Professional Documents
Culture Documents
SOP Installation of L 9 250KVA SEDEMAC Acuator
SOP Installation of L 9 250KVA SEDEMAC Acuator
Installation of SEDEMAC Acuator inplace of Wood ward Acuator keeping control panel,engine haress
same with adding Retrofit Harness.
Euipments/Items:
Procedure: Assembly
1. Ensure control panel EMG push button is in pressed/ locked position for local as well as remote
EMG.
2. Remove the battery terminal connection from battery: +ve & -ve battery cables.
3. Once battery connections are removed controller will be in OFF mode.
4. Remove Existence Actuator harness connections connected with Woodward Actuator & Remove
Actuator from Engine FIP.
Page 1 of 10
Standard Operating Procedure (SOP)
Name: Installation SEDEMAC Actuator replacing of Woodward on L8.9_ 250kVA Revision
Category/Type: Domestic Genset 01
5. Take SEDEMAC Actuator Mounting bracket as shown & mount actuator on top side.
Bracket mounting
locations on Engine
Note: Please ensure Actuator Part No. sticker in Top on mounting location as shown below.
SEDEMAC
Sticker & details
Page 2 of 10
Standard Operating Procedure (SOP)
Name: Installation SEDEMAC Actuator replacing of Woodward on L8.9_ 250kVA Revision
Category/Type: Domestic Genset 01
7. Tighten Actuator 4 Qty. Mounting Capscrew using 10-11mm open spanner / 10mm Box socket.
Apply Torque 8 ± 1 N-m using torque tool & yellow mark after torqueing.
8. Actuator comes from supplier with Linkage Length seating & assembly as shown
Note : Do not tight & distrub linkage Capscrew, Its CD Finalize with 128 ± 3mm from supplier end,
just please check & ensure using scale .
Page 3 of 10
Standard Operating Procedure (SOP)
Name: Installation SEDEMAC Actuator replacing of Woodward on L8.9_ 250kVA Revision
Category/Type: Domestic Genset 01
Page 4 of 10
Standard Operating Procedure (SOP)
Name: Installation SEDEMAC Actuator replacing of Woodward on L8.9_ 250kVA Revision
Category/Type: Domestic Genset 01
Page 5 of 10
Standard Operating Procedure (SOP)
Name: Installation SEDEMAC Actuator replacing of Woodward on L8.9_ 250kVA Revision
Category/Type: Domestic Genset 01
c) Take & Mount SEDEMAC Actuator sub-assembly on engine block on 2 mounting holes as
below
SEDEMAC Actuator
mounting Bracket 2 locations
on Cylinder block
d) Tighten mounting Bracket Capscrew -2nos.using 16-17mm spanner & 16mm socket, Apply
Torque 52 ± 5 N-m., Yellow mark after torqueing.
Page 6 of 10
Standard Operating Procedure (SOP)
Name: Installation SEDEMAC Actuator replacing of Woodward on L8.9_ 250kVA Revision
Category/Type: Domestic Genset 01
b) Connect Actuator linkage to FIP ‘C’ type lever (inside) using mounting Capscrew-1 Qty. as
shown.
Actuator Linkage
connect with Engine
FIP ‘C’ lever.
Page 7 of 10
Standard Operating Procedure (SOP)
Name: Installation SEDEMAC Actuator replacing of Woodward on L8.9_ 250kVA Revision
Category/Type: Domestic Genset 01
c) Tighten FIP lever mounting Capscrew -1 Nos. using 10-11mm open spanner
d) Connect Actautor Retrofit Harness Connection to SEDEMAC Acuator by using Connector .
Note : A) Battery supply to ECU to be given directly through fuse.(ECU pin number 1(+) and 2)(-ve)
Page 8 of 10
Standard Operating Procedure (SOP)
Name: Installation SEDEMAC Actuator replacing of Woodward on L8.9_ 250kVA Revision
Category/Type: Domestic Genset 01
Page 9 of 10
Standard Operating Procedure (SOP)
Name: Installation SEDEMAC Actuator replacing of Woodward on L8.9_ 250kVA Revision
Category/Type: Domestic Genset 01
Revision History:
Page 10 of 10