Water Tank, Fire
Suppression System, Communication Equipment, Fiber Optic Ground Wire, Insulator Bushings, Disconnect Switches,
Converter Station, Wiring, Reclosers, Dead-End Structures, Disconnects, Transformer Banks, Underground Distribution
Feeders, Bus Structure, Air Circuit Breakers, Batteries, UPS, Conduits, Coupling Capacitors, Suspension Insulators,
Vacuum Circuit Breakers. ENVIRONMENTAL: (L) Excavation, Waste Oil Disposal, Disturbance Monitoring Device,
Trenching, Vegetation Removal.
Schedule Energia de Entre Rios SA (ENERSA) reached Capital Approval 4Q22 (Nov) and expects releases RFQs and Bid
Documents for EPC Contractor 1Q23 (Mar). Construction Kick-Off expected 3Q23 (Jul) Project Completion expected 4Q24
(Dec).
AFE 202211 Sub Bid Doc 202303 Completion 29-Dec-2024 Precision QUARTER
Project Milestones
Long-Lead 202303 Equip RFQ 202303 Kick-Off 202307 Kickoff Slippage 0 Months Duration 18 Months
Engineering Civil Electrical Instrumentation Structural
Contracting Civil Electrical Instrumentation Structural
Project Key Needs Civil/Site Control Room
Instrumentation Electrical Storage
Insulation/Coatings Utilities
Communications Transportation
Matter Phase
Energy
Buy
Sell Electricity
Plant Standard Contacts
Functional/Actual Title Contact Name/E-mail Telephone/On-site QC Date/LinkedIn ID
Plant Manager Oscar Bustamante [Phn.] +54 343 420 4420 Dec-2022
Project Manager obustama@enersa.com.ar No oscar-bustamante-9969941a
© 2023 ALL RIGHTS RESERVED. Industrial Info Resources, Inc. - Sugar Land, TX - 800-762-3361
Capital PEC Report Project ID: 300847658
Project Name ENTRE RIOS 132/33/13.2 KV GRASSROOT FEDERACION SUBSTATION PEC Activity Diagram
Industry Code 01 Power Project Type Electricity
Transmission
TIV (USD) 25,000,000 TIV (ARS) 4,703,000,000
SIC Code 4939 Electric power transmission Sector Transmission &
or distribution Distribution
SIC Product 4939*0001 Electric power transmission
Status Active Last Update 29-Dec-2022 Initial Release 29-Dec-2022
Environmental Land (L) Construction Labor Preference Unconfirmed
Operations Labor Preference Unconfirmed
Project Capacity Planned 132 kV of Electricity Transmission
Plant Owner ENERSA Plant Parent ENERSA
Plant Name Estacion Transformadora Unit Name
Federacion
Plant ID 3534076
Location Near Federacion Phone +54 343 420 4420
City/State Federacion, Entre Rios E3206 Zone/County AG*01, Entre Rios
Argentina
Project Responsibility Project Company Project Contact
Project Manager ENERSA Oscar Bustamante
25 de Junio 101 Project Manager
Parana, Entre Rios E3100 [Tel.] +54 343 420 4420
Argentina [E-Mail] obustama@enersa.com.ar ; [LinkedIn]
oscar-bustamante-9969941a
Project Executive ENERSA Walter Faure
25 de Junio 101 Transmission Manager
Parana, Entre Rios E3100 [Tel.] +54 343 420 4420
Argentina [E-Mail] walter_faure@hotmail.com
Project Executive ENERSA Eduardo Perez
25 de Junio 101 Electrical Manager
Parana, Entre Rios E3100 [Tel.] +54 343 420 4420
Argentina [E-Mail] ing_eduardoperez@hotmail.com ;
[LinkedIn] eduardo-andres-perez-15163290
PEC® Timing E1 PEC® Activity Capital Approval
Project Probability High (81-99%)
Scope Energia de Entre Rios SA (ENERSA) reached Capital Approval for 132/33/13.2 kV Federacion Substation. DETAILS:
Construct 132/33/13.2 kV AIS Substation with (1) 132/33/13.2kV Transformers plus Associated Equipment to improve
Entre Rios Transport System. REQUIRES: Site preparation, Concrete & Gravel Foundations, Steel Support Structure,
Insulators, Transformers, Switchgear, Oiled Circuit Breakers, Steel Cable, Distribution Circuits, Chain-Linked fence, MCC,
DCS, SCADA, Voltage Regulators, Lightning Arresters, Ground Resistors, Duct Runs, Frequency Chargers, Reclosers,
Rectifiers, Control Panel, Control House, Surge Arresters, Shunt Reactors, Capacitor Bank, Bus Support Insulators,
Meters, Protective Relays, Manholes, Fenced Yards, Air-Insulated Electrical Buses, Control Building, Water Tank, Fire
Suppression System, Communication Equipment, Fiber Optic Ground Wire, Insulator Bushings, Disconnect Switches,
Converter Station, Wiring, Reclosers, Dead-End Structures, Disconnects, Transformer Banks, Underground Distribution
Feeders, Bus Structure, Air Circuit Breakers, Batteries, UPS, Conduits, Coupling Capacitors, Suspension Insulators,
Vacuum Circuit Breakers. ENVIRONMENTAL: (L) Excavation, Waste Oil Disposal, Disturbance Monitoring Device,
Trenching, Vegetation Removal.
Schedule Energia de Entre Rios SA (ENERSA) reached Capital Approval 4Q22 (Nov) and expects releases RFQs and Bid
Documents for EPC Contractor 1Q23 (Mar). Construction Kick-Off expected 3Q23 (Jul) Project Completion expected 4Q24
(Dec).
AFE 202211 Sub Bid Doc 202303 Completion 29-Dec-2024 Precision QUARTER
Project Milestones
Long-Lead 202303 Equip RFQ 202303 Kick-Off 202307 Kickoff Slippage 0 Months Duration 18 Months
Engineering Civil Electrical Instrumentation Structural
Contracting Civil Electrical Instrumentation Structural
Project Key Needs Civil/Site Control Room
Instrumentation Electrical Storage
Insulation/Coatings Utilities
Communications Transportation
Matter Phase
Energy
Buy
Sell Electricity
Plant Standard Contacts
Functional/Actual Title Contact Name/E-mail Telephone/On-site QC Date/LinkedIn ID
Plant Manager Oscar Bustamante [Phn.] +54 343 420 4420 Dec-2022
Project Manager obustama@enersa.com.ar No oscar-bustamante-9969941a
© 2023 ALL RIGHTS RESERVED. Industrial Info Resources, Inc. - Sugar Land, TX - 800-762-3361
Capital PEC Report Project ID: 300854586
Project Name CORDOBA 132/13.2 NEW MARCOS JUAREZ SUBSTATION PEC Activity Diagram
Industry Code 01 Power Project Type Electricity
Transmission
TIV (USD) 25,000,000 TIV (ARS) 4,703,000,000
SIC Code 4939 Electric power transmission Sector Transmission &
or distribution Distribution
SIC Product 4939*0001 Electric power transmission
Status Active Last Update 28-Jan-2023 Initial Release 28-Jan-2023
Environmental Land (L) Construction Labor Preference Unconfirmed
Operations Labor Preference Unconfirmed
Project Capacity Planned 132 kV of Electricity Transmission
Plant Owner Empresa Provincial de Energia Plant Parent Empresa Provincial de Energia de Cordoba
de Cordoba
Plant Name Estacion Transformadora Unit Name
Marcos Juarez
Plant ID 3536887
Location Near Marcos Juarez Phone +54 351 429 6000
City/State Marcos Juarez, Cordoba X2580 Zone/County AG*01, Cordoba
Argentina
Project Responsibility Project Company Project Contact
Project Director Empresa Provincial de Energia de Cordoba Lucas Estigarribia
La Tablada 350 Transmission Director
Cordoba, Cordoba X5000FEJ [Tel.] +54 351 429 6000
Argentina [E-Mail] lestigarribia@epec.com.ar
Procurement - Purchasing Empresa Provincial de Energia de Cordoba Pablo Maero
La Tablada 350 Corporate Purchasing Contract Admin
Cordoba, Cordoba X5000FEJ [Tel.] +54 351 429 6034
Argentina [E-Mail] pmaero@epec.com.ar
Planning & Scheduling Empresa Provincial de Energia de Cordoba Franco Cuarta
La Tablada 350 Planning Director
Cordoba, Cordoba X5000FEJ [Tel.] +54 351 429 6000
Argentina [E-Mail] fcuarta@epec.com.ar
PEC® Timing E1 PEC® Activity Capital Approval
Project Probability High (81-99%)
Scope Empresa Provincial de Energia de Cordoba (EPEC) reached Capital Approval for 132/13.2 kV Marcos Juarez Substation.
DETAILS: Construct 132/13.2 kV AIS Substation with (2) 132/13.2kV 40/55MVA Transformers plus Associated Equipment
to improve Cordoba Transport System. REQUIRES: Site preparation, Concrete & Gravel Foundations, Steel Support
Structure, Insulators, Transformers, Switchgear, Oiled Circuit Breakers, Steel Cable, Distribution Circuits, Chain-Linked
fence, MCC, DCS, SCADA, Voltage Regulators, Lightning Arresters, Ground Resistors, Duct Runs, Frequency Chargers,
Reclosers, Rectifiers, Control Panel, Control House, Surge Arresters, Shunt Reactors, Capacitor Bank, Bus Support
Insulators, Meters, Protective Relays, Manholes, Fenced Yards, Air-Insulated Electrical Buses, Control Building, Water
Tank, Fire Suppression System, Communication Equipment, Fiber Optic Ground Wire, Insulator Bushings, Disconnect
Switches, Converter Station, Wiring, Reclosers, Dead-End Structures, Disconnects, Transformer Banks, Underground
Distribution Feeders, Bus Structure, Air Circuit Breakers, Batteries, UPS, Conduits, Coupling Capacitors, Suspension
Insulators, Vacuum Circuit Breakers. ENVIRONMENTAL: (L) Excavation, Waste Oil Disposal, Disturbance Monitoring
Device, Trenching, Vegetation Removal.
Schedule Empresa Provincial de Energia de Cordoba (EPEC) reached Capital Approval 4Q22 (Oct) and expects releases RFQ and
Bid Documents for EPC Contractor 1Q23 (Mar). Construction Kick-Off expected 3Q23 (Aug) Project Completion expected
4Q24 (Dec).
AFE 202210 Sub Bid Doc 202303 Completion 29-Dec-2024 Precision QUARTER
Project Milestones
Long-Lead 202303 Equip RFQ 202303 Kick-Off 202308 Kickoff Slippage 0 Months Duration 17 Months
Engineering Civil Electrical Instrumentation Structural
Contracting Civil Electrical Instrumentation Structural
Project Key Needs Civil/Site Control Room
Instrumentation Electrical Storage
Insulation/Coatings Utilities
Communications Transportation
Matter Phase
Energy
Buy
Sell Electricity
Plant Standard Contacts
Functional/Actual Title Contact Name/E-mail Telephone/On-site QC Date/LinkedIn ID
Plant Manager Lucas Estigarribia [Phn.] +54 351 429 6000 Jan-2023
Transmission
lestigarribia@epec.com.ar No
Director
© 2023 ALL RIGHTS RESERVED. Industrial Info Resources, Inc. - Sugar Land, TX - 800-762-3361
Capital PEC Report Project ID: 300855676
Project Name CORDOBA 132/13.2 NEW SANTA ISABEL SUBSTATION PEC Activity Diagram
Industry Code 01 Power Project Type Electricity
Transmission
TIV (USD) 25,000,000 TIV (ARS) 4,703,000,000
SIC Code 4939 Electric power transmission Sector Transmission &
or distribution Distribution
SIC Product 4939*0001 Electric power transmission
Status Active Last Update 30-Jan-2023 Initial Release 30-Jan-2023
Environmental Land (L) Construction Labor Preference Unconfirmed
Operations Labor Preference Unconfirmed
Project Capacity Planned 132 kV of Electricity Transmission
Plant Owner Empresa Provincial de Energia Plant Parent Empresa Provincial de Energia de Cordoba
de Cordoba
Plant Name Estacion Transformadora Santa Unit Name
Isabel
Plant ID 3537359
Location In Santa Isabel Phone +54 351 429 6000
City/State Cordoba, Cordoba 5000 Zone/County AG*01, Cordoba
Argentina
Project Responsibility Project Company Project Contact
Project Director Empresa Provincial de Energia de Cordoba Lucas Estigarribia
La Tablada 350 Transmission Director
Cordoba, Cordoba X5000FEJ [Tel.] +54 351 429 6000
Argentina [E-Mail] lestigarribia@epec.com.ar
Procurement - Purchasing Empresa Provincial de Energia de Cordoba Pablo Maero
La Tablada 350 Corporate Purchasing Contract Admin
Cordoba, Cordoba X5000FEJ [Tel.] +54 351 429 6034
Argentina [E-Mail] pmaero@epec.com.ar
Planning & Scheduling Empresa Provincial de Energia de Cordoba Franco Cuarta
La Tablada 350 Planning Director
Cordoba, Cordoba X5000FEJ [Tel.] +54 351 429 6000
Argentina [E-Mail] fcuarta@epec.com.ar
PEC® Timing E1 PEC® Activity Capital Approval
Project Probability High (81-99%)
Scope Empresa Provincial de Energia de Cordoba (EPEC) reached Capital Approval for 132/13.2 kV Santa Isabel Substation.
DETAILS: Construct 132/13.2 kV AIS Substation with (2) 132/13.2kV 40/55MVA Transformers plus Associated Equipment
to improve Cordoba Transport System. REQUIRES: Site preparation, Concrete & Gravel Foundations, Steel Support
Structure, Insulators, Transformers, Switchgear, Oiled Circuit Breakers, Steel Cable, Distribution Circuits, Chain-Linked
fence, MCC, DCS, SCADA, Voltage Regulators, Lightning Arresters, Ground Resistors, Duct Runs, Frequency Chargers,
Reclosers, Rectifiers, Control Panel, Control House, Surge Arresters, Shunt Reactors, Capacitor Bank, Bus Support
Insulators, Meters, Protective Relays, Manholes, Fenced Yards, Air-Insulated Electrical Buses, Control Building, Water
Tank, Fire Suppression System, Communication Equipment, Fiber Optic Ground Wire, Insulator Bushings, Disconnect
Switches, Converter Station, Wiring, Reclosers, Dead-End Structures, Disconnects, Transformer Banks, Underground
Distribution Feeders, Bus Structure, Air Circuit Breakers, Batteries, UPS, Conduits, Coupling Capacitors, Suspension
Insulators, Vacuum Circuit Breakers. ENVIRONMENTAL: (L) Excavation, Waste Oil Disposal, Disturbance Monitoring
Device, Trenching, Vegetation Removal.
Schedule Empresa Provincial de Energia de Cordoba (EPEC) reached Capital Approval 4Q22 (Oct) and expects to release RFQ and
Bid Documents for EPC Contractor 2Q23 (Apr). Construction Kick-Off expected 3Q23 (Aug) Project Completion expected
4Q24 (Dec).
AFE 202210 Sub Bid Doc 202304 Completion 29-Dec-2024 Precision QUARTER
Project Milestones
Long-Lead 202303 Equip RFQ 202304 Kick-Off 202308 Kickoff Slippage 0 Months Duration 17 Months
Engineering Civil Electrical Instrumentation Structural
Contracting Civil Electrical Instrumentation Structural
Project Key Needs Civil/Site Control Room
Instrumentation Electrical Storage
Insulation/Coatings Utilities
Communications Transportation
Matter Phase
Energy
Buy
Sell Electricity
Plant Standard Contacts
Functional/Actual Title Contact Name/E-mail Telephone/On-site QC Date/LinkedIn ID
Plant Manager Lucas Estigarribia [Phn.] +54 351 429 6000 Jan-2023
Transmission
lestigarribia@epec.com.ar No
Director
© 2023 ALL RIGHTS RESERVED. Industrial Info Resources, Inc. - Sugar Land, TX - 800-762-3361
Capital PEC Report Project ID: 300855776
Project Name CORDOBA 132/13.2 NEW SAN ISIDRO SUBSTATION PEC Activity Diagram
Industry Code 01 Power Project Type Electricity
Transmission
TIV (USD) 25,000,000 TIV (ARS) 4,703,000,000
SIC Code 4939 Electric power transmission Sector Transmission &
or distribution Distribution
SIC Product 4939*0001 Electric power transmission
Status Active Last Update 30-Jan-2023 Initial Release 30-Jan-2023
Environmental Land (L) Construction Labor Preference Unconfirmed
Operations Labor Preference Unconfirmed
Project Capacity Planned 132 kV of Electricity Transmission
Plant Owner Empresa Provincial de Energia Plant Parent Empresa Provincial de Energia de Cordoba
de Cordoba
Plant Name Estacion Transformadora San Unit Name
Isidro
Plant ID 3537394
Location Near the city exit Phone +54 351 429 6000
City/State Cordoba, Cordoba 5000 Zone/County AG*01, Cordoba
Argentina
Project Responsibility Project Company Project Contact
Project Director Empresa Provincial de Energia de Cordoba Lucas Estigarribia
La Tablada 350 Transmission Director
Cordoba, Cordoba X5000FEJ [Tel.] +54 351 429 6000
Argentina [E-Mail] lestigarribia@epec.com.ar
Procurement - Purchasing Empresa Provincial de Energia de Cordoba Pablo Maero
La Tablada 350 Corporate Purchasing Contract Admin
Cordoba, Cordoba X5000FEJ [Tel.] +54 351 429 6034
Argentina [E-Mail] pmaero@epec.com.ar
Planning & Scheduling Empresa Provincial de Energia de Cordoba Franco Cuarta
La Tablada 350 Planning Director
Cordoba, Cordoba X5000FEJ [Tel.] +54 351 429 6000
Argentina [E-Mail] fcuarta@epec.com.ar
PEC® Timing E1 PEC® Activity Capital Approval
Project Probability High (81-99%)
Scope Empresa Provincial de Energia de Cordoba (EPEC) reached Capital Approval for 132/13.2 kV San Isidro Substation.
DETAILS: Construct 132/13.2 kV AIS Substation with (2) 132/13.2kV 40/55MVA Transformers plus Associated Equipment
to improve Cordoba Transport System. REQUIRES: Site preparation, Concrete & Gravel Foundations, Steel Support
Structure, Insulators, Transformers, Switchgear, Oiled Circuit Breakers, Steel Cable, Distribution Circuits, Chain-Linked
fence, MCC, DCS, SCADA, Voltage Regulators, Lightning Arresters, Ground Resistors, Duct Runs, Frequency Chargers,
Reclosers, Rectifiers, Control Panel, Control House, Surge Arresters, Shunt Reactors, Capacitor Bank, Bus Support
Insulators, Meters, Protective Relays, Manholes, Fenced Yards, Air-Insulated Electrical Buses, Control Building, Water
Tank, Fire Suppression System, Communication Equipment, Fiber Optic Ground Wire, Insulator Bushings, Disconnect
Switches, Converter Station, Wiring, Reclosers, Dead-End Structures, Disconnects, Transformer Banks, Underground
Distribution Feeders, Bus Structure, Air Circuit Breakers, Batteries, UPS, Conduits, Coupling Capacitors, Suspension
Insulators, Vacuum Circuit Breakers. ENVIRONMENTAL: (L) Excavation, Waste Oil Disposal, Disturbance Monitoring
Device, Trenching, Vegetation Removal.
Schedule Empresa Provincial de Energia de Cordoba (EPEC) reached Capital Approval 4Q22 (Oct) and expects to release RFQ and
Bid Documents for EPC Contractor 2Q23 (Apr). Construction Kick-Off expected 3Q23 (Aug) Project Completion expected
4Q24 (Dec).
AFE 202210 Sub Bid Doc 202304 Completion 29-Dec-2024 Precision QUARTER
Project Milestones
Long-Lead 202304 Equip RFQ 202304 Kick-Off 202308 Kickoff Slippage 0 Months Duration 17 Months
Engineering Civil Electrical Instrumentation Structural
Contracting Civil Electrical Instrumentation Structural
Project Key Needs Civil/Site Control Room
Instrumentation Electrical Storage
Insulation/Coatings Utilities
Communications Transportation
Matter Phase
Energy
Buy
Sell Electricity
Plant Standard Contacts
Functional/Actual Title Contact Name/E-mail Telephone/On-site QC Date/LinkedIn ID
Plant Manager Lucas Estigarribia [Phn.] +54 351 429 6000 Jan-2023
Transmission
lestigarribia@epec.com.ar No
Director
© 2023 ALL RIGHTS RESERVED. Industrial Info Resources, Inc. - Sugar Land, TX - 800-762-3361
Capital PEC Report Project ID: 300817210
Project Name SALTA 10MW SAN CARLOS GRASSROOT PHOTOVOLTAIC POWER PLANT PEC Activity Diagram
Industry Code 01 Power Project Type Grassroot
TIV (USD) 20,000,000 TIV (ARS) 3,762,000,000
SIC Code 4931 Electricity/Steam [IPP] Sector Power Generation
SIC Product 4931*0003 Nonutility Owned Power Generation
Market Trends ESG - Renewable Power
Status Active Last Update 30-Aug-2022 Initial Release 30-Aug-2022
Environmental Land (L) Construction Labor Preference Unconfirmed
Operations Labor Preference Unconfirmed
Project Capacity Planned 10 MW of Electricity
Plant Owner Petroquimica Comodoro Plant Parent Petroquimica Comodoro Rivadavia
Rivadavia
Plant Name Parque Fotovoltaico San Carlos Unit Name San Carlos 01
Plant ID 3519958
Location Near San Carlos Phone +54 115 068 3000
City/State San Carlos, Salta 4427 Zone/County AG*01, Salta
Argentina
Project Responsibility Project Company Project Contact
Project Director Petroquimica Comodoro Rivadavia Juan Aragone
Alicia Moreau de Justo 2050, 3 Piso Oficina 304 Project Director
Buenos Aires, Buenos Aires C1107 [Tel.] +54 115 068 3000
Argentina [E-Mail] jaragone@pcr.com.ar ; [LinkedIn] juan-
manuel-aragone-05181815
Procurement - Purchasing Petroquimica Comodoro Rivadavia Gustavo Scarni
Alicia Moreau de Justo 2050, 3 Piso Oficina 304 Purchasing Director
Buenos Aires, Buenos Aires C1107 [Tel.] +54 114 124 9800
Argentina [E-Mail] gscarni@pcr.energy
Project Manager Petroquimica Comodoro Rivadavia Gustavo Vescio
Alicia Moreau de Justo 2050, 3 Piso Oficina 304 Project Manager
Buenos Aires, Buenos Aires C1107AFP [Tel.] +54 114 124 9800
Argentina [E-Mail] gvescio@pcr.com.ar ; [LinkedIn]
gustavo-vescio-16502047
PEC® Timing E2 PEC® Activity Purchasing
Project Probability High (81-99%)
Scope Petroquimica Comodoro Rivadavia conducts Purchasing for the construction of Grassroot 10MW San Carlos Power Plant.
DETAILS: Construct 10MW Solar Photovoltaic Plant using Polycrystalline Solar Panels to provide renewable energy to
local grid as part of MATER auction. REQUIRES: Pre-cast Concrete Foundations, Pilings, Pedestals, Beams and Rails,
DC and AC Overhead and Underground Electrical Collection and Gathering System, Solar Panel Wiring, Fiber Optic Data
Cables, Junction Boxes, Surge Protective Devices, Terminations, Stress Cones, 3-phase Step-up Pad-Mounted
Transformers, Conduit System, Cables, Cable Trays, Trenching and Installation, Power Inverters, MCC and DCS Control
Panels, SCADA Monitoring System, Transmission Line, Terminal Blocks, Contactors, Relays, Capacitors, Splices, Bus
Duct Equipment and Buses, Anchors, Medal Shielding, Waterproof Enclosures, Insulators and Connectors, Disconnects,
Circuit Breakers, High Voltage Switchgear, Combiners and Recombiner Boxes, Instrumentation and Metering, Flood
Lighting, Fire Protection System (Detection and Suppression), Fencing and Security System, Remote Terminal Units
(RTU), Uninterrupted Power Supply (UPS) System, Batteries, Prefabricated Operations and Maintenance Building,
Operator Consoles, Transportation and Heavy Rigging Equipment. ENVIRONMENTAL: (L) Excavation Road, Access
Road, Landscaping, Spill Containment.
Schedule Petroquimica Comodoro Rivadavia releases RFQ and Bid Documents for Major Equipment and Contractors 3Q22 (Sep)
through 1Q23 (Jan). Construction Kick-Off expected 1Q23 (Mar). Project Completion scheduled for 1Q24 (Mar).
AFE 202207 Sub Bid Doc 202301 Completion 29-Mar-2024 Precision QUARTER
Project Milestones
Long-Lead 202209 Equip RFQ 202209 Kick-Off 202303 Kickoff Slippage 0 Months Duration 13 Months
Engineering Civil Electrical Environmental Instrumentation Mechanical Structural
Contracting Civil Electrical Environmental Instrumentation Mechanical Structural General
[G/C]
Project Key Needs Civil/Site Control Room
Instrumentation Electrical Mechanical HVAC Storage
Piping/Fittings Insulation/Coatings Utilities
Communications
Matter Phase
Energy
Buy
Sell Electricity
Project Fuel Type Solar
Plant Standard Contacts
Functional/Actual Title Contact Name/E-mail Telephone/On-site QC Date/LinkedIn ID
Plant Manager Gustavo Scarni [Phn.] +54 114 124 9800 Aug-2022
Purchasing Director gscarni@pcr.energy No
© 2023 ALL RIGHTS RESERVED. Industrial Info Resources, Inc. - Sugar Land, TX - 800-762-3361

You might also like