Download as pdf or txt
Download as pdf or txt
You are on page 1of 1

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO.

NO REPRODUCTION IN FULL, OR IN PART, SHALL BE OBTAINED FROM THIS DRAWING WITHOUT THE WRITTEN CONSENT OF SAUDI ARAMCO.
NOTES:

N2 852000
6"A/G P/L H-5 1. ALL DIMENSIONS AND COORDINATE VALUES ARE IN
METERS UNLESS OTHERWISE NOTED.

H-4
H-4 8"A/G P/L
H-5 2. UTM ZONE 39. INTERNATIONAL 1924 ELLIPSOID

N2851958 115KV WOODEN POLE


N2851958 VALUES IN METER HORIZONTAL DATUM: 1994
N2851958 HORIZONTAL ADJUSTMENT (AIN ABD)
E343300 E345900 E345900
E345900 N2850961
N2850961 N=2851257.7544
E=343309.6362

N=2851231.0258
E=343262.7944
N=2851256.6826
E=343511.5100

N=2851250.0611
3. CONTRACTOR TO CARRY OUT GROUND LEVELING WORK
N=2851258.8873 E=343878.4108
E=343128.2714
N=2851247.7110

E342344 IF REQUIRED TO MAINTAIN A MINIMUM OF 8.5M


E=344776.3965

N=2851176.1786
E=343806.5666 E347059 VERTICAL GROUND CLEARANCE AS PER SAES-P-107.
N=2850979.0773
E=344993.4335

N=2850924.4283
E=342833.9315
4. OVERHEAD POWER DISTRIBUTION SYSTEM SHALL BE
IN ACCORDANCE WITH SAUDI ARAMCO ENGINEERING
N=2850724.6946

STANDARD SAES-P-107 AND SAES-B-064.


E=345137.7733

N=2850598.3206
E=342539.3543

N2849958
N2849958 N=2850550.6376
E=345184.1907
5. ALL BELOW GROUND CABLE INSTALLATION SHALL
ASPHALT ROAD N=2850402.6413
E=342364.9905

E343300
E343300 N=2850395.6794
E=345321.5592
CONFORM TO SAUDI ARAMCO STD. SAES-P-104,
SAES-P-107 AND APPLICABLE STANDARD DRAWING

H-7
H-7 H-9
H-9
N=2850179.2401
E=345484.7263
AD-036874.001.

6. OHPL SHALL MAINTAIN ADEQUATE/STANDARD


N=2850003.1843
E=345380.7407

UNDERGROUND
N2 850000 N=2849958.1197
E=341968.8909

CABLES CLEARANCES FROM ALL OTHER TYPE OF


13.8V WOODEN POLE#3-3-44
N=2849835.7483
E=345649.8079

INSTALLATIONS AS PER SAES-P-107 AND SAES-B-064.


UNDERGROUND
N=2849748.9232

13.8V STEEL POLE#2-4-63


E=346424.0647
N=2849705.3558

N2849958
E=341717.1487

N=2849584.8062
E=341576.6609

CABLES 7. FOR DETAILED DRAWINGS OF OHPL POLES REFER


N=2849447.3277
E=341421.1378
E345900 N=2849614.2547
E=345852.5310 SAUDI ARAMCO STANDARD DRAWING SERIES AA-036142.
N=2849499.8577
E=346142.7161
STEEL POLE MATERIAL SHALL COMPLY WITH
N2849958 14-SAMSS-603.
N=2849187.4039
E=341135.4347
N=2849123.4479

E345900
E=346967.8425

8. FINAL POLE SPACING AND LOCATION FIXED IN DETAIL


DESIGN AFTER COORDINATION WITH FINAL DRILL SITE
N=2848810.5815
E=341228.3028
ACCESS ROADS.
N2847958
9. ALL OVERHEAD POWER LINES SHALL BE COMPOSITE
H-11
N=2848685.2995
E=346539.5417

E341800

N2847958
N2847958
H-14
N2847958
AS PER SAES-P-107 SECTION 8.7.

10. VERTICAL GROUND CLEARANCES SHALL BE MEETING


N=2848221.9741
E=346514.2635

E344550
E344550 THE REQUIREMENTS OF CLAUSE 4.15 AND TABLE-1
E347300
6"A/G PIPE LINE
13.8KV H-13
WOODEN POLE#2-122-17
N2 848000
OF SAES-P-107.

11. AERIAL TO UNDERGROUND TRANSITION, CABLE RUN


N2847958
E341800
H-13 H-11 36"PIPE LINE N=2847735.7122
E=346354.1103

H-14 SHALL ENCASED IN A RIGID GALVANIZED STEEL


CONDUIT OR PVC COATED RIGID GALVANIZED STEEL
ASPHALT ROAD CONDUIT IN ACCORDANCE TO SAES-P-104 AND
115KV
115KV POLE
WOODEN POLE
N=2847474.1704
E=346256.8296

N2847958 SAES-P-107.
N=2847303.6396
E=346190.9492
E347300 12. CONSTRUCTION CONTRACTOR TO CARRY GROUND
N=2847132.2304

LEVELING WORK IF REQUIRED TO MAINTAIN A


E=346124.7295

N=2847042.0570

SDG1
E=346162.5287

MINIMUM VERTICAL GROUND CLEARANCE AS


EXISTING BERM PER SAES-P-107.
N2846200
SHDGOSP-1

W ELL
W ATER
WASI
13. PROVISION FOR POWER AND OPGW CONDUCTOR SHALL

#902

A
H-16
N
N=2846684.5147

N2845958
E=346136.9201

PR
WIND
EV
AI
E342344

LING
N2845958

COMMUNI
TOWER

LUP
CATI
BE PROVIDED FOR CONNECTIVITY TO FUTURE ESPs.

LI
MI
ON

T
PAD
SUBSTATI
AREA FOR M OBI
115
1200
N=2846531.8075

2500

KV

30M
45000

7300

GANTRY
E=342745.3257

ON
x 10M
18880
APPROVED VENDOR
DW G.AB-036679.
WI
7300m m DRI
DTH AS PER SA.

LE
VE GATE
001 AND
STD
DATA
N=2846539.0458

UNDERGROUND CABL
34.
16150

DUCTBANK
34.
E=342758.5118

5KV DOUBLE CI
5KV CONCRETE

T LE
R
E
E345800

E CT
N

POLES
34.
C RIC
H

5KV RI
A
L

UNDERGROUND CABLE
115KV DOUBLE CI
C
RCUI

A
B
E

SER
L
G-261/262
FEEDI
281-LCP-0001

E
MOREOVER, LOCATION OF AUTO-RECLOSERS AND

281-I

T
H-20

NG

JB-1005
D

PC-0060
U

E348800
1
1 CT

RELOCATED
STATI
OW S
5
K BA
V N

RCUI
I

I
C K

C-1076

C-1075

C-1066

C-1065

LI
ON
O
N

FT
C
RE

T
CONCRETE DUCTBA
115KV & 34.
T
E

N2845958

SECURI

PC-0202

PC-0201

PC-0186

PC-0035
GUARD
DRAI
NAGE

TY
PI
T

PC-0

PC- 078 I

PC-0075 I

PC-0193 I

PC-0189 I

PC-0109 I

PC-0082 I

PC-0081 I

PC-0080 I

PC-0042 I
(
281-U-002)

0174 I

5KV
N2845958
I
SOLATED UTI
LITY

11245
PC-0187
C-1004

C-1003

C-1002

C-1001

C-1067

NK
C-1066

C-1065

C-1064

C-1044

C-1043

(
RELOCATED
STATI
LI
SANI
PC-0178

PC-0077

NOTE-6)

FT
U56-D-060
281-CPR-1

TARY
U56-G-052
U56-G-054
U56-G-056

ON
TANK
DI
I

I
C-1016

281-I
281-I
C-1015

I
C-1013

I
C-1012

I
C-1011

PC-0167
C-1010

C-1009

C-1008

C-1007

C-1005

ESEL

13000
EDGE OF SLEEPE

BLDG.
SURGE

NEW DG.
R

DRUM

JB-1004
JB-1003
N 9929'-0" EXISTI
NG

AI
281-GM-264A/B
281-GM-263A/B
EDGE OF PIPEWAY PI
PERACK

R
I

PC-0191
C-DCS

I
C-FACP

I
C-ESD

I
C-1076

I
C-1075

PC-0079
C-1020
N 9908'

C-1019

C-1018

C-1017
-0"
281-D-104

281-PP-24
281-RP-05

10000
281-RP-04
SECTIONALIZERS SHALL BE DECIDED DURING PROJECT
281

PC-0170
-GM-

PC-0169
114

-240
281-T
TEST TRAP 281

281-T-3
-D-3
N=2846223.8694
16920

PC-0019

PC-0017
PC-0101

15475
25000

6815
LP PROD TRAP 2
81-D-2
N=2846311.9223

281-GM-266A/B
281-GM-265A/B

5000
PUMP -G-4
FI
281-GM-054A

SWEET WATER TAN


281-T-407
E=343160.4231

PC-0057
MOV-

PC-0038
STATI
FI
1

EXI
007

(
PARKI
RE WATER

RELOCATED)
U56-D-301
U56-K-301
AI
SMOKELESS

62 58
RE

PC-0192
N=2846293.8616

7 22 5
N=2846381.8954

STI
E=346082.2539

R COMPR.

3 5 00
H-16

ON

NG AREA
PC-0083 PC-0168

NG
PC-0028 PC-0112

PC-0024 PC-0118
281-G-117A/B
NEW PUMPS

281-I
281-I

6 95 0
7500

15414
281-GM -11B
281-GM -11A
E=342918.0672 E=346041.9663

4300

695 0
U56-U-1XX1

NOTE-7

JB-1002
JB-1001
U56-U-3XX1

75 00

7 50 0

6950
PC-0158

PC-0157

PC-0161
PC-0175 PC-0177

PC-0159

PC-0121

PC-0102

PC-0085
U56-U-2XX1
N=2846248.5964 N=2846259.1579

281-I
4301
U56-U-1XX2
N=2846256.2714

SUBSTATI

6 7 25
K

6000
(
281-GM-221 C/D/B
MOTHBALLED)

410
JB-1006
87950
281-GM-222A/B
281-GM-221A

4 30 0
E=343255.5577

PC-0205
E=345114.1673

PC-0179
N=2846244.2592 E=344947.4373

SWRK
KM-004A
281-GM-119A/B
M OTHBALLED)

6000
U56-K-004A/B
N=2846210.5069

41848
6M

4300
ON
CONTROL
EXI
STI
NG PI
PERACK

WI
N=2846172.1489

7312

60 00
R OOM

DE

42500
E=343622.5577

ACCESS

1500
E=343027.0865

281-D-17

4301
MOV-319
MOV-304
M OTHBALLED

PC-0026

M OTHBALLED
E341800

281-G-105A/B

281-G-10
M OV-311
SWRK
KM-002A
002A/B
U56-K-

9150

6000
281-G-117B
281-G-117A
281-D-101
E=344932.0910

ROAD
281-G-2

1220
DEHYDRATOR

4300
6800

5560

75 00
3500
2415 2500

3300

46 48
6800
281

PC-0165 PC-0166

11179

9880
-D-102
DESALATER N=2846206.2470

1009
19600

PC-0097

PC-0059

PC-0100

PC-0099 PC-0166

PC-0103 PC-0165
PC- 0123

281-GM-120
N=2846197.7238

PC-0124

PC-0171

13080

30.ALL PANELS

29.SPACE FOR A
PC-0122

28.SUMP PI

27.DESI

26.281-001-PPDC

25.M TC CABI
PC-0147

20.BATTERY ROO

19.THE EXI
ARE EXCEPTI
PROVI
ROOM I

PER SAES-P-119

TES-P-119,CLAUS
BASEM ENT I

BE FOLLOW I

PER 31-TM SS-02


281-001-PPDC-000

TOOL BOX CABI


BAYS FUTUTRE E

REM OTE RACKI


ALSO,LSTK CONT

DETAI

TRANSFORM ER TA
LESS THAN 300
THE HEI

REQUI
CABLE-BUS SHAL

SECTI
LUX)SHALL BE I
WI
OF 30-FT CANDL
COMPLI
DESI

6.
APPLI
RESI

TO BE RELOCATE
DEHYDRATOR SHA
FOR POW ERI
TH I

8 OF SAES-K-00
DED BY NG CONT

GN FOR 34.
NTENDED TO BE

L DESI

REM ENTS OF 16-

GN OF BATTERY
ON 6.

STANT AND CERT


N=2846193.0186

LLUM I

CATI
TS & SUM PUMPS

GHT OF A FI

ANCE W I
PC-0148

PC-0098

NET QUANTI

STI
E=346114.3822

PC-0149

PC-0164

PC-0091

ON OF THAT.

N COM PLI

NG THE SAES-P-

2.

ONS TO MEET TH
LOCATED I

RC DUCT SHALL

GN BASED ON VEN

NATI

NG 48 0V M CC I
PC-00

PC-

-0005,281-001-P

7 & SAES-P-123

NG POW ER UNI
NG DEVI
N=2846191.6050

281-XFR-7

5KV GI

NET I

M NEW EXHAUST
TH M I
CL.6.

E.

AND PROVI

NK AS PER SAES
MM ABOVE THE H

L BE M ANUFACTUR

N COM PLI
ON LEVEL OF 10
ES (
7.

XTENSI
RACTOR TO CONS

4 WI

D AND I
LL BE RELOCATE
2.
2.
ANCE W I

TY W I

RE BARRI

NSI

NI
PROPOSAL.

RACTOR,LV PANEL

28 .
USED FOR NG W I
N NATI

2.

S SW I

LL BE DESI

CES SHALL BE KE

SAMSS-520.

300 LUX)
M UM LEVEL OF I
ROOM LI
DE THE SW I

I
FI
N=2846186.8892

ONS.

ED FOR USE I
SHALL BE PROVI

LL BE FI

ANCE WI

NSTALLED UNDER

TS OF DUAL FRE
TH SEC STANDAR

119 SECTI
TCHGEAR SHALL

DED BY LSTK CO

E REQUI

NSTALLED UNDER
ONAL GRI

BE CONSI

ER SHALL NOT B
P-0005 AND

DOR NM R.

GHTI
.EM ERGENCY LI
SEC.

FANS SHALL BE
-FT CANDLES (
GN AS PER SE A

-P-119.
EI

TH SAES-P-103

NG SHALL BE I
IDER TW O

NALI

TCHGEAR ROOM.
0119

GHT OF

ED M EETI
E=345443.3785

6.

REM ENTS SECTI

D TO NEW SUBST
D (

ON 6.
LL BE

DERED AS

2.
ZED,DURI

LLUM I

N BATTERY ROOM
BROADS

PT I

3.
NG)

DED W I

28.
D

NTRACTOR.

N THE

NG THE

NATI

BI

QUENCY
N=2846283.5147

GHTI

:10-10214.

BI
100

:10-10215
E=345162.3785
6000

THI

NG

ON
N

SPARK
NG
19964

ON
N=2846179.1812

23
1

N
5720

ATI
281-M OV-3008
19600

ON
E=346118.8338
18027

NOTE-8
6000 12176

E345800
WOSEP 281-D-213 E=344921.5771

MOV-317
E=342906.9040 E=345832.1375

PC-0195

PC-0194

STATI
ZV
EXISTI
NG OPEN
DRAIN CHANNEL

N=2846155.5654

MANI
PRODUCTI

ON

281-XFR-6
281-G-214B

281-G-214A
DETAI

PC-0120

PC-0027
FOLD

DETAI
E=343675.9434

PC-0163
L-A
ON
24"PVCPi
pe

N=2846136.2812

L-A
@d ept
h0.
2m

N=2846233.5738 N=2846244.0253

REFER DW G.PA-Q501
FOUNDATI
CABLE TRAY RAC

PC-0047

M ANI
NOTE-7

REM OTE
NOTE-8
E=343257.3880 E=346135.6538

ON LAYOUT
E=345106.6359

FOLD
N=2846229.3591

PC-0052 PC-0099

PI
NEW
PC-0051 PC-0053
U56-D-051

PI
24"PVCPi

K
pe
@d ept
h0.
6m

NG
12.
E=343614.0186

WI
CABLE RACK
SDG5

ELECTRI

PRODUCTI
N=2846194.9906

U56-T-241

001
U56-U-052D

U56-D-059
U56-GM-055

SR-001
PI
OI
U56-K-001-

281-T-111
E1

DTH 6M
13.8KV POLE#B30

T SWI
LY WATER

CORRI
U56-K-001

U56-D-0064
U56-K-001-E2

CULVERT

DRAI
281-U-001)
PC-0116
281

U56-D-061

U56-D-052
-D-245

E=343022.6844

NEW

TCHRACK

PI

DOR
CAL

NAGE
PC-0192

T
N=2846241.4506

ON
NEW SLEEPER
EXI
STI
NG SLEEPER

PC-0061

PC-0030
N=2846209.0599 N=2846182.7409
E=344957.9214

PC-0069 PC-0067

PC-0068 PC-0056

PC-0066 PC-0055

PC-0065 PC-0054

U56-U-052-GM 4
U56-U-052-GM3
U56-U-052-GM 2
U56-U-052-GM 1
E=343163.0734

RECEI
SCRAPER
LP GAS
SHGOSP-5

PC-0153

PC-0152 PC-0156

PC-0
PC-0151 PC-0155

PC-0062 PC-0150
PC-0084 PC-0154

PC- 050 PC-0064


HP
E=345442.6638

281-D-201

0063 PC-0058
N=2846177.8903 N=2846164.1469

VER

PROD TRAP
U56-D-XXX1

U56-D-XXX2

U56-E-XXX1

U56-U-2XX2
U56-E-XXX4

U56-U-XXX1

U56-K-XXX1

U56-D-XXX5 EM -1
U56-E-XXX2 EM -051-4
E=345154.8439 E=345832.4979

SUPPLY TRANSFO
BACKUP POW ER
PLANT SCRAPER

MOV-104
U/G CABLE
EXI

SHEDGUM GAS
LAUNCHER
STI
N=2846140.3507

NG

EM -2

EM-051-3
EM -051-2
EM -051-1
FI
E=343667.5937 N=2846028.3475

N FANS
RECEI
HP GAS SCRAPER
SHGOSP-5

RM ER
PC-0131 PC-0043

PC-0130 PC-0140

PC-0129 PC-0139

PC-0107 PC-0138

PC-0106 PC-0137

PC-0105 PC-0136
115KV POLE#A37

PC-0104 PC-0134

PC-0092 PC-0132
E=346231.5633

VER

PC-0020
N2 846000 13.8KV POLE#A31 N=2846024.0016
E=347004.3193

N2845733 U/G BERM N=2845895.4994


E=347029.8700

SDG5
N=2845812.6564
SHEDGUM GOSP-1

SEE DETAIL-A
E=346922.2658

H-17
N=2845758.1592
E=346850.3339

E340448 13.8KV POLE#3AA500013


N=2845665.2797
E=346750.9068
N=2845709.5229
E=346793.1268

VARIES (90M MAX)


N2845958 N2845958
E344550 E344550
HDD-001A LEGEND
10M

N=2845087.9560
E=346338.3119

H-17 N=2844926.7217
E=346518.8143

-34.5kV, OVER HEAD POWER LINE


DOUBLE CIRCUIT LINE
N=2844683.3277
10M

E=346345.7275

N2843958 -PROPSED LOCATION OF ESP WELLS


N2843958
N=2844569.3950

N2843958
E=346488.1770

N=2844483.1665
E=346454.8426

N=2844399.0180
E=346451.7562

E344550
E344550 E347300
-HORIZONTAL DIRECTION DRILLING
34.5KV OVERHEAD POWER LINE

STEEL MONO POLE


H-26
N2 844000 H-23 H-23 N=2843904.1905
N=2844010.9843
E=345811.6905

N=2843863.0406
E=345734.3675
H-28 HDD -HORIZONTAL DIRECTION DRILLING

13.8KV POLE#2-1080-8
E=345710.0516

13.8KV POLE#3-5-3 N=2843756.8053


E=345590.9804

STEEL POLE#2-1015-3
N=2843626.5932
E=345447.8727

N=2843641.2463
E=345392.0053 N=2843696.1580
E=345504.7557

DETAIL-B, 34.5KV OH POWER LINE CORRIDOR N=2843557.6363


E=345287.7098
N2843958
N=2843371.4542

N.T.S E347300
E=345155.8517 N=2843433.8296
E=345188.7097

N2842803 REFERENCE DRAWINGS


SEE DETAIL-B
E347059 DWG. CONTROL FOR J.O.10-10214-0001 PD-A00001

SCOPE OF WORK PE-A00002


H-34 OVERALL AREA MAP OF 34.5KV OHPL PA-P00002.001
H-31
N=2842716.1576
E=345447.7906

VARIES (90M MAX) H-34N2841958


N2841958
H-31 CABLE & CONDUIT SCHEDULE PD-P10024
E341800
E341800
N2841958
N2841958 H-35 H-35
7.5M

E344550
E344550 N2841958
E347300
13.8KV WOODEN POLE#2-1-24
N2 842000 N=2841891.0484
E=345858.6057

13.8KV POLE#2-1047-1
6"PIPE LINE A/G
15M

P/L BERM N=2841612.2040


E=346031.7196

N=2841610.2115
E=346024.1878

N=2841458.6312
E=346021.7682

N=2841463.3003
E=345829.1304
7.5M

ASPHALT ROAD

34.5KV OVERHEAD POWER LINE


H-38 H-39 N=2840735.3979
E=345799.0910

N2839958
STEEL MONO POLE
N2839958 E341800
N2839958 H-36
E340300 E341800
N2839958
H-38 E345800
DETAIL-A, 34.5KV OH POWER LINE CORRIDOR
N.T.S N2 840000
13.8KV STEEL POLE
H-39 N=2839882.6662
E=345185.9593
N=2840015.3163
E=345264.7815

N=2839888.7961
E=345250.1486

H-36
HV TOWER#A6SCH20
N=2839752.7527
E=344898.0628

EXISTING
EXISTING WELL#513
WELL#513 N2839958
N=2839836.5743
E=345184.4039

E345800
N=2839528.6566
E=344617.0421
N=2839608.9407
E=344705.9591

N=2839500.3083
E=344560.5576 N=2839434.4827
E=344560.4709

N=2839162.1119
E=344411.6828

0 500 1000 1500 2000 2500

H-43 N=2838935.5507
E=344248.2737

METERS
N2837958 N=2838725.1788
E=344146.2690

E340000 N2837958
H-40
N=2838579.0707
E=344064.5493
SCALE: 1 : 25000M

E343300 N=2838522.7173
E=344020.6287
N=2838458.3394
E=344023.9819

N=2838432.2335

N2837958
E=343993.9994

REVISION VALIDATION

H-43 E343300 H-40 N=2838276.6771


E=343892.5376

THIS REVISION NO. F IS COVERED, FOR ALL APPROVAL AND CERTIFICATION

REQUIREMENTS, PER SAEP-334, UNDER DRAWING COMPLETION CERTIFICATE NO:


N2 838000
10-10214-0001-001
6"PIPE LINE A/G
DESIGN CERTIFICATION REVIEW FOR KEY DRAWINGS OTHER
(DESIGN AGENCY) REQUIRED (SAUDI ARAMCO)
BERM U/G P/L N=2837592.2773
E=343812.0446

ENGG./DATE CERTIFIED BY/DATE CONST. AGENCY/DATE OPERATIONS/DATE BY/DATE

ASD MAP
N=2837305.7755
E=343136.4663 04/28/22 04/28/22
UNDERGROUND REV.NO. DATE REVISION DESCRIPTION

CABLES F 04/28/22 ISSUED FOR 100% PP APPROVAL

JOB ORDER/EWO NO.


THIS REVISION IS NOT TO BE USED FOR

H-45
H-45 10-10214-0001 CONSTRUCTION UNTIL CERTIFIED AND DATED

N2835958
N2835958 SAUDI ARABIAN OIL COMPANY
E340000

E342000

E344000

E346000

E348000
E341800
E341800 DRAWING TYPE

OVERHEAD POWER LINE LAYOUT CBL

34.5KV DISTRIBUTION LINE


N2 836000
GOSP-1 PUMPSTATION & TIE-LINE

SHEDGUM SAUDI ARABIA


PLANT NO. INDEX DRAWING NUMBER SHT. NO. REV. NO.

281 P PA-P10060 001 F


Saudi Aramco 2615 ENG. (05/05)

RESTRICTED VECTOR CADD-01