Single Interlock Valve: Tools That Make People Move
Single Interlock Valve: Tools That Make People Move
Single Interlock Valve: Tools That Make People Move
com
1. General
2. Model
3. Characteristic data
2) Application : For load-holding parts (hydraulic lifting, pivoting and turning etc.)
3) Advantage
- It controls the oil flow automatically by spring tension and hydraulic pressure.
3
2. Model Model : LHDV 33H-B6-350/370
1) LHDV 33H- : Banjo bolt mounting,
consumer side
① ② ③ 2) 15 : shock valve
3) B : When the valve is operated with the
max. flow rate, B is pressure rising.
4
2. Model Model : LHDV 33H-B6-350/370
4) 6 : Orifice 2 diameter
Coding 4 5 6 7 8 0
5
3. Characteristic data
Model : LHDV 33H-B6-350/370
1) Designation - Load holding valve(over center valve), with hydraulic release.
by-pass check valve.
2) Valve design - Load holding valve : cone seated piston valve
By-pass check valve : disk seated valve
3) Alternation of pressure approx.
6
3. Characteristic data
4) SIV pressure setting
When you set the SIV pressure, you need the manual pump and pressure gage.
① The grub screw, serves for locking of ② and must be loosened prior to any pressure
adjustment.
② Perforated disc can be rotated with Allen Key A/F
= Pressure increase
= Pressure decrease
③ Retighten the grub screw ① after performed adjustment.
7
3. Characteristic data
5) Pressure fluid
6) Temperature
8
Before the work(replace O-ring and cleaning)
1. Before the work, you have to fix the boom. Because if you remove the SIV, there will be
no hydraulic pressure in the cylinder. So the boom may retract while at work.
9
4. Replace the O-ring
Before working – FOR SAFE WORKING, ALL BOOMS HAVE TO BE FOLDED
① Before the working, you have to remove the hydraulic oil in
the SIV. Unscrew the bolt A (13mm spanner).
Warning : The oil pressure remains in the SIV.
C Unscrew slowly.
A ② After releasing the oil, remove the pipes around the SIV.
③ Change B(O-ring)
④ Assemble the SIV and connect the pipe.
Caution : When you screw bolt C, please screw the
bolt C slowly, Connected portion of 1st cylinder with
SIV is possible to be broken, if you screw the bolt C
B too tight.
⑤ After assembling, operate joystick 1st boom fold function
for charging hydraulic oil into SIV and check the boom
movement.
10
5. Cleaning method for SIV
Before working – FOR SAFE WORKING, ALL BOOMS HAVE TO BE FOLDED
11
5. Cleaning method for SIV
Before working – FOR SAFE WORKING, ALL BOOMS HAVE TO BE FOLDED
12
5. Cleaning method for SIV
Before working – FOR SAFE WORKING, ALL BOOMS HAVE TO BE FOLDED
13
5. Cleaning method for SIV
Before working – FOR SAFE WORKING, ALL BOOMS HAVE TO BE FOLDED
14
5. Cleaning method for SIV
Before working – FOR SAFE WORKING, ALL BOOMS HAVE TO BE FOLDED
① Assembly sequence is of
dismantlement in reverse sequence.
② Release “C”(for adjusting) to the
maximum(It has to be assembled).
③ Assemble the case with spanner.
Don’t forget to put the washer.
④ Fasten “C”(for adjusting) slowly.
The pressure is getting high.
⑤ Fasten “C”(for adjusting) until same
depth which is measured before
disassemble.
⑥ Fasten “B” (for fixing).
15
5. Cleaning method for SIV
Before working – FOR SAFE WORKING, ALL BOOMS HAVE TO BE FOLDED
16
6. Hydraulic circuit for SIV(MBC block)
B A B A
2. P : Pilot line
1
T : Transfer line
P
T
17
6. Hydraulic circuit for SIV Load holding valve
1 2
1. 1 : Cylinder extension
2 : Cylinder retraction
Shock valve
18
6. Hydraulic circuit for SIV
Load holding valve ① F : F line is flow line for hydraulic. The hydraulic moves
Shock valve
19