Flowline Project Phase I

Hydrostatic Test Report

Clint CNOOC Service Order No. CMIT-220023-S2


Contractor SWCO Report No. CMIT-220023-S2-710-
QUA-15.81-0006-001
Contract No. CMIT-PRT-10.53-220023-S2 Date. 11-06-2023
SWCO

DRAWING No. CMIT-220023-S2-710-PCS-15. 01-12400001

Pressure cycle description: BUN DGS TO OGM02 (16’’ TRUNKLINE)


Pressure gauges certificate -211H216E0007 Valid till 12-03-2024
No& CODE. -600214-0(CODE)

Pressure Test Required: 50 Bar/ 44 Bar Design Temp. 120 ºC

Design Pressure: 40 Bar Test Temperature 50

Test Fluid Water Material grade A106 Gr. B

Holding Time 4 hrs. at 50 Bar/ 24hrs Range of Gauge 0-100 Bar


at 44 Bar
Range of P.T. Recorder
700 Bar Equipment Employed: Filling Water Pump,
Pressure pump.

Test Result

Failed □ Accepted □
REMARKS:

SWCO PMC PMT


NAME Abdulrahman Taha

DATE SIGNATURE

Date 11-06-2023

Page 1 of 1