Ex-R101-B Elliott Compressor Bundle Refurbishment Final Report Oct-2014
Ex-R101-B Elliott Compressor Bundle Refurbishment Final Report Oct-2014
Revision 2
8 October 2014
Elliott Group
Elliott Turbomachinery S.A.
Zona Industriale n. 1
54011 Frazione Albiano Magra
AULLA (MS) - Italy
Tel. +39 0187 41311
Fax +39 0187 413000
CONTACT DETAILS
Sales Rep. NA
Address
Contact
E-mail
Tel
Fax
Mobile
Seller data
Company Elliott Turbomachinery S.A.
Address Zona Industriale n. 1
54011 Frazione Albiano Magra, Aulla (MS)
Italy
Tel. (+39) 0187 41311
Fax (+39) 0187 413000
REVISION TRACKING
Rev. Date Description Initials
2 21 august 2014 Initial issue SB
1 18 September 2014 Change following customer discussions SB
2 8 October 2014 Updated with disassembled rotor findings SB
TABLE OF CONTENTS
Contact Details 2
Revision Tracking 2
Table Of Contents 3
Inspection Workscope 4
1 Findings 4
1.1 Visual Examination 5
1.2 Dimensional Inspection 6
1.3 Rotor Concentricity Check 7
1.4 Non Destructive Examination 7
1.5 After rotor disassembled components inspection 7
2 Repair Proposal 7
3 Commercial proposal 9
3.1 Repairs and new parts per contract 9
3.2 Repairs and new parts off contract 9
4 Terms and conditions 10
5 PHOTOS 12
INSPECTION WORKSCOPE
Casing works:
- Receive, identify and log all owner supplied materials upon receipt and verify against the packing list
- Open bundle top casing and remove rotor
- Disassemble diaphragms from casing
- Visual inspect bundle interiors before cleaning
- Sand blast parts
- Check sand blasting cleaning
- Remove seals from diaphragms
- Visual inspect diaphragms and casing
- Dimensional inspect casing and diaphragms
- MPI on casing and diaphragms
- Hold for discussion findings with Customer
Rotor works:
- Visual inspection of compressor rotor before cleaning
- Sand blast rotor
- Visual inspection of compressor rotor
- Dimensional inspection of assembled rotor on key dimensions
- Check concentricity of rotor
- Check blue contact at coupling taper
- Survey coating thicknesses
- Check gaps between each impeller and sleeve.
- Check axial position of impellers
- Perform MPI on assembled rotor
- Hold for discussion findings with Customer
1 FINDINGS
Bundle was received on its own steel container, not cleaned and as removed from the plant
conditions.
In general we can say that the entity of the process deposits and rust found is reasonably
good compared with previous bundles received. The HP section is quite clean, while the LP
section has a lot of process deposits completely filling the seals.
Diaphragms and rotor appear not to have been previously coated, and therefore is not one of
the bundle or rotor refurbished in the recent years. In fact the rotor was punched with the
reference of our job SQ3042 (2005). In that occasion the rotor was not yet coated.
Rotor: The rotor dimensional inspection is acceptable, no major deviations were found in the
main diameters and impellers axial positions.
Impeller eyes items 3, 5 are very slightly under tolerance. Deviation can be neglected.
Both shaft ends sleeves (items 21 and 22) were found half of mm over the tolerance. This
issue was already discussed in 2005.
2 REPAIR PROPOSAL
Concerning the thrust disk it is scrap due to the bore oversized and with fretting erosion.
To return fully functional the bundle asset we propose the following main repairs:
Supply new set of casing bolts and pins
Supply new diaphragms antirotation screws need replacement
Supply new diaphragm split line keys
Supply a new set of inner seals
Supply a new set of seals antirotation keys
Perform local weld repair on the damages key slots on diaphragm split lines items 14,
8 ,6
Apply weld buttons on diaphragm item 7 to restore outer diameter and casing
clearance deviation.
Weld repair n. 3 impellers.
Dress blades leading edges of 4th stage impeller.
Weld repair both shaft ends
Replace HVOF coating on impeller eyes stages 5 ,6 ,7 ,8
Perform HVOF coating on impeller bores stages 1, 2, 3, 4, 7 (items 2, 3, 4, 5, 7)
Supply new thrust disk and lockwasher
Supply new rotating contact rings
Apply electro less nickel plating to diaphragms and rotor parts
Casing modification for field realignment of drain holes according previous job design.
As per previous jobs the external o-rings and rotor high speed balance are excluded from the
repair proposal.
Main repairs and replacement schema. For full list see above.
3 COMMERCIAL PROPOSAL
3.1 Repairs and new parts per contract
Unit Total
Pos. Description Q.ty
price price
Refurbishment of bundle assembly
Ref. ATTACHMENT-1, page 185 of contract no. 144438
Includes:
- Rotor refurbishment per ATTACHMENT-2, page 186 of contract no. 144438
- Basic overhaul and reassembly of bundle per ATTACHMENT-1
- All new seals
1 - Application of anti-fouling coating on all rotor impellers, rotor sleeves and casing € 188,000 1 € 188,000
diaphragms
Does NOT include:
- Component repairs per ATTACHMENT-3, page 186 of contract no. 144438
- New parts per ATTACHMENT-5 & -6, pages 190-191 of contract no. 144438
- High speed balancing
5 Casing bolts and pins n. 20 p/n P23T3262 + n. 4 p/n P36K262 € 866 1 € 866
The standard delivery for the repairs and parts listed above is 24 weeks since order confirmation
excluding rotor high speed balancing.
Deliveries exclude holiday periods and are based on the current workload and shelf availability of
spare parts and wrought products. They need to be confirmed or reviewed at the time of the order.
5 PHOTOS
High pressure side conditions as opened Low pressure side conditions as opened