Download as pdf or txt
Download as pdf or txt
You are on page 1of 1

X: 4040.

00
Y: -37040.00

CULVERT CULVERT
WITHOUT SCALE WITHOUT SCALE

0.50 M 0.25M

G, H, I AND J A, B, C, D, E, F, K AND L

ROAD
A BUILDING
TREE
GATES
L PIPE
CULVERT
SB SIGNBOARD
TE ELECTRICAL POLE
TL LAMP POST
MM MONUMENT
DRAINAGE

K
CONCRETE GATE
WIRED FENCE
TEMPORARY
B
BENCHMARKS

SPOT LEVEL AND DETAILS AT


JALAN KAMPUNG SEBELAH
C PARIT, MUKIM LINNGI, ALOR
GAJAH, MELAKA

1) ALL MEASUREMENT ARE BASED ON METERS

2) ALL LEVEL REFERRED TBM 2 (RL: 2.671) ARE BASED FROM


BM 1053 (5.280 METER) LOCATED NEAR AT SIMPANG EMPAT
TO PROJECT BENIH IKAN SIAKAP KAMPUNG KUALA LINGGI

3) PLANIMETRIC DATUM BASED ON CPs 10746, 10747, 43953, 3446


MM

AND 2149

E
1. MUHAMMAD ARIFF
F ISKANDAR BIN ABDUL
RAZAK
I 2. UNGKU MUHAMMAD DZAR
BIN UNGKU ABDUL AZIZ
3. MUHAMMAD SALAHUDDIN
BIN MUHAMMAD SHAHRUL
H ANUAR
4. MUHAMMAD ALIF ISHAR
BIN MOHAMAD
5. WAN NUR NISA BINTI WAN
G
MUHAMMAD SABRI
6. NUR RADHIA BINTI AHMAD
NAZARI
7. ALYA FARZANA BINTI
MOHD AYUB
8. AWANDHANA ANGGI
ARRIZKI

TBM 2
(RL: 2.671 m)
CONCRETE NAIL Sr. RAIZ BIN RAZALI

DEPARTMENT OF
SURVEYING SCIENCE
AND GEOMATIC

Sr. Gs. HARIS BIN ABDUL


RAHIM
X: 4200.00
Y: -37280.00
DEPARTMENT OF
SURVEYING SCIENCE
AND GEOMATIC

Dr.MOHD SHAHMY BIN


MOHD SAID

DEPARTMENT OF
SURVEYING SCIENCE
AND GEOMATIC

You might also like