Kabupaten Kabupaten Kabupaten Kabupaten

No. Uraian Upah, Bahan dan Alat Satuan Kabupaten Tegal Kota Pekalongan Kota Tegal
Batang Pekalongan Pemalang Brebes
0 1 2 3 4 5 6 7 8 9
I Upah
Pekerja Oh 90,000.00 90,000.00 90,000.00 90,000.00 100,000.00 90,000.00 85,000.00
Pekerja tak terlatih Oh 60,000.00 81,600.00 65,000.00 72,500.00 70,000.00 75,000.00 82,500.00
Mandor Oh 107,500.00 146,250.00 107,000.00 106,875.00 120,000.00 112,500.00 108,300.00
Buruh semi terlatih Oh 65,000.00 87,800.00 72,500.00 77,500.00 75,000.00 75,000.00 85,700.00
Tukang listrik / Buruh terlatih Oh 105,000.00 106,400.00 100,000.00 102,500.00 95,000.00 105,000.00 105,000.00
Tukang Kayu Oh 105,000.00 106,400.00 102,500.00 102,500.00 110,000.00 117,500.00 107,150.00
Kepala tukang kayu Oh 115,000.00 138,750.00 117,000.00 107,500.00 115,000.00 117,500.00 110,000.00
Tukang batu Oh 110,000.00 110,000.00 110,000.00 120,000.00 120,000.00 120,000.00 110,000.00
Kepala tukang batu Oh 115,000.00 138,750.00 117,000.00 107,500.00 115,000.00 117,500.00 110,000.00
Tukang besi Oh 105,000.00 105,000.00 102,500.00 102,500.00 120,000.00 117,500.00 105,000.00
Kepala tukang besi Oh 115,000.00 138,750.00 117,000.00 107,500.00 115,000.00 117,500.00 110,000.00
Tukang cat Oh 105,000.00 105,000.00 100,000.00 102,500.00 100,000.00 110,000.00 105,000.00
Kepala tukang cat Oh 115,000.00 120,150.00 115,000.00 107,500.00 95,000.00 125,000.00 110,000.00
Tukang plitur Oh 105,000.00 105,000.00 100,000.00 102,500.00 100,000.00 110,000.00 105,000.00
Tukang jalan Oh 82,500.00 90,800.00 87,500.00 82,500.00 75,000.00 85,000.00 85,000.00
Tukang gali Oh 82,500.00 90,800.00 87,500.00 82,500.00 75,000.00 85,000.00 85,000.00
Tukang masak aspal Oh 82,500.00 131,400.00 87,500.00 82,500.00 78,000.00 85,000.00 86,950.00
Tukang leideng Oh 105,000.00 105,000.00 100,000.00 102,500.00 100,000.00 110,000.00 105,000.00
Masinis Oh 185,000.00 178,300.00 162,500.00 140,000.00 150,500.00 187,500.00 171,400.00
Pembantu masinis Oh 85,000.00 85,150.00 75,000.00 70,000.00 80,000.00 95,000.00 89,200.00
Penjaga api Oh 70,000.00 80,000.00 75,000.00 70,000.00 75,000.00 85,000.00 85,000.00
Penjaga malam Oh 85,000.00 85,000.00 85,000.00 85,000.00 100,000.00 85,000.00 85,000.00
Sopir Oh 160,000.00 160,000.00 160,000.00 160,000.00 160,000.00 160,000.00 160,000.00
Pembantu sopir Oh 85,000.00 85,000.00 85,000.00 85,000.00 85,000.00 85,000.00 85,000.00
Juru ukur Oh 187,500.00 178,300.00 162,500.00 162,500.00 162,500.00 162,500.00 171,400.00
Pembantu juru ukur Oh 117,500.00 117,500.00 117,500.00 117,500.00 117,500.00 117,500.00 137,500.00
Operator alat berat Oh 225,000.00 225,000.00 225,000.00 225,000.00 225,000.00 225,000.00 225,000.00
Pembantu operator Oh 100,000.00 100,000.00 100,000.00 100,000.00 100,000.00 100,000.00 100,000.00
Pekerja (Penjaga alat) Ls 2,300,000.00 2,300,000.00 2,300,000.00 2,300,000.00 2,300,000.00 2,300,000.00 2,300,000.00

II Bahan
A Bahan Dasar
, Batu Kali Bulat Utuh m3 185,000.00 174,950.00 215,400.00 236,100.00 189,375.00 182,500.00 204,900.00
Batu Kali Bulat Belah m3 350,000.00 230,000.00 240,000.00 360,000.00 310,000.00 230,000.00 335,000.00
Batu Kali Pecah 10/15 m3 230,000.00 195,000.00 253,750.00 255,250.00 218,350.00 202,500.00 197,500.00
Batu Kali Pecah 5/7 m3 240,000.00 237,469.50 266,200.00 270,000.00 258,750.00 235,000.00 201,000.00
Batu Kali Pecah 3/5 m3 240,000.00 242,469.50 256,200.00 279,000.00 327,100.00 242,500.00 269,300.00
Kerikil Timbun m3 155,000.00 228,846.00 160,000.00 155,000.00 146,000.00 183,148.00 170,000.00
Kerikil Sawur / Koral m3 177,500.00 165,000.00 161,350.00 177,500.00 187,500.00 195,000.00 187,500.00
Kerikil Beton 0,5/1 m3 226,750.00 225,000.00 285,550.00 266,000.00 334,600.00 237,500.00 300,000.00
Kerikil Beton 1/2 m3 310,000.00 250,000.00 285,550.00 340,000.00 337,100.00 240,000.00 300,000.00
Kerikil Beton m3 305,000.00 247,500.00 256,200.00 292,500.00 332,100.00 252,500.00 290,200.00
Kerikil Biasa m3 145,000.00 155,000.00 146,350.00 160,000.00 165,000.00 160,000.00 165,000.00
Kerikil Tras Giling m3 212,500.00 222,500.00 196,350.00 262,500.00 225,000.00 215,000.00 240,000.00
Batu Bata ex lokal Bh 762.50 950.00 975.00 975.00 960.00 900.00 925.00

Pasir Urug m3 195,000.00 179,600.00 170,000.00 171,500.00 190,000.00 190,000.00 187,500.00


Pasir Pasang m3 400,000.00 340,000.00 360,000.00 340,000.00 320,000.00 415,000.00 300,000.00
Pasir Beton m3 400,000.00 450,000.00 360,000.00 370,000.00 320,000.00 415,000.00 300,000.00
Tanah Padas m3 96,500.00 85,000.00 95,750.00 97,500.00 127,500.00 60,000.00 90,000.00
Tanah Liat m3 95,000.00 55,000.00 110,000.00 97,500.00 103,000.00 60,000.00 100,000.00
Kapur Pasang m3 310,000.00 278,650.00 202,800.00 302,500.00 360,000.00 230,000.00 330,000.00
Kapur Semen Merah m3 180,000.00 182,500.00 141,650.00 182,500.00 190,000.00 165,000.00 187,500.00

Portland Cement Merk I 40 kg Zak 46,000.00 50,000.00 46,800.00 45,750.00 45,250.00 47,000.00 46,000.00
Portland Cement Merk I 50 kg Zak 56,000.00 61,900.00 57,000.00 57,500.00 57,000.00 56,000.00 63,200.00
Portland Cement Merk II 40 kg Zak 45,250.00 49,500.00 46,300.00 46,000.00 45,700.00 45,000.00 45,250.00
Portland Cement Merk II 50 kg Zak 54,000.00 62,500.00 55,750.00 55,500.00 55,250.00 56,000.00 62,250.00
Portland Cement Semen Putih 40 kg Zak 95,000.00 90,000.00 101,150.00 87,500.00 100,000.00 86,500.00 99,750.00
Portland Cement Semen Putih 50 kg Zak 92,500.00 88,500.00 100,650.00 91,000.00 119,000.00 88,500.00 90,000.00
Portland Cement Semen warna Kg 10,125.00 11,500.00 11,900.00 8,687.50 13,550.00 11,250.00 20,000.00

2 Bahan Penutup Atap


Sirap (100 lbr) Pak 215,000.00 205,650.00 183,000.00 182,500.00 185,000.00 192,500.00 185,000.00

Genteng Beton Warna standard Bh 4,000.00 7,016.00 4,600.00 5,700.00 6,150.00 4,050.00 5,250.00
Genteng Beton Warna Special Bh 7,450.00 9,400.00 7,876.00 7,350.00 7,450.00 7,150.00 7,350.00
Genteng Beton Warna Khusus Bh 5,950.00 8,550.00 8,745.00 6,900.00 5,450.00 5,500.00 5,600.00
Kerpus Beton Warna Standard Bh 4,583.33 7,800.00 6,300.00 6,400.00 7,350.00 6,000.00 12,250.00
Kerpus Beton Warna Special Bh 7,000.00 9,250.00 8,875.00 7,625.00 8,175.00 6,950.00 14,700.00
Kerpus Beton Warna Khusus Bh 10,750.00 12,500.00 11,100.00 10,350.00 10,650.00 10,625.00 9,550.00

Genteng Tanah Liat Vlaam/Plentong Bh 2,100.00 2,500.00 2,300.00 1,500.00 2,000.00 2,400.00 1,500.00
Genteng Tanah Liat Kodok Bh 2,800.00 3,550.00 3,000.00 2,650.00 2,700.00 2,950.00 2,700.00
Genteng Tanah Liat Kodok Glasur Bh 4,550.00 4,900.00 4,450.00 4,500.00 4,350.00 4,350.00 4,500.00
Genteng Tanah Liat Nok kerpus Kodok Bh 9,800.00 7,950.00 5,500.00 5,250.00 5,550.00 5,000.00 5,150.00
Genteng Tanah Liat Nok kerpus Kodok Glasur Bh 9,800.00 9,900.00 7,050.00 9,350.00 6,750.00 9,350.00 9,650.00
Genteng Tanah Liat Plentong super besar 18 bh/m2 Bh 3,950.00 4,975.00 4,650.00 4,750.00 4,325.00 4,875.00 4,550.00
Genteng Tanah Liat Nok kerpus plentong super Bh 8,200.00 6,750.00 7,100.00 8,000.00 7,250.00 6,200.00 8,100.00

Asbes Gelombang Besar 200 cm x 102 cm x 5 mm Bh 82,000.00 84,500.00 78,150.00 84,500.00 88,750.00 83,500.00 89,500.00
Asbes Gelombang Besar 225 cm x 102 cm x 5 mm Bh 93,950.00 92,450.00 88,100.00 91,450.00 98,700.00 87,000.00 99,450.00
Asbes Gelombang Besar 250 cm x 102 cm x 5 mm Bh 104,200.00 94,200.00 95,700.00 102,200.00 107,950.00 99,200.00 109,200.00
Asbes Gelombang Besar 200 cm x 102 cm x 6 mm Bh 83,700.00 87,450.00 83,750.00 86,950.00 80,450.00 88,950.00 80,950.00
Asbes Gelombang Besar 225 cm x 102 cm x 6 mm Bh 92,300.00 96,800.00 91,950.00 91,800.00 87,800.00 96,525.00 87,800.00
Asbes Gelombang Besar 250 cm x 102 cm x 6 mm Bh 108,500.00 109,200.00 101,200.00 102,700.00 99,700.00 106,925.00 96,700.00

Asbes Gelombang Kecil 150 cm x 105 cm x 4 mm Bh 41,900.00 49,550.00 46,150.00 41,150.00 39,500.00 49,500.00 49,400.00
Asbes Gelombang Kecil 180 cm x 105 cm x 4 mm Bh 38,500.00 45,150.00 41,500.00 48,400.00 47,000.00 52,500.00 67,450.00
Asbes Gelombang Kecil 210 cm x 105 cm x 4 mm Bh 44,250.00 51,850.00 45,650.00 50,650.00 53,500.00 51,500.00 70,150.00
Asbes Gelombang Kecil 240 cm x 105 cm x 4 mm Bh 50,000.00 61,850.00 51,000.00 58,750.00 61,250.00 58,500.00 79,000.00
Asbes Gelombang Kecil 270 cm x 105 cm x 4 mm Bh 76,200.00 69,250.00 75,950.00 74,200.00 81,400.00 80,700.00 91,700.00
Asbes Gelombang Kecil 300 cm x 105 cm x 4 mm Bh 68,250.00 56,000.00 72,400.00 67,500.00 66,450.00 69,250.00 75,750.00

Nok Kerpus Genteng Bh 32,250.00 38,050.00 34,500.00 37,000.00 28,500.00 34,000.00 33,000.00
Nok Stel Besar Bh 51,000.00 47,900.00 51,000.00 65,000.00 52,500.00 52,500.00 53,000.00
Nok Paten Besar Bh 41,000.00 53,250.00 41,000.00 44,500.00 41,000.00 41,500.00 41,000.00

Nokstel gelombang harflex Stel Besar Bh 48,750.00 56,450.00 50,250.00 50,750.00 52,500.00 50,750.00 49,500.00
Nokstel gelombang harflex Patent Besar Bh 25,250.00 31,650.00 26,500.00 26,000.00 24,250.00 24,000.00 29,000.00
Nokstel gelombang harflex Plat besar Bh 48,500.00 65,900.00 48,500.00 49,000.00 49,500.00 51,000.00 49,000.00

Asbes Plat 100cm x 100 cm x 3 mm Bh 17,500.00 18,000.00 16,250.00 17,500.00 16,000.00 18,000.00 18,000.00
Asbes Plat 100cm x 100 cm x 4 mm Bh 22,250.00 22,500.00 26,650.00 21,750.00 18,000.00 21,875.00 22,000.00
Asbes Plat 50 cm x 200 cm x 3 mm Bh 13,750.00 14,750.00 15,000.00 14,400.00 13,750.00 13,750.00 14,000.00
Asbes Plat 40 cm x 200 cm x 3 mm Bh 13,250.00 13,500.00 13,300.00 13,500.00 13,000.00 13,375.00 13,250.00

Fibre Glass (Jabes) 180 x 92 cm Bh 63,500.00 68,150.00 48,950.00 40,750.00 64,500.00 57,250.00 55,300.00
Fibre Glass (Jabes) 200 x 92 cm Bh 74,000.00 79,400.00 65,650.00 46,000.00 83,000.00 70,000.00 63,250.00
Fibre Glass (Jabes) 250 x 92 cm Bh 84,000.00 88,150.00 72,650.00 54,000.00 90,250.00 80,000.00 76,500.00
Fibre Glass (Jabes) 180 x 105 cm Bh 66,750.00 78,150.00 49,275.00 46,500.00 71,000.00 71,750.00 84,750.00
Fibre Glass (Jabes) 210 x 105 cm Bh 74,850.00 88,150.00 59,925.00 52,500.00 88,000.00 79,850.00 100,000.00
Fibre Glass (Jabes) 250 x 105 cm Bh 87,500.00 98,750.00 78,000.00 63,500.00 86,000.00 87,500.00 126,000.00

Seng Plat BJLS 0,18 lebar 55 cm m' 22,400.00 20,500.00 20,000.00 21,500.00 23,500.00 22,400.00 22,400.00
Seng Plat BJLS 0,20 lebar 55 cm m' 30,500.00 26,625.00 23,500.00 33,500.00 23,000.00 26,000.00 30,300.00
Seng Plat BJLS 0,28 lebar 55 cm m' 35,000.00 36,000.00 36,500.00 34,000.00 34,000.00 33,500.00 34,000.00
Seng Plat BJLS 0,30 lebar 55 cm m' 39,500.00 40,300.00 39,800.00 46,500.00 44,350.00 39,000.00 42,600.00

Seng Gelombang BJLS 0,18 panjang 180 cm Lbr 53,100.00 57,500.00 54,000.00 47,500.00 41,000.00 50,250.00 48,600.00
Seng Gelombang BJLS 0,20 panjang 180 cm Lbr 59,000.00 61,250.00 56,000.00 52,500.00 55,750.00 55,000.00 58,000.00
Seng Gelombang BJLS 0,30 panjang 180 cm Lbr 61,250.00 74,400.00 66,650.00 57,500.00 63,500.00 69,150.00 65,650.00
Seng Gelombang BJLS 0,40 panjang 180 cm Lbr 74,000.00 83,400.00 73,400.00 64,500.00 71,500.00 87,500.00 72,000.00

3 Bahan Kayu
Kayu Jati Papan m3 25,500,000.00 27,250,000.00 27,250,000.00 16,175,000.00 19,777,600.00 21,500,000.00 20,660,550.00
Kayu Jati Balok/pesagen m3 23,750,000.00 26,125,000.00 25,525,000.00 15,050,000.00 18,223,800.00 21,250,000.00 19,206,200.00

Kayu Kamper Papan m3 8,900,000.00 8,493,350.00 8,543,350.00 9,850,000.00 11,674,900.00 9,750,000.00 6,800,000.00
Kayu Kamper Balok/pesagen m3 7,900,000.00 8,812,500.00 7,750,000.00 9,200,000.00 10,796,450.00 7,550,000.00 6,150,000.00

Kayu Kruing Papan m3 7,050,000.00 7,051,250.00 7,101,250.00 7,000,000.00 8,649,850.00 6,137,500.00 5,350,000.00
Kayu Kruing Balok/pesagen m3 6,450,000.00 6,575,000.00 6,675,000.00 6,350,000.00 7,477,000.00 5,750,000.00 4,750,000.00

Kayu Meranti Papan m3 5,250,000.00 5,956,250.00 5,956,250.00 4,625,000.00 5,327,250.00 5,400,000.00 6,116,350.00
Kayu Meranti Balok/pesagen m3 4,900,000.00 5,343,750.00 5,393,750.00 4,400,000.00 4,400,000.00 5,050,000.00 3,750,000.00

Kayu Lanan Papan m3 2,473,750.00 2,554,150.00 2,354,150.00 2,473,750.00 2,950,000.00 2,473,750.00 2,548,750.00
Kayu Lanan Balok/pesagen m3 2,050,000.00 1,970,800.00 2,050,000.00 2,050,000.00 3,450,000.00 1,750,000.00 2,070,000.00

Kayu Bengkirai Papan m3 11,200,000.00 11,975,000.00 11,087,500.00 11,925,000.00 11,826,150.00 10,150,000.00 14,910,550.00
Kayu Bengkirai Balok/pesagen m3 10,300,000.00 13,225,000.00 9,962,500.00 11,350,000.00 12,576,150.00 10,725,000.00 13,469,200.00

Dolken Sedang 8 x 10 x 400 cm Btg 25,000.00 19,080.00 23,500.00 23,250.00 18,100.00 23,000.00 49,650.00
Dolken Kecil 6 x 7 x 400 cm Btg 20,500.00 22,000.00 21,000.00 16,750.00 20,500.00 21,000.00 19,000.00
Dolken Besar 10 x 12 x 400 cm Btg 36,000.00 35,000.00 49,000.00 26,500.00 27,500.00 34,000.00 32,500.00
Kayu cetakan m3 2,375,000.00 2,687,500.00 2,000,000.00 2,125,000.00 2,111,200.00 1,950,000.00 2,383,100.00
Kayu bakar m3 145,000.00 195,000.00 142,500.00 135,000.00 261,600.00 177,500.00 201,950.00
Bambu Btg 15,500.00 12,788.00 15,000.00 16,500.00 18,500.00 13,000.00 13,500.00
Seseg Bambu Lbr 40,000.00 40,000.00 40,000.00 40,000.00 40,000.00 40,000.00 40,000.00

D Penutup Dinding/Lantai
Ubin (Tegel Biasa) 30 x 30 cm Polos m2 36,000.00 37,650.00 37,000.00 40,500.00 33,000.00 34,000.00 37,000.00
Ubin (Tegel Biasa) 20 x 20 cm Polos m2 32,000.00 34,400.00 34,500.00 37,500.00 31,500.00 30,500.00 31,000.00
Ubin (Tegel Biasa) 30 x 30 cm Warna m2 40,000.00 40,650.00 40,000.00 44,500.00 35,000.00 35,500.00 42,500.00
Ubin (Tegel Biasa) 20 x 20 cm Warna m2 34,000.00 38,350.00 37,500.00 42,000.00 32,500.00 32,500.00 32,500.00
Ubin (Tegel Biasa) 30 x 30 cm Taraso m2 53,000.00 64,100.00 54,000.00 55,500.00 53,000.00 50,500.00 52,000.00

Ubin Porselin Lokal 11 x 11 putih dos 39,500.00 40,650.00 40,000.00 41,750.00 37,500.00 36,500.00 33,500.00
Ubin Porselin Lokal 11 x 11 warna dos 42,500.00 42,450.00 43,500.00 45,500.00 40,500.00 39,000.00 37,000.00
Ubin Porselin Lokal 15 x 15 putih dos 42,000.00 42,350.00 47,400.00 50,000.00 37,500.00 39,500.00 38,000.00
Ubin Porselin Lokal 15 x 15 warna dos 46,750.00 45,950.00 49,100.00 52,000.00 41,500.00 43,000.00 40,500.00

Mozaik Porselin 10 x 20 cm m2 56,500.00 59,750.00 56,000.00 53,500.00 55,000.00 51,000.00 56,500.00


Mozaik Porselin 15 x 15 cm m2 57,500.00 61,500.00 55,600.00 52,500.00 52,500.00 53,250.00 53,500.00
Mozaik Porselin 20 x 20 cm m2 54,000.00 57,500.00 56,850.00 54,500.00 55,500.00 53,750.00 60,000.00
Mozaik Porselin 20 x 25 cm m2 55,000.00 58,650.00 57,150.00 54,500.00 55,500.00 54,000.00 60,000.00

Keramik 30 x 30 cm m2 43,500.00 54,500.00 53,500.00 45,000.00 46,000.00 55,000.00 54,550.00


Keramik 20 x 20 cm m2 57,500.00 60,000.00 58,100.00 57,000.00 55,400.00 62,000.00 58,500.00
Keramik 33 x 33 cm m2 59,000.00 59,700.00 59,550.00 56,250.00 62,000.00 61,000.00 60,000.00
Keramik 25 x 25 cm m2 62,000.00 62,400.00 59,000.00 70,500.00 62,350.00 60,500.00 63,500.00
Keramik 15 x 20 cm m2 60,500.00 59,000.00 59,500.00 57,000.00 58,500.00 63,500.00 70,000.00

E Bahan Cetak / Precast


Buis Beton Ø 10 cm - 100 cm Bh 31,700.00 32,700.00 38,500.00 31,200.00 37,500.00 31,200.00 32,700.00
Buis Beton Ø 20 cm - 100 cm Bh 58,500.00 52,500.00 60,000.00 59,000.00 68,900.00 40,000.00 58,100.00
Buis Beton Ø 30 cm - 100 cm Bh 79,500.00 65,650.00 77,450.00 75,750.00 90,100.00 46,000.00 72,600.00
Buis Beton Ø 50 cm - 100 cm Bh 118,500.00 112,500.00 115,000.00 123,350.00 185,000.00 115,000.00 90,000.00
Buis Beton Ø 60 cm - 100 cm Bh 156,000.00 143,150.00 137,500.00 146,000.00 190,000.00 162,500.00 190,050.00
Buis Beton Ø 70 cm - 100 cm Bh 249,500.00 117,000.00 163,000.00 175,000.00 159,500.00 190,000.00 140,000.00
Buis Beton Ø 10 cm - 100 cm Bh 19,000.00 22,500.00 22,500.00 31,250.00 27,000.00 20,000.00 25,000.00
Buis Beton Ø 15 cm - 100 cm Bh 26,000.00 28,000.00 34,500.00 39,750.00 31,250.00 27,500.00 31,250.00
Buis Beton Ø 20 cm - 100 cm Bh 38,000.00 43,150.00 45,500.00 51,000.00 37,750.00 36,000.00 37,000.00
Buis Beton Ø 30 cm - 100 cm Bh 46,000.00 67,500.00 57,500.00 65,000.00 49,350.00 54,500.00 52,500.00
Buis Beton Ø 50 cm - 100 cm Bh 52,000.00 30,000.00 60,000.00 32,500.00 32,500.00 80,000.00 40,000.00

F Bahan Besi
Besi Beton Polos Kg 10,500.00 12,475.00 16,000.00 17,000.00 14,000.00 10,100.00 12,000.00
Besi Beton Prestress Kg 13,750.00 14,225.00 13,650.00 12,500.00 12,625.00 17,250.00 14,350.00
Besi Beton Ulir Kg 11,250.00 13,288.00 12,800.00 14,500.00 14,000.00 10,125.00 12,800.00

Besi Plat Strip Kg 15,875.00 15,038.00 14,250.00 16,475.00 16,625.00 15,000.00 15,150.00

Besi Profil Kg 14,250.00 15,750.00 17,550.00 14,350.00 13,200.00 13,250.00 14,700.00

Jaring-jaring Baja Diameter 4 - 15 Kg 14,600.00 14,550.00 15,600.00 14,875.00 23,100.00 15,700.00 14,900.00
Jaring-jaring Baja Diameter 6 - 15 Kg 15,000.00 15,250.00 15,250.00 15,500.00 20,060.00 15,750.00 14,600.00

Besi Siku L 40 x 40 x 4 Btg 222,575.00 222,575.00 112,800.00 139,200.00 222,575.00 223,300.00 222,575.00
Besi Siku L 50 x 50 x 5 Btg 345,375.00 345,375.00 177,700.00 217,375.00 345,375.00 346,500.00 345,375.00
Besi Siku L 60 x 60 x 6 Btg 498,875.00 498,875.00 277,650.00 334,875.00 413,562.50 500,500.00 498,875.00

Kawat bendrat Kg 19,500.00 21,450.00 19,350.00 20,250.00 20,500.00 19,400.00 21,600.00


Kawat Harmonika 12 x 45 mm m2 27,310.00 27,310.00 20,600.00 27,310.00 27,310.00 27,000.00 27,310.00
Kawat Harmonika 12 x 24 mm m2 25,225.00 25,225.00 23,250.00 25,225.00 25,225.00 23,725.00 25,225.00
Kawat Harmonika 14 x 30 mm m2 23,735.00 23,735.00 19,750.00 23,735.00 23,735.00 24,735.00 23,735.00
Kawat Harmonika 14 x 35 mm m2 22,700.00 22,700.00 18,250.00 22,700.00 22,700.00 23,450.00 22,700.00
Kawat Nyamuk Nylon m2 18,500.00 17,000.00 16,000.00 13,740.00 13,500.00 16,000.00 13,740.00
Kawat Kasa m2 13,000.00 17,000.00 14,750.00 17,000.00 17,000.00 21,000.00 17,000.00
Kawat Saringan pasir m2 14,000.00 17,500.00 15,300.00 14,825.00 15,250.00 14,000.00 15,825.00
Kawat loket m2 73,500.00 18,400.00 14,000.00 16,400.00 18,000.00 13,000.00 16,400.00
Kawat duri Rol 77,500.00 77,750.00 76,600.00 85,250.00 114,250.00 78,850.00 77,750.00
Kawat bronjong Kg 20,500.00 24,048.00 15,800.00 20,000.00 20,500.00 19,750.00 26,550.00

G Bahan Pipa
Pipa PVC SII SCJ , S - 12,5 (10 bar)
Pipa PVC DN 20 ( ½" ) AW JIS Btg 20,350.00 25,600.00 26,000.00 23,750.00 25,250.00 22,000.00 28,750.00
Pipa PVC DN 25 ( ¾" ) AW JIS Btg 28,500.00 34,350.00 32,775.00 31,000.00 33,500.00 31,000.00 37,500.00
Pipa PVC DN 32 ( 1" ) AW JIS Btg 39,850.00 46,100.00 42,000.00 41,000.00 43,000.00 37,500.00 57,050.00
Pipa PVC DN 40 ( 1½" ) Btg 47,500.00 107,250.00 64,175.00 56,300.00 61,750.00 56,500.00 69,750.00
Pipa PVC DN 63 ( 2" ) Btg 59,500.00 135,900.00 93,000.00 88,950.00 87,500.00 70,500.00 121,400.00
Pipa PVC DN 90 ( 3" ) Btg 95,000.00 276,750.00 142,150.00 175,250.00 152,500.00 118,000.00 69,562.50
Pipa PVC DN 110 ( 4" ) Btg 119,000.00 355,150.00 198,125.00 120,562.50 527,000.00 188,500.00 199,550.00
Pipa PVC DN 160 ( 6" ) Btg 350,000.00 885,550.00 615,000.00 305,000.00 508,500.00 415,000.00 426,650.00
Pipa PVC DN 200 ( 8" ) Btg 554,150.00 1,450,650.00 1,105,000.00 457,500.00 1,115,000.00 777,500.00 795,800.00
Pipa PVC DN 250 ( 10" ) Btg 465,800.00 2,293,000.00 1,745,000.00 1,040,800.00 1,650,000.00 815,800.00 1,152,000.00
Pipa PVC DN 315 ( 12" ) Btg 1,250,000.00 725,000.00 1,750,000.00 639,500.00 1,162,500.00 639,500.00 -

Pipa Medium A Galvanis - SII


Pipa Medium Galvanis 0,50" Btg 135,000.00 161,062.50 115,000.00 132,500.00 170,000.00 128,000.00 157,500.00
Pipa Medium Galvanis 0,75" Btg 175,000.00 205,565.00 140,000.00 160,000.00 200,000.00 161,500.00 205,000.00
Pipa Medium Galvanis 1" Btg 230,000.00 318,750.00 190,000.00 230,000.00 325,000.00 231,500.00 315,000.00
Pipa Medium Galvanis 1,25" Btg 290,000.00 382,500.00 422,500.00 307,500.00 397,500.00 380,000.00 400,000.00
Pipa Medium Galvanis 1,50" Btg 380,000.00 473,190.00 295,000.00 360,000.00 462,500.00 410,900.00 458,500.00
Pipa Medium Galvanis 2" Btg 400,000.00 641,002.50 377,500.00 605,000.00 377,500.00 494,000.00 602,500.00
Pipa Medium Galvanis 2,50" Btg 575,000.00 812,190.00 447,500.00 755,000.00 470,000.00 740,000.00 765,000.00
Pipa Medium Galvanis 3" Btg 1,010,000.00 1,059,627.50 672,500.00 997,500.00 617,500.00 698,500.00 1,010,000.00
Pipa Medium Galvanis 4" Btg 1,427,500.00 1,543,627.50 862,500.00 1,487,500.00 880,000.00 1,083,500.00 1,462,500.00
Pipa Medium Galvanis 5" Btg 1,902,500.00 2,282,315.00 1,625,000.00 1,975,000.00 2,000,000.00 1,905,000.00 1,962,500.00
Pipa Medium Galvanis 6" Btg - - 1,463,300.00 - - - -

H Bahan Langit-langit
Teak wood 90 x 210 x 3 mm Lbr 74,500.00 55,000.00 76,000.00 99,500.00 67,700.00 45,000.00 72,300.00
Teak wood 120 x 240 x 3 mm Lbr 87,500.00 84,400.00 101,250.00 131,000.00 92,350.00 87,500.00 94,000.00
Teak wood 90 x 210 x 4 mm Lbr 59,500.00 67,500.00 65,000.00 110,500.00 85,200.00 73,000.00 80,500.00
Teak wood 90 x 210 x 9 mm Lbr 155,000.00 156,900.00 155,000.00 151,000.00 150,000.00 137,500.00 162,300.00
Teak wood 90 x 210 x 12 mm Lbr 182,500.00 195,650.00 185,000.00 181,000.00 180,000.00 173,750.00 185,000.00
Teak wood 90 x 210 x 15 mm Lbr 232,500.00 256,250.00 240,000.00 236,000.00 227,500.00 235,000.00 235,000.00
Teak wood 90 x 210 x 18 mm Lbr 300,000.00 312,500.00 282,500.00 283,500.00 280,000.00 285,000.00 285,000.00
- - - - - - -
Tripleks 120 x 240 x 3 mm Lbr 51,500.00 57,500.00 59,000.00 64,850.00 52,500.00 56,000.00 57,400.00
Tripleks 120 x 240 x 4 mm Lbr 72,500.00 70,000.00 69,500.00 71,000.00 63,250.00 65,000.00 70,150.00
Tripleks 120 x 240 x 6 mm Lbr 78,000.00 84,400.00 81,250.00 88,500.00 74,100.00 75,000.00 88,950.00
- - - - - - -
Multipleks 120 x 240 x 9 mm Lbr 122,500.00 123,000.00 109,750.00 116,000.00 135,600.00 125,000.00 135,050.00
Multipleks 120 x 240 x 12 mm Lbr 159,500.00 170,650.00 157,500.00 149,500.00 187,500.00 155,000.00 181,700.00
Multipleks 120 x 240 x 15 mm Lbr 221,000.00 219,750.00 197,000.00 202,500.00 222,750.00 192,500.00 192,300.00
Multipleks 120 x 240 x 18 mm Lbr 250,000.00 264,400.00 223,300.00 226,000.00 230,000.00 220,000.00 215,800.00

Formika ukuran pintu Lbr 60,000.00 67,500.00 57,500.00 54,000.00 79,300.00 87,500.00 53,000.00

I Bahan Finishing
Kayu
Menie Kg 28,500.00 35,250.00 31,250.00 30,100.00 36,450.00 32,500.00 31,600.00
Dempul plamur Kg 33,000.00 36,800.00 27,650.00 26,050.00 20,650.00 35,250.00 30,700.00
Ambril/amplas Lbr 4,850.00 4,500.00 4,250.00 4,250.00 4,300.00 8,500.00 4,500.00
Batu Apung Kg 50,000.00 39,300.00 25,050.00 51,000.00 40,000.00 45,000.00 50,000.00
Cat Dasar Kg 35,750.00 46,250.00 69,500.00 78,050.00 44,400.00 45,000.00 78,550.00
Cat Kayu Ex. Emco Kg 57,500.00 77,300.00 65,300.00 64,000.00 63,000.00 63,000.00 64,000.00
Cat Kayu Ex. Yunior 66 (nippon paint) Kg 51,500.00 63,900.00 58,300.00 61,500.00 60,000.00 59,500.00 62,650.00
Cat Kayu Ex. Deculux Kg 66,500.00 104,950.00 56,650.00 42,500.00 67,500.00 65,500.00 66,500.00
Cat Kayu Ex. Siralax Ons 55,000.00 22,750.00 14,650.00 25,000.00 73,150.00 31,000.00 31,500.00
Spiritus Ltr 11,500.00 20,850.00 13,800.00 15,000.00 12,000.00 20,000.00 11,000.00
Plitur jadi Ltr 70,500.00 72,500.00 42,500.00 55,600.00 58,650.00 50,000.00 58,100.00

Tembok
Kalkarium kg 4,600.00 5,500.00 4,850.00 7,500.00 4,250.00 4,250.00 5,250.00
Kapur sirih kg 4,725.00 6,750.00 5,000.00 5,375.00 4,750.00 4,625.00 4,625.00
Plamur kg 38,500.00 39,800.00 28,500.00 41,250.00 16,750.00 19,000.00 22,750.00
Cat Tembok kg 28,000.00 43,050.00 24,500.00 72,000.00 75,000.00 22,000.00 28,950.00
Cat Tembok Ex. Sintex 5 kg 114,000.00 107,500.00 109,050.00 117,500.00 106,500.00 107,500.00 111,000.00
Cat Tembok Ex. Danabride 5 kg 125,000.00 118,500.00 110,000.00 122,500.00 120,000.00 117,500.00 122,500.00
Cat Tembok Ex. Catylac 5 kg 142,500.00 135,000.00 130,400.00 182,500.00 132,500.00 127,500.00 135,000.00
Cat Tembok Ex. Mowilex 2,50 kg 256,250.00 276,500.00 184,000.00 274,000.00 311,620.00 256,750.00 279,000.00

Besi
Menie kg 42,500.00 39,700.00 48,750.00 37,500.00 32,500.00 32,500.00 37,000.00
Cat mengkilat kg 58,000.00 72,900.00 63,150.00 55,850.00 59,250.00 50,000.00 53,600.00
Cat kg 52,000.00 53,500.00 55,000.00 50,000.00 46,500.00 47,000.00 44,350.00
Thinner A ltr 15,250.00 25,250.00 29,400.00 26,900.00 22,250.00 20,250.00 21,900.00
Minyak cat ltr 15,000.00 17,900.00 16,350.00 16,000.00 19,750.00 9,250.00 19,400.00
Thinner Super ltr 26,500.00 23,400.00 27,750.00 16,500.00 33,500.00 18,000.00 30,000.00
Residu (teer/aspal) drum 53,000.00 56,000.00 60,500.00 67,500.00 76,500.00 38,750.00 55,000.00

Fibre glass (tanki air) kapasitas 550 liter bh 1,075,000.00 1,150,000.00 1,028,300.00 1,025,000.00 1,075,000.00 1,012,500.00 1,075,000.00
Fibre glass (tanki air) kapasitas 1100 liter bh 1,700,000.00 1,975,000.00 1,633,300.00 1,650,000.00 1,875,000.00 1,675,000.00 1,725,000.00

Lem Aica Aibon kg 33,500.00 33,500.00 33,500.00 33,500.00 33,500.00 33,500.00 52,900.00
J Bahan Kaca
Kaca Polos 3 mm m2 89,250.00 92,500.00 81,850.00 107,500.00 84,100.00 87,500.00 93,500.00
Kaca Polos 5 mm m2 122,000.00 112,200.00 104,450.00 122,500.00 100,000.00 101,000.00 130,050.00

Kaca Es Kabur 3 mm m2 105,000.00 110,000.00 142,800.00 98,500.00 107,500.00 100,000.00 107,500.00


Kaca Es Kabur 5 mm m2 131,000.00 130,000.00 157,500.00 111,000.00 134,800.00 112,500.00 117,500.00

Kaca Ray Band 3 mm m2 96,250.00 96,250.00 87,800.00 117,500.00 92,500.00 92,000.00 96,250.00
Kaca Ray Band 5 mm m2 125,000.00 115,000.00 109,300.00 132,500.00 107,500.00 102,000.00 144,550.00

K Bahan Pengikat Kayu


Paku 1" s/d 4" kg 18,500.00 21,025.00 18,500.00 17,500.00 21,000.00 16,500.00 18,000.00
Paku payung kg 27,500.00 20,500.00 29,650.00 33,500.00 22,500.00 20,500.00 19,050.00
Paku sekrup kg 22,000.00 14,250.00 21,100.00 33,500.00 23,500.00 42,500.00 15,500.00
Paku beton kg 22,000.00 19,000.00 22,500.00 18,750.00 26,250.00 20,500.00 20,500.00
Mur Baut(kuda-kuda) kg 14,250.00 14,250.00 19,750.00 21,000.00 14,250.00 18,250.00 26,050.00
Ngakur Baut bh 12,900.00 12,900.00 14,250.00 13,900.00 13,500.00 15,500.00 13,750.00
Lem Kayu bh 19,000.00 19,000.00 15,000.00 14,250.00 19,000.00 19,500.00 19,000.00
Tali Ijuk m3 34,500.00 33,500.00 23,800.00 20,750.00 34,500.00 34,500.00 33,500.00

L Bahan Pompa
Pompa Air Tangan
Dragon buatan Indonesia bh 330,000.00 330,000.00 330,000.00 292,500.00 292,500.00 330,000.00 330,000.00

Pompa Air Listrik - - - - - - -


Pompa Air Listrik ex. Sanyo 100 watt bh 1,012,500.00 1,012,500.00 755,800.00 1,012,500.00 1,012,500.00 1,012,500.00 1,012,500.00
Pompa Air Listrik ex. Fuji 250 watt bh 1,475,000.00 1,475,000.00 1,209,150.00 1,475,000.00 1,475,000.00 1,475,000.00 1,475,000.00
Pompa Air Listrik ex. Shimizu 100 watt bh 480,000.00 480,000.00 471,250.00 480,000.00 480,000.00 480,000.00 480,000.00
Pompa Air Listrik ex. Shimizu 90 watt bh 365,000.00 365,000.00 375,000.00 365,000.00 365,000.00 365,000.00 365,000.00
Pompa Air Listrik ex. DAB 125 watt bh 375,000.00 375,000.00 375,000.00 375,000.00 375,000.00 375,000.00 375,000.00
Pompa Air Listrik ex. DAB 175 watt bh 437,500.00 437,500.00 438,750.00 437,500.00 437,500.00 437,500.00 725,000.00

M Bahan Lain-lain
Krei 25 mm m2 47,500.00 47,500.00 47,500.00 47,500.00 47,500.00 47,500.00 47,500.00
Sliding Pintu J4 bh 207,500.00 207,500.00 207,500.00 207,500.00 207,500.00 207,500.00 207,500.00
Naco per Daun bh 40,750.00 33,000.00 41,050.00 12,250.00 12,250.00 40,750.00 41,000.00
Rolling door Besi m2 312,500.00 353,150.00 312,500.00 312,500.00 312,500.00 337,500.00 312,500.00
Rolling door Almunium m2 260,000.00 396,250.00 252,500.00 252,500.00 252,500.00 315,000.00 252,500.00
Awning Almunium m2 217,500.00 217,500.00 217,500.00 217,500.00 217,500.00 217,500.00 217,500.00
Kusen Almunium 4" Putih m' 102,500.00 90,000.00 87,500.00 82,500.00 82,500.00 82,500.00 82,500.00
Besi Profil WF 150 x 75 x 5 x 7 x 12 btg 2,578,800.00 2,568,384.00 1,910,250.00 814,800.00 1,318,800.00 2,158,800.00 2,662,800.00
Aspal Ex Pertamina isi Net 160 kg drum 1,062,500.00 1,446,000.00 1,155,000.00 1,479,800.00 1,080,000.00 1,300,000.00 1,075,000.00
Hotmix Tebal = 4 Cm m2 67,500.00 67,500.00 68,750.00 68,750.00 67,500.00 68,750.00 68,750.00
Hotmix Tebal = 5 Cm m2 82,500.00 82,500.00 83,500.00 83,500.00 82,500.00 83,500.00 83,500.00
Hotmix Tebal = 6 Cm m2 97,500.00 97,500.00 98,500.00 98,500.00 97,500.00 98,500.00 98,500.00
Hotmix Tebal = 7 Cm m2 115,000.00 115,000.00 117,500.00 117,500.00 115,000.00 117,500.00 117,500.00
Binder Course ton 1,325,000.00 1,325,000.00 1,337,500.00 1,337,500.00 1,325,000.00 1,337,500.00 1,337,500.00
Wearing Course ton 1,375,000.00 1,375,000.00 1,425,000.00 1,425,000.00 1,375,000.00 1,425,000.00 1,425,000.00
Hot Roller Sheet ton 1,225,000.00 1,225,000.00 1,250,000.00 1,250,000.00 1,225,000.00 1,250,000.00 1,225,000.00
Sand Sheet ton 1,175,000.00 1,175,000.00 1,225,000.00 1,225,000.00 1,175,000.00 1,225,000.00 1,550,000.00
Sand Sheet Emulsi ton 1,525,000.00 1,525,000.00 1,550,000.00 1,550,000.00 1,525,000.00 1,550,000.00 1,550,000.00
Cold Mix ton 1,800,000.00 1,800,000.00 1,800,000.00 1,800,000.00 1,800,000.00 1,825,000.00 1,800,000.00
Prime / Tack Coard RC liter 6,800.00 6,750.00 6,800.00 7,100.00 8,450.00 7,100.00 7,100.00
Prime Coat MC liter 6,800.00 6,750.00 6,800.00 7,100.00 8,450.00 7,100.00 7,100.00
Prime / Tack Coat Emulsi liter 6,800.00 6,750.00 6,800.00 7,100.00 8,450.00 7,100.00 7,100.00
Cermin tebal 5 mm m2 280,000.00 233,150.00 287,500.00 300,000.00 250,000.00 231,250.00 275,000.00
Pagar BRC 90 A2 Lbr 300,000.00 262,500.00 280,000.00 277,500.00 187,500.00 225,000.00 204,750.00
Pagar BRC 120 A2 Lbr 339,999.50 362,500.00 300,800.00 387,500.00 237,500.00 315,000.00 235,450.00
Minyak Beton & bekisting Ltr 9,500.00 9,500.00 13,150.00 9,500.00 9,500.00 9,500.00 25,000.00
Pintu Lipat Besi m2 402,500.00 402,500.00 402,500.00 402,500.00 402,500.00 402,500.00 402,500.00
Sunscreen Allumunim m2 330,000.00 330,000.00 330,000.00 330,000.00 330,000.00 330,000.00 330,000.00
Allumunium Foil m2 7,750.00 7,750.00 8,600.00 7,750.00 7,750.00 7,750.00 7,750.00
Soda api kg 25,000.00 12,500.00 12,500.00 19,000.00 12,500.00 12,500.00 12,500.00
Sabun kg 12,000.00 12,000.00 12,500.00 20,000.00 12,000.00 12,000.00 12,000.00
Air m3 22,500.00 17,500.00 17,500.00 17,500.00 13,750.00 17,500.00 22,500.00
Koas Alang-alang ikat 2,750.00 2,250.00 1,625.00 2,500.00 1,625.00 2,250.00 2,500.00
Solar (Industri) ltr 8,050.00 8,300.00 6,700.00 8,300.00 7,100.00 8,300.00 8,750.00
Premium (Industri) ltr 7,850.00 7,950.00 7,850.00 7,850.00 6,500.00 7,950.00 7,950.00
Pelumas ltr 41,250.00 38,750.00 40,500.00 41,250.00 41,250.00 40,000.00 41,250.00
Paving block abu-abu 10 x 20 x 6 m2 57,000.00 57,000.00 95,000.00 80,000.00 61,500.00 85,000.00 85,000.00
Pagar BRC tinggi 1,20 m Ø 6 mm (lapis galvanis) Lbr - - - - 300,000.00 - -
Pagar BRC tinggi 1,50 m Ø 7 mm (lapis galvanis) Lbr - - - - - - -
Pagar BRC tinggi 1,75 m Ø 7 mm (lapis galvanis) Lbr - - - - - - -
Pagar BRC tinggi 1,90 m Ø 7 mm (lapis galvanis) Lbr - - - - - - -
Wiremesh Ø 5,5 mm Lbr - - - - - - -
Wiremesh Ø 6 mm Lbr 600,000.00 600,000.00 512,500.00 630,000.00 637,500.00 600,000.00 600,000.00
Wiremesh Ø 8 mm Lbr - - 710,000.00 780,000.00 65,000.00 - -
Wiremesh Ø 10 mm Lbr - - 1,025,000.00 1,225,000.00 860,000.00 - -
Kawat bronjong Ø 2,7 mm (2x1x0,5) Lbr 365,000.00 365,000.00 365,000.00 365,000.00 365,000.00 365,000.00 365,000.00
Kansteen 10 x 30 x 50 lbr - - 150,000.00 - - - -
Ready Mix K.225 m3 - - 870,000.00 - - - -
Ready Mix K.250 m3 - - 900,000.00 - - - -
Ready Mix K.300 m3 - - 975,000.00 - - - -
Batu Tempel Hitam m3 121,600.00 120,000.00 120,000.00 121,600.00 121,600.00 121,600.00 121,600.00
Batu Candi m3 - - - - -
Gebalan rumput m3 - - - - 32,500.00
Karung Plastik Bh 7,000.00 7,000.00 7,000.00 7,000.00 7,000.00 7,000.00 7,000.00
Tali Plastik m 750.00 750.00 750.00 750.00 750.00 750.00 750.00
Rambu Peringatan Ls 100,000.00 100,000.00 100,000.00 100,000.00 100,000.00 100,000.00 100,000.00
Perlengkapan Medis P3K Ls 100,000.00 100,000.00 100,000.00 100,000.00 100,000.00 100,000.00 100,000.00

N Bahan Bakar Minyak


Dexlite Ltr 15,000.00 15,000.00 15,000.00 15,000.00 15,000.00 15,000.00 15,000.00
Solar (Industri) ltr 8,050.00 8,300.00 6,700.00 8,300.00 7,100.00 8,300.00 8,750.00
Premium (Industri) ltr 7,850.00 7,950.00 7,850.00 7,850.00 6,500.00 7,950.00 7,950.00

Alat
Molen /Jam 200,000.00 200,000.00 200,000.00 200,000.00 200,000.00 200,000.00 200,000.00
Stamper/Pemadat /Jam 100,000.00 100,000.00 100,000.00 100,000.00 100,000.00 100,000.00 100,000.00
Mesin potong besi /Jam - - - - - - -
Pompa Beton /Jam - - - - - - -
Pompa Air /Jam - - - - - - -
Chainsaw /Jam 100,000.00 100,000.00 100,000.00 100,000.00 100,000.00 100,000.00 100,000.00
Jack hammer /Jam 50,000.00 50,000.00 50,000.00 50,000.00 50,000.00 50,000.00 50,000.00
Tripot /Jam - - - - - - -
Excavator /Jam 207,604.75 207,604.75 207,604.75 207,604.75 207,604.75 207,604.75 207,604.75
Bulldozer /Jam - - - - - - -
Mesin las listrik /Jam - - - - - - -
Baby roller /Jam - - - - - - -
Vibrator /Jam - - - - - - -
Dump Truck /Jam 77,218.43 77,218.43 77,218.43 77,218.43 77,218.43 77,218.43 77,218.43
Rental Mobil /Jam - - - - - - -
Waterpass /Jam 200,000.00 200,000.00 200,000.00 200,000.00 200,000.00 200,000.00 200,000.00
Theodolit /Jam - - - - - - -
Palu/Godem /Jam - - - - - - -
Pahat Beton /Jam - - - - - - -
Truck trailer Ls 8,000,000.00 8,000,000.00 8,000,000.00 8,000,000.00 8,000,000.00 8,000,000.00 8,000,000.00
Mesin Potong Rumput /Hari 50,000.00 50,000.00 50,000.00 50,000.00 50,000.00 50,000.00 50,000.00
Tripod /Hari 75,000.00 75,000.00 75,000.00 75,000.00 75,000.00 75,000.00 75,000.00
Alat Pancang /Hari 150,000.00 150,000.00 150,000.00 150,000.00 150,000.00 150,000.00 150,000.00
Ponton /Hari 250,000.00 250,000.00 250,000.00 250,000.00 250,000.00 250,000.00 250,000.00
Bor Listrik /Hari 50,000.00 50,000.00 50,000.00 50,000.00 50,000.00 50,000.00 50,000.00
Gergaji Listrik /Hari 50,000.00 50,000.00 50,000.00 50,000.00 50,000.00 50,000.00 50,000.00
Slepan /Hari 50,000.00 50,000.00 50,000.00 50,000.00 50,000.00 50,000.00 50,000.00
Generator set 5 KW /Hari 50,000.00 50,000.00 50,000.00 50,000.00 50,000.00 50,000.00 50,000.00
Las Listrik /Hari 50,000.00 50,000.00 50,000.00 50,000.00 50,000.00 50,000.00 50,000.00
Tripod tinggi 7m, max 3 ton /Hari 100,000.00 100,000.00 100,000.00 100,000.00 100,000.00 100,000.00 100,000.00
Bandul pancang 0,5 ton /Hari 50,000.00 50,000.00 50,000.00 50,000.00 50,000.00 50,000.00 50,000.00
- -
RENCANA ANGGARAN BIAYA
Kegiatan : Pengembangan dan Pengelolaan Sistem Irigasi Primer dan Sekunder pada Daerah Irigasi yang Luasnya 1000 Ha - 3000 Ha dan
Daerah Irigasi Lintas Daerah Kabupaten/Kota
Sub Kegiatan : Operasi dan Pemeliharaan Jaringan Irigasi Permukaan
Pekerjaan : Penataan Jaringan Irigasi ( 1 Paket Pemeliharaan Rutin Sal. Sek. .... D.I. ..... Kab. .... )
Lokasi : Desa …. Kecamatan …. Kabupaten Tegal
Tahun Anggaran : 2022

Harga Satuan (Rp.) Jumlah Harga (Rp.)


No Uraian Pekerjaan Volume Sat. Analisa
Upah Bahan Upah Bahan
1 2 3 4 5 6 7 8 =(3 x6) 9=(3 x7)
I Pekerjaan Persiapan
1 Manajemen K3 Err:504 Ls An.Hit.2 - 200,000.00 Err:504 Err:504

II Pekerjaan Tanah
1 Pek. Galian Tanah Biasa < 1m Err:504 m3 1.7.7.1.1.a (a) 50,670.00 - Err:504 Err:504
2 Pek. Galian tanah biasa > 1 m s.d. 2 m Err:504 m3 1.7.7.1.1.d.(a) 60,750.00 - Err:504 Err:504
3 Pek. Timbunan Atau Urugan Kembali Tanah Err:504 m3 1.7.14.b.(a) 9,000.00 136,500.00 Err:504 Err:504
Liat
4 Pek. Timbunan pasir Err:504 m3 1.7.14.e.(a) 28,620.00 408,000.00 Err:504 Err:504

III Pekerjaan Pasangan


1 Pek. Pas. batu kali 1 PC : 4 PP Err:504 m3 2.1.2.a.3.a.(a) 195,000.00 796,250.00 Err:504 Err:504
2 Pek. Pas. batu kali 1 PC : 4 PP (batu tersedia) Err:504 m3 2.1.2.a.3.a.1.(a) 195,000.00 580,250.00 Err:504 Err:504
3 Pek. Bongkar Pas. Batu Err:504 m3 2.1.2.a.5.a.(a) 126,000.00 - Err:504 Err:504
4 Pek. Pas. Bata Merah 1 PC : 4 PP Err:504 m3 2.1.3.3.a.(a) 202,500.00 735,775.00 Err:504 Err:504
5 Pek. Siaran 1 PC : 2 PP Err:504 m2 3.2.2.1.1.a. (a) 42,000.00 4,391.00 Err:504 Err:504
6 Pek. Plesteran Tbl. 1,5 cm 1 PC : 3 PP Err:504 m2 3.2.1.(c) 42,600.00 16,762.40 Err:504 Err:504
7 Pek. Acian Err:504 m2 3.2.2.2.35.(a) 21,000.00 3,737.50 Err:504 Err:504
8 Pek. Pas. batu kosong Err:504 m3 1.5.1.1.a.(a) 120,000.00 442,005.00 Err:504 Err:504
9 Pek. Pas. paving block tebal 6 cm Err:504 m2 A.4.4.3.63 82,500.00 259,840.00 Err:504 Err:504

IV Pekerjaan Bronjong
1 Pek. Pas. Bronjong Pabrikasi Err:504 m3 1.5.7.a.(a) 46,800.00 452,805.00 Err:504 Err:504
2 Pek. Bongkar Bronjong Err:504 m3 An. Hit. 90,000.00 - Err:504 Err:504

V Pekerjaan Beton
1 Pek. Beton B0, lantai kerja K.100 Err:504 m3 2.2.1.1.a.(a) 132,000.00 742,760.00 Err:504 Err:504
2 Pek. Beton mutu K.125 Err:504 m3 2.2.2.1.c.(a) 181,500.00 791,070.00 Err:504 Err:504
3 Pek. Beton mutu K.175 Err:504 m3 2.2.2.1.g.(a) 181,500.00 834,890.00 Err:504 Err:504
4 Pek. Pembesian dengan besi polos/ulir Err:504 Kg 2.2.6.1.b.(c) 1,347.50 18,153.75 Err:504 Err:504
5 Pek. Pembesian dengan jaring kawat Err:504 Kg 2.2.7.a.(a) 481.25 661,601.25 Err:504 Err:504
(wiremesh)
6 Pek. Bekisting lantai beton expose dg. Err:504 m2 B.11.a 57,750.00 45,528.00 Err:504 Err:504
multiplex 18 mm kaso 5/7 cm (tanpa
perancah)
7 Pek. Bekisting utk permukaan beton biasa Err:504 m2 B.11.b 28,250.00 35,736.00 Err:504 Err:504
dg. multiplex 12 mm atau 18 mm (tanpa
perancah)

8 Pek. Bekisting utk permukaan beton biasa Err:504 m2 B.11.c 28,250.00 46,257.50 Err:504 Err:504
dg. papan uk. 3/20 cm (tanpa perancah)
9 Pek. Perancah bekisting kaso 5/7 cm tinggi Err:504 m2 B.11.d 42,375.00 45,375.00 Err:504 Err:504
4m JAT < 60 cm
10 Pek. Beton Siklop 40% batu belah, 60% Err:504 m3 2.2.12.a.(a) 160,004.00 719,882.67 Err:504 Err:504
beton K.175 ( manual )

VI Pekerjaan Lain-lain
1 Pek. Pas. Kistdam Karung Untuk Tanggul Err:504 Bh 1.2.1.a.(c) 3,600.00 8,500.00 Err:504 Err:504
2 Pek. Pas. Rangka Kistdam Karung Untuk Tangg Err:504 m3 1.2.2.(c) 9,000.00 48,587.50 Err:504 Err:504
3 Pek. Pas. Seseg Bambu Err:504 m2 An.Hit.3 11,925.00 45,984.50 Err:504 Err:504
4 Pek. Pas. dan penetrasi tiang pancang Err:504 m' 2.2.13.b.(a) 11,220.00 25,575.00 Err:504 Err:504
dolken ø 6-8 cm

Jumlah Err:504 Err:504


PPN 11% Err:504 Err:504
Total Err:504 Err:504
Dibulatkan Err:504 Err:504
VII Pekerjaan Galian Mekanis
1 Pek. Mobilisasi dan Demobilisasi Err:504 Unit An.Hit.1 2,300,000.00 - Err:504 Err:504
2 Pek. Galian Tanah Mekanis dan urug posisi Err:504 m3 TM.02.3.a 1,873.43 8,081.70 Err:504 Err:504
dekat
3 Pek. Galian Tanah Mekanis dan urug posisi Err:504 m3 TM.02.3.b 2,329.93 10,050.98 Err:504 Err:504
Jauh
4 Pek. Angkutan Tanah Biasa menggunakan Err:504 m3 TM.01.2.a.1.(a) 4,211.43 15,972.00 Err:504 Err:504
DT untuk Jarak 1 Km

Jumlah Err:504 Err:504


PPN 11% - -
Total Err:504 Err:504
Dibulatkan Err:504 Err:504

1. Upah Err:504
2. Bahan Err:504
3. Alat Err:504
Jumlah Total Err:504

Terbilang : Err:504

Tegal, Agustus 2022

Mengetahui, Tim Persiapan,


Kepala Balai Pengelolaan Sumber Daya Air Pemali Comal
Selaku Pejabat Pembuat Komitmen 1. YUDI ISKANDAR, S.T, M.PSDA. ……………………..
NIP. 19830227 201001 1 015

2. RISTOPO S.H. ……………………..


NIP. 19700807 200604 1 005

Ir. RADITO, M.T, 3. ANUNG VERI NANDIKA S.T, ……………………..


NIP. 19661221 199102 1 001 NIP. 19930120 202203 1 005
DAFTAR HARGA UPAH, BAHAN DAN ALAT
SWAKELOLA
DAERAH KABUPATEN TEGAL
TAHUN 2022

No. Uraian Upah, Bahan dan Alat Sat. Harga (Rp.)

I Upah
Pekerja Oh 90,000.00
Pekerja tak terlatih Oh 72,500.00
Mandor Oh 106,875.00
Buruh semi terlatih Oh 77,500.00
Tukang listrik / Buruh terlatih Oh 102,500.00
Tukang Kayu Oh 102,500.00
Kepala tukang kayu Oh 107,500.00
Tukang batu Oh 120,000.00
Kepala tukang batu Oh 107,500.00
Tukang besi Oh 102,500.00
Kepala tukang besi Oh 107,500.00
Tukang cat Oh 102,500.00
Kepala tukang cat Oh 107,500.00
Tukang plitur Oh 102,500.00
Tukang jalan Oh 82,500.00
Tukang gali Oh 82,500.00
Tukang masak aspal Oh 82,500.00
Tukang leideng Oh 102,500.00
Masinis Oh 140,000.00
Pembantu masinis Oh 70,000.00
Penjaga api Oh 70,000.00
Penjaga malam Oh 85,000.00
Sopir Oh 160,000.00
Pembantu sopir Oh 85,000.00
Juru ukur Oh 162,500.00
Pembantu juru ukur Oh 117,500.00
Operator alat berat Oh 225,000.00
Pembantu operator Oh 100,000.00
Pekerja (Penjaga alat) Ls 2,300,000.00
- -
II Bahan
1 Bahan Dasar
Batu Kali Bulat Utuh m3 236,100.00
Batu Kali Bulat Belah m3 360,000.00
Batu Kali Pecah 10/15 m3 255,250.00
Batu Kali Pecah 5/7 m3 270,000.00
Batu Kali Pecah 3/5 m3 279,000.00
Kerikil Timbun m3 155,000.00
Kerikil Sawur / Koral m3 177,500.00
Kerikil Beton 0,5/1 m3 266,000.00
Kerikil Beton 1/2 m3 340,000.00
Kerikil Beton m3 292,500.00
Kerikil Biasa m3 160,000.00
Kerikil Tras Giling m3 262,500.00
Batu Bata ex lokal Bh 975.00

Pasir Urug m3 171,500.00


Pasir Pasang m3 340,000.00
Pasir Beton m3 370,000.00
Tanah Padas m3 97,500.00
Tanah Liat m3 97,500.00
Kapur Pasang m3 302,500.00
Kapur Semen Merah m3 182,500.00

Portland Cement Merk I 40 kg Zak 45,750.00


Portland Cement Merk I 50 kg Zak 57,500.00
Portland Cement Merk II 40 kg Zak 46,000.00
Portland Cement Merk II 50 kg Zak 55,500.00
Portland Cement Semen Putih 40 kg Zak 87,500.00
Portland Cement Semen Putih 50 kg Zak 91,000.00
Portland Cement Semen warna Kg 8,687.50

2 Bahan Penutup Atap


Sirap (100 lbr) Pak 182,500.00

Genteng Beton Warna standard Bh 5,700.00


Genteng Beton Warna Special Bh 7,350.00
Genteng Beton Warna Khusus Bh 6,900.00
Kerpus Beton Warna Standard Bh 6,400.00
Kerpus Beton Warna Special Bh 7,625.00
Kerpus Beton Warna Khusus Bh 10,350.00

Genteng Tanah Liat Vlaam/Plentong Bh 1,500.00


Genteng Tanah Liat Kodok Bh 2,650.00
Genteng Tanah Liat Kodok Glasur Bh 4,500.00
Genteng Tanah Liat Nok kerpus Kodok Bh 5,250.00
Genteng Tanah Liat Nok kerpus Kodok Glasur Bh 9,350.00
Genteng Tanah Liat Plentong super besar 18 bh/m2 Bh 4,750.00
Genteng Tanah Liat Nok kerpus plentong super Bh 8,000.00

Asbes Gelombang Besar 200 cm x 102 cm x 5 mm Bh 84,500.00


Asbes Gelombang Besar 225 cm x 102 cm x 5 mm Bh 91,450.00
Asbes Gelombang Besar 250 cm x 102 cm x 5 mm Bh 102,200.00
Asbes Gelombang Besar 200 cm x 102 cm x 6 mm Bh 86,950.00
Asbes Gelombang Besar 225 cm x 102 cm x 6 mm Bh 91,800.00
Asbes Gelombang Besar 250 cm x 102 cm x 6 mm Bh 102,700.00

Asbes Gelombang Kecil 150 cm x 105 cm x 4 mm Bh 41,150.00


Asbes Gelombang Kecil 180 cm x 105 cm x 4 mm Bh 48,400.00
Asbes Gelombang Kecil 210 cm x 105 cm x 4 mm Bh 50,650.00
Asbes Gelombang Kecil 240 cm x 105 cm x 4 mm Bh 58,750.00
Asbes Gelombang Kecil 270 cm x 105 cm x 4 mm Bh 74,200.00
Asbes Gelombang Kecil 300 cm x 105 cm x 4 mm Bh 67,500.00

Nok Kerpus Genteng Bh 37,000.00


Nok Stel Besar Bh 65,000.00
Nok Paten Besar Bh 44,500.00

Nokstel gelombang harflex Stel Besar Bh 50,750.00


Nokstel gelombang harflex Patent Besar Bh 26,000.00
Nokstel gelombang harflex Plat besar Bh 49,000.00

Asbes Plat 100cm x 100 cm x 3 mm Bh 17,500.00


Asbes Plat 100cm x 100 cm x 4 mm Bh 21,750.00
Asbes Plat 50 cm x 200 cm x 3 mm Bh 14,400.00
Asbes Plat 40 cm x 200 cm x 3 mm Bh 13,500.00

Fibre Glass (Jabes) 180 x 92 cm Bh 40,750.00


Fibre Glass (Jabes) 200 x 92 cm Bh 46,000.00
Fibre Glass (Jabes) 250 x 92 cm Bh 54,000.00
Fibre Glass (Jabes) 180 x 105 cm Bh 46,500.00
Fibre Glass (Jabes) 210 x 105 cm Bh 52,500.00
Fibre Glass (Jabes) 250 x 105 cm Bh 63,500.00

Seng Plat BJLS 0,18 lebar 55 cm m' 21,500.00


Seng Plat BJLS 0,20 lebar 55 cm m' 33,500.00
Seng Plat BJLS 0,28 lebar 55 cm m' 34,000.00
Seng Plat BJLS 0,30 lebar 55 cm m' 46,500.00

Seng Gelombang BJLS 0,18 panjang 180 cm Lbr 47,500.00


Seng Gelombang BJLS 0,20 panjang 180 cm Lbr 52,500.00
Seng Gelombang BJLS 0,30 panjang 180 cm Lbr 57,500.00
Seng Gelombang BJLS 0,40 panjang 180 cm Lbr 64,500.00
3 Bahan Kayu
Kayu Jati Papan m3 16,175,000.00
Kayu Jati Balok/pesagen m3 15,050,000.00

Kayu Kamper Papan m3 9,850,000.00


Kayu Kamper Balok/pesagen m3 9,200,000.00

Kayu Kruing Papan m3 7,000,000.00


Kayu Kruing Balok/pesagen m3 6,350,000.00

Kayu Meranti Papan m3 4,625,000.00


Kayu Meranti Balok/pesagen m3 4,400,000.00

Kayu Lanan Papan m3 2,473,750.00


Kayu Lanan Balok/pesagen m3 2,050,000.00

Kayu Bengkirai Papan m3 11,925,000.00


Kayu Bengkirai Balok/pesagen m3 11,350,000.00

Dolken Sedang 8 x 10 x 400 cm Btg 23,250.00


Dolken Kecil 6 x 7 x 400 cm Btg 16,750.00
Dolken Besar 10 x 12 x 400 cm Btg 26,500.00
Kayu cetakan m3 2,125,000.00
Kayu bakar m3 135,000.00
Bambu Btg 16,500.00
Seseg Bambu Lbr 40,000.00

4 Penutup Dinding/Lantai
Ubin (Tegel Biasa) 30 x 30 cm Polos m2 40,500.00
Ubin (Tegel Biasa) 20 x 20 cm Polos m2 37,500.00
Ubin (Tegel Biasa) 30 x 30 cm Warna m2 44,500.00
Ubin (Tegel Biasa) 20 x 20 cm Warna m2 42,000.00
Ubin (Tegel Biasa) 30 x 30 cm Taraso m2 55,500.00

Ubin Porselin Lokal 11 x 11 putih dos 41,750.00


Ubin Porselin Lokal 11 x 11 warna dos 45,500.00
Ubin Porselin Lokal 15 x 15 putih dos 50,000.00
Ubin Porselin Lokal 15 x 15 warna dos 52,000.00

Mozaik Porselin 10 x 20 cm m2 53,500.00


Mozaik Porselin 15 x 15 cm m2 52,500.00
Mozaik Porselin 20 x 20 cm m2 54,500.00
Mozaik Porselin 20 x 25 cm m2 54,500.00

Keramik 30 x 30 cm m2 45,000.00
Keramik 20 x 20 cm m2 57,000.00
Keramik 33 x 33 cm m2 56,250.00
Keramik 25 x 25 cm m2 70,500.00
Keramik 15 x 20 cm m2 57,000.00

5 Bahan Cetak / Precast


Buis Beton Ø 10 cm - 100 cm Bh 31,200.00
Buis Beton Ø 20 cm - 100 cm Bh 59,000.00
Buis Beton Ø 30 cm - 100 cm Bh 75,750.00
Buis Beton Ø 50 cm - 100 cm Bh 123,350.00
Buis Beton Ø 60 cm - 100 cm Bh 146,000.00
Buis Beton Ø 70 cm - 100 cm Bh 175,000.00
Buis Beton Ø 10 cm - 100 cm Bh 31,200.00
Buis Beton Ø 15 cm - 100 cm Bh 39,750.00
Buis Beton Ø 20 cm - 100 cm Bh 59,000.00
Buis Beton Ø 30 cm - 100 cm Bh 75,750.00
Buis Beton Ø 50 cm - 100 cm Bh 123,350.00

6 Bahan Besi
Besi Beton Polos Kg 17,000.00
Besi Beton Prestress Kg 12,500.00
Besi Beton Ulir Kg 14,500.00

Besi Plat Strip Kg 16,475.00

Besi Profil Kg 14,350.00

Jaring-jaring Baja Diameter 4 - 15 Kg 14,875.00


Jaring-jaring Baja Diameter 6 - 15 Kg 15,500.00

Besi Siku L 40 x 40 x 4 Btg 139,200.00


Besi Siku L 50 x 50 x 5 Btg 217,375.00
Besi Siku L 60 x 60 x 6 Btg 334,875.00

Kawat bendrat Kg 20,250.00


Kawat Harmonika 12 x 45 mm m2 27,310.00
Kawat Harmonika 12 x 24 mm m2 25,225.00
Kawat Harmonika 14 x 30 mm m2 23,735.00
Kawat Harmonika 14 x 35 mm m2 22,700.00
Kawat Nyamuk Nylon m2 13,740.00
Kawat Kasa m2 17,000.00
Kawat Saringan pasir m2 14,825.00
Kawat loket m2 16,400.00
Kawat duri Rol 85,250.00
Kawat bronjong Kg 20,000.00

7 Bahan Pipa
Pipa PVC SII SCJ , S - 12,5 (10 bar)
Pipa PVC DN 20 ( ½" ) AW JIS Btg 23,750.00
Pipa PVC DN 25 ( ¾" ) AW JIS Btg 31,000.00
Pipa PVC DN 32 ( 1" ) AW JIS Btg 41,000.00
Pipa PVC DN 40 ( 1½" ) Btg 56,300.00
Pipa PVC DN 63 ( 2" ) Btg 88,950.00
Pipa PVC DN 90 ( 3" ) Btg 175,250.00
Pipa PVC DN 110 ( 4" ) Btg 120,562.50
Pipa PVC DN 160 ( 6" ) Btg 305,000.00
Pipa PVC DN 200 ( 8" ) Btg 457,500.00
Pipa PVC DN 250 ( 10" ) Btg 1,040,800.00
Pipa PVC DN 315 ( 12" ) Btg 639,500.00

Pipa Medium A Galvanis - SII


Pipa Medium Galvanis 0,50" Btg 132,500.00
Pipa Medium Galvanis 0,75" Btg 160,000.00
Pipa Medium Galvanis 1" Btg 230,000.00
Pipa Medium Galvanis 1,25" Btg 307,500.00
Pipa Medium Galvanis 1,50" Btg 360,000.00
Pipa Medium Galvanis 2" Btg 605,000.00
Pipa Medium Galvanis 2,50" Btg 755,000.00
Pipa Medium Galvanis 3" Btg 997,500.00
Pipa Medium Galvanis 4" Btg 1,487,500.00
Pipa Medium Galvanis 5" Btg 1,975,000.00
Pipa Medium Galvanis 6" Btg -

8 Bahan Langit-langit
Teak wood 90 x 210 x 3 mm Lbr 99,500.00
Teak wood 120 x 240 x 3 mm Lbr 131,000.00
Teak wood 90 x 210 x 4 mm Lbr 110,500.00
Teak wood 90 x 210 x 9 mm Lbr 151,000.00
Teak wood 90 x 210 x 12 mm Lbr 181,000.00
Teak wood 90 x 210 x 15 mm Lbr 236,000.00
Teak wood 90 x 210 x 18 mm Lbr 283,500.00

Tripleks 120 x 240 x 3 mm Lbr 64,850.00


Tripleks 120 x 240 x 4 mm Lbr 71,000.00
Tripleks 120 x 240 x 6 mm Lbr 88,500.00

Multipleks 120 x 240 x 9 mm Lbr 116,000.00


Multipleks 120 x 240 x 12 mm Lbr 149,500.00
Multipleks 120 x 240 x 15 mm Lbr 202,500.00
Multipleks 120 x 240 x 18 mm Lbr 226,000.00

Formika ukuran pintu Lbr 54,000.00

9 Bahan Finishing
Kayu
Menie Kg 30,100.00
Dempul plamur Kg 26,050.00
Ambril/amplas Lbr 4,250.00
Batu Apung Kg 51,000.00
Cat Dasar Kg 78,050.00
Cat Kayu Ex. Emco Kg 64,000.00
Cat Kayu Ex. Yunior 66 (nippon paint) Kg 61,500.00
Cat Kayu Ex. Deculux Kg 42,500.00
Cat Kayu Ex. Siralax Ons 25,000.00
Spiritus Ltr 15,000.00
Plitur jadi Ltr 55,600.00

Tembok
Kalkarium kg 7,500.00
Kapur sirih kg 5,375.00
Plamur kg 41,250.00
Cat Tembok kg 72,000.00
Cat Tembok Ex. Sintex 5 kg 117,500.00
Cat Tembok Ex. Danabride 5 kg 122,500.00
Cat Tembok Ex. Catylac 5 kg 182,500.00
Cat Tembok Ex. Mowilex 2,50 kg 274,000.00

Besi
Menie kg 37,500.00
Cat mengkilat kg 55,850.00
Cat kg 50,000.00
Thinner A ltr 26,900.00
Minyak cat ltr 16,000.00
Thinner Super ltr 16,500.00
Residu (teer/aspal) drum 67,500.00

Fibre glass (tanki air) kapasitas 550 liter bh 1,025,000.00


Fibre glass (tanki air) kapasitas 1100 liter bh 1,650,000.00

Lem Aica Aibon kg 33,500.00

10 Bahan Kaca
Kaca Polos 3 mm m2 107,500.00
Kaca Polos 5 mm m2 122,500.00

Kaca Es Kabur 3 mm m2 98,500.00


Kaca Es Kabur 5 mm m2 111,000.00

Kaca Ray Band 3 mm m2 117,500.00


Kaca Ray Band 5 mm m2 132,500.00

11 Bahan Pengikat Kayu


Paku 1" s/d 4" kg 17,500.00
Paku payung kg 33,500.00
Paku sekrup kg 33,500.00
Paku beton kg 18,750.00
Mur Baut(kuda-kuda) kg 21,000.00
Ngakur Baut bh 13,900.00
Lem Kayu bh 14,250.00
Tali Ijuk m3 20,750.00

12 Bahan Pompa
Pompa Air Tangan
Dragon buatan Indonesia bh 292,500.00
Pompa Air Listrik
Pompa Air Listrik ex. Sanyo 100 watt bh 1,012,500.00
Pompa Air Listrik ex. Fuji 250 watt bh 1,475,000.00
Pompa Air Listrik ex. Shimizu 100 watt bh 480,000.00
Pompa Air Listrik ex. Shimizu 90 watt bh 365,000.00
Pompa Air Listrik ex. DAB 125 watt bh 375,000.00
Pompa Air Listrik ex. DAB 175 watt bh 437,500.00

13 Bahan Lain-lain
Krei 25 mm m2 47,500.00
Sliding Pintu J4 bh 207,500.00
Naco per Daun bh 12,250.00
Rolling door Besi m2 312,500.00
Rolling door Almunium m2 252,500.00
Awning Almunium m2 217,500.00
Kusen Almunium 4" Putih m' 82,500.00
Besi Profil WF 150 x 75 x 5 x 7 x 12 btg 814,800.00
Aspal Ex Pertamina isi Net 160 kg drum 1,479,800.00
Hotmix Tebal = 4 Cm m2 68,750.00
Hotmix Tebal = 5 Cm m2 83,500.00
Hotmix Tebal = 6 Cm m2 98,500.00
Hotmix Tebal = 7 Cm m2 117,500.00
Binder Course ton 1,337,500.00
Wearing Course ton 1,425,000.00
Hot Roller Sheet ton 1,250,000.00
Sand Sheet ton 1,225,000.00
Sand Sheet Emulsi ton 1,550,000.00
Cold Mix ton 1,800,000.00
Prime / Tack Coard RC liter 7,100.00
Prime Coat MC liter 7,100.00
Prime / Tack Coat Emulsi liter 7,100.00
Cermin tebal 5 mm m2 300,000.00
Pagar BRC 90 A2 Lbr 277,500.00
Pagar BRC 120 A2 Lbr 387,500.00
Minyak Beton & bekisting Ltr 9,500.00
Pintu Lipat Besi m2 402,500.00
Sunscreen Allumunim m2 330,000.00
Allumunium Foil m2 7,750.00
Soda api kg 19,000.00
Sabun kg 20,000.00
Air m3 17,500.00
Koas Alang-alang ikat 2,500.00
Pelumas ltr 41,250.00
Paving block abu-abu 10 x 20 x 6 m2 80,000.00
Pagar BRC tinggi 1,20 m Ø 6 mm (lapis galvanis) Lbr -
Pagar BRC tinggi 1,50 m Ø 7 mm (lapis galvanis) Lbr -
Pagar BRC tinggi 1,75 m Ø 7 mm (lapis galvanis) Lbr -
Pagar BRC tinggi 1,90 m Ø 7 mm (lapis galvanis) Lbr -
Wiremesh Ø 5,5 mm Lbr -
Wiremesh Ø 6 mm Lbr 630,000.00
Wiremesh Ø 8 mm Lbr 780,000.00
Wiremesh Ø 10 mm Lbr 1,225,000.00
Kawat bronjong Ø 2,7 mm (2x1x0,5) Lbr 365,000.00
Kansteen 10 x 30 x 50 lbr -
Ready Mix K.225 m3 -
Ready Mix K.250 m3 -
Ready Mix K.300 m3 -
Batu Tempel Hitam m3 121,600.00
Batu Candi m3 -
Gebalan rumput m3 -
Karung Plastik Bh 7,000.00
Tali Plastik m 750.00
Rambu Peringatan Ls 100,000.00
Perlengkapan Medis P3K Ls 100,000.00
- -
14 Bahan Bakar Minyak
Dexlite Ltr 15,000.00
Solar (Industri) ltr 8,300.00
Premium (Industri) ltr 7,850.00
- -
III Alat
Molen /Hari 200,000.00
Stamper/Pemadat /Hari 100,000.00
Mesin potong besi /Hari -
Pompa Beton /Hari -
Pompa Air /Hari -
Chainsaw /Hari 100,000.00
Jack hammer /Hari 50,000.00
Tripot /Hari -
Excavator /Jam 207,604.75
Bulldozer /Hari -
Mesin las listrik /Hari -
Baby roller /Hari -
Vibrator /Hari -
Dump Truck /Jam 77,218.43
Rental Mobil /Hari -
Waterpass /Hari 200,000.00
Theodolit /Hari -
Palu/Godem /Hari -
Pahat Beton /Hari -
Truck trailer Ls 8,000,000.00
Mesin Potong Rumput /Hari 50,000.00
Tripod /Hari 75,000.00
Alat Pancang /Hari 150,000.00
Ponton /Hari 250,000.00
Bor Listrik /Hari 50,000.00
Gergaji Listrik /Hari 50,000.00
Slepan /Hari 50,000.00
Generator set 5 KW /Hari 50,000.00
Las Listrik /Hari 50,000.00
Tripod tinggi 7m, max 3 ton /Hari 100,000.00
Bandul pancang 0,5 ton /Hari 50,000.00
- -

REKAPITULASI HARGA SATUAN PEKERJAAN


(PERMEN PU & PR RI NO. 1 TAHUN 2022)

Harga Satuan
( Rp. )
No. Kode Analisa Uraian Sat.
Tenaga Kerja Bahan Alat

1 1.7.7.1.1.a (a) Galian tanah biasa (manual) sedalam < 1 m m3 50,670.00 - -


2 1.7.7.1.1.d.(a) Galian tanah biasa (manual) sedalam > 1 m m3 60,750.00 - -
s.d. 2 m
3 1.7.14.b.(a) Timbunan Atau Urugan Kembali Tanah Liat m3 9,000.00 136,500.00 -

4 1.7.14.e.(a) Timbunan pasir m3 28,620.00 408,000.00 -


5 2.1.2.a.3.a.(a) Pasangan batu kali dengan Mortar fc' = 5,2 m3 195,000.00 796,250.00 -
Mpa setara 1 PC : 4 PP (manual),
6 2.1.2.a.3.a.1.(a) Pasangan batu kali dengan 1 PC : 4 PP (batu m3 195,000.00 580,250.00 -
tersedia)
7 2.1.2.a.5.a.(a) Bongkar pasangan batu (manual) m3 126,000.00 - -
8 2.1.3.3.a.(a) Pasangan Bata Merah dengan Mortar tipe N, m3 202,500.00 735,775.00 -
fc’ = 5,2 MPa (setara 1 PC : 4 PP)
9 3.2.2.1.1.a. (a) Siaran 1 PC : 2 PP m2 42,000.00 4,391.00 -
10 3.2.1.(c) Plesteran tebal 1,5 cm dengan 1 PC : 3 PP m2 42,600.00 16,762.40 -
11 3.2.2.2.35.(a) Pekerjaan Acian m2 21,000.00 3,737.50 -
12 1.5.1.1.a.(a) Pasangan batu kosong m3 120,000.00 442,005.00 -
13 1.5.7.a.(a) Bronjong kawat Pabrikasi m3 46,800.00 452,805.00 -
14 A.4.4.3.63 Pemasangan paving block natural tebal 6 cm m2 82,500.00 259,840.00 -

15 An. Hit. Bongkaran bronjong m3 90,000.00 - -


16 2.2.1.1.a.(a) Beton B0, untuk lantai kerja (bedding) K100 m3 132,000.00 742,760.00 -

17 2.2.2.1.c.(a) Beton mutu K.125 ( manual ) m3 181,500.00 791,070.00 -


18 2.2.2.1.g.(a) Beton mutu K.175 ( manual ) m3 181,500.00 834,890.00 -
19 2.2.6.1.b.(c) Pembesian dengan besi polos/ulir Kg 1,347.50 18,153.75 -
20 2.2.7.a.(a) Pembesian dengan jaring kawat (wiremesh) Kg 481.25 661,601.25 -
21 B.11.a Bekisting lantai beton expose dg. multiplex m2 57,750.00 45,528.00 -
18 mm kaso 5/7 cm (tanpa perancah)
22 B.11.b Bekisting utk permukaan beton biasa dg. m2 28,250.00 35,736.00 -
multiplex 12 mm atau 18 mm (tanpa
23 B.11.c perancah)
Bekisting utk permukaan beton biasa dg. m2 28,250.00 46,257.50 -
papan uk. 3/20 cm (tanpa perancah)
24 B.11.d Perancah bekisting kaso 5/7 cm tinggi 4m m2 42,375.00 45,375.00 -
JAT < 60 cm
25 2.2.12.a.(a) Beton Siklop 40% batu belah, 60% m3 160,004.00 719,882.67 -
beton( K.175 ) ( manual )
26 1.2.1.a.(c) kistdam pasir/tanah dibungkus karung Bh 3,600.00 8,500.00 -
plastik bagor
27 1.2.2.(c) Kerangka kayu/bambu untuk kistdam m3 9,000.00 48,587.50 -
pasir/tanah
28 TM.02.3.a Galian Tanah Mekanis dan urug posisi dekat m3 1,873.43 8,081.70 6,560.31

29 TM.02.3.b Galian Tanah Mekanis dan urug posisi Jauh m3 2,329.93 10,050.98 8,158.87

30 TM.01.2.a.1.(a) Angkutan Tanah Biasa menggunakan DT m3 4,211.43 15,972.00 6,795.22


untuk Jarak 1 Km
31 An.Hit.1 Mobilisasi dan Demobilisasi Ls 2,300,000.00 - 8,000,000.00
32 An.Hit.2 Sistem Manajemen K3 Ls - 200,000.00 -
33 An.Hit.3 Pasangan 1 lapis Seseg Bambu, JAT< 1,2 m' m2 11,925.00 45,984.50 -

34 2.2.13.b.(a) Pasangan dan penetrasi tiang pancang kayu m' 11,220.00 25,575.00 4,290.00
atau dolken ø 6-8 cm

ANALISA HARGA SATUAN PEKERJAAN


(PERMEN PU & PR RI NO. 1 TAHUN 2022)

Pekerjaan : Penataan Jaringan Irigasi ( 1 Paket Pemeliharaan Rutin Sal. Sek. .... D.I. ..... Kab. .... )
Item Pekerjaan : Galian tanah biasa (manual) sedalam < 1 m
Analisa : AHSP Permen PUPR No. 1 Tahun 2022
Satuan : m3
Harga Satuan : Rp 50,670.00

1.7.7.1.1.a (a) 1 m3 Galian tanah biasa (manual) sedalam < 1 m


Harga Satuan Jumlah
No. Uraian Kode Sat. Koefesien
(Rp.) (Rp.)
1 2 3 4 5 6 7
A Tenaga Kerja
1 Pekerja L.01 Oh 0.5630 90,000.00 50,670.00
Jumlah Harga Tenaga Kerja 50,670.00
B Bahan
Jumlah Harga Bahan -
C Alat
Jumlah Harga Alat -
D Jumlah Tenaga Kerja, Bahan dan Peralatan (A + B + C) 50,670.00
E Overhead & Profit (0% x D ) -
F Harga Satuan Pekerjaan per - 1 m3 (D+E) 50,670.00

Pekerjaan : Penataan Jaringan Irigasi ( 1 Paket Pemeliharaan Rutin Sal. Sek. .... D.I. ..... Kab. .... )
Item Pekerjaan : Galian tanah biasa (manual) sedalam > 1 m s.d. 2 m
Analisa : AHSP Permen PUPR No. 1 Tahun 2022
Satuan : m3
Harga Satuan : Rp 60,750.00

1.7.7.1.1.d.(a) 1 m3 Galian tanah biasa (manual) sedalam > 1 m s.d. 2 m


Harga Satuan Jumlah
No. Uraian Kode Sat. Koefesien
(Rp.) (Rp.)
1 2 3 4 5 6 7
A Tenaga Kerja
1 Pekerja L.01 Oh 0.6750 90,000.00 60,750.00
Jumlah Harga Tenaga Kerja 60,750.00
B Bahan
Jumlah Harga Bahan -
C Alat
Jumlah Harga Alat -
D Jumlah Tenaga Kerja, Bahan dan Peralatan (A + B + C) 60,750.00
E Overhead & Profit (0% x D ) -
F Harga Satuan Pekerjaan per - 1 m3 (D+E) 60,750.00

Pekerjaan : Penataan Jaringan Irigasi ( 1 Paket Pemeliharaan Rutin Sal. Sek. .... D.I. ..... Kab. .... )
Item Pekerjaan : Timbunan atau urugan kembali tanah liat
Analisa : AHSP Permen PUPR No. 1 Tahun 2022
Satuan : m3
Harga Satuan : Rp 145,500.00

1.7.14.b.(a) 1 m3 Timbunan atau urugan kembali tanah liat


Harga Satuan Jumlah
No. Uraian Kode Sat. Koefesien
(Rp.) (Rp.)
1 2 3 4 5 6 7
A Tenaga Kerja
1 Pekerja L.01 Oh 0.1000 90,000.00 9,000.00
Jumlah Harga Tenaga Kerja 9,000.00
B Bahan
1 Tanah Liat M.08.d.2 m3 1.4000 97,500.00 136,500.00
Jumlah Harga Bahan 136,500.00
C Alat
Jumlah Harga Alat -
D Jumlah Tenaga Kerja, Bahan dan Peralatan (A + B + C) 145,500.00
E Overhead & Profit (0% x D ) -
F Harga Satuan Pekerjaan per - 1 m3 (D+E) 145,500.00

Pekerjaan : Penataan Jaringan Irigasi ( 1 Paket Pemeliharaan Rutin Sal. Sek. .... D.I. ..... Kab. .... )
Item Pekerjaan : Timbunan pasir
Analisa : AHSP Permen PUPR No. 1 Tahun 2022
Satuan : m3
Harga Satuan : Rp 436,620.00

1.7.14.e.(a) 1 m3 Timbunan pasir


Harga Satuan Jumlah
No. Uraian Kode Sat. Koefesien
(Rp.) (Rp.)
1 2 3 4 5 6 7
A Tenaga Kerja
1 Pekerja L.01 Oh 0.3180 90,000.00 28,620.00
Jumlah Harga Tenaga Kerja 28,620.00
B Bahan
1 Pasir Pasang M.05.b.2 m3 1.2000 340,000.00 408,000.00
Jumlah Harga Bahan 408,000.00
C Alat
Jumlah Harga Alat -
D Jumlah Tenaga Kerja, Bahan dan Peralatan (A + B + C) 436,620.00
E Overhead & Profit (0% x D ) -
F Harga Satuan Pekerjaan per - 1 m3 (D+E) 436,620.00

Pekerjaan : Penataan Jaringan Irigasi ( 1 Paket Pemeliharaan Rutin Sal. Sek. .... D.I. ..... Kab. .... )
Item Pekerjaan : Pasangan batu kali dengan Mortar fc' = 5,2 Mpa setara 1 PC : 4 PP (manual),
Analisa : AHSP Permen PUPR No. 1 Tahun 2022
Satuan : m3
Harga Satuan : Rp 991,250.00

2.1.2.a.3.a.(a) 1 m3 Pasangan batu kali dengan Mortar fc' = 5,2 Mpa setara 1 PC : 4 PP (manual),
Harga Satuan Jumlah
No. Uraian Kode Sat. Koefesien
(Rp.) (Rp.)
1 2 3 4 5 6 7
A Tenaga Kerja
1 Pekerja L.01 Oh 1.5000 90,000.00 135,000.00
2 Tukang Batu L.02 Oh 0.5000 120,000.00 60,000.00
Jumlah Harga Tenaga Kerja 195,000.00
B Bahan
1 Batu Kali Bulat Belah M.03.c.3 m3 1.2000 360,000.00 432,000.00
2 Pasir Pasang M.05.b.3 m3 0.5200 340,000.00 176,800.00
3 Portland Cement Merk I 50 kg M.23 Zak 3.2600 57,500.00 187,450.00
Jumlah Harga Bahan 796,250.00
C Alat
Jumlah Harga Alat -
D Jumlah Tenaga Kerja, Bahan dan Peralatan (A + B + C) 991,250.00
E Overhead & Profit (0% x D ) -
F Harga Satuan Pekerjaan per - 1 m3 (D+E) 991,250.00

Pekerjaan : Penataan Jaringan Irigasi ( 1 Paket Pemeliharaan Rutin Sal. Sek. .... D.I. ..... Kab. .... )
Item Pekerjaan : Pasangan batu kali dengan 1 PC : 4 PP (batu tersedia)
Analisa : AHSP Permen PUPR No. 1 Tahun 2022
Satuan : m3
Harga Satuan : Rp 775,250.00

2.1.2.a.3.a.1.(a) 1 m3 Pasangan batu kali dengan 1 PC : 4 PP (batu tersedia)


Harga Satuan Jumlah
No. Uraian Kode Sat. Koefesien
(Rp.) (Rp.)
1 2 3 4 5 6 7
A Tenaga Kerja
1 Pekerja L.01 Oh 1.5000 90,000.00 135,000.00
2 Tukang Batu L.02 Oh 0.5000 120,000.00 60,000.00
Jumlah Harga Tenaga Kerja 195,000.00
B Bahan
1 Batu Kali Bulat Belah (tersedia) - m3 0.6000 - -
2 Batu Kali Bulat Belah M.03.c.3 m3 0.6000 360,000.00 216,000.00
3 Pasir Pasang M.05.b.3 m3 0.5200 340,000.00 176,800.00
4 Portland Cement Merk I 50 kg M.23 Zak 3.2600 57,500.00 187,450.00
Jumlah Harga Bahan 580,250.00
C Alat
Jumlah Harga Alat -
D Jumlah Tenaga Kerja, Bahan dan Peralatan (A + B + C) 775,250.00
E Overhead & Profit (0% x D ) -
F Harga Satuan Pekerjaan per - 1 m3 (D+E) 775,250.00

Pekerjaan : Penataan Jaringan Irigasi ( 1 Paket Pemeliharaan Rutin Sal. Sek. .... D.I. ..... Kab. .... )
Item Pekerjaan : Bongkar pasangan batu (manual)
Analisa : AHSP Permen PUPR No. 1 Tahun 2022
Satuan : m3
Harga Satuan : Rp 126,000.00

2.1.2.a.5.a.(a) 1 m3 Bongkar pasangan batu (manual)


Harga Satuan Jumlah
No. Uraian Kode Sat. Koefesien
(Rp.) (Rp.)
1 2 3 4 5 6 7
A Tenaga Kerja
1 Pekerja L.01 Oh 1.4000 90,000.00 126,000.00
Jumlah Harga Tenaga Kerja 126,000.00
B Bahan
Jumlah Harga Bahan -
C Alat
Jumlah Harga Alat -
D Jumlah Tenaga Kerja, Bahan dan Peralatan (A + B + C) 126,000.00
E Overhead & Profit (0% x D ) -
F Harga Satuan Pekerjaan per - 1 m3 (D+E) 126,000.00

Pekerjaan : Penataan Jaringan Irigasi ( 1 Paket Pemeliharaan Rutin Sal. Sek. .... D.I. ..... Kab. .... )
Item Pekerjaan : Pasangan Bata Merah dengan Mortar tipe N, fc’ = 5,2 MPa (setara 1 PC : 4 PP)
Analisa : AHSP Permen PUPR No. 1 Tahun 2022
Satuan : m3
Harga Satuan : Rp 938,275.00

2.1.3.3.a.(a) 1 m3 Pasangan Bata Merah dengan Mortar tipe N, fc’ = 5,2 MPa (setara 1 PC : 4 PP)
Harga Satuan Jumlah
No. Uraian Kode Sat. Koefesien
(Rp.) (Rp.)
1 2 3 4 5 6 7
A Tenaga Kerja
1 Pekerja L.01 Oh 1.3500 90,000.00 121,500.00
2 Tukang Batu L.02 Oh 0.6750 120,000.00 81,000.00
Jumlah Harga Tenaga Kerja 202,500.00
B Bahan
1 Batu Bata ex lokal M.25.c Bh 500.0000 975.00 487,500.00
2 Portland Cement Merk I 50 kg M.23 Zak 2.1300 57,500.00 122,475.00
3 Pasir Pasang M.05.b.3 m3 0.3700 340,000.00 125,800.00
Jumlah Harga Bahan 735,775.00
C Alat
Jumlah Harga Alat -
D Jumlah Tenaga Kerja, Bahan dan Peralatan (A + B + C) 938,275.00
E Overhead & Profit (0% x D ) -
F Harga Satuan Pekerjaan per - 1 m3 (D+E) 938,275.00

Pekerjaan : Penataan Jaringan Irigasi ( 1 Paket Pemeliharaan Rutin Sal. Sek. .... D.I. ..... Kab. .... )
Item Pekerjaan : Siaran 1 PC : 2 PP
Analisa : AHSP Permen PUPR No. 1 Tahun 2022
Satuan : m2
Harga Satuan : Rp 46,391.00

3.2.2.1.1.a. (a) 1 m2 Siaran 1 PC : 2 PP


Harga Satuan Jumlah
No. Uraian Kode Sat. Koefesien
(Rp.) (Rp.)
1 2 3 4 5 6 7
A Tenaga Kerja
1 Pekerja L.01 Oh 0.2000 90,000.00 18,000.00
2 Tukang Batu L.02 Oh 0.2000 120,000.00 24,000.00
Jumlah Harga Tenaga Kerja 42,000.00
B Bahan
1 Pasir Pasang M.05.b.3 m3 0.0050 340,000.00 1,700.00
2 Portland Cement Merk I 50 kg M.23 Zak 0.0468 57,500.00 2,691.00
Jumlah Harga Bahan 4,391.00
C Alat
Jumlah Harga Alat -
D Jumlah Tenaga Kerja, Bahan dan Peralatan (A + B + C) 46,391.00
E Overhead & Profit (0% x D ) -
F Harga Satuan Pekerjaan per - 1 m2 (D+E) 46,391.00

Pekerjaan : Penataan Jaringan Irigasi ( 1 Paket Pemeliharaan Rutin Sal. Sek. .... D.I. ..... Kab. .... )
Item Pekerjaan : Plesteran tebal 1,5 cm dengan 1 PC : 3 PP
Analisa : AHSP Permen PUPR No. 1 Tahun 2022
Satuan : m2
Harga Satuan : Rp 59,362.40

3.2.1.(c) 1 m2 Plesteran tebal 1,5 cm dengan 1 PC : 3 PP


Harga Satuan Jumlah
No. Uraian Kode Sat. Koefesien
(Rp.) (Rp.)
1 2 3 4 5 6 7
A Tenaga Kerja
1 Pekerja L.01 Oh 0.3000 90,000.00 27,000.00
2 Tukang Batu L.02 Oh 0.1300 120,000.00 15,600.00
Jumlah Harga Tenaga Kerja 42,600.00
B Bahan
1 Pasir Pasang M.05.b.3 m3 0.0230 340,000.00 7,820.00
2 Portland Cement Merk I 50 kg M.23 Zak 0.1555 57,500.00 8,942.40
Jumlah Harga Bahan 16,762.40
C Alat
Jumlah Harga Alat -
D Jumlah Tenaga Kerja, Bahan dan Peralatan (A + B + C) 59,362.40
E Overhead & Profit (0% x D ) -
F Harga Satuan Pekerjaan per - 1 m2 (D+E) 59,362.40

Pekerjaan : Penataan Jaringan Irigasi ( 1 Paket Pemeliharaan Rutin Sal. Sek. .... D.I. ..... Kab. .... )
Item Pekerjaan : Pekerjaan Acian
Analisa : AHSP Permen PUPR No. 1 Tahun 2022
Satuan : m2
Harga Satuan : Rp 24,737.50

3.2.2.2.35.(a) 1 m2 Pekerjaan Acian


Harga Satuan Jumlah
No. Uraian Kode Sat. Koefesien
(Rp.) (Rp.)
1 2 3 4 5 6 7
A Tenaga Kerja
1 Pekerja L.01 Oh 0.1000 90,000.00 9,000.00
2 Tukang Batu L.02 Oh 0.1000 120,000.00 12,000.00
Jumlah Harga Tenaga Kerja 21,000.00
B Bahan
1 Portland Cement Merk I 50 kg M.23 Zak 0.0650 57,500.00 3,737.50
Jumlah Harga Bahan 3,737.50
C Alat
Jumlah Harga Alat -
D Jumlah Tenaga Kerja, Bahan dan Peralatan (A + B + C) 24,737.50
E Overhead & Profit (0% x D ) -
F Harga Satuan Pekerjaan per - 1 m2 (D+E) 24,737.50

Pekerjaan : Penataan Jaringan Irigasi ( 1 Paket Pemeliharaan Rutin Sal. Sek. .... D.I. ..... Kab. .... )
Item Pekerjaan : Pasangan batu kosong
Analisa : AHSP Permen PUPR No. 1 Tahun 2022
Satuan : m3
Harga Satuan : Rp 562,005.00

1.5.1.1.a.(a) 1 m3 Pasangan batu kosong


Harga Satuan Jumlah
No. Uraian Kode Sat. Koefesien
(Rp.) (Rp.)
1 2 3 4 5 6 7
A Tenaga Kerja
1 Pekerja L.01 Oh 0.8000 90,000.00 72,000.00
2 Tukang Batu L.02 Oh 0.4000 120,000.00 48,000.00
Jumlah Harga Tenaga Kerja 120,000.00
B Bahan
1 Batu Kali Bulat Utuh M.04.a.3 m3 1.2500 236,100.00 295,125.00
2 Pasir Pasang M.05.b.3 m3 0.4320 340,000.00 146,880.00
Jumlah Harga Bahan 442,005.00
C Alat
Jumlah Harga Alat -
D Jumlah Tenaga Kerja, Bahan dan Peralatan (A + B + C) 562,005.00
E Overhead & Profit (0% x D ) -
F Harga Satuan Pekerjaan per - 1 m3 (D+E) 562,005.00

Pekerjaan : Penataan Jaringan Irigasi ( 1 Paket Pemeliharaan Rutin Sal. Sek. .... D.I. ..... Kab. .... )
Item Pekerjaan : Bronjong kawat Pabrikasi
Analisa : AHSP Permen PUPR No. 1 Tahun 2022
Satuan : m3
Harga Satuan : Rp 499,605.00

1.5.7.a.(a) 1 m3 Bronjong kawat Pabrikasi


Harga Satuan Jumlah
No. Uraian Kode Sat. Koefesien
(Rp.) (Rp.)
1 2 3 4 5 6 7
A Tenaga Kerja
1 Pekerja L.01 Oh 0.3600 90,000.00 32,400.00
3 Tukang Batu L.02 Oh 0.1200 120,000.00 14,400.00
Jumlah Harga Tenaga Kerja 46,800.00
B Bahan
1 Batu Kali Bulat Utuh M.04.a.3 m3 1.2500 236,100.00 295,125.00
2 Kawat bronjong Ø 2,7 mm (2x1x0,5) M.05.b.3 m3 0.4320 365,000.00 157,680.00
Jumlah Harga Bahan 452,805.00
C Alat
Jumlah Harga Alat -
D Jumlah Tenaga Kerja, Bahan dan Peralatan (A + B + C) 499,605.00
E Overhead & Profit (0% x D ) -
F Harga Satuan Pekerjaan per - 1 m3 (D+E) 499,605.00

Pekerjaan : Penataan Jaringan Irigasi ( 1 Paket Pemeliharaan Rutin Sal. Sek. .... D.I. ..... Kab. .... )
Item Pekerjaan : Pemasangan paving block natural tebal 6 cm
Analisa : AHSP Permen PUPR No. 1 Tahun 2022
Satuan : m2
Harga Satuan : Rp 342,340.00

A.4.4.3.63 1 m2 Pemasangan paving block natural tebal 6 cm


Harga Satuan Jumlah
No. Uraian Kode Sat. Koefesien
(Rp.) (Rp.)
1 2 3 4 5 6 7
A Tenaga Kerja
1 Pekerja L.01 Oh 0.2500 90,000.00 22,500.00
3 Tukang Batu L.02 Oh 0.5000 120,000.00 60,000.00
Jumlah Harga Tenaga Kerja 82,500.00
B Bahan
1 Paving block abu-abu 10 x 20 x 6 - m3 1.2500 80,000.00 100,000.00
2 Pasir Beton - m3 0.4320 370,000.00 159,840.00
Jumlah Harga Bahan 259,840.00
C Alat
Jumlah Harga Alat -
D Jumlah Tenaga Kerja, Bahan dan Peralatan (A + B + C) 342,340.00
E Overhead & Profit (0% x D ) -
F Harga Satuan Pekerjaan per - 1 m2 (D+E) 342,340.00

Pekerjaan : Penataan Jaringan Irigasi ( 1 Paket Pemeliharaan Rutin Sal. Sek. .... D.I. ..... Kab. .... )
Item Pekerjaan : Bongkaran bronjong
Analisa : AHSP Permen PUPR No. 1 Tahun 2022
Satuan : m3
Harga Satuan : Rp 90,000.00

An. Hit. 1 m3 Bongkaran bronjong


Harga Satuan Jumlah
No. Uraian Kode Sat. Koefesien
(Rp.) (Rp.)
1 2 3 4 5 6 7
A Tenaga Kerja
1 Pekerja L.01 Oh 1.0000 90,000.00 90,000.00
Jumlah Harga Tenaga Kerja 90,000.00
B Bahan
Jumlah Harga Bahan -
C Alat
Jumlah Harga Alat -
D Jumlah Tenaga Kerja, Bahan dan Peralatan (A + B + C) 90,000.00
E Overhead & Profit (0% x D ) -
F Harga Satuan Pekerjaan per - 1 m3 (D+E) 90,000.00

Pekerjaan : Penataan Jaringan Irigasi ( 1 Paket Pemeliharaan Rutin Sal. Sek. .... D.I. ..... Kab. .... )
Item Pekerjaan : Beton B0, untuk lantai kerja (bedding) K100
Analisa : AHSP Permen PUPR No. 1 Tahun 2022
Satuan : m3
Harga Satuan : Rp 874,760.00

2.2.1.1.a.(a) 1 m3 Beton B0, untuk lantai kerja (bedding) K100


Harga Satuan Jumlah
No. Uraian Kode Sat. Koefesien
(Rp.) (Rp.)
1 2 3 4 5 6 7
A Tenaga Kerja
1 Pekerja L.01 Oh 1.2000 90,000.00 108,000.00
2 Tukang Batu L.02 Oh 0.2000 120,000.00 24,000.00
Jumlah Harga Tenaga Kerja 132,000.00
B Bahan
1 Portland Cement Merk I 50 kg M.23 Zak 4.5400 57,500.00 261,050.00
2 Pasir Beton M.05.a.3 m3 0.6210 370,000.00 229,770.00
3 Kerikil Beton 1/2 M.04.d.3 m3 0.7410 340,000.00 251,940.00
Jumlah Harga Bahan 742,760.00
C Alat
Jumlah Harga Alat -
D Jumlah Tenaga Kerja, Bahan dan Peralatan (A + B + C) 874,760.00
E Overhead & Profit (0% x D ) -
F Harga Satuan Pekerjaan per - 1 m3 (D+E) 874,760.00

Pekerjaan : Penataan Jaringan Irigasi ( 1 Paket Pemeliharaan Rutin Sal. Sek. .... D.I. ..... Kab. .... )
Item Pekerjaan : Beton mutu K.125 ( manual )
Analisa : AHSP Permen PUPR No. 1 Tahun 2022
Satuan : m3
Harga Satuan : Rp 972,570.00

2.2.2.1.c.(a) 1 m3 Beton mutu K.125 ( manual )


Harga Satuan Jumlah
No. Uraian Kode Sat. Koefesien
(Rp.) (Rp.)
1 2 3 4 5 6 7
A Tenaga Kerja
1 Pekerja L.01 Oh 1.6500 90,000.00 148,500.00
2 Tukang Batu L.02 Oh 0.2750 120,000.00 33,000.00
Jumlah Harga Tenaga Kerja 181,500.00
B Bahan
1 Portland Cement Merk I 50 kg M.23 Zak 5.5200 57,500.00 317,400.00
2 Pasir Beton M.05.a.3 m3 0.5910 370,000.00 218,670.00
3 Kerikil Beton 1/2 M.04.d.3 m3 0.7500 340,000.00 255,000.00
Jumlah Harga Bahan 791,070.00
C Alat
Jumlah Harga Alat -
D Jumlah Tenaga Kerja, Bahan dan Peralatan (A + B + C) 972,570.00
E Overhead & Profit (0% x D ) -
F Harga Satuan Pekerjaan per - 1 m3 (D+E) 972,570.00

Pekerjaan : Penataan Jaringan Irigasi ( 1 Paket Pemeliharaan Rutin Sal. Sek. .... D.I. ..... Kab. .... )
Item Pekerjaan : Beton mutu K.175 ( manual )
Analisa : AHSP Permen PUPR No. 1 Tahun 2022
Satuan : m3
Harga Satuan : Rp 1,016,390.00

2.2.2.1.g.(a) 1 m3 Beton mutu K.175 ( manual )


Harga Satuan Jumlah
No. Uraian Kode Sat. Koefesien
(Rp.) (Rp.)
1 2 3 4 5 6 7
A Tenaga Kerja
1 Pekerja L.01 Oh 1.6500 90,000.00 148,500.00
2 Tukang Batu L.02 Oh 0.2750 120,000.00 33,000.00
Jumlah Harga Tenaga Kerja 181,500.00
B Bahan
1 Portland Cement Merk I 50 kg M.23 Zak 6.5200 57,500.00 374,900.00
2 Pasir Beton M.05.a.3 m3 0.5430 370,000.00 200,910.00
3 Kerikil Beton 1/2 M.04.d.3 m3 0.7620 340,000.00 259,080.00
Jumlah Harga Bahan 834,890.00
C Alat
Jumlah Harga Alat -
D Jumlah Tenaga Kerja, Bahan dan Peralatan (A + B + C) 1,016,390.00
E Overhead & Profit (0% x D ) -
F Harga Satuan Pekerjaan per - 1 m3 (D+E) 1,016,390.00

Pekerjaan : Penataan Jaringan Irigasi ( 1 Paket Pemeliharaan Rutin Sal. Sek. .... D.I. ..... Kab. .... )
Item Pekerjaan : Pembesian dengan besi polos/ulir
Analisa : AHSP Permen PUPR No. 1 Tahun 2022
Satuan : Kg
Harga Satuan : Rp 19,501.25

2.2.6.1.b.(c) 1 Kg Pembesian dengan besi polos/ulir


Harga Satuan Jumlah
No. Uraian Kode Sat. Koefesien
(Rp.) (Rp.)
1 2 3 4 5 6 7
A Tenaga Kerja
1 Pekerja L.01 Oh 0.0070 90,000.00 630.00
2 Tukang Besi L.02 Oh 0.0070 102,500.00 717.50
Jumlah Harga Tenaga Kerja 1,347.50
B Bahan
1 Besi Beton Polos M.60.d Kg 1.0500 17,000.00 17,850.00
2 Kawat Bendrat M.27 Kg 0.0150 20,250.00 303.75
Jumlah Harga Bahan 18,153.75
C Alat
Jumlah Harga Alat -
D Jumlah Tenaga Kerja, Bahan dan Peralatan (A + B + C) 19,501.25
E Overhead & Profit (0% x D ) -
F Harga Satuan Pekerjaan per - 1 Kg (D+E) 19,501.25

Pekerjaan : Penataan Jaringan Irigasi ( 1 Paket Pemeliharaan Rutin Sal. Sek. .... D.I. ..... Kab. .... )
Item Pekerjaan : Pembesian dengan jaring kawat (wiremesh)
Analisa : AHSP Permen PUPR No. 1 Tahun 2022
Satuan : Kg
Harga Satuan : Rp 662,082.50

2.2.7.a.(a) 1 Kg Pembesian dengan jaring kawat (wiremesh)


Harga Satuan Jumlah
No. Uraian Kode Sat. Koefesien
(Rp.) (Rp.)
1 2 3 4 5 6 7
A Tenaga Kerja
1 Pekerja L.01 Oh 0.0025 90,000.00 225.00
2 Tukang Besi L.02 Oh 0.0025 102,500.00 256.25
Jumlah Harga Tenaga Kerja 481.25
B Bahan
1 Wiremesh Ø 6 mm M.60.d Kg 1.0500 630,000.00 661,500.00
2 Kawat Bendrat M.27 Kg 0.0050 20,250.00 101.25
Jumlah Harga Bahan 661,601.25
C Alat
Jumlah Harga Alat -
D Jumlah Tenaga Kerja, Bahan dan Peralatan (A + B + C) 662,082.50
E Overhead & Profit (0% x D ) -
F Harga Satuan Pekerjaan per - 1 Kg (D+E) 662,082.50

Pekerjaan : Penataan Jaringan Irigasi ( 1 Paket Pemeliharaan Rutin Sal. Sek. .... D.I. ..... Kab. .... )
Item Pekerjaan : Bekisting lantai beton expose dg. multiplex 18 mm kaso 5/7 cm (tanpa perancah)
Analisa : AHSP Permen PUPR No. 1 Tahun 2022
Satuan : m2
Harga Satuan : Rp 103,278.00

B.11.a 1 m2 Bekisting lantai beton expose dg. multiplex 18 mm kaso 5/7 cm (tanpa perancah)
Harga Satuan Jumlah
No. Uraian Kode Sat. Koefesien
(Rp.) (Rp.)
1 2 3 4 5 6 7
A Tenaga Kerja
1 Pekerja L.01 Oh 0.3000 90,000.00 27,000.00
2 Tukang Kayu L.02 Oh 0.3000 102,500.00 30,750.00
Jumlah Harga Tenaga Kerja 57,750.00
B Bahan
1 Multipleks 120 x 240 x 18 mm - Lbr 0.1280 226,000.00 28,928.00
2 Kayu cetakan - m3 0.0060 2,125,000.00 12,750.00
3 Paku 1" s/d 4" - Kg 0.2200 17,500.00 3,850.00
Jumlah Harga Bahan 45,528.00
C Alat
Jumlah Harga Alat -
D Jumlah Tenaga Kerja, Bahan dan Peralatan (A + B + C) 103,278.00
E Overhead & Profit (0% x D ) -
F Harga Satuan Pekerjaan per - 1 m2 (D+E) 103,278.00

Pekerjaan : Penataan Jaringan Irigasi ( 1 Paket Pemeliharaan Rutin Sal. Sek. .... D.I. ..... Kab. .... )
Item Pekerjaan : Bekisting utk permukaan beton biasa dg. multiplex 12 mm atau 18 mm (tanpa perancah)
Analisa : AHSP Permen PUPR No. 1 Tahun 2022
Satuan : m2
Harga Satuan : Rp 63,986.00

B.11.b 1 m2 Bekisting utk permukaan beton biasa dg. multiplex 12 mm atau 18 mm (tanpa perancah)
Harga Satuan Jumlah
No. Uraian Kode Sat. Koefesien
(Rp.) (Rp.)
1 2 3 4 5 6 7
A Tenaga Kerja
1 Pekerja L.01 Oh 0.2000 90,000.00 18,000.00
2 Tukang Kayu L.02 Oh 0.1000 102,500.00 10,250.00
Jumlah Harga Tenaga Kerja 28,250.00
B Bahan
1 Multipleks 120 x 240 x 12 mm - Lbr 0.1280 149,500.00 19,136.00
2 Kayu cetakan - m3 0.0060 2,125,000.00 12,750.00
3 Paku 1" s/d 4" - Kg 0.2200 17,500.00 3,850.00
Jumlah Harga Bahan 35,736.00
C Alat
Jumlah Harga Alat -
D Jumlah Tenaga Kerja, Bahan dan Peralatan (A + B + C) 63,986.00
E Overhead & Profit (0% x D ) -
F Harga Satuan Pekerjaan per - 1 m2 (D+E) 63,986.00

Pekerjaan : Penataan Jaringan Irigasi ( 1 Paket Pemeliharaan Rutin Sal. Sek. .... D.I. ..... Kab. .... )
Item Pekerjaan : Bekisting utk permukaan beton biasa dg. papan uk. 3/20 cm (tanpa perancah)
Analisa : AHSP Permen PUPR No. 1 Tahun 2022
Satuan : m2
Harga Satuan : Rp 74,507.50

B.11.c 1 m2 Bekisting utk permukaan beton biasa dg. papan uk. 3/20 cm (tanpa perancah)
Harga Satuan Jumlah
No. Uraian Kode Sat. Koefesien
(Rp.) (Rp.)
1 2 3 4 5 6 7
A Tenaga Kerja
1 Pekerja L.01 Oh 0.2000 90,000.00 18,000.00
2 Tukang Kayu L.02 Oh 0.1000 102,500.00 10,250.00
Jumlah Harga Tenaga Kerja 28,250.00
B Bahan
1 Kayu Lanan Papan - Lbr 0.0140 2,473,750.00 34,632.50
2 Kayu cetakan - m3 0.0030 2,125,000.00 6,375.00
3 Paku 1" s/d 4" - Kg 0.3000 17,500.00 5,250.00
Jumlah Harga Bahan 46,257.50
C Alat
Jumlah Harga Alat -
D Jumlah Tenaga Kerja, Bahan dan Peralatan (A + B + C) 74,507.50
E Overhead & Profit (0% x D ) -
F Harga Satuan Pekerjaan per - 1 m2 (D+E) 74,507.50
Pekerjaan : Penataan Jaringan Irigasi ( 1 Paket Pemeliharaan Rutin Sal. Sek. .... D.I. ..... Kab. .... )
Item Pekerjaan : Perancah bekisting kaso 5/7 cm tinggi 4m JAT < 60 cm
Analisa : AHSP Permen PUPR No. 1 Tahun 2022
Satuan : m2
Harga Satuan : Rp 87,750.00

B.11.d 1 m2 Perancah bekisting kaso 5/7 cm tinggi 4m JAT < 60 cm


Harga Satuan Jumlah
No. Uraian Kode Sat. Koefesien
(Rp.) (Rp.)
1 2 3 4 5 6 7
A Tenaga Kerja
1 Pekerja L.01 Oh 0.3000 90,000.00 27,000.00
2 Tukang Kayu L.02 Oh 0.1500 102,500.00 15,375.00
Jumlah Harga Tenaga Kerja 42,375.00
B Bahan
1 Kayu Lanan Balok/pesagen - Lbr 0.0200 2,050,000.00 41,000.00
2 Paku 1" s/d 4" - Kg 0.2500 17,500.00 4,375.00
Jumlah Harga Bahan 45,375.00
C Alat
Jumlah Harga Alat -
D Jumlah Tenaga Kerja, Bahan dan Peralatan (A + B + C) 87,750.00
E Overhead & Profit (0% x D ) -
F Harga Satuan Pekerjaan per - 1 m2 (D+E) 87,750.00

Pekerjaan : Penataan Jaringan Irigasi ( 1 Paket Pemeliharaan Rutin Sal. Sek. .... D.I. ..... Kab. .... )
Item Pekerjaan : Beton Siklop 40% batu belah, 60% beton( K.175 ) ( manual )
Analisa : AHSP Permen PUPR No. 1 Tahun 2022
Satuan : m3
Harga Satuan : Rp 879,886.67

2.2.12.a.(a) 1 m3 Beton Siklop 40% batu belah, 60% beton( K.175 ) ( manual )
Harga Satuan Jumlah
No. Uraian Kode Sat. Koefesien
(Rp.) (Rp.)
1 2 3 4 5 6 7
A Tenaga Kerja
1 Pekerja L.01 Oh 1.4480 90,000.00 130,320.00
2 Tukang Kayu L.02 Oh 0.2896 102,500.00 29,684.00
Jumlah Harga Tenaga Kerja 160,004.00
B Bahan
1 Batu Kali Bulat Utuh - m3 0.5810 236,100.00 137,174.10
2 Portland Cement Merk I 50 kg - Zak 4.5500 57,500.00 261,625.00
3 Pasir Beton - m3 0.3789 370,000.00 140,203.57
4 Kerikil Beton 1/2 - m3 0.5320 340,000.00 180,880.00
Jumlah Harga Bahan 719,882.67
C Alat
Jumlah Harga Alat -
D Jumlah Tenaga Kerja, Bahan dan Peralatan (A + B + C) 879,886.67
E Overhead & Profit (0% x D ) -
F Harga Satuan Pekerjaan per - 1 m3 (D+E) 879,886.67

Pekerjaan : Penataan Jaringan Irigasi ( 1 Paket Pemeliharaan Rutin Sungai Karuk DAS Plawangan Kab. Pemalang )
Item Pekerjaan : kistdam pasir/tanah dibungkus karung plastik bagor
Analisa : AHSP Permen PUPR No. 1 Tahun 2022
Satuan : Bh
Harga Satuan : Rp 12,100.00

1.2.1.a.(c) 1 Bh kistdam pasir/tanah dibungkus karung plastik bagor


Harga Satuan Jumlah
No. Uraian Kode Sat. Koefesien
(Rp.) (Rp.)
1 2 3 4 5 6 7
A Tenaga Kerja
1 Pekerja L.01 Oh 0.0400 90,000.00 3,600.00
Jumlah Harga Tenaga Kerja 3,600.00
B Bahan
1 Karung Plastik M.136.a Bh 1.0000 7,000.00 7,000.00
2 Tali Plastik M.151.e m 2.0000 750.00 1,500.00
Jumlah Harga Bahan 8,500.00
C Alat
Jumlah Harga Alat -
D Jumlah Tenaga Kerja, Bahan dan Peralatan (A + B + C) 12,100.00
E Overhead & Profit (0% x D ) -
F Harga Satuan Pekerjaan per - 1 Bh (D+E) 12,100.00

Pekerjaan : Penataan Jaringan Irigasi ( 1 Paket Pemeliharaan Rutin Sungai Karuk DAS Plawangan Kab. Pemalang )
Item Pekerjaan : Kerangka kayu/bambu untuk kistdam pasir/tanah
Analisa : AHSP Permen PUPR No. 1 Tahun 2022
Satuan : m3
Harga Satuan : Rp 57,587.50

1.2.2.(c) 1 m3 Kerangka kayu/bambu untuk kistdam pasir/tanah


Harga Satuan Jumlah
No. Uraian Kode Sat. Koefesien
(Rp.) (Rp.)
1 2 3 4 5 6 7
A Tenaga Kerja
1 Pekerja L.01 Oh 0.1000 90,000.00 9,000.00
Jumlah Harga Tenaga Kerja 9,000.00
B Bahan
1 Bambu - Btg 2.6000 16,500.00 42,900.00
2 Paku 1" s/d 4" - Kg 0.3250 17,500.00 5,687.50
Jumlah Harga Bahan 48,587.50
C Alat
Jumlah Harga Alat -
D Jumlah Tenaga Kerja, Bahan dan Peralatan (A + B + C) 57,587.50
E Overhead & Profit (0% x D ) -
F Harga Satuan Pekerjaan per - 1 m3 (D+E) 57,587.50

Pekerjaan : Penataan Jaringan Irigasi ( 1 Paket Pemeliharaan Rutin Sal. Sek. .... D.I. ..... Kab. .... )
Item Pekerjaan : Galian Tanah Mekanis dan urug posisi dekat
Analisa : AHSP Permen PUPR No. 1 Tahun 2022
Satuan : m3
Harga Satuan : Rp 16,515.44

TM.02.3.a 1 m3 Galian Tanah Mekanis dan urug posisi dekat


Harga Satuan Jumlah
No. Uraian Kode Sat. Koefesien
(Rp.) (Rp.)
1 2 3 4 5 6 7
A Tenaga Kerja
1 Pekerja L.01 Oj 0.0316 12,857.14 406.29
2 Operator Alat Berat L.02 Oj 0.0316 32,142.86 1,015.71
3 Pembantu Operator L.02 Oj 0.0316 14,285.71 451.43
Jumlah Harga Tenaga Kerja 1,873.43
B Bahan
1 Dexlite - Ltr 0.5388 15,000.00 8,081.70
Jumlah Harga Bahan 8,081.70
C Alat
1 Excavator E.15.h Jam 0.0316 207,604.75 6,560.31
Jumlah Harga Alat 6,560.31
D Jumlah Tenaga Kerja, Bahan dan Peralatan (A + B + C) 16,515.44
E Overhead & Profit (0% x D ) -
F Harga Satuan Pekerjaan per - 1 m3 (D+E) 16,515.44

Pekerjaan : Penataan Jaringan Irigasi ( 1 Paket Pemeliharaan Rutin Sal. Sek. .... D.I. ..... Kab. .... )
Item Pekerjaan : Galian Tanah Mekanis dan urug posisi Jauh
Analisa : AHSP Permen PUPR No. 1 Tahun 2022
Satuan : m3
Harga Satuan : Rp 20,539.77

TM.02.3.b 1 m3 Galian Tanah Mekanis dan urug posisi Jauh


Harga Satuan Jumlah
No. Uraian Kode Sat. Koefesien
(Rp.) (Rp.)
1 2 3 4 5 6 7
A Tenaga Kerja
1 Pekerja L.01 Oj 0.0393 12,857.14 505.29
2 Operator Alat Berat L.02 Oj 0.0393 32,142.86 1,263.21
3 Pembantu Operator L.02 Oj 0.0393 14,285.71 561.43
Jumlah Harga Tenaga Kerja 2,329.93
B Bahan
1 Dexlite - Ltr 0.6701 15,000.00 10,050.98
Jumlah Harga Bahan 10,050.98
C Alat
1 Excavator E.15.h Jam 0.0393 207,604.75 8,158.87
Jumlah Harga Alat 8,158.87
D Jumlah Tenaga Kerja, Bahan dan Peralatan (A + B + C) 20,539.77
E Overhead & Profit (0% x D ) -
F Harga Satuan Pekerjaan per - 1 m3 (D+E) 20,539.77

Pekerjaan : Penataan Jaringan Irigasi ( 1 Paket Pemeliharaan Rutin Sal. Sek. .... D.I. ..... Kab. .... )
Item Pekerjaan : Angkutan Tanah Biasa menggunakan DT untuk Jarak 1 Km
Analisa : AHSP Permen PUPR No. 1 Tahun 2022
Satuan : m3
Harga Satuan : Rp 26,978.65

TM.01.2.a.1.(a) 1 m3 Angkutan Tanah Biasa menggunakan DT untuk Jarak 1 Km


Harga Satuan Jumlah
No. Uraian Kode Sat. Koefesien
(Rp.) (Rp.)
1 2 3 4 5 6 7
A Tenaga Kerja
1 Pekerja L.01 Oj 0.0880 12,857.14 1,131.43
2 Sopir L.02 Oj 0.0880 22,857.14 2,011.43
3 Pembantu sopir L.02 Oj 0.0880 12,142.86 1,068.57
Jumlah Harga Tenaga Kerja 4,211.43
B Bahan
1 Dexlite - Ltr 1.0648 15,000.00 15,972.00
Jumlah Harga Bahan 15,972.00
C Alat
2 Dump Truck E.13.b Jam 0.0880 77,218.43 6,795.22
Jumlah Harga Alat 6,795.22
D Jumlah Tenaga Kerja, Bahan dan Peralatan (A + B + C) 26,978.65
E Overhead & Profit (0% x D ) -
F Harga Satuan Pekerjaan per - 1 m3 (D+E) 26,978.65

Pekerjaan : Penataan Jaringan Irigasi ( 1 Paket Pemeliharaan Rutin Sal. Sek. .... D.I. ..... Kab. .... )
Item Pekerjaan : Mobilisasi dan Demobilisasi
Analisa : AHSP Permen PUPR No. 1 Tahun 2022
Satuan : Ls
Harga Satuan : Rp 10,300,000.00

An.Hit.1 1 Ls Mobilisasi dan Demobilisasi


Harga Satuan Jumlah
No. Uraian Kode Sat. Koefesien
(Rp.) (Rp.)
1 2 3 4 5 6 7
A Tenaga Kerja
1 Pekerja (Penjaga alat) L.01 Ls 1.0000 2,300,000.00 2,300,000.00
Jumlah Harga Tenaga Kerja 2,300,000.00
B Bahan
Jumlah Harga Bahan -
C Alat
1 Truck trailer - Ls 1.0000 8,000,000.00 8,000,000.00
Jumlah Harga Alat 8,000,000.00
D Jumlah Tenaga Kerja, Bahan dan Peralatan (A + B + C) 10,300,000.00
E Overhead & Profit (0% x D ) -
F Harga Satuan Pekerjaan per - 1 Ls (D+E) 10,300,000.00

Pekerjaan : Penataan Jaringan Irigasi ( 1 Paket Pemeliharaan Rutin Sal. Sek. .... D.I. ..... Kab. .... )
Item Pekerjaan : Sistem Manajemen K3
Analisa : AHSP Permen PUPR No. 1 Tahun 2022
Satuan : Ls
Harga Satuan : Rp 200,000.00

An.Hit.2 1 Ls Sistem Manajemen K3


Harga Satuan Jumlah
No. Uraian Kode Sat. Koefesien
(Rp.) (Rp.)
1 2 3 4 5 6 7
A Tenaga Kerja
Jumlah Harga Tenaga Kerja -
B Bahan
1 Rambu Peringatan - Ls 1.0000 100,000.00 100,000.00
2 Perlengkapan Medis P3K - Ls 1.0000 100,000.00 100,000.00
Jumlah Harga Bahan 200,000.00
C Alat
Jumlah Harga Alat -
D Jumlah Tenaga Kerja, Bahan dan Peralatan (A + B + C) 200,000.00
E Overhead & Profit (0% x D ) -
F Harga Satuan Pekerjaan per - 1 Ls (D+E) 200,000.00

Pekerjaan : Penataan Jaringan Irigasi ( 1 Paket Pemeliharaan Rutin Sungai Karuk DAS Plawangan Kab. Pemalang )
Item Pekerjaan : Pasangan 1 lapis Seseg Bambu, JAT< 1,2 m'
Analisa : AHSP Permen PUPR No. 1 Tahun 2022
Satuan : m2
Harga Satuan : Rp 57,909.50

An.Hit.3 1 m2 Pasangan 1 lapis Seseg Bambu, JAT< 1,2 m'


Harga Satuan Jumlah
No. Uraian Kode Sat. Koefesien
(Rp.) (Rp.)
1 2 3 4 5 6 7
A Tenaga Kerja
1 Pekerja L.01 Oh 0.0300 90,000.00 2,700.00
2 Tukang Kayu L.02 Oh 0.0900 102,500.00 9,225.00
Jumlah Harga Tenaga Kerja 11,925.00
B Bahan
1 Seseg Bambu - m2 1.1000 40,000.00 44,000.00
2 Paku 1" s/d 4" M.77.b Kg 0.1134 17,500.00 1,984.50
Jumlah Harga Bahan 45,984.50
C Alat
Jumlah Harga Alat -
D Jumlah Tenaga Kerja, Bahan dan Peralatan (A + B + C) 57,909.50
E Overhead & Profit (0% x D ) -
F Harga Satuan Pekerjaan per - 1 m2 (D+E) 57,909.50

Pekerjaan : Penataan Jaringan Irigasi ( 1 Paket Pemeliharaan Rutin Sungai Karuk DAS Plawangan Kab. Pemalang )
Item Pekerjaan : Pasangan dan penetrasi tiang pancang kayu atau dolken ø 6-8 cm
Analisa : AHSP Permen PUPR No. 1 Tahun 2022
Satuan : m'
Harga Satuan : Rp 41,085.00

2.2.13.b.(a) 1 m' Pasangan dan penetrasi tiang pancang kayu atau dolken ø 6-8 cm
Harga Satuan Jumlah
No. Uraian Kode Sat. Koefesien
(Rp.) (Rp.)
1 2 3 4 5 6 7
A Tenaga Kerja
1 Pekerja L.01 Oh 0.0860 90,000.00 7,740.00
2 Tukang Batu L.02 Oh 0.0290 120,000.00 3,480.00
Jumlah Harga Tenaga Kerja 11,220.00
B Bahan
1 Dolken Sedang 8 x 10 x 400 cm - m' 1.1000 23,250.00 25,575.00
Jumlah Harga Bahan 25,575.00
C Alat
1 Tripod tinggi 7m, max 3 ton To.40.s /Hr 0.0286 100,000.00 2,860.00
2 Bandul pancang 0,5 ton To.40.b /Hr 0.0286 50,000.00 1,430.00
Jumlah Harga Alat 4,290.00
D Jumlah Tenaga Kerja, Bahan dan Peralatan (A + B + C) 41,085.00
E Overhead & Profit (0% x D ) -
F Harga Satuan Pekerjaan per - 1 m' (D+E) 41,085.00
DAFTAR HARGA UPAH, BAHAN DAN ALAT
SWAKELOLA
DAERAH KABUPATEN TEGAL
TAHUN 2022

No. Uraian Upah, Bahan dan Alat Sat. Harga (Rp.)

I Upah
Pekerja Oh 90,000.00
Pekerja tak terlatih Oh 72,500.00
Mandor Oh 106,875.00
Buruh semi terlatih Oh 77,500.00
Tukang listrik / Buruh terlatih Oh 102,500.00
Tukang Kayu Oh 102,500.00
Kepala tukang kayu Oh 107,500.00
Tukang batu Oh 120,000.00
Kepala tukang batu Oh 107,500.00
Tukang besi Oh 102,500.00
Kepala tukang besi Oh 107,500.00
Tukang cat Oh 102,500.00
Kepala tukang cat Oh 107,500.00
Tukang plitur Oh 102,500.00
Tukang jalan Oh 82,500.00
Tukang gali Oh 82,500.00
Tukang masak aspal Oh 82,500.00
Tukang leideng Oh 102,500.00
Masinis Oh 140,000.00
Pembantu masinis Oh 70,000.00
Penjaga api Oh 70,000.00
Penjaga malam Oh 85,000.00
Sopir Oh 160,000.00
Pembantu sopir Oh 85,000.00
Juru ukur Oh 162,500.00
Pembantu juru ukur Oh 117,500.00
Operator alat berat Oh 225,000.00
Pembantu operator Oh 100,000.00
Pekerja (Penjaga alat) Ls 2,300,000.00
- -
II Bahan
1 Bahan Dasar
Batu Kali Bulat Utuh m3 236,100.00
Batu Kali Bulat Belah m3 360,000.00
Batu Kali Pecah 10/15 m3 255,250.00
Batu Kali Pecah 5/7 m3 270,000.00
Batu Kali Pecah 3/5 m3 279,000.00
Kerikil Timbun m3 155,000.00
Kerikil Sawur / Koral m3 177,500.00
Kerikil Beton 0,5/1 m3 266,000.00
Kerikil Beton 1/2 m3 340,000.00
Kerikil Beton m3 292,500.00
Kerikil Biasa m3 160,000.00
Kerikil Tras Giling m3 262,500.00
Batu Bata ex lokal Bh 975.00

Pasir Urug m3 171,500.00


Pasir Pasang m3 340,000.00
Pasir Beton m3 370,000.00
Tanah Padas m3 97,500.00
Tanah Liat m3 97,500.00
Kapur Pasang m3 302,500.00
Kapur Semen Merah m3 182,500.00

Portland Cement Merk I 40 kg Zak 45,750.00


Portland Cement Merk I 50 kg Zak 57,500.00
Portland Cement Merk II 40 kg Zak 46,000.00
Portland Cement Merk II 50 kg Zak 55,500.00
Portland Cement Semen Putih 40 kg Zak 87,500.00
Portland Cement Semen Putih 50 kg Zak 91,000.00
Portland Cement Semen warna Kg 8,687.50

2 Bahan Penutup Atap


Sirap (100 lbr) Pak 182,500.00

Genteng Beton Warna standard Bh 5,700.00


Genteng Beton Warna Special Bh 7,350.00
Genteng Beton Warna Khusus Bh 6,900.00
Kerpus Beton Warna Standard Bh 6,400.00
Kerpus Beton Warna Special Bh 7,625.00
Kerpus Beton Warna Khusus Bh 10,350.00

Genteng Tanah Liat Vlaam/Plentong Bh 1,500.00


Genteng Tanah Liat Kodok Bh 2,650.00
Genteng Tanah Liat Kodok Glasur Bh 4,500.00
Genteng Tanah Liat Nok kerpus Kodok Bh 5,250.00
Genteng Tanah Liat Nok kerpus Kodok Glasur Bh 9,350.00
Genteng Tanah Liat Plentong super besar 18 bh/m2 Bh 4,750.00
Genteng Tanah Liat Nok kerpus plentong super Bh 8,000.00

Asbes Gelombang Besar 200 cm x 102 cm x 5 mm Bh 84,500.00


Asbes Gelombang Besar 225 cm x 102 cm x 5 mm Bh 91,450.00
Asbes Gelombang Besar 250 cm x 102 cm x 5 mm Bh 102,200.00
Asbes Gelombang Besar 200 cm x 102 cm x 6 mm Bh 86,950.00
Asbes Gelombang Besar 225 cm x 102 cm x 6 mm Bh 91,800.00
Asbes Gelombang Besar 250 cm x 102 cm x 6 mm Bh 102,700.00

Asbes Gelombang Kecil 150 cm x 105 cm x 4 mm Bh 41,150.00


Asbes Gelombang Kecil 180 cm x 105 cm x 4 mm Bh 48,400.00
Asbes Gelombang Kecil 210 cm x 105 cm x 4 mm Bh 50,650.00
Asbes Gelombang Kecil 240 cm x 105 cm x 4 mm Bh 58,750.00
Asbes Gelombang Kecil 270 cm x 105 cm x 4 mm Bh 74,200.00
Asbes Gelombang Kecil 300 cm x 105 cm x 4 mm Bh 67,500.00

Nok Kerpus Genteng Bh 37,000.00


Nok Stel Besar Bh 65,000.00
Nok Paten Besar Bh 44,500.00

Nokstel gelombang harflex Stel Besar Bh 50,750.00


Nokstel gelombang harflex Patent Besar Bh 26,000.00
Nokstel gelombang harflex Plat besar Bh 49,000.00

Asbes Plat 100cm x 100 cm x 3 mm Bh 17,500.00


Asbes Plat 100cm x 100 cm x 4 mm Bh 21,750.00
Asbes Plat 50 cm x 200 cm x 3 mm Bh 14,400.00
Asbes Plat 40 cm x 200 cm x 3 mm Bh 13,500.00

Fibre Glass (Jabes) 180 x 92 cm Bh 40,750.00


Fibre Glass (Jabes) 200 x 92 cm Bh 46,000.00
Fibre Glass (Jabes) 250 x 92 cm Bh 54,000.00
Fibre Glass (Jabes) 180 x 105 cm Bh 46,500.00
Fibre Glass (Jabes) 210 x 105 cm Bh 52,500.00
Fibre Glass (Jabes) 250 x 105 cm Bh 63,500.00

Seng Plat BJLS 0,18 lebar 55 cm m' 21,500.00


Seng Plat BJLS 0,20 lebar 55 cm m' 33,500.00
Seng Plat BJLS 0,28 lebar 55 cm m' 34,000.00
Seng Plat BJLS 0,30 lebar 55 cm m' 46,500.00

Seng Gelombang BJLS 0,18 panjang 180 cm Lbr 47,500.00


Seng Gelombang BJLS 0,20 panjang 180 cm Lbr 52,500.00
Seng Gelombang BJLS 0,30 panjang 180 cm Lbr 57,500.00
Seng Gelombang BJLS 0,40 panjang 180 cm Lbr 64,500.00
3 Bahan Kayu
Kayu Jati Papan m3 16,175,000.00
Kayu Jati Balok/pesagen m3 15,050,000.00

Kayu Kamper Papan m3 9,850,000.00


Kayu Kamper Balok/pesagen m3 9,200,000.00

Kayu Kruing Papan m3 7,000,000.00


Kayu Kruing Balok/pesagen m3 6,350,000.00

Kayu Meranti Papan m3 4,625,000.00


Kayu Meranti Balok/pesagen m3 4,400,000.00

Kayu Lanan Papan m3 2,473,750.00


Kayu Lanan Balok/pesagen m3 2,050,000.00

Kayu Bengkirai Papan m3 11,925,000.00


Kayu Bengkirai Balok/pesagen m3 11,350,000.00

Dolken Sedang 8 x 10 x 400 cm Btg 23,250.00


Dolken Kecil 6 x 7 x 400 cm Btg 16,750.00
Dolken Besar 10 x 12 x 400 cm Btg 26,500.00
Kayu cetakan m3 2,125,000.00
Kayu bakar m3 135,000.00
Bambu Btg 16,500.00
Seseg Bambu Lbr 40,000.00

4 Penutup Dinding/Lantai
Ubin (Tegel Biasa) 30 x 30 cm Polos m2 40,500.00
Ubin (Tegel Biasa) 20 x 20 cm Polos m2 37,500.00
Ubin (Tegel Biasa) 30 x 30 cm Warna m2 44,500.00
Ubin (Tegel Biasa) 20 x 20 cm Warna m2 42,000.00
Ubin (Tegel Biasa) 30 x 30 cm Taraso m2 55,500.00

Ubin Porselin Lokal 11 x 11 putih dos 41,750.00


Ubin Porselin Lokal 11 x 11 warna dos 45,500.00
Ubin Porselin Lokal 15 x 15 putih dos 50,000.00
Ubin Porselin Lokal 15 x 15 warna dos 52,000.00

Mozaik Porselin 10 x 20 cm m2 53,500.00


Mozaik Porselin 15 x 15 cm m2 52,500.00
Mozaik Porselin 20 x 20 cm m2 54,500.00
Mozaik Porselin 20 x 25 cm m2 54,500.00

Keramik 30 x 30 cm m2 45,000.00
Keramik 20 x 20 cm m2 57,000.00
Keramik 33 x 33 cm m2 56,250.00
Keramik 25 x 25 cm m2 70,500.00
Keramik 15 x 20 cm m2 57,000.00

5 Bahan Cetak / Precast


Buis Beton Ø 10 cm - 100 cm Bh 31,200.00
Buis Beton Ø 20 cm - 100 cm Bh 59,000.00
Buis Beton Ø 30 cm - 100 cm Bh 75,750.00
Buis Beton Ø 50 cm - 100 cm Bh 123,350.00
Buis Beton Ø 60 cm - 100 cm Bh 146,000.00
Buis Beton Ø 70 cm - 100 cm Bh 175,000.00
Buis Beton Ø 10 cm - 100 cm Bh 31,200.00
Buis Beton Ø 15 cm - 100 cm Bh 39,750.00
Buis Beton Ø 20 cm - 100 cm Bh 59,000.00
Buis Beton Ø 30 cm - 100 cm Bh 75,750.00
Buis Beton Ø 50 cm - 100 cm Bh 123,350.00

6 Bahan Besi
Besi Beton Polos Kg 17,000.00
Besi Beton Prestress Kg 12,500.00
Besi Beton Ulir Kg 14,500.00

Besi Plat Strip Kg 16,475.00

Besi Profil Kg 14,350.00

Jaring-jaring Baja Diameter 4 - 15 Kg 14,875.00


Jaring-jaring Baja Diameter 6 - 15 Kg 15,500.00

Besi Siku L 40 x 40 x 4 Btg 139,200.00


Besi Siku L 50 x 50 x 5 Btg 217,375.00
Besi Siku L 60 x 60 x 6 Btg 334,875.00

Kawat bendrat Kg 20,250.00


Kawat Harmonika 12 x 45 mm m2 27,310.00
Kawat Harmonika 12 x 24 mm m2 25,225.00
Kawat Harmonika 14 x 30 mm m2 23,735.00
Kawat Harmonika 14 x 35 mm m2 22,700.00
Kawat Nyamuk Nylon m2 13,740.00
Kawat Kasa m2 17,000.00
Kawat Saringan pasir m2 14,825.00
Kawat loket m2 16,400.00
Kawat duri Rol 85,250.00
Kawat bronjong Kg 20,000.00

7 Bahan Pipa
Pipa PVC SII SCJ , S - 12,5 (10 bar)
Pipa PVC DN 20 ( ½" ) AW JIS Btg 23,750.00
Pipa PVC DN 25 ( ¾" ) AW JIS Btg 31,000.00
Pipa PVC DN 32 ( 1" ) AW JIS Btg 41,000.00
Pipa PVC DN 40 ( 1½" ) Btg 56,300.00
Pipa PVC DN 63 ( 2" ) Btg 88,950.00
Pipa PVC DN 90 ( 3" ) Btg 175,250.00
Pipa PVC DN 110 ( 4" ) Btg 120,562.50
Pipa PVC DN 160 ( 6" ) Btg 305,000.00
Pipa PVC DN 200 ( 8" ) Btg 457,500.00
Pipa PVC DN 250 ( 10" ) Btg 1,040,800.00
Pipa PVC DN 315 ( 12" ) Btg 639,500.00

Pipa Medium A Galvanis - SII


Pipa Medium Galvanis 0,50" Btg 132,500.00
Pipa Medium Galvanis 0,75" Btg 160,000.00
Pipa Medium Galvanis 1" Btg 230,000.00
Pipa Medium Galvanis 1,25" Btg 307,500.00
Pipa Medium Galvanis 1,50" Btg 360,000.00
Pipa Medium Galvanis 2" Btg 605,000.00
Pipa Medium Galvanis 2,50" Btg 755,000.00
Pipa Medium Galvanis 3" Btg 997,500.00
Pipa Medium Galvanis 4" Btg 1,487,500.00
Pipa Medium Galvanis 5" Btg 1,975,000.00
Pipa Medium Galvanis 6" Btg -

8 Bahan Langit-langit
Teak wood 90 x 210 x 3 mm Lbr 99,500.00
Teak wood 120 x 240 x 3 mm Lbr 131,000.00
Teak wood 90 x 210 x 4 mm Lbr 110,500.00
Teak wood 90 x 210 x 9 mm Lbr 151,000.00
Teak wood 90 x 210 x 12 mm Lbr 181,000.00
Teak wood 90 x 210 x 15 mm Lbr 236,000.00
Teak wood 90 x 210 x 18 mm Lbr 283,500.00

Tripleks 120 x 240 x 3 mm Lbr 64,850.00


Tripleks 120 x 240 x 4 mm Lbr 71,000.00
Tripleks 120 x 240 x 6 mm Lbr 88,500.00

Multipleks 120 x 240 x 9 mm Lbr 116,000.00


Multipleks 120 x 240 x 12 mm Lbr 149,500.00
Multipleks 120 x 240 x 15 mm Lbr 202,500.00
Multipleks 120 x 240 x 18 mm Lbr 226,000.00

Formika ukuran pintu Lbr 54,000.00

9 Bahan Finishing
Kayu
Menie Kg 30,100.00
Dempul plamur Kg 26,050.00
Ambril/amplas Lbr 4,250.00
Batu Apung Kg 51,000.00
Cat Dasar Kg 78,050.00
Cat Kayu Ex. Emco Kg 64,000.00
Cat Kayu Ex. Yunior 66 (nippon paint) Kg 61,500.00
Cat Kayu Ex. Deculux Kg 42,500.00
Cat Kayu Ex. Siralax Ons 25,000.00
Spiritus Ltr 15,000.00
Plitur jadi Ltr 55,600.00

Tembok
Kalkarium kg 7,500.00
Kapur sirih kg 5,375.00
Plamur kg 41,250.00
Cat Tembok kg 72,000.00
Cat Tembok Ex. Sintex 5 kg 117,500.00
Cat Tembok Ex. Danabride 5 kg 122,500.00
Cat Tembok Ex. Catylac 5 kg 182,500.00
Cat Tembok Ex. Mowilex 2,50 kg 274,000.00

Besi
Menie kg 37,500.00
Cat mengkilat kg 55,850.00
Cat kg 50,000.00
Thinner A ltr 26,900.00
Minyak cat ltr 16,000.00
Thinner Super ltr 16,500.00
Residu (teer/aspal) drum 67,500.00

Fibre glass (tanki air) kapasitas 550 liter bh 1,025,000.00


Fibre glass (tanki air) kapasitas 1100 liter bh 1,650,000.00

Lem Aica Aibon kg 33,500.00

10 Bahan Kaca
Kaca Polos 3 mm m2 107,500.00
Kaca Polos 5 mm m2 122,500.00

Kaca Es Kabur 3 mm m2 98,500.00


Kaca Es Kabur 5 mm m2 111,000.00

Kaca Ray Band 3 mm m2 117,500.00


Kaca Ray Band 5 mm m2 132,500.00

11 Bahan Pengikat Kayu


Paku 1" s/d 4" kg 17,500.00
Paku payung kg 33,500.00
Paku sekrup kg 33,500.00
Paku beton kg 18,750.00
Mur Baut(kuda-kuda) kg 21,000.00
Ngakur Baut bh 13,900.00
Lem Kayu bh 14,250.00
Tali Ijuk m3 20,750.00

12 Bahan Pompa
Pompa Air Tangan
Dragon buatan Indonesia bh 292,500.00
Pompa Air Listrik
Pompa Air Listrik ex. Sanyo 100 watt bh 1,012,500.00
Pompa Air Listrik ex. Fuji 250 watt bh 1,475,000.00
Pompa Air Listrik ex. Shimizu 100 watt bh 480,000.00
Pompa Air Listrik ex. Shimizu 90 watt bh 365,000.00
Pompa Air Listrik ex. DAB 125 watt bh 375,000.00
Pompa Air Listrik ex. DAB 175 watt bh 437,500.00

13 Bahan Lain-lain
Krei 25 mm m2 47,500.00
Sliding Pintu J4 bh 207,500.00
Naco per Daun bh 12,250.00
Rolling door Besi m2 312,500.00
Rolling door Almunium m2 252,500.00
Awning Almunium m2 217,500.00
Kusen Almunium 4" Putih m' 82,500.00
Besi Profil WF 150 x 75 x 5 x 7 x 12 btg 814,800.00
Aspal Ex Pertamina isi Net 160 kg drum 1,479,800.00
Hotmix Tebal = 4 Cm m2 68,750.00
Hotmix Tebal = 5 Cm m2 83,500.00
Hotmix Tebal = 6 Cm m2 98,500.00
Hotmix Tebal = 7 Cm m2 117,500.00
Binder Course ton 1,337,500.00
Wearing Course ton 1,425,000.00
Hot Roller Sheet ton 1,250,000.00
Sand Sheet ton 1,225,000.00
Sand Sheet Emulsi ton 1,550,000.00
Cold Mix ton 1,800,000.00
Prime / Tack Coard RC liter 7,100.00
Prime Coat MC liter 7,100.00
Prime / Tack Coat Emulsi liter 7,100.00
Cermin tebal 5 mm m2 300,000.00
Pagar BRC 90 A2 Lbr 277,500.00
Pagar BRC 120 A2 Lbr 387,500.00
Minyak Beton & bekisting Ltr 9,500.00
Pintu Lipat Besi m2 402,500.00
Sunscreen Allumunim m2 330,000.00
Allumunium Foil m2 7,750.00
Soda api kg 19,000.00
Sabun kg 20,000.00
Air m3 17,500.00
Koas Alang-alang ikat 2,500.00
Pelumas ltr 41,250.00
Paving block abu-abu 10 x 20 x 6 m2 80,000.00
Pagar BRC tinggi 1,20 m Ø 6 mm (lapis galvanis) Lbr -
Pagar BRC tinggi 1,50 m Ø 7 mm (lapis galvanis) Lbr -
Pagar BRC tinggi 1,75 m Ø 7 mm (lapis galvanis) Lbr -
Pagar BRC tinggi 1,90 m Ø 7 mm (lapis galvanis) Lbr -
Wiremesh Ø 5,5 mm Lbr -
Wiremesh Ø 6 mm Lbr 630,000.00
Wiremesh Ø 8 mm Lbr 780,000.00
Wiremesh Ø 10 mm Lbr 1,225,000.00
Kawat bronjong Ø 2,7 mm (2x1x0,5) Lbr 365,000.00
Kansteen 10 x 30 x 50 lbr -
Ready Mix K.225 m3 -
Ready Mix K.250 m3 -
Ready Mix K.300 m3 -
Batu Tempel Hitam m3 121,600.00
Batu Candi m3 -
Gebalan rumput m3 -
Karung Plastik Bh 7,000.00
Tali Plastik m 750.00
Rambu Peringatan Ls 100,000.00
Perlengkapan Medis P3K Ls 100,000.00
- -
14 Bahan Bakar Minyak
Dexlite Ltr 15,000.00
Solar (Industri) ltr 8,300.00
Premium (Industri) ltr 7,850.00
- -
III Alat
Molen /Hari 200,000.00
Stamper/Pemadat /Hari 100,000.00
Mesin potong besi /Hari -
Pompa Beton /Hari -
Pompa Air /Hari -
Chainsaw /Hari 100,000.00
Jack hammer /Hari 50,000.00
Tripot /Hari -
Excavator /Jam 207,604.75
Bulldozer /Hari -
Mesin las listrik /Hari -
Baby roller /Hari -
Vibrator /Hari -
Dump Truck /Jam 77,218.43
Rental Mobil /Hari -
Waterpass /Hari 200,000.00
Theodolit /Hari -
Palu/Godem /Hari -
Pahat Beton /Hari -
Truck trailer Ls 8,000,000.00
Mesin Potong Rumput /Hari 50,000.00
Tripod /Hari 75,000.00
Alat Pancang /Hari 150,000.00
Ponton /Hari 250,000.00
Bor Listrik /Hari 50,000.00
Gergaji Listrik /Hari 50,000.00
Slepan /Hari 50,000.00
Generator set 5 KW /Hari 50,000.00
Las Listrik /Hari 50,000.00
Tripod tinggi 7m, max 3 ton /Hari 100,000.00
Bandul pancang 0,5 ton /Hari 50,000.00
- -

REKAPITULASI HARGA SATUAN PEKERJAAN


(PERMEN PU & PR RI NO. 1 TAHUN 2022)

Harga Satuan
( Rp. )
No. Kode Analisa Uraian Sat.
Tenaga Kerja Bahan Alat

1 1.7.7.1.1.a (a) Galian tanah biasa (manual) sedalam < 1 m m3 50,670.00 - -


2 1.7.7.1.1.d.(a) Galian tanah biasa (manual) sedalam > 1 m m3 60,750.00 - -
s.d. 2 m
3 1.7.14.b.(a) Timbunan Atau Urugan Kembali Tanah Liat m3 9,000.00 136,500.00 -

4 1.7.14.e.(a) Timbunan pasir m3 28,620.00 408,000.00 -


5 2.1.2.a.3.a.(a) Pasangan batu kali dengan Mortar fc' = 5,2 m3 195,000.00 796,250.00 -
Mpa setara 1 PC : 4 PP (manual),
6 2.1.2.a.3.a.1.(a) Pasangan batu kali dengan 1 PC : 4 PP (batu m3 195,000.00 580,250.00 -
tersedia)
7 2.1.2.a.5.a.(a) Bongkar pasangan batu (manual) m3 126,000.00 - -
8 2.1.3.3.a.(a) Pasangan Bata Merah dengan Mortar tipe N, m3 202,500.00 735,775.00 -
fc’ = 5,2 MPa (setara 1 PC : 4 PP)
9 3.2.2.1.1.a. (a) Siaran 1 PC : 2 PP m2 42,000.00 4,391.00 -
10 3.2.1.(c) Plesteran tebal 1,5 cm dengan 1 PC : 3 PP m2 42,600.00 16,762.40 -
11 3.2.2.2.35.(a) Pekerjaan Acian m2 21,000.00 3,737.50 -
12 1.5.1.1.a.(a) Pasangan batu kosong m3 120,000.00 442,005.00 -
13 1.5.7.a.(a) Bronjong kawat Pabrikasi m3 46,800.00 452,805.00 -
14 A.4.4.3.63 Pemasangan paving block natural tebal 6 cm m2 82,500.00 259,840.00 -

15 An. Hit. Bongkaran bronjong m3 90,000.00 - -


16 2.2.1.1.a.(a) Beton B0, untuk lantai kerja (bedding) K100 m3 132,000.00 742,760.00 -

17 2.2.2.1.c.(a) Beton mutu K.125 ( manual ) m3 181,500.00 791,070.00 -


18 2.2.2.1.g.(a) Beton mutu K.175 ( manual ) m3 181,500.00 834,890.00 -
19 2.2.6.1.b.(c) Pembesian dengan besi polos/ulir Kg 1,347.50 18,153.75 -
20 2.2.7.a.(a) Pembesian dengan jaring kawat (wiremesh) Kg 481.25 661,601.25 -
21 B.11.a Bekisting lantai beton expose dg. multiplex m2 57,750.00 45,528.00 -
18 mm kaso 5/7 cm (tanpa perancah)
22 B.11.b Bekisting utk permukaan beton biasa dg. m2 28,250.00 35,736.00 -
multiplex 12 mm atau 18 mm (tanpa
23 B.11.c perancah)
Bekisting utk permukaan beton biasa dg. m2 28,250.00 46,257.50 -
papan uk. 3/20 cm (tanpa perancah)
24 B.11.d Perancah bekisting kaso 5/7 cm tinggi 4m m2 42,375.00 45,375.00 -
JAT < 60 cm
25 2.2.12.a.(a) Beton Siklop 40% batu belah, 60% m3 160,004.00 719,882.67 -
beton( K.175 ) ( manual )
26 1.2.1.a.(c) kistdam pasir/tanah dibungkus karung Bh 3,600.00 8,500.00 -
plastik bagor
27 1.2.2.(c) Kerangka kayu/bambu untuk kistdam m3 9,000.00 48,587.50 -
pasir/tanah
28 TM.02.3.a Galian Tanah Mekanis dan urug posisi dekat m3 1,873.43 8,081.70 6,560.31

29 TM.02.3.b Galian Tanah Mekanis dan urug posisi Jauh m3 2,329.93 10,050.98 8,158.87

30 TM.01.2.a.1.(a) Angkutan Tanah Biasa menggunakan DT m3 4,211.43 15,972.00 6,795.22


untuk Jarak 1 Km
31 An.Hit.1 Mobilisasi dan Demobilisasi Ls 2,300,000.00 - 8,000,000.00
32 An.Hit.2 Sistem Manajemen K3 Ls - 200,000.00 -
33 An.Hit.3 Pasangan 1 lapis Seseg Bambu, JAT< 1,2 m' m2 11,925.00 45,984.50 -

34 2.2.13.b.(a) Pasangan dan penetrasi tiang pancang kayu m' 11,220.00 25,575.00 4,290.00
atau dolken ø 6-8 cm

ANALISA HARGA SATUAN PEKERJAAN


(PERMEN PU & PR RI NO. 1 TAHUN 2022)

Pekerjaan : Penataan Jaringan Irigasi ( 1 Paket Pemeliharaan Rutin Sal. Sek. .... D.I. ..... Kab. .... )
Item Pekerjaan : Galian tanah biasa (manual) sedalam < 1 m
Analisa : AHSP Permen PUPR No. 1 Tahun 2022
Satuan : m3
Harga Satuan : Rp 58,270.50

1.7.7.1.1.a (a) 1 m3 Galian tanah biasa (manual) sedalam < 1 m


Harga Satuan Jumlah
No. Uraian Kode Sat. Koefesien
(Rp.) (Rp.)
1 2 3 4 5 6 7
A Tenaga Kerja
1 Pekerja L.01 Oh 0.5630 90,000.00 50,670.00
Jumlah Harga Tenaga Kerja 50,670.00
B Bahan
Jumlah Harga Bahan -
C Alat
Jumlah Harga Alat -
D Jumlah Tenaga Kerja, Bahan dan Peralatan (A + B + C) 50,670.00
E Overhead & Profit (15% x D ) 7,600.50
F Harga Satuan Pekerjaan per - 1 m3 (D+E) 58,270.50

Pekerjaan : Penataan Jaringan Irigasi ( 1 Paket Pemeliharaan Rutin Sal. Sek. .... D.I. ..... Kab. .... )
Item Pekerjaan : Galian tanah biasa (manual) sedalam > 1 m s.d. 2 m
Analisa : AHSP Permen PUPR No. 1 Tahun 2022
Satuan : m3
Harga Satuan : Rp 69,862.50

1.7.7.1.1.d.(a) 1 m3 Galian tanah biasa (manual) sedalam > 1 m s.d. 2 m


Harga Satuan Jumlah
No. Uraian Kode Sat. Koefesien
(Rp.) (Rp.)
1 2 3 4 5 6 7
A Tenaga Kerja
1 Pekerja L.01 Oh 0.6750 90,000.00 60,750.00
Jumlah Harga Tenaga Kerja 60,750.00
B Bahan
Jumlah Harga Bahan -
C Alat
Jumlah Harga Alat -
D Jumlah Tenaga Kerja, Bahan dan Peralatan (A + B + C) 60,750.00
E Overhead & Profit (15% x D ) 9,112.50
F Harga Satuan Pekerjaan per - 1 m3 (D+E) 69,862.50

Pekerjaan : Penataan Jaringan Irigasi ( 1 Paket Pemeliharaan Rutin Sal. Sek. .... D.I. ..... Kab. .... )
Item Pekerjaan : Timbunan atau urugan kembali tanah liat
Analisa : AHSP Permen PUPR No. 1 Tahun 2022
Satuan : m3
Harga Satuan : Rp 167,325.00

1.7.14.b.(a) 1 m3 Timbunan atau urugan kembali tanah liat


Harga Satuan Jumlah
No. Uraian Kode Sat. Koefesien
(Rp.) (Rp.)
1 2 3 4 5 6 7
A Tenaga Kerja
1 Pekerja L.01 Oh 0.1000 90,000.00 9,000.00
Jumlah Harga Tenaga Kerja 9,000.00
B Bahan
1 Tanah Liat M.08.d.2 m3 1.4000 97,500.00 136,500.00
Jumlah Harga Bahan 136,500.00
C Alat
Jumlah Harga Alat -
D Jumlah Tenaga Kerja, Bahan dan Peralatan (A + B + C) 145,500.00
E Overhead & Profit (15% x D ) 21,825.00
F Harga Satuan Pekerjaan per - 1 m3 (D+E) 167,325.00

Pekerjaan : Penataan Jaringan Irigasi ( 1 Paket Pemeliharaan Rutin Sal. Sek. .... D.I. ..... Kab. .... )
Item Pekerjaan : Timbunan pasir
Analisa : AHSP Permen PUPR No. 1 Tahun 2022
Satuan : m3
Harga Satuan : Rp 502,113.00

1.7.14.e.(a) 1 m3 Timbunan pasir


Harga Satuan Jumlah
No. Uraian Kode Sat. Koefesien
(Rp.) (Rp.)
1 2 3 4 5 6 7
A Tenaga Kerja
1 Pekerja L.01 Oh 0.3180 90,000.00 28,620.00
Jumlah Harga Tenaga Kerja 28,620.00
B Bahan
1 Pasir Pasang M.05.b.2 m3 1.2000 340,000.00 408,000.00
Jumlah Harga Bahan 408,000.00
C Alat
Jumlah Harga Alat -
D Jumlah Tenaga Kerja, Bahan dan Peralatan (A + B + C) 436,620.00
E Overhead & Profit (15% x D ) 65,493.00
F Harga Satuan Pekerjaan per - 1 m3 (D+E) 502,113.00

Pekerjaan : Penataan Jaringan Irigasi ( 1 Paket Pemeliharaan Rutin Sal. Sek. .... D.I. ..... Kab. .... )
Item Pekerjaan : Pasangan batu kali dengan Mortar fc' = 5,2 Mpa setara 1 PC : 4 PP (manual),
Analisa : AHSP Permen PUPR No. 1 Tahun 2022
Satuan : m3
Harga Satuan : Rp 1,139,937.50

2.1.2.a.3.a.(a) 1 m3 Pasangan batu kali dengan Mortar fc' = 5,2 Mpa setara 1 PC : 4 PP (manual),
Harga Satuan Jumlah
No. Uraian Kode Sat. Koefesien
(Rp.) (Rp.)
1 2 3 4 5 6 7
A Tenaga Kerja
1 Pekerja L.01 Oh 1.5000 90,000.00 135,000.00
2 Tukang Batu L.02 Oh 0.5000 120,000.00 60,000.00
Jumlah Harga Tenaga Kerja 195,000.00
B Bahan
1 Batu Kali Bulat Belah M.03.c.3 m3 1.2000 360,000.00 432,000.00
2 Pasir Pasang M.05.b.3 m3 0.5200 340,000.00 176,800.00
3 Portland Cement Merk I 50 kg M.23 Zak 3.2600 57,500.00 187,450.00
Jumlah Harga Bahan 796,250.00
C Alat
Jumlah Harga Alat -
D Jumlah Tenaga Kerja, Bahan dan Peralatan (A + B + C) 991,250.00
E Overhead & Profit (15% x D ) 148,687.50
F Harga Satuan Pekerjaan per - 1 m3 (D+E) 1,139,937.50

Pekerjaan : Penataan Jaringan Irigasi ( 1 Paket Pemeliharaan Rutin Sal. Sek. .... D.I. ..... Kab. .... )
Item Pekerjaan : Pasangan batu kali dengan 1 PC : 4 PP (batu tersedia)
Analisa : AHSP Permen PUPR No. 1 Tahun 2022
Satuan : m3
Harga Satuan : Rp 891,537.50

2.1.2.a.3.a.1.(a) 1 m3 Pasangan batu kali dengan 1 PC : 4 PP (batu tersedia)


Harga Satuan Jumlah
No. Uraian Kode Sat. Koefesien
(Rp.) (Rp.)
1 2 3 4 5 6 7
A Tenaga Kerja
1 Pekerja L.01 Oh 1.5000 90,000.00 135,000.00
2 Tukang Batu L.02 Oh 0.5000 120,000.00 60,000.00
Jumlah Harga Tenaga Kerja 195,000.00
B Bahan
1 Batu Kali Bulat Belah (tersedia) - m3 0.6000 - -
2 Batu Kali Bulat Belah M.03.c.3 m3 0.6000 360,000.00 216,000.00
3 Pasir Pasang M.05.b.3 m3 0.5200 340,000.00 176,800.00
4 Portland Cement Merk I 50 kg M.23 Zak 3.2600 57,500.00 187,450.00
Jumlah Harga Bahan 580,250.00
C Alat
Jumlah Harga Alat -
D Jumlah Tenaga Kerja, Bahan dan Peralatan (A + B + C) 775,250.00
E Overhead & Profit (15% x D ) 116,287.50
F Harga Satuan Pekerjaan per - 1 m3 (D+E) 891,537.50

Pekerjaan : Penataan Jaringan Irigasi ( 1 Paket Pemeliharaan Rutin Sal. Sek. .... D.I. ..... Kab. .... )
Item Pekerjaan : Bongkar pasangan batu (manual)
Analisa : AHSP Permen PUPR No. 1 Tahun 2022
Satuan : m3
Harga Satuan : Rp 144,900.00

2.1.2.a.5.a.(a) 1 m3 Bongkar pasangan batu (manual)


Harga Satuan Jumlah
No. Uraian Kode Sat. Koefesien
(Rp.) (Rp.)
1 2 3 4 5 6 7
A Tenaga Kerja
1 Pekerja L.01 Oh 1.4000 90,000.00 126,000.00
Jumlah Harga Tenaga Kerja 126,000.00
B Bahan
Jumlah Harga Bahan -
C Alat
Jumlah Harga Alat -
D Jumlah Tenaga Kerja, Bahan dan Peralatan (A + B + C) 126,000.00
E Overhead & Profit (15% x D ) 18,900.00
F Harga Satuan Pekerjaan per - 1 m3 (D+E) 144,900.00

Pekerjaan : Penataan Jaringan Irigasi ( 1 Paket Pemeliharaan Rutin Sal. Sek. .... D.I. ..... Kab. .... )
Item Pekerjaan : Pasangan Bata Merah dengan Mortar tipe N, fc’ = 5,2 MPa (setara 1 PC : 4 PP)
Analisa : AHSP Permen PUPR No. 1 Tahun 2022
Satuan : m3
Harga Satuan : Rp 1,079,016.25

2.1.3.3.a.(a) 1 m3 Pasangan Bata Merah dengan Mortar tipe N, fc’ = 5,2 MPa (setara 1 PC : 4 PP)
Harga Satuan Jumlah
No. Uraian Kode Sat. Koefesien
(Rp.) (Rp.)
1 2 3 4 5 6 7
A Tenaga Kerja
1 Pekerja L.01 Oh 1.3500 90,000.00 121,500.00
2 Tukang Batu L.02 Oh 0.6750 120,000.00 81,000.00
Jumlah Harga Tenaga Kerja 202,500.00
B Bahan
1 Batu Bata ex lokal M.25.c Bh 500.0000 975.00 487,500.00
2 Portland Cement Merk I 50 kg M.23 Zak 2.1300 57,500.00 122,475.00
3 Pasir Pasang M.05.b.3 m3 0.3700 340,000.00 125,800.00
Jumlah Harga Bahan 735,775.00
C Alat
Jumlah Harga Alat -
D Jumlah Tenaga Kerja, Bahan dan Peralatan (A + B + C) 938,275.00
E Overhead & Profit (15% x D ) 140,741.25
F Harga Satuan Pekerjaan per - 1 m3 (D+E) 1,079,016.25

Pekerjaan : Penataan Jaringan Irigasi ( 1 Paket Pemeliharaan Rutin Sal. Sek. .... D.I. ..... Kab. .... )
Item Pekerjaan : Siaran 1 PC : 2 PP
Analisa : AHSP Permen PUPR No. 1 Tahun 2022
Satuan : m2
Harga Satuan : Rp 53,349.65

3.2.2.1.1.a. (a) 1 m2 Siaran 1 PC : 2 PP


Harga Satuan Jumlah
No. Uraian Kode Sat. Koefesien
(Rp.) (Rp.)
1 2 3 4 5 6 7
A Tenaga Kerja
1 Pekerja L.01 Oh 0.2000 90,000.00 18,000.00
2 Tukang Batu L.02 Oh 0.2000 120,000.00 24,000.00
Jumlah Harga Tenaga Kerja 42,000.00
B Bahan
1 Pasir Pasang M.05.b.3 m3 0.0050 340,000.00 1,700.00
2 Portland Cement Merk I 50 kg M.23 Zak 0.0468 57,500.00 2,691.00
Jumlah Harga Bahan 4,391.00
C Alat
Jumlah Harga Alat -
D Jumlah Tenaga Kerja, Bahan dan Peralatan (A + B + C) 46,391.00
E Overhead & Profit (15% x D ) 6,958.65
F Harga Satuan Pekerjaan per - 1 m2 (D+E) 53,349.65

Pekerjaan : Penataan Jaringan Irigasi ( 1 Paket Pemeliharaan Rutin Sal. Sek. .... D.I. ..... Kab. .... )
Item Pekerjaan : Plesteran tebal 1,5 cm dengan 1 PC : 3 PP
Analisa : AHSP Permen PUPR No. 1 Tahun 2022
Satuan : m2
Harga Satuan : Rp 68,266.76

3.2.1.(c) 1 m2 Plesteran tebal 1,5 cm dengan 1 PC : 3 PP


Harga Satuan Jumlah
No. Uraian Kode Sat. Koefesien
(Rp.) (Rp.)
1 2 3 4 5 6 7
A Tenaga Kerja
1 Pekerja L.01 Oh 0.3000 90,000.00 27,000.00
2 Tukang Batu L.02 Oh 0.1300 120,000.00 15,600.00
Jumlah Harga Tenaga Kerja 42,600.00
B Bahan
1 Pasir Pasang M.05.b.3 m3 0.0230 340,000.00 7,820.00
2 Portland Cement Merk I 50 kg M.23 Zak 0.1555 57,500.00 8,942.40
Jumlah Harga Bahan 16,762.40
C Alat
Jumlah Harga Alat -
D Jumlah Tenaga Kerja, Bahan dan Peralatan (A + B + C) 59,362.40
E Overhead & Profit (15% x D ) 8,904.36
F Harga Satuan Pekerjaan per - 1 m2 (D+E) 68,266.76

Pekerjaan : Penataan Jaringan Irigasi ( 1 Paket Pemeliharaan Rutin Sal. Sek. .... D.I. ..... Kab. .... )
Item Pekerjaan : Pekerjaan Acian
Analisa : AHSP Permen PUPR No. 1 Tahun 2022
Satuan : m2
Harga Satuan : Rp 28,448.13

3.2.2.2.35.(a) 1 m2 Pekerjaan Acian


Harga Satuan Jumlah
No. Uraian Kode Sat. Koefesien
(Rp.) (Rp.)
1 2 3 4 5 6 7
A Tenaga Kerja
1 Pekerja L.01 Oh 0.1000 90,000.00 9,000.00
2 Tukang Batu L.02 Oh 0.1000 120,000.00 12,000.00
Jumlah Harga Tenaga Kerja 21,000.00
B Bahan
1 Portland Cement Merk I 50 kg M.23 Zak 0.0650 57,500.00 3,737.50
Jumlah Harga Bahan 3,737.50
C Alat
Jumlah Harga Alat -
D Jumlah Tenaga Kerja, Bahan dan Peralatan (A + B + C) 24,737.50
E Overhead & Profit (15% x D ) 3,710.63
F Harga Satuan Pekerjaan per - 1 m2 (D+E) 28,448.13

Pekerjaan : Penataan Jaringan Irigasi ( 1 Paket Pemeliharaan Rutin Sal. Sek. .... D.I. ..... Kab. .... )
Item Pekerjaan : Pasangan batu kosong
Analisa : AHSP Permen PUPR No. 1 Tahun 2022
Satuan : m3
Harga Satuan : Rp 646,305.75

1.5.1.1.a.(a) 1 m3 Pasangan batu kosong


Harga Satuan Jumlah
No. Uraian Kode Sat. Koefesien
(Rp.) (Rp.)
1 2 3 4 5 6 7
A Tenaga Kerja
1 Pekerja L.01 Oh 0.8000 90,000.00 72,000.00
2 Tukang Batu L.02 Oh 0.4000 120,000.00 48,000.00
Jumlah Harga Tenaga Kerja 120,000.00
B Bahan
1 Batu Kali Bulat Utuh M.04.a.3 m3 1.2500 236,100.00 295,125.00
2 Pasir Pasang M.05.b.3 m3 0.4320 340,000.00 146,880.00
Jumlah Harga Bahan 442,005.00
C Alat
Jumlah Harga Alat -
D Jumlah Tenaga Kerja, Bahan dan Peralatan (A + B + C) 562,005.00
E Overhead & Profit (15% x D ) 84,300.75
F Harga Satuan Pekerjaan per - 1 m3 (D+E) 646,305.75

Pekerjaan : Penataan Jaringan Irigasi ( 1 Paket Pemeliharaan Rutin Sal. Sek. .... D.I. ..... Kab. .... )
Item Pekerjaan : Bronjong kawat Pabrikasi
Analisa : AHSP Permen PUPR No. 1 Tahun 2022
Satuan : m3
Harga Satuan : Rp 574,545.75

1.5.7.a.(a) 1 m3 Bronjong kawat Pabrikasi


Harga Satuan Jumlah
No. Uraian Kode Sat. Koefesien
(Rp.) (Rp.)
1 2 3 4 5 6 7
A Tenaga Kerja
1 Pekerja L.01 Oh 0.3600 90,000.00 32,400.00
3 Tukang Batu L.02 Oh 0.1200 120,000.00 14,400.00
Jumlah Harga Tenaga Kerja 46,800.00
B Bahan
1 Batu Kali Bulat Utuh M.04.a.3 m3 1.2500 236,100.00 295,125.00
2 Kawat bronjong Ø 2,7 mm (2x1x0,5) M.05.b.3 m3 0.4320 365,000.00 157,680.00
Jumlah Harga Bahan 452,805.00
C Alat
Jumlah Harga Alat -
D Jumlah Tenaga Kerja, Bahan dan Peralatan (A + B + C) 499,605.00
E Overhead & Profit (15% x D ) 74,940.75
F Harga Satuan Pekerjaan per - 1 m3 (D+E) 574,545.75

Pekerjaan : Penataan Jaringan Irigasi ( 1 Paket Pemeliharaan Rutin Sal. Sek. .... D.I. ..... Kab. .... )
Item Pekerjaan : Pemasangan paving block natural tebal 6 cm
Analisa : AHSP Permen PUPR No. 1 Tahun 2022
Satuan : m2
Harga Satuan : Rp 393,691.00

A.4.4.3.63 1 m2 Pemasangan paving block natural tebal 6 cm


Harga Satuan Jumlah
No. Uraian Kode Sat. Koefesien
(Rp.) (Rp.)
1 2 3 4 5 6 7
A Tenaga Kerja
1 Pekerja L.01 Oh 0.2500 90,000.00 22,500.00
3 Tukang Batu L.02 Oh 0.5000 120,000.00 60,000.00
Jumlah Harga Tenaga Kerja 82,500.00
B Bahan
1 Paving block abu-abu 10 x 20 x 6 - m3 1.2500 80,000.00 100,000.00
2 Pasir Beton - m3 0.4320 370,000.00 159,840.00
Jumlah Harga Bahan 259,840.00
C Alat
Jumlah Harga Alat -
D Jumlah Tenaga Kerja, Bahan dan Peralatan (A + B + C) 342,340.00
E Overhead & Profit (15% x D ) 51,351.00
F Harga Satuan Pekerjaan per - 1 m2 (D+E) 393,691.00

Pekerjaan : Penataan Jaringan Irigasi ( 1 Paket Pemeliharaan Rutin Sal. Sek. .... D.I. ..... Kab. .... )
Item Pekerjaan : Bongkaran bronjong
Analisa : AHSP Permen PUPR No. 1 Tahun 2022
Satuan : m3
Harga Satuan : Rp 103,500.00

An. Hit. 1 m3 Bongkaran bronjong


Harga Satuan Jumlah
No. Uraian Kode Sat. Koefesien
(Rp.) (Rp.)
1 2 3 4 5 6 7
A Tenaga Kerja
1 Pekerja L.01 Oh 1.0000 90,000.00 90,000.00
Jumlah Harga Tenaga Kerja 90,000.00
B Bahan
Jumlah Harga Bahan -
C Alat
Jumlah Harga Alat -
D Jumlah Tenaga Kerja, Bahan dan Peralatan (A + B + C) 90,000.00
E Overhead & Profit (15% x D ) 13,500.00
F Harga Satuan Pekerjaan per - 1 m3 (D+E) 103,500.00

Pekerjaan : Penataan Jaringan Irigasi ( 1 Paket Pemeliharaan Rutin Sal. Sek. .... D.I. ..... Kab. .... )
Item Pekerjaan : Beton B0, untuk lantai kerja (bedding) K100
Analisa : AHSP Permen PUPR No. 1 Tahun 2022
Satuan : m3
Harga Satuan : Rp 1,005,974.00

2.2.1.1.a.(a) 1 m3 Beton B0, untuk lantai kerja (bedding) K100


Harga Satuan Jumlah
No. Uraian Kode Sat. Koefesien
(Rp.) (Rp.)
1 2 3 4 5 6 7
A Tenaga Kerja
1 Pekerja L.01 Oh 1.2000 90,000.00 108,000.00
2 Tukang Batu L.02 Oh 0.2000 120,000.00 24,000.00
Jumlah Harga Tenaga Kerja 132,000.00
B Bahan
1 Portland Cement Merk I 50 kg M.23 Zak 4.5400 57,500.00 261,050.00
2 Pasir Beton M.05.a.3 m3 0.6210 370,000.00 229,770.00
3 Kerikil Beton 1/2 M.04.d.3 m3 0.7410 340,000.00 251,940.00
Jumlah Harga Bahan 742,760.00
C Alat
Jumlah Harga Alat -
D Jumlah Tenaga Kerja, Bahan dan Peralatan (A + B + C) 874,760.00
E Overhead & Profit (15% x D ) 131,214.00
F Harga Satuan Pekerjaan per - 1 m3 (D+E) 1,005,974.00

Pekerjaan : Penataan Jaringan Irigasi ( 1 Paket Pemeliharaan Rutin Sal. Sek. .... D.I. ..... Kab. .... )
Item Pekerjaan : Beton mutu K.125 ( manual )
Analisa : AHSP Permen PUPR No. 1 Tahun 2022
Satuan : m3
Harga Satuan : Rp 1,118,455.50

2.2.2.1.c.(a) 1 m3 Beton mutu K.125 ( manual )


Harga Satuan Jumlah
No. Uraian Kode Sat. Koefesien
(Rp.) (Rp.)
1 2 3 4 5 6 7
A Tenaga Kerja
1 Pekerja L.01 Oh 1.6500 90,000.00 148,500.00
2 Tukang Batu L.02 Oh 0.2750 120,000.00 33,000.00
Jumlah Harga Tenaga Kerja 181,500.00
B Bahan
1 Portland Cement Merk I 50 kg M.23 Zak 5.5200 57,500.00 317,400.00
2 Pasir Beton M.05.a.3 m3 0.5910 370,000.00 218,670.00
3 Kerikil Beton 1/2 M.04.d.3 m3 0.7500 340,000.00 255,000.00
Jumlah Harga Bahan 791,070.00
C Alat
Jumlah Harga Alat -
D Jumlah Tenaga Kerja, Bahan dan Peralatan (A + B + C) 972,570.00
E Overhead & Profit (15% x D ) 145,885.50
F Harga Satuan Pekerjaan per - 1 m3 (D+E) 1,118,455.50

Pekerjaan : Penataan Jaringan Irigasi ( 1 Paket Pemeliharaan Rutin Sal. Sek. .... D.I. ..... Kab. .... )
Item Pekerjaan : Beton mutu K.175 ( manual )
Analisa : AHSP Permen PUPR No. 1 Tahun 2022
Satuan : m3
Harga Satuan : Rp 1,168,848.50

2.2.2.1.g.(a) 1 m3 Beton mutu K.175 ( manual )


Harga Satuan Jumlah
No. Uraian Kode Sat. Koefesien
(Rp.) (Rp.)
1 2 3 4 5 6 7
A Tenaga Kerja
1 Pekerja L.01 Oh 1.6500 90,000.00 148,500.00
2 Tukang Batu L.02 Oh 0.2750 120,000.00 33,000.00
Jumlah Harga Tenaga Kerja 181,500.00
B Bahan
1 Portland Cement Merk I 50 kg M.23 Zak 6.5200 57,500.00 374,900.00
2 Pasir Beton M.05.a.3 m3 0.5430 370,000.00 200,910.00
3 Kerikil Beton 1/2 M.04.d.3 m3 0.7620 340,000.00 259,080.00
Jumlah Harga Bahan 834,890.00
C Alat
Jumlah Harga Alat -
D Jumlah Tenaga Kerja, Bahan dan Peralatan (A + B + C) 1,016,390.00
E Overhead & Profit (15% x D ) 152,458.50
F Harga Satuan Pekerjaan per - 1 m3 (D+E) 1,168,848.50

Pekerjaan : Penataan Jaringan Irigasi ( 1 Paket Pemeliharaan Rutin Sal. Sek. .... D.I. ..... Kab. .... )
Item Pekerjaan : Pembesian dengan besi polos/ulir
Analisa : AHSP Permen PUPR No. 1 Tahun 2022
Satuan : Kg
Harga Satuan : Rp 22,426.44

2.2.6.1.b.(c) 1 Kg Pembesian dengan besi polos/ulir


Harga Satuan Jumlah
No. Uraian Kode Sat. Koefesien
(Rp.) (Rp.)
1 2 3 4 5 6 7
A Tenaga Kerja
1 Pekerja L.01 Oh 0.0070 90,000.00 630.00
2 Tukang Besi L.02 Oh 0.0070 102,500.00 717.50
Jumlah Harga Tenaga Kerja 1,347.50
B Bahan
1 Besi Beton Polos M.60.d Kg 1.0500 17,000.00 17,850.00
2 Kawat Bendrat M.27 Kg 0.0150 20,250.00 303.75
Jumlah Harga Bahan 18,153.75
C Alat
Jumlah Harga Alat -
D Jumlah Tenaga Kerja, Bahan dan Peralatan (A + B + C) 19,501.25
E Overhead & Profit (15% x D ) 2,925.19
F Harga Satuan Pekerjaan per - 1 Kg (D+E) 22,426.44

Pekerjaan : Penataan Jaringan Irigasi ( 1 Paket Pemeliharaan Rutin Sal. Sek. .... D.I. ..... Kab. .... )
Item Pekerjaan : Pembesian dengan jaring kawat (wiremesh)
Analisa : AHSP Permen PUPR No. 1 Tahun 2022
Satuan : Kg
Harga Satuan : Rp 761,394.88

2.2.7.a.(a) 1 Kg Pembesian dengan jaring kawat (wiremesh)


Harga Satuan Jumlah
No. Uraian Kode Sat. Koefesien
(Rp.) (Rp.)
1 2 3 4 5 6 7
A Tenaga Kerja
1 Pekerja L.01 Oh 0.0025 90,000.00 225.00
2 Tukang Besi L.02 Oh 0.0025 102,500.00 256.25
Jumlah Harga Tenaga Kerja 481.25
B Bahan
1 Wiremesh Ø 6 mm M.60.d Kg 1.0500 630,000.00 661,500.00
2 Kawat Bendrat M.27 Kg 0.0050 20,250.00 101.25
Jumlah Harga Bahan 661,601.25
C Alat
Jumlah Harga Alat -
D Jumlah Tenaga Kerja, Bahan dan Peralatan (A + B + C) 662,082.50
E Overhead & Profit (15% x D ) 99,312.38
F Harga Satuan Pekerjaan per - 1 Kg (D+E) 761,394.88

Pekerjaan : Penataan Jaringan Irigasi ( 1 Paket Pemeliharaan Rutin Sal. Sek. .... D.I. ..... Kab. .... )
Item Pekerjaan : Bekisting lantai beton expose dg. multiplex 18 mm kaso 5/7 cm (tanpa perancah)
Analisa : AHSP Permen PUPR No. 1 Tahun 2022
Satuan : m2
Harga Satuan : Rp 118,769.70

B.11.a 1 m2 Bekisting lantai beton expose dg. multiplex 18 mm kaso 5/7 cm (tanpa perancah)
Harga Satuan Jumlah
No. Uraian Kode Sat. Koefesien
(Rp.) (Rp.)
1 2 3 4 5 6 7
A Tenaga Kerja
1 Pekerja L.01 Oh 0.3000 90,000.00 27,000.00
2 Tukang Kayu L.02 Oh 0.3000 102,500.00 30,750.00
Jumlah Harga Tenaga Kerja 57,750.00
B Bahan
1 Multipleks 120 x 240 x 18 mm - Lbr 0.1280 226,000.00 28,928.00
2 Kayu cetakan - m3 0.0060 2,125,000.00 12,750.00
3 Paku 1" s/d 4" - Kg 0.2200 17,500.00 3,850.00
Jumlah Harga Bahan 45,528.00
C Alat
Jumlah Harga Alat -
D Jumlah Tenaga Kerja, Bahan dan Peralatan (A + B + C) 103,278.00
E Overhead & Profit (15% x D ) 15,491.70
F Harga Satuan Pekerjaan per - 1 m2 (D+E) 118,769.70

Pekerjaan : Penataan Jaringan Irigasi ( 1 Paket Pemeliharaan Rutin Sal. Sek. .... D.I. ..... Kab. .... )
Item Pekerjaan : Bekisting utk permukaan beton biasa dg. multiplex 12 mm atau 18 mm (tanpa perancah)
Analisa : AHSP Permen PUPR No. 1 Tahun 2022
Satuan : m2
Harga Satuan : Rp 73,583.90

B.11.b 1 m2 Bekisting utk permukaan beton biasa dg. multiplex 12 mm atau 18 mm (tanpa perancah)
Harga Satuan Jumlah
No. Uraian Kode Sat. Koefesien
(Rp.) (Rp.)
1 2 3 4 5 6 7
A Tenaga Kerja
1 Pekerja L.01 Oh 0.2000 90,000.00 18,000.00
2 Tukang Kayu L.02 Oh 0.1000 102,500.00 10,250.00
Jumlah Harga Tenaga Kerja 28,250.00
B Bahan
1 Multipleks 120 x 240 x 12 mm - Lbr 0.1280 149,500.00 19,136.00
2 Kayu cetakan - m3 0.0060 2,125,000.00 12,750.00
3 Paku 1" s/d 4" - Kg 0.2200 17,500.00 3,850.00
Jumlah Harga Bahan 35,736.00
C Alat
Jumlah Harga Alat -
D Jumlah Tenaga Kerja, Bahan dan Peralatan (A + B + C) 63,986.00
E Overhead & Profit (15% x D ) 9,597.90
F Harga Satuan Pekerjaan per - 1 m2 (D+E) 73,583.90

Pekerjaan : Penataan Jaringan Irigasi ( 1 Paket Pemeliharaan Rutin Sal. Sek. .... D.I. ..... Kab. .... )
Item Pekerjaan : Bekisting utk permukaan beton biasa dg. papan uk. 3/20 cm (tanpa perancah)
Analisa : AHSP Permen PUPR No. 1 Tahun 2022
Satuan : m2
Harga Satuan : Rp 85,683.63

B.11.c 1 m2 Bekisting utk permukaan beton biasa dg. papan uk. 3/20 cm (tanpa perancah)
Harga Satuan Jumlah
No. Uraian Kode Sat. Koefesien
(Rp.) (Rp.)
1 2 3 4 5 6 7
A Tenaga Kerja
1 Pekerja L.01 Oh 0.2000 90,000.00 18,000.00
2 Tukang Kayu L.02 Oh 0.1000 102,500.00 10,250.00
Jumlah Harga Tenaga Kerja 28,250.00
B Bahan
1 Kayu Lanan Papan - Lbr 0.0140 2,473,750.00 34,632.50
2 Kayu cetakan - m3 0.0030 2,125,000.00 6,375.00
3 Paku 1" s/d 4" - Kg 0.3000 17,500.00 5,250.00
Jumlah Harga Bahan 46,257.50
C Alat
Jumlah Harga Alat -
D Jumlah Tenaga Kerja, Bahan dan Peralatan (A + B + C) 74,507.50
E Overhead & Profit (15% x D ) 11,176.13
F Harga Satuan Pekerjaan per - 1 m2 (D+E) 85,683.63
Pekerjaan : Penataan Jaringan Irigasi ( 1 Paket Pemeliharaan Rutin Sal. Sek. .... D.I. ..... Kab. .... )
Item Pekerjaan : Perancah bekisting kaso 5/7 cm tinggi 4m JAT < 60 cm
Analisa : AHSP Permen PUPR No. 1 Tahun 2022
Satuan : m2
Harga Satuan : Rp 100,912.50

B.11.d 1 m2 Perancah bekisting kaso 5/7 cm tinggi 4m JAT < 60 cm


Harga Satuan Jumlah
No. Uraian Kode Sat. Koefesien
(Rp.) (Rp.)
1 2 3 4 5 6 7
A Tenaga Kerja
1 Pekerja L.01 Oh 0.3000 90,000.00 27,000.00
2 Tukang Kayu L.02 Oh 0.1500 102,500.00 15,375.00
Jumlah Harga Tenaga Kerja 42,375.00
B Bahan
1 Kayu Lanan Balok/pesagen - Lbr 0.0200 2,050,000.00 41,000.00
2 Paku 1" s/d 4" - Kg 0.2500 17,500.00 4,375.00
Jumlah Harga Bahan 45,375.00
C Alat
Jumlah Harga Alat -
D Jumlah Tenaga Kerja, Bahan dan Peralatan (A + B + C) 87,750.00
E Overhead & Profit (15% x D ) 13,162.50
F Harga Satuan Pekerjaan per - 1 m2 (D+E) 100,912.50

Pekerjaan : Penataan Jaringan Irigasi ( 1 Paket Pemeliharaan Rutin Sal. Sek. .... D.I. ..... Kab. .... )
Item Pekerjaan : Beton Siklop 40% batu belah, 60% beton( K.175 ) ( manual )
Analisa : AHSP Permen PUPR No. 1 Tahun 2022
Satuan : m3
Harga Satuan : Rp 1,011,869.67

2.2.12.a.(a) 1 m3 Beton Siklop 40% batu belah, 60% beton( K.175 ) ( manual )
Harga Satuan Jumlah
No. Uraian Kode Sat. Koefesien
(Rp.) (Rp.)
1 2 3 4 5 6 7
A Tenaga Kerja
1 Pekerja L.01 Oh 1.4480 90,000.00 130,320.00
2 Tukang Kayu L.02 Oh 0.2896 102,500.00 29,684.00
Jumlah Harga Tenaga Kerja 160,004.00
B Bahan
1 Batu Kali Bulat Utuh - m3 0.5810 236,100.00 137,174.10
2 Portland Cement Merk I 50 kg - Zak 4.5500 57,500.00 261,625.00
3 Pasir Beton - m3 0.3789 370,000.00 140,203.57
4 Kerikil Beton 1/2 - m3 0.5320 340,000.00 180,880.00
Jumlah Harga Bahan 719,882.67
C Alat
Jumlah Harga Alat -
D Jumlah Tenaga Kerja, Bahan dan Peralatan (A + B + C) 879,886.67
E Overhead & Profit (15% x D ) 131,983.00
F Harga Satuan Pekerjaan per - 1 m3 (D+E) 1,011,869.67

Pekerjaan : Penataan Jaringan Irigasi ( 1 Paket Pemeliharaan Rutin Sungai Karuk DAS Plawangan Kab. Pemalang )
Item Pekerjaan : kistdam pasir/tanah dibungkus karung plastik bagor
Analisa : AHSP Permen PUPR No. 1 Tahun 2022
Satuan : Bh
Harga Satuan : Rp 13,915.00

1.2.1.a.(c) 1 Bh kistdam pasir/tanah dibungkus karung plastik bagor


Harga Satuan Jumlah
No. Uraian Kode Sat. Koefesien
(Rp.) (Rp.)
1 2 3 4 5 6 7
A Tenaga Kerja
1 Pekerja L.01 Oh 0.0400 90,000.00 3,600.00
Jumlah Harga Tenaga Kerja 3,600.00
B Bahan
1 Karung Plastik M.136.a Bh 1.0000 7,000.00 7,000.00
2 Tali Plastik M.151.e m 2.0000 750.00 1,500.00
Jumlah Harga Bahan 8,500.00
C Alat
Jumlah Harga Alat -
D Jumlah Tenaga Kerja, Bahan dan Peralatan (A + B + C) 12,100.00
E Overhead & Profit (15% x D ) 1,815.00
F Harga Satuan Pekerjaan per - 1 Bh (D+E) 13,915.00

Pekerjaan : Penataan Jaringan Irigasi ( 1 Paket Pemeliharaan Rutin Sungai Karuk DAS Plawangan Kab. Pemalang )
Item Pekerjaan : Kerangka kayu/bambu untuk kistdam pasir/tanah
Analisa : AHSP Permen PUPR No. 1 Tahun 2022
Satuan : m3
Harga Satuan : Rp 66,225.63

1.2.2.(c) 1 m3 Kerangka kayu/bambu untuk kistdam pasir/tanah


Harga Satuan Jumlah
No. Uraian Kode Sat. Koefesien
(Rp.) (Rp.)
1 2 3 4 5 6 7
A Tenaga Kerja
1 Pekerja L.01 Oh 0.1000 90,000.00 9,000.00
Jumlah Harga Tenaga Kerja 9,000.00
B Bahan
1 Bambu - Btg 2.6000 16,500.00 42,900.00
2 Paku 1" s/d 4" - Kg 0.3250 17,500.00 5,687.50
Jumlah Harga Bahan 48,587.50
C Alat
Jumlah Harga Alat -
D Jumlah Tenaga Kerja, Bahan dan Peralatan (A + B + C) 57,587.50
E Overhead & Profit (15% x D ) 8,638.13
F Harga Satuan Pekerjaan per - 1 m3 (D+E) 66,225.63

Pekerjaan : Penataan Jaringan Irigasi ( 1 Paket Pemeliharaan Rutin Sal. Sek. .... D.I. ..... Kab. .... )
Item Pekerjaan : Galian Tanah Mekanis dan urug posisi dekat
Analisa : AHSP Permen PUPR No. 1 Tahun 2022
Satuan : m3
Harga Satuan : Rp 18,992.75

TM.02.3.a 1 m3 Galian Tanah Mekanis dan urug posisi dekat


Harga Satuan Jumlah
No. Uraian Kode Sat. Koefesien
(Rp.) (Rp.)
1 2 3 4 5 6 7
A Tenaga Kerja
1 Pekerja L.01 Oj 0.0316 12,857.14 406.29
2 Operator Alat Berat L.02 Oj 0.0316 32,142.86 1,015.71
3 Pembantu Operator L.02 Oj 0.0316 14,285.71 451.43
Jumlah Harga Tenaga Kerja 1,873.43
B Bahan
1 Dexlite - Ltr 0.5388 15,000.00 8,081.70
Jumlah Harga Bahan 8,081.70
C Alat
1 Excavator E.15.h Jam 0.0316 207,604.75 6,560.31
Jumlah Harga Alat 6,560.31
D Jumlah Tenaga Kerja, Bahan dan Peralatan (A + B + C) 16,515.44
E Overhead & Profit (15% x D ) 2,477.32
F Harga Satuan Pekerjaan per - 1 m3 (D+E) 18,992.75

Pekerjaan : Penataan Jaringan Irigasi ( 1 Paket Pemeliharaan Rutin Sal. Sek. .... D.I. ..... Kab. .... )
Item Pekerjaan : Galian Tanah Mekanis dan urug posisi Jauh
Analisa : AHSP Permen PUPR No. 1 Tahun 2022
Satuan : m3
Harga Satuan : Rp 23,620.74

TM.02.3.b 1 m3 Galian Tanah Mekanis dan urug posisi Jauh


Harga Satuan Jumlah
No. Uraian Kode Sat. Koefesien
(Rp.) (Rp.)
1 2 3 4 5 6 7
A Tenaga Kerja
1 Pekerja L.01 Oj 0.0393 12,857.14 505.29
2 Operator Alat Berat L.02 Oj 0.0393 32,142.86 1,263.21
3 Pembantu Operator L.02 Oj 0.0393 14,285.71 561.43
Jumlah Harga Tenaga Kerja 2,329.93
B Bahan
1 Dexlite - Ltr 0.6701 15,000.00 10,050.98
Jumlah Harga Bahan 10,050.98
C Alat
1 Excavator E.15.h Jam 0.0393 207,604.75 8,158.87
Jumlah Harga Alat 8,158.87
D Jumlah Tenaga Kerja, Bahan dan Peralatan (A + B + C) 20,539.77
E Overhead & Profit (15% x D ) 3,080.97
F Harga Satuan Pekerjaan per - 1 m3 (D+E) 23,620.74

Pekerjaan : Penataan Jaringan Irigasi ( 1 Paket Pemeliharaan Rutin Sal. Sek. .... D.I. ..... Kab. .... )
Item Pekerjaan : Angkutan Tanah Biasa menggunakan DT untuk Jarak 1 Km
Analisa : AHSP Permen PUPR No. 1 Tahun 2022
Satuan : m3
Harga Satuan : Rp 31,025.45

TM.01.2.a.1.(a) 1 m3 Angkutan Tanah Biasa menggunakan DT untuk Jarak 1 Km


Harga Satuan Jumlah
No. Uraian Kode Sat. Koefesien
(Rp.) (Rp.)
1 2 3 4 5 6 7
A Tenaga Kerja
1 Pekerja L.01 Oj 0.0880 12,857.14 1,131.43
2 Sopir L.02 Oj 0.0880 22,857.14 2,011.43
3 Pembantu sopir L.02 Oj 0.0880 12,142.86 1,068.57
Jumlah Harga Tenaga Kerja 4,211.43
B Bahan
1 Dexlite - Ltr 1.0648 15,000.00 15,972.00
Jumlah Harga Bahan 15,972.00
C Alat
2 Dump Truck E.13.b Jam 0.0880 77,218.43 6,795.22
Jumlah Harga Alat 6,795.22
D Jumlah Tenaga Kerja, Bahan dan Peralatan (A + B + C) 26,978.65
E Overhead & Profit (15% x D ) 4,046.80
F Harga Satuan Pekerjaan per - 1 m3 (D+E) 31,025.45

Pekerjaan : Penataan Jaringan Irigasi ( 1 Paket Pemeliharaan Rutin Sal. Sek. .... D.I. ..... Kab. .... )
Item Pekerjaan : Mobilisasi dan Demobilisasi
Analisa : AHSP Permen PUPR No. 1 Tahun 2022
Satuan : Ls
Harga Satuan : Rp 10,300,000.00

An.Hit.1 1 Ls Mobilisasi dan Demobilisasi


Harga Satuan Jumlah
No. Uraian Kode Sat. Koefesien
(Rp.) (Rp.)
1 2 3 4 5 6 7
A Tenaga Kerja
1 Pekerja (Penjaga alat) L.01 Ls 1.0000 2,300,000.00 2,300,000.00
Jumlah Harga Tenaga Kerja 2,300,000.00
B Bahan
Jumlah Harga Bahan -
C Alat
1 Truck trailer - Ls 1.0000 8,000,000.00 8,000,000.00
Jumlah Harga Alat 8,000,000.00
D Jumlah Tenaga Kerja, Bahan dan Peralatan (A + B + C) 10,300,000.00
E Overhead & Profit (0% x D ) -
F Harga Satuan Pekerjaan per - 1 Ls (D+E) 10,300,000.00

Pekerjaan : Penataan Jaringan Irigasi ( 1 Paket Pemeliharaan Rutin Sal. Sek. .... D.I. ..... Kab. .... )
Item Pekerjaan : Sistem Manajemen K3
Analisa : AHSP Permen PUPR No. 1 Tahun 2022
Satuan : Ls
Harga Satuan : Rp 230,000.00

An.Hit.2 1 Ls Sistem Manajemen K3


Harga Satuan Jumlah
No. Uraian Kode Sat. Koefesien
(Rp.) (Rp.)
1 2 3 4 5 6 7
A Tenaga Kerja
Jumlah Harga Tenaga Kerja -
B Bahan
1 Rambu Peringatan - Ls 1.0000 100,000.00 100,000.00
2 Perlengkapan Medis P3K - Ls 1.0000 100,000.00 100,000.00
Jumlah Harga Bahan 200,000.00
C Alat
Jumlah Harga Alat -
D Jumlah Tenaga Kerja, Bahan dan Peralatan (A + B + C) 200,000.00
E Overhead & Profit (15% x D ) 30,000.00
F Harga Satuan Pekerjaan per - 1 Ls (D+E) 230,000.00

Pekerjaan : Penataan Jaringan Irigasi ( 1 Paket Pemeliharaan Rutin Sungai Karuk DAS Plawangan Kab. Pemalang )
Item Pekerjaan : Pasangan 1 lapis Seseg Bambu, JAT< 1,2 m'
Analisa : AHSP Permen PUPR No. 1 Tahun 2022
Satuan : m2
Harga Satuan : Rp 66,595.93

An.Hit.3 1 m2 Pasangan 1 lapis Seseg Bambu, JAT< 1,2 m'


Harga Satuan Jumlah
No. Uraian Kode Sat. Koefesien
(Rp.) (Rp.)
1 2 3 4 5 6 7
A Tenaga Kerja
1 Pekerja L.01 Oh 0.0300 90,000.00 2,700.00
2 Tukang Kayu L.02 Oh 0.0900 102,500.00 9,225.00
Jumlah Harga Tenaga Kerja 11,925.00
B Bahan
1 Seseg Bambu - m2 1.1000 40,000.00 44,000.00
2 Paku 1" s/d 4" M.77.b Kg 0.1134 17,500.00 1,984.50
Jumlah Harga Bahan 45,984.50
C Alat
Jumlah Harga Alat -
D Jumlah Tenaga Kerja, Bahan dan Peralatan (A + B + C) 57,909.50
E Overhead & Profit (15% x D ) 8,686.43
F Harga Satuan Pekerjaan per - 1 m2 (D+E) 66,595.93

Pekerjaan : Penataan Jaringan Irigasi ( 1 Paket Pemeliharaan Rutin Sungai Karuk DAS Plawangan Kab. Pemalang )
Item Pekerjaan : Pasangan dan penetrasi tiang pancang kayu atau dolken ø 6-8 cm
Analisa : AHSP Permen PUPR No. 1 Tahun 2022
Satuan : m'
Harga Satuan : Rp 47,247.75

2.2.13.b.(a) 1 m' Pasangan dan penetrasi tiang pancang kayu atau dolken ø 6-8 cm
Harga Satuan Jumlah
No. Uraian Kode Sat. Koefesien
(Rp.) (Rp.)
1 2 3 4 5 6 7
A Tenaga Kerja
1 Pekerja L.01 Oh 0.0860 90,000.00 7,740.00
2 Tukang Batu L.02 Oh 0.0290 120,000.00 3,480.00
Jumlah Harga Tenaga Kerja 11,220.00
B Bahan
1 Dolken Sedang 8 x 10 x 400 cm - m' 1.1000 23,250.00 25,575.00
Jumlah Harga Bahan 25,575.00
C Alat
1 Tripod tinggi 7m, max 3 ton To.40.s /Hr 0.0286 100,000.00 2,860.00
2 Bandul pancang 0,5 ton To.40.b /Hr 0.0286 50,000.00 1,430.00
Jumlah Harga Alat 4,290.00
D Jumlah Tenaga Kerja, Bahan dan Peralatan (A + B + C) 41,085.00
E Overhead & Profit (15% x D ) 6,162.75
F Harga Satuan Pekerjaan per - 1 m' (D+E) 47,247.75
Harga Satuan
No. Jenis Pengeluaran / Uraian Kegiatan Satuan
(Rp)

1 2 4 5
1 Tenaga Pendukung O & P OB 150,000
2 Tenaga lapangan OB 100,000
3 Tenaga Pelaksana Operasi OB 200,000
4 Tenaga Pengelola Operasi OB 300,000
5 Tenaga Kawal Air OB 100,000
6 Upah Tenaga Kerja OB 85,000
7 Honor Pemeriksa Pekerjaan OB 500,000
8 Honor Pengawas Kontraktual OB 450,000
9 Kertas HVS 70 Gram rim 49,000
10 Snelhecter bh 7,000
11 Stopmap plastik bh 46,000
12 Stabillo Boss Dos 65,000
13 Penghapus Cair bh 8,000
14 Klip Dos 3,000
15 Foto Copy Folio Lbr 300
16 Foto Copy Double Folio Lbr 600
17 Jilid Lakban > 5 cm Ganda 14,000
18 Minuman dan Makanan kecil Dos 25,000
19 Makanan Siang Dos 30,000
20 Pertalite Ltr 10,000
21 Oli Sae 40 Ltr 44,000
22 Pakaian Kerja Stel 100,000
23 Sepatu kerja lapangan Stel 200,000
24 Jas Hujan Bh 104,000
25 Senter Bh 25,000
26 Dan Lain - Lian Ls -
27 Biaya langganan listrik Bendung/ Pomp Ls -
28 Biaya langganan PDAM Ls -
29 Biaya Telepon Ls -
30 Olie Ltr 44,000
31 Gemuk Ltr 30,000
32 Solar Ltr 10,000
33 Cat perak Kg 31,000
34 Cat dasar Kg 27,500
35 Minyak cat Kg 20,000
36 Teer Kg 7,500
37 Cat hitam Ltr 31,000
38 Cangkul Bh 203,000
39 Sabit Bh 66,000
40 Garu Sampah Bh 203,000
41 Linggis Bh 31,000
42 Cetok Bh 15,000
43 Batu Asahan Bh 15,000
44 Sikat Baja Bh 15,000
45 Dexlite Ltr 20,000
46 Portland Cement Zak 57,500
47 Pasir Pasang m3 340,000
48 Batu Belah m3 360,000
49 Kerikil m3 340,000
50 Tanah Urug m3 97,500
51 Perjalanan Dinas Oh 370,000
52 Amplas Lbr -
53 Sarangan besi Bh 100,000
54 Peilschal Bh 250,000
55 Papan OP irigasi Bh 3,000,000
56 Nomenklatur Bh 250,000
56 Perb. Pintu Air Bh 4,000,000
56 Pekerja Oh 90,000
56 Tukang Oh 120,000
PEMERINTAH PROVINSI JAWA TENGAH
DINAS PEKERJAAN UMUM SUMBER DAYA AIR
DAN PENATAAN RUANG
BALAI PENGELOLAAN SUMBER DAYA AIR
PEMALI COMAL
Jl. Dr. Sutomo No. 53 Telp. (0283) 356259 Tegal

Daerah Irigasi : Pesayangan

Area : 1870 Ha
Tegal, Oktober 2021

ANGKA KEBUTUHAN NYATA PENGELOLAAN IRIGASI


( AKNPI ) TAHUN ANGGARAN 2022
BLANKO AKNPI-01

PERHITUNGAN KEBUTUHAN BIAYA OPERASI JARINGAN IRIGASI


Tahun Anggaran 2023

Daerah Irigasi / Areal : Pesayangan/ 1870 Ha Kabupaten : Tegal


Perwakilan Balai : Gung Kecamatan : Talang

Harga Satuan Jumlah Biaya


No. Jenis Pengeluaran / Uraian Kegiatan Volume Sat. Keterangan
(Rp) (Rp)

1 2 3 4 5 6 7

1 GAJI/UPAH/HONOR
- Tenaga Pendukung O & P 6 Org x 12 Bln 72 OB 150,000 10,800,000
- Tenaga lapangan 9 Org x 12 Bln 108 OB 100,000 10,800,000
- Tenaga Pelaksana Operasi 12 Org x 12 Bln 144 OB 200,000 28,800,000
- Tenaga Pengelola Operasi 1 Org x 12 Bln 12 OB 300,000 3,600,000
- Tenaga Kawal Air 6 Org x 3 Bln 18 OB 100,000 1,800,000

Sub Jumlah 55,800,000


2 ALAT TULIS KANTOR
- Kertas HVS 70 Gram 38 rim 49,000 1,862,000
- Snelhecter 114 bh 7,000 798,000
- Stopmap plastik 114 bh 46,000 5,244,000
- Stabillo Boss 19 Dos 65,000 1,235,000
- Penghapus Cair 19 bh 8,000 152,000
- Klip 19 Dos 3,000 57,000

Sub Jumlah 9,348,000


3 CETAK / PENGGANDAAN
- Foto Copy Folio 3,800 Lbr 300 1,140,000
- Foto Copy Double Folio 3,800 Lbr 600 2,280,000
- Jilid Lakban > 5 cm 38 Ganda 14,000 532,000

Sub Jumlah 3,952,000

4 BIAYA RAPAT
- Minuman dan Makanan kecil 30 Org x 2 Keg 60 Dos 25,000 1,500,000
- Makanan Siang 30 Org x 2 Keg 60 Dos 30,000 1,800,000

Sub Jumlah 3,300,000

5 BAHAN BAKAR MINYAK


a. Kendaraan Operasional
- Pertalite 10 lt x 12 Bln 120 ltr 10,000 1,200,000
- Oli Sae 40 2 lt x 4 Bln 8 ltr 44,000 352,000
b. Mesin pompa air
- Pertalite - ltr - -
- Oli Sae 40 - ltr - -

Sub Jumlah 1,552,000

6 PERLENGKAPAN KERJA
- Pakaian Kerja 34 Stel 100,000 3,400,000
- Sepatu kerja lapangan 34 Stel 200,000 6,800,000
- Jas Hujan 34 Bh 104,000 3,536,000
- Senter 34 Bh 25,000 850,000
- Dan Lain - Lian - - - -

Sub Jumlah 14,586,000

7 BIAYA LAIN - LAIN


- Biaya langganan listrik Bendung/ Pompa air - Ls - -
- Biaya langganan PDAM - Ls - -
- Biaya Telepon - Ls - -
- Dan lain - lain -

Sub Jumlah -
Jumlah 88,538,000
Tegal, Oktober 2022

Kepala Seksi Operasi dan Pemeliharaan Koordinator Perwakilan Balai


Balai PSDA Pemali Comal Wilayah Gung

YUDI ISKANDAR, ST, M. PSDA SAEFUDIN, S.E,


NIP. 19830227 201001 1 015 NIP. 19731202 200604 1 006
BLANKO AKNPI-02

PERHITUNGAN KEBUTUHAN PEMELIHARAAN RUTIN


Tahun Anggaran 2023

Daerah Irigasi / Areal : Pesayangan/ 1870 Ha Kabupaten : Tegal


Perwakilan Balai : Gung Kecamatan : Talang

Harga Satuan
No. Jenis Bahan Volume Sat. Jumlah (Rp)
(Rp)
1 2 3 4 5 6
1 GAJI/UPAH/HONOR
- Upah Tenaga Kerja 7 Org x 12 Bln 84 OB 2,210,000 185,640,000
Sub Jumlah 185,640,000
2 ALAT TULIS KANTOR
- Kertas HVS 70 Gram 38 Rim 49,000 1,862,000
- Snelhecter 114 Bh 7,000 798,000
- Stopmap plastik 114 Bh 46,000 5,244,000
- Stabillo Boss 19 Dos 65,000 1,235,000
- Penghapus Cair 19 Bh 8,000 152,000
- Klip 19 Dos 3,000 57,000
Sub Jumlah 9,348,000
3 CETAK/PENGADAAN
- Foto Copy Folio 3,800 Lbr 300 1,140,000
- Foto Copy Double Folio 3,800 Lbr 600 2,280,000
- Jilid Lakban > 5 cm 38 Ganda 14,000 532,000
Sub Jumlah 3,952,000
4 BAHAN BAKAR MINYAK
a. Potong rumput
- Pertalite 70 Lt x 12 Bln 840 Ltr 10,000 8,400,000
- Oli Sae 40 32 Lt x 6 Bln 192 Ltr 44,000 8,448,000
b. Mesin Gergaji
- Pertalite - Lt x 12 Bln - Ltr 10,000 -
- Oli Sae 40 - Lt x 12 Bln - Ltr 44,000 -
Sub Jumlah 16,848,000
5 PERALATAN KERJA
- Cangkul 14 Bh 203,000 2,842,000
- Sabit 14 Bh 66,000 924,000
- Garu Sampah 14 Bh 203,000 2,842,000
- Linggis 14 Bh 31,000 434,000
- Cetok 14 Bh 15,000 210,000
- Batu Asahan 14 Bh 15,000 210,000
Sub Jumlah 7,462,000
6 KEBUTUHAN BAHAN PELUMAS PINTU
- Sikat Baja 29.00 Bh 15,000 435,000
- Kuas 29.00 Bh 7,500 217,500
- Olie 90 140.04 Ltr 44,000 6,161,760
- Olie 20 39.24 Ltr 44,000 1,726,560
- Solar 322.20 Ltr 10,000 3,222,000
- Paslin 70.20 Ltr 30,000 2,106,000
- Cat Perak 93.00 Ltr 31,000 2,883,000
- Cat Dasar 93.00 Ltr 27,500 2,557,500
- Minyak Cat 93.00 Kg 20,000 1,860,000
- Teer 93.00 Kg 7,500 697,500
- Cat Tembok 791.83 Ltr 31,000 24,546,792
Sub Jumlah 46,413,612
7 BIAYA PEKERJAAN PEMELIHARAAN RUTIN
- Batu Belah 648.78 m3 360,000 233,560,800
- Pasir Pasang 298.61 m3 340,000 101,527,570
- Portland Cement 1,915.08 Zak 57,500 110,117,344
- Kerikil 2.29 m3 340,000 777,240
- Tanah Urug - m3 97,500 -
- Sarangan besi - m2 100,000 -
- Peilschal - Bh 250,000 -
- Papan OP irigasi - Bh 3,000,000 -
- Nomenklatur - Bh 250,000 -
- Perb. Pintu Air - Bh 4,000,000 -
- Pekerja 2,033.00 Oh 90,000 182,970,000
- Tukang 567.00 Oh 120,000 68,040,000
Sub Total 696,992,954
8 BIAYA PENELUSURAN
- Perjalanan Dinas 4 Org x 1 Hr x 12 Kl 48 Oh 370,000 17,760,000
Sub Jumlah 17,760,000
Jumlah 984,416,566
Harga Satuan
No. Jenis Bahan Volume Sat. Jumlah (Rp)
(Rp)
1 2 3 4 5 6

Tegal, Oktober 2022

Kepala Seksi Operasi dan Pemeliharaan Koordinator Perwakilan Balai


Balai PSDA Pemali Comal Wilayah Gung

YUDI ISKANDAR, ST, M. PSDA SAEFUDIN, S.E,


NIP. 19830227 201001 1 015 NIP. 19731202 200604 1 006
Blanko AKNPI - 02.A

PERHITUNGAN KEBUTUHAN BAHAN PELUMAS PINTU DAN CAT


Tahun Anggaran 2023

Daerah Irigasi : Pesayangan Kabupaten : Tegal


Perwakilan Balai : Gung Kecamatan : Talang
Balai PU SDA TARU : Pemali Comal

Jumlah Pintu Kebutuhan Bahan Pelumas Kebutuhan Bahan Cat


Jumlah Jumlah
No Daerah Irigasi Sedang Olie 90 Olie 20 Solar Paslin Cat Perak Cat Dasar Minyak Cat Teer Cat Tembok Keterangan
Besar (bh) Kecil (bh) (Rp) (Rp)
(bh)
(Rp/Ltr) (Rp/Ltr) (Rp/Ltr) (Rp/Ltr) (Rp/Kg) (Rp/Kg) (Rp/Ltr) (Rp/Ltr) (Rp/Kg)
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

I D.I. Pesayangan 16 7 47 6,161,760 1,726,560 3,222,000 2,106,000 13,216,320 2,883,000 2,557,500 1,860,000 697,500 24,546,792 32,544,792

JUMLAH 6,161,760 1,726,560 3,222,000 2,106,000 13,216,320 2,883,000 2,557,500 1,860,000 697,500 24,546,792 32,544,792

Catatan :
Pintu Kecil : lebar pintu < 0,60 m dan drat stang < 1 m Bahan pelumas 12 liter/tahun, bahan cat 2 kg/tahun untuk pintu > 0,60 m
Pintu Sedang : lebar pintu < 0,60 m - 1,00 m dan drat stang 1-2 m Bahan pelumas 6 liter/tahun, bahan cat 1 kg/tahun untuk pintu < 0,60 m
Pintu Besar : lebar pintu > 1,00 m dan drat stang > 2 m Cat perak : 31,000 / Kg
Cat dasar : 27,500 / Kg
Perkiraan Harga : Olie : 44,000 / liter Minyak cat : 20,000 / Kg
Gemuk : 30,000 / liter Teer : 7,500 / Kg
Solar : 10,000 / liter Cat hitam : 31,000 / Kg

Tegal, Oktober 2022

Koordinator Perwakilan Balai Koordinator Perwakilan Balai


Wilayah Gung Wilayah Gung

SAEFUDIN, S.E, SAEFUDIN, S.E,


NIP. 19731202 200604 1 006 NIP. 19731202 200604 1 006
BLANKO AKNPI-02 B

DAFTAR KEBUTUHAN BAHAN PEKERJAAN PEMELIHARAAN RUTIN


Tahun Anggaran 2023

Daerah Irigasi : Pesayangan Kabupaten : Tegal


Perwakilan Balai : Gung Kecamatan : Talang
Balai PSDA : Pemali Comal

Jenis Pekerjaan
Galian Bongkar Papan OP. Prioritas
Timbunan Babatan Pas. batu Pas. Batu Siaran Plesteran Pas. Beton Sarangan Peil schaal Nomenklat Perbk. Area yang 1.segera
Nama Lokasi lumpur/tana pasangan baru
No. Nama Saluran tanah rumput kali '1:4 kosong besi baru ur pintu dilayani 2.perlu
Bangunan (hm) h 1:2 1:3 1:2:3 lama tersier
(ha) 3.dapat
m3 m3 m2 m3 m3 m2 m2 m3 m3 m2 bh bh bh bh ditunda
1000 1000 1000 1000 1000 1000 1000 1000 1000 1000 1000 1000 1000 1000
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20

I Sal. Sek. Lemahduwur


1 Sal. Sek. Lemahduwur B.Ld.3 14 + 39 - - - 157.50 - 405.00 202.50 - 157.50 - - - - - 322.00 2
2 Sal. Sek. Lemahduwur B.Ld.4a 18 + 63 - - - 52.50 - 135.00 67.50 - 52.50 - - - - - 260.00 2
3 Sal. Sek. Lemahduwur B.Ld.4 22 + 88 - - - 14.00 - 36.00 18.00 - 14.00 - - - - - 200.00 1
4 Sal. Sek. Lemahduwur B.Ld.8a 44 + 00 - - - 10.50 - 27.00 13.50 - 10.50 - - - - - 171.00 2
5 Sal. Sek. Lemahduwur B.Ld.8b 46 + 00 - - - 7.00 - 18.00 9.00 - 7.00 - - - - - 154.00 2

II Sal. Sek. Cangkring


1 Sal. Sek. Cangkring B.Ck.1a 3 + 41 138.24 - - 35.00 - 90.00 45.00 - 35.00 - - - - - - 2
2 Sal. Sek. Cangkring B.Ck.1 5 + 76 - - - 10.50 - 27.00 13.50 - 10.50 - - - - - - 2
3 Sal. Sek. Cangkring Cr.Ck.1 10 + 15 - - - 115.20 - 240.00 72.00 - 115.20 - - - - - - 1

III Sal. Sek. Kaladawa


1 Sal. Sek. Kaladawa B.Kd.1a 13 + 45 - - - 126.00 - 132.00 54.00 - 126.00 - - - - - - 1

IV Sal. Sek. Getaskerep


2 Sal. Sek. Getaskerep B..Ge.1 Hm. 9 + 96 - - - 1.95 - 6.90 2.50 - 1.95 - - - - - - 2

V Sal. Sek. Langon


1 Sal. Sek. Langon B.Lg.1 4 + 40 - - - 10.50 - 27.00 13.50 3.00 10.50 - - - - - - 1

Volume Total 138 - - 540.65 - 1,143.90 511.00 3.00 540.65 - - - - -


Harga Satuan ( Rp 1.000 ). 60.75 145.50 60.75 991.25 562.01 46.39 59.36 1,016.39 126.00 100.00 250.00 3,000.00 250.00 4,000.00
Total Harga (Rp.1000) 8,398 - - 535,919 - 53,066.66 30,334.19 3,049.17 68,121.90 - - - - -

Catatan : Bila ada item pekerjaan yang belum tercakup dalam Tabel ini dapat ditambahkan sendiri Tegal, Oktober 2022

Kepala Seksi Operasi dan Pemeliharaan Koordinator Perwakilan Balai


Balai PSDA Pemali Comal Wilayah Gung

YUDI ISKANDAR, ST, M. PSDA SAEFUDIN, S.E,


NIP. 19830227 201001 1 015 NIP. 19731202 200604 1 006
BLANKO AKNPI-03

PERHITUNGAN BIAYA PEMELIHARAAN BERKALA


Tahun Anggaran 2023

Daerah Irigasi : Pesayangan Kabupaten : Tegal


Perwakilan Balai : Gung Kecamatan : Talang
Balai PSDA : Pemali Comal

Harga Satuan
NO. Jenis Pengeluaran / Uraian Kegiatan Volume Sat. Jumlah Biaya (Rp) Ket.
(Rp)

1 2 3 4 5 6 7
1 Biaya Pemeliharaan Berkala Bersifat Perawatan
1.1 Gaji/Upah/Honor
- Upah tenaga kerja 113 org x 107 Hr 12,091 OH 85,000 1,027,735,000

Sub Jumlah 1,027,735,000

1.2 Alat Tulis Kantor


- Kertas HVS 70 gram 38 rim 49,000 1,862,000
- Snelhecter 114 bh 7,000 798,000 ,
- Stopmap plastik 114 bh 46,000 5,244,000
- Stabillo Boss 19 dos 65,000 1,235,000
- Penghapus cair 19 bh 8,000 152,000
- Klip 19 dos 3,000 57,000
- Dan lain-lain.
Sub Jumlah 9,348,000

1.3 Bahan Cat :


- Cat perak 93 Kg 31,000 385,000
- Cat dasar 93 Kg 27,500 266,000
- Minyak cat 93 Kg 20,000 105,000
- Teer 93 Kg 7,500 105,000
- Cat hitam 792 Kg 31,000 385,000
- Amplas 1,584 lbr 10,000 15,836,640

1.4 Bahan Bakar Minyak


Pompa Air :
- Pertalite - lt x - Bln - Ltr 10,000 -
- Solar - lt x - Bln - Ltr 10,000 -
- Olie - lt x - Bln - Ltr 44,000 -

Mesin potong rumput.


- Pertalite 50 lt x 12 Bln 600 Ltr 10,000 6,000,000
- Oli Sae 40 5 lt x 6 Bln 30 Ltr 44,000 1,320,000
- Dan lain-lain. - - -

Sub Jumlah 24,402,640


Jumlah (1)

2 Biaya Pemeliharaan Berkala Bersifat Perbaikan


2.1 Alat Tulis Kantor
- Kertas HVS 70 gram 17 rim 49,000 833,000
- Snelhecter 51 bh 7,000 357,000
- Stopmap plastik 51 bh 46,000 2,346,000
- Stabillo Boss 9 dos 65,000 552,500
- Penghapus cair 9 bh 8,000 68,000
- Klip 9 dos 3,000 27,000
- Dan lain-lain.
128
Sub Jumlah 4,183,500

2.2 Cetak/Penggandaan
- Foto Copy Folio 1,700 Lbr 300 510,000
- Jilid Lakban > 5 cm 17 Bk 14,000 238,000
- Dan lain-lain.

Sub Jumlah 748,000


2.3 Sosialisasi.
- Minuman dan makanan keci 30 org x 5 Keg 150 Dos 25,000 3,750,000
- Makanan Siang 30 org x 5 Keg 150 Dos 30,000 4,500,000

Sub Jumlah 8,250,000


Harga Satuan
NO. Jenis Pengeluaran / Uraian Kegiatan Volume Sat. Jumlah Biaya (Rp) Ket.
(Rp)

1 2 3 4 5 6 7

2.4 Biaya Pekerjaan Pemeliharaan Berkala,


- Galian lumpur/tanah 16,886 m3 60,750 1,025,822,070
- Timbunan tanah - m3 145,500 -
- Babatan rumput - m2 60,750 -
- Pas. batu kali '1:4 278 m3 991,250 275,815,313 Diambil
- Pas. Batu kosong - m3 562,005 - dari blanko
- Siaran 716 m2 46,391 33,192,761 AKNPI
- Plesteran 358 m2 59,362 21,236,899 03.A.
- Pas. Beton 80 m3 1,016,390 80,803,005
- Bongkar pasangan lama 278 m3 126,000 35,059,500
- Dan lain-lain.

Sub Jumlah 446,107,477


Jumlah (2)

3 Biaya Pemeliharaan Berkala Bersifat Penggantian


3.1 Gaji/Upah/Honor
- Upah tenaga kerja 12 Oh 85,000 1,020,000

Sub Jumlah 1,020,000

3.2 Bahan Bangunan


- Sarangan besi - m2 100,000 -
- Peil schaal baru - bh 250,000 -
- Papan OP. baru tersier - bh 3,000,000 -
- Nomenklatur - bh 250,000 -
- Perbk. pintu 3 bh 4,000,000 12,000,000
- Dan lain-lain.

Sub Jumlah 12,000,000


Jumlah (3)
Total 1,533,794,617

Tegal, Oktober 2022

Kepala Seksi Operasi dan Pemeliharaan Koordinator Perwakilan Balai


Balai PSDA Pemali Comal Wilayah Gung

YUDI ISKANDAR, ST, M. PSDA SAEFUDIN, S.E,


NIP. 19830227 201001 1 015 NIP. 19731202 200604 1 006
BLANKO AKNPI-03 A

DAFTAR USULAN PEKERJAAN PEMELIHARAAN BERKALA


Tahun Anggaran 2023

Daerah Irigasi : Pesayangan Kabupaten : Tegal


Perwakilan Balai : Gung Kecamatan : Talang
Balai PSDA : Pemali Comal

Jenis Pekerjaan
Prioritas
Galian Bongkar Papan OP.
Timbunan Babatan Pas. batu Pas. Batu Siaran Plesteran Pas. Beton Sarangan Peil schaal Nomenklat Perbk. Area yang 1.segera
Nama Lokasi lumpur/tan pasangan baru
No. Nama Saluran tanah rumput kali '1:4 kosong besi baru ur pintu dilayani 2.perlu
Bangunan (hm) ah 1:2 1:3 1:2:3 lama tersier
(ha) 3.dapat
m3 m3 m2 m3 m3 m2 m2 m3 m3 m2 bh bh bh bh ditunda
1000 1000 1000 1000 1000 1000 1000 1000 1000 1000 1000 1000 1000 1000
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20

I Sal. Sek. Lemahduwur


1 Sal. Sek. Lemahduwur B.Ld.1a 0 + 00 1,692.00 - - - - - - - - - - - - - 468.00 1
7 Sal. Sek. Lemahduwur B.Ld.8b 46 + 00 1,600.00 - - - - - - - - - - - - - 154.00 1
8 Sal. Sek. Lemahduwur B.Ld.8 56 + 00 1,920.00 - - - - - - - - - - - - - 135.00 1
9 Sal. Sek. Lemahduwur B.Ld.10.a 68 + 00 849.60 - - 35.00 - 90.00 45.00 10.00 35.00 - - - - - 123.00 1

II Sal. Sek. Tegalwangi


1 Sal. Sek. Tegalwangi B.Tw.1 0 + 00 - - - - - - - - - - - - - 1.00 155.00 1
2 Sal. Sek. Tegalwangi B.Tw.2 52 + 80 - - - - - - - - - - - - - 1.00 42.00 1

III Sal. Sek. Cangkring


2 Sal. Sek. Cangkring B.Ck.3 14 + 33 1,317.00 - - 35.00 - 90.00 45.00 10.00 35.00 - - - - - 593.00 1
4 Sal. Sek. Cangkring B.Ck.4a 18 + 77 - - - 42.00 - 108.00 54.00 12.00 42.00 - - - - - 593.00 1
5 Sal. Sek. Cangkring B.Ck.4 22 + 28 - - - 47.25 - 121.50 60.75 13.50 47.25 - - - - - 571.00 1
6 Sal. Sek. Cangkring B.Ck.5 27 + 23 - - - 52.50 - 135.00 67.50 15.00 52.50 - - - - - 568.00 1
7 Sal. Sek. Cangkring B.Ck.6 31 + 05 - - - 45.50 - 117.00 58.50 13.00 45.50 - - - - - 473.00 1
8 Sal. Sek. Cangkring B.Ck.8 40 + 96 - - - - - - - - - - - - - 1.00 242.00 1
9 Sal. Sek. Cangkring B.Ck.9b 56 + 19 - - - 21.00 - 54.00 27.00 6.00 21.00 - - - - - 242.00 1
10 Sal. Sek. Cangkring B.Ck.10 72 + 18 2,260.26 - - - - - - - - - - - - - 242.00 1

IV Sal. Sek. Langon


1 Sal. Sek. Langon B.Lg.2 23 + 58 3,623.55
3,623.55

Volume Total 16,886 - - 278.25 - 715.50 357.75 79.50 278.25 - - - - 3.00


Harga Satuan ( Rp 1.000 ). 60.75 145.50 60.75 991.25 562.01 46.39 59.36 1,016.39 126.00 100.00 250.00 3,000.00 250.00 4,000.00
Totahl Harga (Rp.1000) 1,025,822 - - 275,815 - 33,193 21,237 80,803 35,059 - - - - 12,000

Catatan : Bila ada item pekerjaan yang belum tercakup dalam Tabel ini dapat ditambahkan sendiri Tegal, Oktober 2022

Kepala Seksi Operasi dan Pemeliharaan Koordinator Perwakilan Balai


Balai PSDA Pemali Comal Wilayah Gung
-

YUDI ISKANDAR, ST, M. PSDA SAEFUDIN, S.E,


NIP. 19830227 201001 1 015 NIP. 19731202 200604 1 006
BLANKO AKNPI-04

PERHITUNGAN KEBUTUHAN BIAYA REHABILITASI


Tahun Anggaran 2023

Daerah Irigasi : Pesayangan Kabupaten : Tegal


Perwakilan Balai : Gung Kecamatan : Talang
Balai PSDA : Pemali Comal

NO. Jenis Pengeluaran / Uraian Biaya Volume Sat. Harga Satuan (Rp) Jumlah Biaya (Rp) Ket.

1 2 3 4 5 6 7

1 UPAH
- Honor Pemeriksa Pekerjaan 5 org x 1 bl 5 OB 500,000 2,500,000
- Honor Pengawas Kontraktual 2 org x 4 bl 8 OB 450,000 3,600,000

Sub Jumlah 6,100,000


2 ALAT TULIS KANTOR
- Kertas HVS 70 gram 38 Rim 49,000 1,862,000
- Snelhecter 51 bh 7,000 357,000
- Stopmap plastik 51 bh 46,000 2,346,000
- Stabillo Boss 8.5 dos 65,000 552,500
- Penghapus cair 8.5 bh 8,000 68,000
- Klip 9 dos 3,000 27,000
- Dan lain-lain

Sub Jumlah 5,212,500


3 CETAK / PENGGANDAAN
- Foto Copy Double Folio 3800 Lbr 600 2,280,000
- Foto copy folio 38 Lbr 300 11,400
- Dan lain-lain.

Sub Jumlah 2,291,400


4 KONSTRUKSI
- Galian lumpur/tanah 4,500 m3 69,863 314,381,250
- Timbunan tanah - m3 167,325 -
- Babatan rumput - m2 69,863 -
- Pas. batu kali '1:4 145 m3 1,139,938 165,689,916
- Pas. Batu kosong - m3 646,306 -
- Siaran 257 m2 53,350 13,684,185 Diambil
dari
- Plesteran 128 m2 68,267 8,755,212
Blanko
- Pas. Beton - m3 1,168,849 - 04-A.
- Bongkar pasangan lama 100 m3 144,900 14,453,775
- Sarangan besi - m2 100,000 -
- Peil schaal baru - bh 250,000 -
- Papan OP. baru tersier - bh 3,000,000 -
- Nomenklatur - bh 250,000 -
- Perbk. pintu - bh 4,000,000 -
- dan lain - lain.

Sub Jumlah 516,964,338


5 BIAYA RAPAT
- Minuman dan makanan kecil 30 Org x 4 kl 120 dos 25,000 3,000,000
- Makanan Siang 30 Org x 4 kl 120 dos 30,000 3,600,000

Sub Jumlah 6,600,000


6 BIAYA SOSIALISASI
- Minuman dan makanan kecil 30 Org x 1 kl 30 dos 25,000 750,000
- Makanan Siang 30 Org x 1 kl 240 dos 30,000 7,200,000

Sub Jumlah 7,950,000


Jumlah 545,118,238
Tegal, Oktober 2022

Kepala Seksi Operasi dan Pemeliharaan Koordinator Perwakilan Balai


Balai PSDA Pemali Comal Wilayah Gung

YUDI ISKANDAR, ST, M. PSDA SAEFUDIN, S.E,


NIP. 19830227 201001 1 015 NIP. 19731202 200604 1 006
BLANKO AKNPI-04 A

DAFTAR USULAN PEKERJAAN REHABILITASI


Tahun Anggaran 2023

Daerah Irigasi : Pesayangan Kabupaten : Tegal


Perwakilan Balai : Gung Kecamatan : Talang
Balai PSDA : Pemali Comal

Jenis Pekerjaan
Prioritas
Galian Bongkar Papan OP.
Timbunan Babatan Pas. batu Pas. Batu Siaran Plesteran Pas. Beton Sarangan Peil schaal Nomenklat Perbk. Area yang 1.segera
Nama Lokasi lumpur/ta pasangan baru
No. Nama Saluran tanah rumput kali '1:4 kosong besi baru ur pintu dilayani 2.perlu
Bangunan (hm) nah 1:2 1:3 1:2:3 lama tersier
(ha) 3.dapat
m3 m3 m2 m3 m3 m2 m2 m3 m3 m2 bh bh bh bh ditunda
1000 1000 1000 1000 1000 1000 1000 1000 1000 1000 1000 1000 1000 1000
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20

I Sal. Sek. Tegalwangi


1 Sal. Sek. Tegalwangi B.Tw.1e 12 + 57 4,500.00 - - 15.30 - 27.00 13.50 - 10.50 - - - - - 155.00 2
2 Sal. Sek. Tegalwangi B.Tw.1f 18 + 17 - - - 25.50 - 45.00 22.50 - 17.50 - - - - - 155.00 2
3 Sal. Sek. Tegalwangi B.Tw.1 36 + 89 - - - 56.10 - 99.00 49.50 - 38.50 - - - - - 155.00 2
4 Sal. Sek. Tegalwangi B.Tw.2a 37 + 42 - - - 48.45 - 85.50 42.75 - 33.25 - - - - - 42.00 2
-
-

Volume Total 4,500.0 - - 145.35 - 256.50 128.25 - 99.75 - - - - -


Harga Satuan ( Rp 1.000 ). 69.86 167.33 69.86 1,139.94 646.31 53.35 68.27 1,168.85 144.90 100.00 250.00 3,000.00 250.00 4,000.00
Totahl Harga (Rp.1000) 314,381 - - 165,690 - 13,684.2 8,755.2 - 14,453.8 - - - - -

Catatan : Bila ada item pekerjaan yang belum tercakup dalam Tabel ini dapat ditambahkan sendiri Tegal, Oktober 2022

Kepala Seksi Operasi dan Pemeliharaan Koordinator Perwakilan Balai


Balai PSDA Pemali Comal Wilayah Gung
-

YUDI ISKANDAR, ST, M. PSDA SAEFUDIN, S.E,


NIP. 19830227 201001 1 015 NIP. 19731202 200604 1 006
BLANKO AKNPI-05

REKAPITULASI KEBUTUHAN ANGGARAN PENGELOLAAN IRIGASI


BALAI PENGELOLAAN SUMBER DAYA AIR PEMALI COMAL
Tahun Anggaran 2023

Biaya Pemeliharaan
Areal Jumlah Biaya Biaya Rehabiliasi Total Biaya
Daerah Irigasi Biaya Operasi (Rp) Rutin Berkala Jumlah
(Ha) (Rp) (Rp) (Rp)
No. (Rp) (Rp) (Rp)
1 2 3 4 5 6 7=5+6 8=4+7 9 10=8+9

1. PESAYANGAN 1870 88,538,000 984,416,566 1,533,794,617 2,518,211,182 2,606,749,182 545,118,238 3,151,867,420

Jumlah 3,151,867,420

Tegal, Oktober 2022

Mengetahui,
Kepala Balai Kepala Seksi Operasi dan Pemeliharaan
PSDA Pemali Comal Balai PSDA Pemali Comal

Ir. RADITO, M.T, YUDI ISKANDAR, ST, M. PSDA


NIP. 19661221 199102 1 001 NIP. 19830227 201001 1 015