D.2. Quality Manual

You might also like

Download as pdf or txt
Download as pdf or txt
You are on page 1of 55

Quality Manual

Version -01

Head office: 158-160 Motijhil C/A, Modhumita Building, 4th Floor, Dhaka-1000.
Telephone: 880-2-7120899 (Hunting)
Fax: 880-2-9564650
Email: info@rizvifashions.com
Factory: Anwar jang road, 1 no kalma bazar, Savar, Dhaka-1341
This Quality Manual is the property of Rizvi Fashions Limited & all rights are reserved by RF
Page | 1
Table of Content
1. Introduction……………………………………………….3
2. Quality Process…………………………………………..5

3. Quality Management 04

1. Trims & Accessory Inspection Procedure 06 ……….. SOP/Q - 01


2. Fabric Inspection Procedure 09………… SOP/Q - 02
3. Fabric Approval Procedure 11……….. SOP/Q - 03
4. Marker Checking Procedure 15……….. SOP/Q - 04
5. Fabric Relaxing & Layering Auditing 17……….. SOP/Q - 05
6. Cutting In-line Inspection Procedure 19 ……… SOP/Q - 06
7. Bundle Inspection procedure 21 ……… SOP/Q - 07
8. Heat Seal Auditing Procedure 24 ……… SOP/Q - 08
9. Line feeding & Muck-up Procedure 25 ……… SOP/Q - 09
10. Sewing In-line Auditing Procedure 28 ……… SOP/Q - 10
11. Sewing End Line Auditing Procedure 36 ……… SOP/Q - 11
12. Sewing End Line AQL Procedure 38 ……… SOP/Q - 12
13. Packing In-line Inspection Procedure 41 ……… SOP/Q - 13
14. Pre-final Inspection Procedure 44 ……… SOP/Q - 14
15. Measurement Procedure 46………. SOP/Q - 15
16. Style File Maintain Procedure 48 ……… SOP/Q - 16
17. Defect Classification 50 ……… SOP/Q - 17

6. Appendix 55
6.1. Control Authority of the Manual 55

This Quality Manual is the property of Rizvi Fashions Limited & all rights are reserved by RF
Page | 2
Introduction
Rizvi Fashions Ltd (RF) is a company of 100% exports oriented manufacturing Company.
Over the years the companies have built an enviable reputation of being a reliable vendor
of consistent high quality, on time delivery and compliance with international labor &
environmental standards. RF has been supplying textiles to several large retail chains in
North America and Western Europe for last 4 years. Our reputation is based on the simple
philosophy that “quality, on-time delivery and competitive price are the essence of long
term relationship in export business”.

Rizvi Fashions Ltd (RF) is fully vertical setup for the sole purpose of manufacturing high
quality Men’s Brief/Boxer/Shorts/Tantop, Ladies Brief/Top/Leggings/Tantop, brassiere-
panty sets, Baby T-Shirts/Bottom etc. Rizvi Fashions equipped to produce a wide range of
styles and designs using a variety of fabrics, lace and accessories based on customer’s
requirement. The plant is fully equipped with to produce high quality based GMTS with
traditional seams. Plant has the capacity of producing 3 to 3.5 million pieces/month Men’s
Brief/Boxer/Shorts/Tantop, Ladies Brief/Top/Leggings/Tantop.

The purpose of this manual is to guide and strength Rizvi Fashions Ltd. overall standard by
making standard process of quality assurance & production.

This Quality Manual is the property of Rizvi Fashions Limited & all rights are reserved by RF
Page | 3
Quality
Management
This Quality Manual is the property of Rizvi Fashions Limited & all rights are reserved by RF
Page | 4
Quality Process Fabric
Trims &
Accessories

Marker &
Pattern
Inspection & Testing

Approval

Marker
auditing

Relaxing, Laying &


Cutting Auditing

Molding In-line
Auditing Bundle Auditing

Sewing in Line audit by


Sewing In-line Auditing
GPQ

Quality Management End Tablle 100%


Inspection

Daily Quality Meeting


with Production

Sewing End Line AQL


Auditing

Weekly Quality Meeting


with Production

Hourly audit Packing In-line Auditing


report (on ctn)
Monthly Quality Goal
Review

Pre-final Inspection

This Quality Manual is the property of Rizvi Fashions Limited & all rights are reserved by RF
Page | 5
Title: Trims & Accessory Inspection Procedure (wUªgm Ges
GK‡mmwiR B݇cKkb cÖwmwWDi)
Created: 20/05/16 Revision: Section: Quality
10/12/16 Assurance
Approved By: Shaikh Rezwan, Authorized: Manager ,QC,
Rizvi Fashions Ltd Director (RF Operation) RF
Standard Operating Procedure for Quality Assurance SOP/Q - 01
Purpose(D‡Ïk¨):
To ensure the Trim and Accessory Quality level before it use.(KvR ïiæi c~‡e© mKj wUªg Ges
GK‡mmwiR Gi †KvqvwjwU wbwðZ Kiv|)
Scope (cÖ‡qv‡Mi ¯’vb): Sewing, Finishing, Accessories Storage area. (myBs †kKkb, wdwbwks,
GK‡mmwiR †óvi|)
Responsibilities (ØvwqZ¡cÖvß e¨vw³): Store Quality inspector.†óvi †KvqvwjwU B݇c±i|
Procedure (Kv‡Ri cÖwµqv):
1. Accessory inspection conduct lot wise and use AQL 2.5 Point (Single sampling plan
normal inspection level II) for auditing But only elastic will do by 10% inspection.If result
:- (2.5 G wKD Gj (Single sampling plan normal inspection level II) AwW‡Ui gva¨‡g cÖ‡Z¨K jU
†_‡K mKj GK‡mmwiR B݇cKkb Ki‡e| Z‡e ïaygvÎ GjvwóK 10% B݇cKkb Ki‡e|)
hw` djvdj :-
a) If less than 2% defect, than whole lot will go to production.
b) If above 2% but less than 15% are defect, take another lot. For the 2 nd lot
inspection considers the following:-
c) If less than 15% are defects, Conduct 100% inspection and arrange for
replacement.
d) If more than 15% are defects, QC must report to the manager (QC), who will co-
ordinate with the planning department for the trims returen to the supplier.
a) hw` 2% Gi g‡a¨ mgm¨v cvIqv hvq Zvn‡j D³ jU wU cvk n‡q ‡cÖvWvK&k‡b hv‡e|
b) hw` 2% Gi †ekx Ges 15% Gi Kg mgm¨v cvIqv hvq Zvn‡j wKD AvB wØZxq jU B݇cK&k‡bi
Rb¨ †b‡e Ges djvdj n‡e :-
c) hw` 15% Gi g‡a¨ mgm¨v nq Zvn‡j 100% †PK Ki‡e Ges mgm¨vhy³ ÷K Gi wi‡cøm‡g‡›Ui
e¨e¯’v Ki‡e|
d) hw` 15% Gi †ekx mgm¨v nq Zvn‡j wKD.AvB Aek¨B †KvqvwjwU g¨v‡bRvi‡K wi‡cvU© Ki‡e| Ges
†KvqvwjwU g¨v‡bRvi cøvwbs g¨v‡bRvi‡K Rvbv‡e mvcøvBqvi‡K †diZ cvVv‡bvi Rb¨|
2. QI is responsible for conduct audit and need to have buyer’s requirements prior to audit.
(†KvqvwjwU B݇c±i/ mycvifvBRvi B݇cKkb Ki‡e| hw` evqv‡ii †Kvb PvIqv cvIqv _v‡K Zvn‡j
†mUv†KB h‡_ó ¸iæZ¡ w`‡Z n‡e|
3. Once one lot comes QI has to select random sample based on AQL 2.5 Point that
sample should represent all colors & sizes in the particular lot .(†KvqvwjwU B݇c±i/
mycvifvBRvi †h‡Kvb j‡Ui Dci 2.5 G wKD Gj AwWU Kivi mgq Aek¨B Kvjvi, mvBR Abyhvqx AwWU
Ki‡e|)

This Quality Manual is the property of Rizvi Fashions Limited & all rights are reserved by RF
Page | 6
4. Next he is responsible for checking them compare to buyer art work or related other
documents, need to check size, print or lettering, color etc. (when check color needs to
follow buyers nominated light source depend on the customer demand. (cieZ©x‡Z †m wbR
`vwq‡Z¡ evqvi AvU©IqvK© A_ev Ab¨vb¨ Z‡_¨i mwnZ Kvjvi, mvBR, †jwg‡bwUs wcÖ›U BZ¨vw` wgwj‡q †`L‡e|
(hw` †Kvb evqvi jvBU †¯‹v‡ii mvnv‡h¨ †PK †`L‡Z Pvq ZvI Ki‡Z n‡e|)
5. QI is responsible for document all the finding and accept or reject the lot based on the
AQL 2.5 Point.(†KvqvwjwU B݇c±i/ mycvifvBRvi wbR `vwq‡Z¡ 2.5 G wKD Gj AwW‡Ui gva¨‡g D³
j‡Ui cvk Ges †dj wbb©q Ki‡e|)
6. If reject need to communicate to supplier under Quality manger’s advice via
merchandiser.(hw` †Kvb jU †dj nq Zvn‡j †KvqvwjwU g¨v‡bRv‡ii civgk© Abyhvqx gv‡P©ÛvBRv‡ii
gva¨‡g evqv‡ii m‡½ †hvMv‡hvM Ki‡Z n‡e|)
7. In the case of some materials even though inspection pass (based on AQL) last
decision will take based on the lab test results.(G wKD Gj AwWU Abyhvqx †Kvb jU cvk n‡j
†kl ch©šÍ j¨ve †Uó †iRvë Gi Dci wfwË K‡i wm×všÍ wb‡Z n‡e|)
8. Final decision on reject lot either 100% check or replace decision is responsibility of the
Quality Manager.(†KvqvwjwU g¨v‡bRv‡ii wm×všÍ Abyhvqx †Kvb †dj j‡Ui Dci nq 100% †PK Ki‡Z
n‡e A_ev wi‡cøm Ki‡Z n‡e|)
9. In the case of labels and price tickets correct printing of numbers or letters are almost
important and incorrect printing is critical defect and entire lot need to reject and
replace.( cÖ‡Z¨K j‡Ui Rb¨B mwVK †j‡ej, cÖvBR wUwKU,wcÖw›Us, bv¤^vi A_ev eb© LyeB ¸iæZ¡c~b© hw`
G¸‡jvi †Kvb GKwU bv _v‡K Zvn‡j GUv wµwU‡Kj mgm¨v Ges H jU wi‡R±| bZzb K‡i wi‡cøm Ki‡Z
n‡e|)
10. QI is responsible to conduct color and size wise barcode scanning from each
style.(cÖwZwU óvB‡ji Kvjvi Ges mvBR Abyhvqx evi‡KvW wiwWs †PK Ki‡e|)
Rizvi Fashions Ltd. R-QC/ST/HE-01
Quality Control Department V ersion-01
Accessories Inspection Report
(For Label AQL 2.5% / Thread,Elastic 10% / Hook & Eye 100%)
DEFECTS
DEFECT %

ST ANDARD MEASUREMENT RESULT SIGN


DEFECT
TOTAL
HOUR

REC. INS. Pass


BUYER STYLE P.O SIZE COLOUR Wrong Sharp P oor Size
QTY QTY Missing Shade Spot Knitting Others Spec Act Act Act Act QC
Cut/P ri. ness Stitch Miss.
Fail

COMMENTS: Note:- Only For Non-Counting Materials


* mgm¨v 2% Gi g‡a¨ n‡j jUwU cvk|
* mgm¨v 15% Gi g‡a¨ n‡j 100% †PK Ki‡e|
* mgm¨v 15% Gi ‡ekx n‡j wi‡cø‡mi e¨e¯’v Ki‡e|

PREPARED BY STORE OFFICER STORE MANAGER QC. OFFICER MERCHANDISER MANAGER (QC)

Documents:
 IQC inspection report

This Quality Manual is the property of Rizvi Fashions Limited & all rights are reserved by RF
Page | 7
Trims & Accessories Quality Control Process Flow Chart:

Trims & Accessories

Color & Fail


Specification
Check

Pass

Fail Communicate with


Lab Test Merchandiser or Suppliers
or Buyer

Pass

AQL 2.5 or 10% Fail Non Conformed


Inspections

Trim Card Make&


Approved

Sewing Line/
Finishing

This Quality Manual is the property of Rizvi Fashions Limited & all rights are reserved by RF
Page | 8
Title: Fabric Inspection Procedure.(†dweªK B݇cKkb c×wZ)
Created: Revision : 10/12/16 Section: Quality
20/05/16 Assurance
Approved By: Shaikh Rezwan, Authorized: Manager, QC,
Director (RF Operation) RF
Rizvi Fashions Ltd
Standard Operating Procedure for Quality Assurance SOP/Q - 02

Purpose (D‡Ïk¨): To ensure the fabric quality level before is use. (†dweª‡Ki gvb e¨env‡ii c~‡e©
wbwðZ Kiv)
Scope (cÖ‡qv‡Mi ¯’vb): Fabric Inspection area. (†dweªK B݇cKkb GjvKv|)
Responsibilities (ØvwqZ¡cÖvß e¨vw³): Fabric Quality inspector. (†dweªK †KvqvwjwU B݇c±i)
Procedure (Kv‡Ri cÖwµqv):
1. For fabric inspection Rizvi Fashions Limited is follow “Four Point System. (‡dweªK
B݇cKk‡bi †ÿ‡Î wiRfx d¨vkbm wjwg‡UW †dvi c‡q›U wm‡÷g †g‡b P‡j)
2. After fabric roll load on to the machine QI will cut right, middle & left fabric pieces and
mark right, middle & left respectively. This is to check the shading side-to-side
(widthwise) and end-to-end (lengthwise) beginning, middle (once at least) and end of
the roll.(†dweªK ‡ivj †gwkb †jvW K‡i †KvqvwjwU B݇c±i †iv‡ji Wvb, evg Ges gv‡Si Ask †K‡U
‡b‡e| †KvqvwjwU B݇c±i GUv mvBW n‡Z mvB‡W Ges j¤^vj¤^x †kW †PK Kivi Rb¨ Ki‡e|)
3. Once finish beginning shade checking QI start the machine and set speed 10 to 15
m/min (speed must slow enough to check the defects) and continue visual inspection.
(†kW †PwKs Gi ci †KvqvwjwU B݇c±i †gwkb 10 †_‡K 15 wgUvi/wgwbU (†gwk‡bi ¯úxW Aek¨B
axiMwZi n‡Z n‡e wW‡d± †PK Kivi Rb¨) MwZ‡Z wfRyqvj B݇cKkb ïiæ Ki‡e|)
4. Once he found any fabric fault he will paste sticker on it and measure and make the
record.(hLb †m †Kvb †dweªK mgm¨v cv‡e Zv‡Z w÷Kvi †có K‡i †gRvi‡g›U K‡i †iKW© Ki‡e|)
5. While continue inspection middle and end of the roll he will check for the shade
continuity by placing initial cut pieces.(hLb B݇cKkb Pj‡e ZLb †iv‡ji †k‡l Ges cÖ_‡g c~‡e©i
KvU cxm¸‡jv w`‡q †kW †PK Ki‡e|)
6. After completion of the visual inspection he needs to record total length inspected and
total defects.(wfRyqvj B݇cKk‡bi c‡i †m cy‡iv •`N¨© Ges wW‡d± cwigvc K‡i wb‡e|)
7. Then he is responsible for calculate the points per 100 meters or yards following bellow
point system (Zvici †m cÖwZ 100 wgUv‡ii Rb¨ wb‡¤œv³ Dcv‡q c‡q›U wnmve Ki‡e|
Defect size (wW‡d± mvBR ) Penalty points (†cbvwë c‡q›U)
3 inches or less (wZb Bw ev Zvi Kg) 1 Point (GK c‡q›U)
Over 3, but less than 6 inches 2 Points (`yB c‡q›U)
(wZb Bw Gi †ekx ev Qq Bw Gi Kg)
Over 6, but less than 9 inches 3 Points (wZb c‡q›U)
(Qq Bw Gi †ekx ev bq Bw Gi Kg)
Over 9 inches 4 Points (Pvi c‡q›U)
(bq Bw Gi †ekx )

This Quality Manual is the property of Rizvi Fashions Limited & all rights are reserved by RF
Page | 9
Formula = Total points fond X 100 (meters or Yards)
Total length inspected X Width of the fabric

cÖvß †gvU c‡q›U X 100 ( wgUvi A_ev BqvW©)|


dg~©jv=
cy‡iv ‰`N©¨ hv B݇cKkb Kiv n‡q‡Q X ‡dweª‡Ki cÖ¯’|
8. Rizvi Fashions accept 28 points per 100 (yards or Meters) and based on this QI has to
accept or reject the lot.(
wiRfx d¨vkbm cÖwZ 100 (BqvW© A_ev wgUv‡i) 28 c‡q›U ch©šÍ
MÖnb K‡i| Gi Dci wfwË K‡iB †KvqvwjwU B݇c±i †dweªK jU MÖnY wi‡R± Ki‡e Gi
wm×všÍ MÖnb K‡i|)
9. All incoming fabric Rizvi Fashions Ltd. will conduct 10% inspection. If in-house fabric
fails it will return for the mill for reprocess and for outsource fabric Quality Manager is
responsible for take final decision with consultation with senior management,
merchandiser and buyer where necessary.(mg¯Í †dweªK wiRfx d¨vkbm 10% B݇cKkb
K‡i MÖnY K‡i| hw` †Kvb †dweªK †dj K‡i Zvn‡j Zv wg‡j †diZ cvVv‡bv nq wi-cÖ‡mm
Kivi Rb¨| evB‡ii †dweªKm Gi †ÿ‡Î †KvqvwjwU g¨v‡bRvi Da©Zb Kg©KZ©v, gv‡P©ÛvBRvi
A_ev evqv‡ii mv‡_ K_v e‡j PzovšÍ wm×všÍ MÖnY Ki‡e|)
10. For the point calculation considers only major defects not minor defects and defect
classification is available in the quality manual. (c‡q›U wnmv‡ei †ÿ‡Î †gRi wW‡d±¸‡jv
aiv nq|
RIZVI FASHIONS LTD.
R-QC/ST-01
QUALITY CONTROL DEPARTMENT Versi on-2
DAILY 10%FABRIC INSPECTION REPORT
Report No-
SUPPLIER CUSTOMER STYLE NO# TTL RCVD QTY TTL PASS
FAB.ITEM PO NO# RCVD DATE TTL CHECKD QTY TTL FAIL
COLOUR LOT NO# REPORT DATE RE-CHECKD QTY INS%

PTS PER 100 LINEAR


WIDTH GSM YARN FAULTS CONSTRUCTION FAULTS DYEING/PRINTING/FINISHING FAULTS CLEANLINESS SHADE
LENGTH

PASS/FAIL
INCORRECT PRINT

DISPOSITION
CONTAMINATION

PRINT OVERLAP

DIRTY/OIL STAIN
YARN PULL OUT
YARN MISSING

Side to Center
CREASE MARK

MEASUREMENT
NEEDLE MARK

PRINT MISSING

ACTUAL REG
ROLL#

WATER MARK

Side to Side
PRINT SPOT
GRAIN LINE

LYCRA OUT

TOTAL

INTIAL
DYE SPOT

BLEEDING

YDS
HOLES

End to End
KONTS

PRINT
SLUB

YARN

BIAS

DECLARED
MIN MAX DECL ACTUAL DECL ACTUAL

SUB TOTAL

TOTAL REJECTION
4 POINT SYESTEM ACCEPTABLE DEFECT POI NT GRADE COMMENTS: RESULTS PASS FAIL SHORT/OVER
0-3" 1 POI NT UPTO 20 POINTS = GREEN TAG QUALITY
>3"-6" 2 POI NT 21-28 POINTS = YELLOE TAG LENGTH
>6"-9" 3 POI NT ABOVE 28 POINTS = RED TAG WIDTH
>9"-UP 4 POI NT GSM
ANY HOLE 4 POI NT SHADING
ACCEPTABLE CALCULATION = TOTAL DEFECT x36x100/FABRIC WIDTH/FABRIC LENGTH

PREPARED BY CHECKED BY QC OFFICER MERCHANDISER FAB.MANAGER QC MANAGER

Documents:
 10% Fabric inspection report.

This Quality Manual is the property of Rizvi Fashions Limited & all rights are reserved by RF
Page | 10
Title: Fabric Approval Procedure. (‡dweªK G¨cÖæfvj c×wZ)
Created: Revision : 10/12/16 Section: Quality
20/05/16 Assurance
Approved By: Shaikh Rezwan, Authorized:Manager,QC, RF
Director (RF Operation)

Rizvi Fashions Ltd


Standard Operating Procedure for Quality Assurance SOP/Q - 03

Fabric Approval Process

Visual
check
under light
Box
Reject goods and
Yes / reprocess; for
No outside fabric hold
the shipping

Review all test


fab. inspection
,G.S.M shade, reports
Reject goods final QA manager
shrinkage, pH, color
decision by RF QA sign or Customer
fastness acceptance e-
manager or
mail
Merchandiser and
customer

All report pass &


shade variation
within 1 or 2 times
Sign off of QA manager
If reject, hold
or Customer’s
responsible QA the goods sign off or e-
for approval Accept mail
and
continue
cutting Commercially
Reject goods
accept / not

This Quality Manual is the property of Rizvi Fashions Limited & all rights are reserved by RF
Page | 11
Purpose (D‡Ïk¨):To ensure the fabric meet customer requirement before comes to
production. (‡cÖvWvKk‡b Avmvi Av‡MB †µZvi Pvwn`v Abyhvqx Kvc‡oi ¸bMZ gvb wbwðZ
Kiv|)
Scope(cÖ‡hvR¨ ¯’vb):Fabric Inspection area (‡dweªK B݇cKkb GjvKv|)
Responsibilities (`vwqZ¡cÖvß e¨w³): Cutting Quality In-charge (KvwUs †KvqvwjwU BbPvR©|)
Procedure: (Kv‡Ri cÖwµqv):
1. All fabrics before comes to cutting must go through the following process to ensure its
quality, legality and safety (fit to use) to meet it’s customer requirements. (mg¯Í Kvco
KvwUs †mKk‡b Avmvi c~‡e©B †µZvi Pvwn`v Abyhvqx H Kvc‡oi ¸bMZgvb, wbivcËv wbwðZ
Ki‡e|)
2. Each bulk lot first cutting quality in-charge will approve color by checking under buyer
light source and computer color matching (Data color-CMC) will perform where the color
is far away from the standard(where decision is difficult).(KvwUs †KvqvwjwU BbPvR© cÖwZwU
evé †dweªK jU G¨cÖæf Kivi mgq evqvi g‡bvbxZ jvBU †¯‹vi Ges Kvjvi Kw¤úDUvi Gi
gva¨‡g †PK Ki‡e| Ges wbwðZ Ki‡e †h Kvjvi †hb ÷¨vÛvW© Gi †P‡q †ekx `y‡i bv nq|)
3. For Out source first bulk submission will sent by the supplier and cutting quality in-
charge is responsible for sent comments to relevant merchandiser via e-mail.(cÖ_g
evé
mvewgkb AvDU †¯‹vi n‡j mvcøvBqv‡ii gva¨‡g cvVv‡e| †KvqvwjwU BbPvR© wbR `vwq‡Z¡
gv‡P©ÛvBRvi B-†gBj Kgv›Um cvVv‡e|)
4. After color approve QC is responsible for the getting lab test report for each lot as per
the customers’ requirements such as color fastness, shrinkage, ph value, GSM etc. .
(Kvjvi G¨cÖæf Gi ci †KvqvwjwU BbPvR© wbR `vwq‡Z¡ †µZvi Pvwn`v Abyhvqx cÖwZwU G¨cª yf
†dweªK j‡Ui †U÷ wi‡cvU© †hgb: wmb‡µR, wc.GBP. †fjy, Kvjvi dv÷‡bm BZ¨vw`|)
5. After reviewing all the reports fabric QC will provide approval if fails fabric will return to
mill for reprocess, for out side fabrics will informed to supplier via e-mail through
merchandiser: this fabric will use under the written approval from buyer .(mg¯Í wi‡cvU©
wiwfD Kivi ci †dweªK ‡KvqvwjwU G¨cÖæfvj †dweªK cvVv‡e| hw` †dj nq Zvn‡j wi-cÖ‡m‡mi
Rb¨ †dweªK wg‡j cvVv‡bvi Av‡M D³ j‡Ui Dci mvcøvBqvi, fvqv B-†gBj, gva¨g:
gv‡P©ÛvBRvi D³ †dweªK evqv‡ii wjwLZ AbygwZ mv‡c‡ÿ e¨envi Kiv hv‡e|)
6. Quality manager has authority for the approval or over right the test reports concerning
the improvement in next process.(†KvqvwjwU g¨v‡bRv‡ii BLwZqv‡i GcÖæfvj n‡e Ges
†h‡Kvb †U÷ wi‡cvU© Ifvi ivBU Ki‡Z cv‡i Ges cieZ©x cÖ‡m‡mi Dbœq‡bi Rb¨|)
7. Once color approval testing process finish before it comes to stores need to pass fabric
inspection and roll wise shade band/GSM has to submit to QC and he is responsible for
checking shade against buyer standard. If any rolls not match with the standard will
reject, in house fabric will send to the mill for re-processing. If fabric is out source quality
This Quality Manual is the property of Rizvi Fashions Limited & all rights are reserved by RF
Page | 12
manager and merchandiser will take final decision after discussion with buyer and the
supplier. (Kvjvi GcÖæfvj cÖ‡mm †k‡l †dweªK B݇cKkb Ki‡e Ges †ivj Abyhvqx †mW
†KvW I wR.Gm.Gg †mvqvQ KvW© •Zix K‡i †KvqvwjwUi Kv‡Q n¯ÍvšÍi Ki‡e| Ges wZwb wbR
`vwq‡Z¡ evqvi Gcªyfvj ÷¨vÛvW© Gi m‡½ †gjv‡e| hw` †Kvb †ivj †dj nq Zvn‡j wi‡R±
†ivj BbnvDR n‡j wi-cÖ‡m‡mi Rb¨ wg‡j hv‡e Ges evB‡ii n‡j †KvqvwjwU g¨v‡bRvi Ges
gv‡P©ÛvBRvi evqv‡ii m‡½ Av‡jvPbv mv‡c‡ÿ wm×všÍ wb‡e|)
8. If all above process pass fabric will come to cutting department .(Dc‡ii me¸‡jv wVKgZ
m¤úbœ nevi ci †dweªK KvwUs G hv‡e|)

Documents:
1. Fabric Lab test report
2. Fabric inspection report
3. Roll wise GSM/Shade band
4. CMC report
5. Molding wash panels

This Quality Manual is the property of Rizvi Fashions Limited & all rights are reserved by RF
Page | 13
Quality Control Flow Chart for Fabrics:

Fabrics

Re-Process Not OK Shade Check

OK

Re-Process Not OK GSM / Shrinkage

OK

Non Confirmed 100% Fabric Inspection at


Fail
4-Point System

OK

Finished Fabric Store

This Quality Manual is the property of Rizvi Fashions Limited & all rights are reserved by RF
Page | 14
Title: Marker Checking Procedure (gvK©vi †PwKs c×wZ)
Created: Revision : 10/12/16 Section: Quality
20/05/16 Assurance
Approved By: Shaikh Rezwan, Authorized: Manager, QC,
Director (RF Operation) RF

Rizvi Fashions Ltd


Standard Operating Procedure for Quality Assurance SOP/Q - 04

Purpose (D‡Ïk¨):To ensure that grain line and pattern used are accurate .
(†j AvDU ev †dweªK KvUvi c~‡e©B gvK©vi Ges c¨vUvb© Abyhvqx †MÖBb jvBb wVK Av‡Q wKbv wbwðZ Kiv)
Scope (cÖ‡qv‡Mi ¯’vb): Cutting area.(KvwUs GjvKv)
Responsibilities (`vwqZ¡cÖvß e¨w³): Quality Inspector and cutting room quality in-
charge.(†KvqvwjwU B݇c±i Ges KvwUs †KvqvwjwU B݇c±i)
Procedure (Kv‡Ri cÖwµqv):

1. All the production markers released by the cad room need check and sign before start
cutting.(K¨vW iæg †_‡K gvK©vi wmU KvwUs-G hvevi Av‡MB †KvqvwjwU B݇c±i †PK Ges mvBb K‡i
wbwðZ Ki‡e|)
2. Once release the marker QI need to check all size one complete garment. For this he
needs to have final approved pattern set which is sign off by pattern maker or pattern
master.(gvK©vi wmU KvwUs G hvevi Av‡MB †KvqvwjwU B݇c±i gvK©v‡i me mvBR Ges KvU wc‡Pm Av‡Q
wKbv †PK Ki‡e Ges c¨vUvb© †gKvi/c¨vUvb© gvóvi mvBb Ki‡e|)
3. First job is to check the marker length & efficiency being printed on the marker and the
size ratio. (cÖ_‡gB gvK©vi j¤^v Ges gvK©v‡ii Dci Bwdwm‡qwÝ I mvBR †iwkI †PK Ki‡e|)
4. Then has to confirm grain line of the marker patterns are align with the approved
pattern.(mZ¨vwqZ c¨vUvb© Gi m‡½ wgwj‡q gvK©v‡ii †MÖBb jvBb Ges GjvBb‡g›U †PK Ki‡e)
5. Next he has to check the selected pattern pieces in the marker by placing approved
pattern over it; if it is matching he has to sign and approved each and every pattern
piece being checked. (cieZ©x‡Z †m cÖwZwU KvUwc‡Pi c¨vUvb© gvK©v‡i †d‡j Gi mwVKZv hvPvB
Ki‡e|)
6. If above any stage found discrepancy against standard need to reject it and cad room is
responsible for the re-making the marker. (hw` Dc‡iv³ wb‡`©kvejxi Dci †Kvb e¨wZµg
cwijwÿZ nq Zvn‡j D³ gvK©vi evwZj n‡e Ges K¨vW iæg BbPvR© wbR `vwq‡Z¡ bZzb gvK©vi •Zix Ki‡e|)
7. Remaking maker need to follow above process (checking process) from beginning.(bZzb
gvK©vi AveviI c~‡e©i me wbqg Abyhvqx †PK Ki‡Z n‡e|)
8. Marker checker need to maintain all correspondence record as specified bellow and
cutting quality In-charge is responsible for supervising. (gvK©vi †PKvi mg‡SvZvi gva¨‡g †iKW©
msiÿb Ki‡e| Ges KvwUs †KvqvwjwU Awdmvi †`Lv ïbv Ki‡e)

This Quality Manual is the property of Rizvi Fashions Limited & all rights are reserved by RF
Page | 15
Rizvi Fashions Ltd.
Anw ar Jang Road,1No Kalma Bazar,Sav ar,Dhaka-1341 R-QC/CT-06
Quality Control Department Version-01
Marker Checking Report
Buyer Dat e
St yle Marker Lengt h
Order Marker Widt h
Colour Lay Qt y
Cut .No Cut .Qt y

Size/
Rat io

Prepared By Q.S.V Cut t ing S.V Officer QC CAD MGR QC MGR


QA MGR

Documents:
1. Marker audit report
2. Marker checking inventory.

This Quality Manual is the property of Rizvi Fashions Limited & all rights are reserved by RF
Page | 16
Title: Fabric Relaxing and Layering Auditing Procedure.
(‡dweªK wijvwKªs Ges †jqvwis AwWwUs c×wZ)
Created: Revision : 10/12/16 Section: Quality
20/05/16 Assurance
Approved By: Shaikh Rezwan, Authorized: Manager,QC,
Rizvi Fashions Ltd Director (RF Operation) RF
Standard Operating Procedure for Quality Assurance SOP/Q - 05

Purpose (D‡Ïk¨):To ensure that fabric are being properly relaxed before it use for layering
and layering is being performed properly which will affect the quality of the cut panel.( wbwðZ
Ki‡e †h †dweªK wijv‡Kªkb †jqvwis Gi c~‡e© fvjfv‡e m¤úbœ n‡”Q| †jqvwis cÖ‡mm fvjfv‡e m¤úbœ n‡”Q Zv
†dweª‡Ki KvU c¨v‡b‡ji gv‡bi Dci †Kvb cÖfve bv †d‡j|)
Scope (cÖ‡qv‡Mi ¯’vb): Fabric relaxing & layering area in cutting. (KvwUs †mKk‡b †dweªK wijvKª
Ges †jqvwis GjvKvq|)
Responsibilities(`vwqZ¡cÖvß e¨w³): Layering area quality auditor and cutting room quality
supervisor .(†jqvwis GjvKvi gvb cwi`k©K Ges KvwUs Gi ‡KvqvwjwU mycvifvBRvi)
Procedure (Kv‡Ri cÖwµqv):
1. All fabric rolls must be relaxed use following minimum relaxed time prior to use as
provided bellow chart or Buyer requirement. (mg¯Í †dweªi †ivj wb¤œwjwLZ Q‡Ki mgq Abymv‡i
A_ev †µZvi Pvwn`v Abyhvqx wijvKª Ki‡Z n‡e|)
Fabric type (†dweªK UvBc) Relaxed Time
Single jersey (Lycra) 24
Rib 24
Micro 24
Nylon 24
Simplex 24
CKD Micro 24
Modal 24
Mesh 24
Sleeknet 24
Brush micro 24
Lace 24
Spacer 24
Interlock 24

2. Layering auditor is responsible to ensure the fabric being properly relaxed prior to use
by checking the relaxing sticker pasted on it.(†jqvwis cwi`k©K wbwðZ Ki‡e †h †dweªK fvjfv‡e
wijvKª Kiv n‡q‡Q Ges Zv‡Z wijvwKªs w÷Kvi mshy³ Av‡Q wKbv )
3. Prior to lay auditor must ensure lay table clean, paper being laid on it and table is
marked for the width & length.(†j AwWUi Aek¨B wbwðZ Ki‡e †h †jqvwis Gi c~‡e© †j †Uwej
cwi®‹vi cwi”Qbœ Av‡Q, †jqv‡ii wb‡P KvMR weQv‡bv Av‡Q Ges †Uwej •`N¨© cÖ‡¯’ cwigvc Abyhvqx wPwýZ
Kiv Av‡Q|)

This Quality Manual is the property of Rizvi Fashions Limited & all rights are reserved by RF
Page | 17
4. During the audit auditor need to ensure lay length is being followed and not allow – ½”
and +1” over the table mark.(AwW‡Ui mgq AwWUi‡K wbwðZ Ki‡Z n‡e †h †j Gi •`N¨© †Uwe‡ji
gv‡K©i 1/2 Bw Ges 1 BwÂi g‡a¨ _v‡K)
5. Check roll wise separator (paper) being put to avoid roll-wise bundling to avoid
shading.(†kW c„_KxKi‡bi Rb¨ cÖ‡Z¨K †iv‡ji gv‡S †kW c„_KxKiY †ccvi w`‡Z n‡e|)
6. QI is responsible to check the lay tension during spreading and if there is roll joints need
to check the joints overlap and put paper for identification.(†KvqvwjwU B݇c±i †¯úÖwWs Gi
mgq †j †Ubkb †PK Ki‡e Ges †ivj R‡q›U _vK‡j Zv‡Z mbv³Ki‡bi Rb¨ †ccvi w`‡q †có K‡i w`‡Z
n‡e)
7. Similarly QI need to check the fabric grain line is placing straight alone the
spread.(†KvqvwjwU B݇c±i †¯úÖwWs Gi mgq †dweª‡Ki †MÖBb jvBb †PK K‡i †`L‡e|)
8. Then after completion of spreading need to count plies all plies in both ends need to
ensure not exceeds maximum lay height. . Maximum lay height is 3 inches .(†¯úÖwWs m¤úbœ
Kivi mgq cÖwZUv cøvB Mbbv Ki‡Z n‡e Ges †j Gi D”PZv hv‡Z 3 BwÂi †ekx bv nq|)
9. If above standards are not being followed he is authorized to stop production and
correct it with advice of his superiors .(hw` Dc‡ii wb‡`©kbv bv gvbv nq Zvn‡j †m Drcv`b eÜ
K‡i w`‡Z cv‡i Ges Da©Zb Kg©KZ©v‡`i wb‡`©k Abymv‡i Zv wVK Ki‡e|)
10. Once complete of the successful layering auditor need to approve it for cutting .(Dc‡iv³
cÖwµqv mdjfv‡e m¤úbœ n‡j †jqvi AwWUi Zv KvwUs Gi Rb¨ AbygwZ w`‡e|)
Rizv i Fashions Ltd.
Anw ar Jang Road,1No Kalma Bazar,Sav ar,Dhaka-1341 R-QC/CT -05

Fabric Relaxat ion Monit oring Report

Buyer …………………………………………………Style ………………………………………………………….Order No ………………………………………………..

Fabric Type ………………………………………… Name of M onitor ……………………………………... Date ………………………………………………….

Relaxation Relaxation
SL Total Relaxation
Colour Roll No Batch Qty Qty start time & End Time & Remarks
No# Time
Date Date

Prepared By Q.S.V Officer QC Manager QC A GM/GM

Documents:
•Relaxing report
•Lay audit report

This Quality Manual is the property of Rizvi Fashions Limited & all rights are reserved by RF
Page | 18
Title: Cutting In Line Inspection Procedure (KvwUs Bb jvBb
B݇cKkb cÖwmwWDi)
Created: Revision : 10/12/16 Section: Quality
20/05/16 Assurance
Rizvi Fashions Ltd Approved By: Shaikh Rezwan, Authorized: Manager,
Director (RF Operation) QC,RF
Standard Operating Procedure for Quality Assurance SOP/Q - 06

Purpose(D‡Ïk¨):To ensure the cut work quality level before it goes to production (myBs
†mKk‡b KvU wcP hvevi Av‡MB KvwUs ‡KvqvwjwU B݇c±i KvU wc‡Pi †KvqvwjwU wbwðZ Ki‡e|)

Scope(cÖ‡qv‡Mi ¯’vb): Cutting area. (KvwUs GjvKv)

Responsibilities (`vwqZ¡cÖvß e¨w³): Quality Inspector (†KvqvwjwU B݇c±i|)


Procedure (Kv‡Ri cÖwµqv):
1. Rizvi Fashions perform random cut audit cut wise and will conduct 10% inspection
based on total cut quantity. (wiRfx d¨vkbm ÷¨vÛvW© Abyhvqx †UvUvj KvU wc‡Pi Dci 10%
B݇cKkb Gi gva¨‡g †KvqvwjwU wbwðZ Ki‡e|)
2. Quality Inspector is responsible to perform audit and first check top, middle and bottom
of the cut lay with pattern (†KvqvwjwU B݇c±i 1 wU evwÛ‡ji 1g gvSLvb Ges bx‡Pi wewfbœ ¯’vb
†_‡K KvU wcP wb‡q c¨vUvb© Gi ms‡½ wgwj‡q mwVKZv wbwðZ Ki‡e|)
3. Next check the cut lay for accuracy of cut marks and shape. If result :- (Gi ci c¨vUvb© Gi
†mf I gvK© mwVK Av‡Q wKbv Zv †PK Ki‡e| hw` djvdj :-
a) If less than 2% defect, Than whole lot will go to production.
b) If above 2% but less than 15% are defect, take another lot. For the 2 nd lot
inspection consider the following :-
c) If less than 15% are defects, Conduct 100% inspection and arrange for
replacement.
d) If more than 15% are defects, QC must report to the manager (QC), Who will co-
ordinate with the planning department for the replacement.
a) hw` 2% Gi g‡a¨ mgm¨v cvIqv hvq Zvn‡j D³ jU wU cvk n‡q ‡cÖvWvK&k‡b hv‡e|
b) hw` 2% Gi †ekx Ges 15% Gi Kg mgm¨v cvIqv hvq Zvn‡j wKD AvB wØZxq jU B݇cK&k‡bi Rb¨
†b‡e Ges djvdj n‡e :-
c) hw` 15% Gi g‡a¨ mgm¨v nq Zvn‡j 100% †PK Ki‡e Ges mgm¨vhy³ KvU wcP Gi
wi‡cøm‡g‡›Ui e¨e¯’v Ki‡e|
d) hw` 15% Gi †ekx mgm¨v nq Zvn‡j wKD AvB Aek¨B †KvqvwjwU g¨v‡bRvi‡K wi‡cvU© Ki‡e| Ges
†KvqvwjwU g¨v‡bRvi cøvwbs g¨v‡bRvi‡K Rvbv‡e wi‡cøm‡g‡›Ui Rb¨|

This Quality Manual is the property of Rizvi Fashions Limited & all rights are reserved by RF
Page | 19
Rzvi Fashions Ltd R-QC/CT-08
Version-01
Quality Control Department
Daily After Cutting Check Report
Accept
Marker Pcs…………………………………………………… Reject
Date………………………………………

MISS CUT
PATTERN CHECK

PATTERN
RAGGED
CORRECTIVE

CENTER
MAINTAIN
BATCH/

LAY.QTY

CUT.QTY

NAME
OF THE

DEFECT

DEFECT
CUTTING
FABRIC

NOTICES

CUTT.SUP
CUT/NO
BUYER

COLOR

SIGN OF
STYLE

PART

TOP IN
CHECK
TYPE
NO#

SIZE

LINE

QTY
LOT

OF

REMARKS

%
ACTION
TOP MIDDLE BOTTOM

PREPARED BY QC SUPERVISOR QC OFFICER CUTTING OFFICER HEAD OF CUTTING QM/ SR.QM

Documents:
1. After Cutting Check Report.

This Quality Manual is the property of Rizvi Fashions Limited & all rights are reserved by RF
Page | 20
Title: Bundle Inspection Procedure (evwÛj B݇cKkb cÖwmwWDi)
Created: Revision : 10/12/16 Section: Quality
20/05/16 Assurance
Approved By: Shaikh Rezwan, Authorized: Manager,QC,
Director (RF Operation) RF
Rizvi Fashions Ltd
Standard Operating Procedure for Quality Assurance SOP/Q - 07

Purpose(D‡Ïk¨):To ensure the bundling quality level.(evwÛ‡ji gvb wbwðZ Kiv|)


Scope (cÖ‡qv‡Mi ¯’vb): Bundle area of cutting. (KvwUs Gi evwÛj GjvKv|)
Responsibilities (ØvwqZ¡cÖvß e¨w³): Quality Auditor (†KvqvwjwU AwWUi|)
Procedure (Kv‡Ri cÖwµqv):
1. Rizvi Fashions perform random bundle audit cut wise and will conduct 10% inspection
based on total bundle quantity.( wiRfx d¨vkbm evwÛj KvU Abymv‡i i¨vÛg B݇cKkb Ges
cy‡iv evwÛj msL¨vi Dci wfwË K‡i 10% B݇cKkb K‡i|)
2. Quality Inspector is responsible to perform audit and will check for shade separation, cut
accuracy, foam cut accuracy.If result :- (†KvqvwjwU B݇c±i GB AwWU Ki‡e Ges †mW
c„_KxKib, KvU A¨vKz‡iwÝ, †dvg KvU A¨vKz‡iwÝ †PK Ki‡e|) hw` djvdj :-
a) If less than 2% defect, than whole lot will go to production.
b) If above 2% but less than 15% are defect, take another lot. For the 2 nd lot
inspection consider the following :-
c) If less than 15% are defects, Conduct 100% inspection and arrange for
replacement.
d) If more than 15% are defects, QC must report to the manager (QC), who will co-
ordinate with the planning department for the replacement.
a) hw` 2% Gi g‡a¨ mgm¨v cvIqv hvq Zvn‡j D³ jU wU cvk n‡q ‡cÖvWvK&k‡b hv‡e|
b) hw` 2% Gi †ekx Ges 15% Gi Kg mgm¨v cvIqv hvq Zvn‡j wKD AvB wØZxq jU B݇cK&k‡bi Rb¨
†b‡e Ges djvdj n‡e :-
c) hw` 15% Gi g‡a¨ mgm¨v nq Zvn‡j 100% †PK Ki‡e Ges mgm¨vhy³ KvU wcP Gi
d) wi‡cøm‡g‡›Ui e¨e¯’v Ki‡e|
hw` 15% Gi †ekx mgm¨v nq Zvn‡j wKD AvB Aek¨B †KvqvwjwU g¨v‡bRvi‡K wi‡cvU© Ki‡e| Ges
†KvqvwjwU g¨v‡bRvi cøvwbs g¨v‡bRvi‡K Rvbv‡e wi‡cøm‡g‡›Ui Rb¨|

This Quality Manual is the property of Rizvi Fashions Limited & all rights are reserved by RF
Page | 21
Rzvi Fashions Ltd R-QC/CT-36
Version-01
Quality Control Department
Daily Bundle Inspection Report
Accept
Reject
Date….………………………………
BUNDLE
BATCH/LOT TYPE OF CUTTING NAME OF BUNDLE BUNDLE STICKER TOTAL PATTERN CORRECTEVE SIGN OF
BUYER STYLE COLOR SIZE STICKER SHADE REMARKS
NO# FABRIC NO THE PART QTY NO COLOR QTY CHECK ACTION CUTT.SUP
SL NO

PREPARED BY QC OFFICER CUTTING OFFICER HEAD OF CUTTING QM/ SR.QM

Documents:
1. Bundle Audit Report

This Quality Manual is the property of Rizvi Fashions Limited & all rights are reserved by RF
Page | 22
Cutting Quality Control Process Flow Chart:
Finished Fabric
Store

Fabric Receive

GSM Fail
Check

Shade Check & Fabric


Relaxing

Marker Check

Laying Audit

Cutting Audit
Print/ Heat Seal
Embroidery
Bundling

Bundle Audit Immediate


Fail
10% Fail Corrective Action or
Sort Out
Fabric, Elastic

Ready For Input

This Quality Manual is the property of Rizvi Fashions Limited & all rights are reserved by RF
Page | 23
Title: Heat Seal Auditing Procedure (wnUwmj AwWUi cÖwmWzi)
Created: Revision : 10/12/16 Section: Quality
20/05/16 Assurance
Approved By: Shaikh Rezwan, Authorized:Manager, QC,
Director (RF Operation) RF

Rizvi Fashions Ltd


Standard Operating Procedure for Quality Assurance SOP/Q - 08
Purpose (D‡Ïk¨):To ensure product quality, safety and legality (c‡b¨i gvb, wbivcËv Ges •eaZv
wbwðZ Kiv|)
Scope (cÖ‡qv‡Mi ¯’vb): Heat Seal Area.( wnUwmj GjvKv|)
Responsibilities (ØvwqZ¡cÖvß e¨vw³): Quality Inspector.( †KvqvwjwU B݇c±i)
Procedure (Kv‡Ri cÖwµqv):
1. Hourly heat seal machine temperature need to check and record by QI , if temperature
is out of tolerance QI has authority to stop the machine.(†KvqvwjwU B݇c±i cÖwZ N›Uvi
ZvcgvÎv †PK K‡i †iKW© Ki‡e hw` ZvcgvÎv mxgvi evB‡i _v‡K Zvn‡j †KvqvwjwU B݇c±i
mycvifvBRvi‡K e‡j ZvcgvÎv A¨vWRv÷ K‡i †b‡e|)
2. QI is responsible to inform to production supervisor to reset the machine and after
machine comes to desired temperature (check regular intervals till reach desired
condition) QI will allow production continue.(†gwk‡b Kvw•LZ ZvcgvÎv AwR©Z n‡j †KvqvwjwU
B݇c±i Drcv`b ïiæi AbygwZ cÖ`vb Ki‡e|)
3. During production QI will conduct 100% inspection of heat seal for quality of transform
and size mistake.(cieZ©x‡Z †KvqvwjwU B݇c±i 100% cb¨ B݇cKkb Ki‡e|)

Documents:
1. Hourly temperature check report (Report not make yet)
2. Heat seal check report (Report not make yet)

This Quality Manual is the property of Rizvi Fashions Limited & all rights are reserved by RF
Page | 24
Title: Line Feeding and Mock-up Procedure (jvBb wdwWs Ges
†gvK Avc cÖwmwWDi)
Created: Revision : Section: Quality
20/05/16 10/12/16 Assurance

Approved By: Shaikh Rezwan, Authorized: Manager,QC,


Rizvi Fashions Ltd
Director (RF Operation) RF
Standard Operating Procedure for Quality Assurance SOP/Q - 09

Purpose (D‡Ïk¨): To ensure the product quality, legality and safety (c‡b¨i gvb, Ges wbivcËv
wbwðZ Kivi Rb¨|)

Scope (cÖ‡qv‡Mi ¯’vb): Sewing Area. (myBs GjvKv|)

Responsibilities (ØvwqZ¡cÖvß e¨vw³): Quality Officer, In-line QI, Technician, Mechanic,


Production Officer and supervisor, IE officer. (†KvqvwjwU Awdmvi, Bb jvBb †KvqvwjwU B݇c±i,
†UKwbwkqvb, †gKvwbK, cÖWvKkb Awdmvi Ges mycvifvBRvi, AvB. B Awdmvi|)

Procedure (Kh©cÖbvjx):
1. First IE officer will provide style lay-outs to production team.(cÖ_‡g AvB. B Awdmvi ÷vBj †j
AvDU wmU cÖWvKkb wUg‡K w`‡q w`‡e )
2. Based on the lay out mechanic arrange the machines and supervisor & production
officer will select the operators for particular operation with the concern of technician, QI
and IE officer.(†j AvDU Abyhvqx †gKvwbK †gwkb †mU Ki‡e| mycvifvBRvi Ges †cÖvWvKkb Awdmvi
cÖ‡mm Abyhvqx Acv‡iUi †mwUs Ki‡e †UKwbwkqvb Ges AvB. B Awdmv‡ii m‡½ civgk© Abyhvqx|)
3. Once start line feeding, mechanic is responsible for providing set machine .(hLb jvBb
wdwWs ïiæ n‡e †gKvwbK m‡½ m‡½ †gwkb †mU K‡i †`‡e|)
4. Then technician will check the machine condition and stitch 5 pieces (maximum)and
within 5 technician need to achieve quality standard. (†UKwbwkqvb †gwkb †PK Ki‡e Kgc‡ÿ 5
wcP •Zix Ki‡e Ges †KvqvwjwU ÷¨vÛvW© wd·W Ki‡e|)
5. After operator sit on the machine technician is responsible for teaching operation
specifications such as.(Acv‡iUi †gwk‡b emvi ci †UKwbwkqvb wbR `vwq‡Z¡ cÖwZwU Acv‡ikb
Abyhvqx wUK ‡`‡e ‡hgb:
 Mention the details of operation (Acv‡ik‡bi eb©bv)
 Purpose of the operation (Acv‡ik‡bi ¸iæZ¡)
 Key quality problems (cÖavb †KvqvwjwU mgm¨v)
 Effect of the quality problems to the finish garment safety, legality & quality (KgwcøU
Mv‡g©›Um Gi †KvqvwjwU wbivcËv)
 Operation key measurements (Acv‡ik‡bi cÖavb ‡gRvi‡g›U)
 Guide setting and trim off allowances (MvBW †mwUs, wUªg myBs GjvDÝ)
 Needle type, size and stitch density (SPI or SPcm) (wb‡Wj UvBc, wb‡Wj mvBR, w÷R †WbwmwU,
Gm,wc,AvB BZ¨vw`)
This Quality Manual is the property of Rizvi Fashions Limited & all rights are reserved by RF
Page | 25
 Thread type and other relevant specifications (myZvi aib Ges Ab¨vb¨ mKj mgm¨v BZ¨vw`)

 Technician & QI is responsible for prepare the mock-card and sign off by Operator,
supervisor, mechanic, quality officer
 After sign off mock-up card need to hang on eye level of the operator.
6. Technician & quality inspector will make mock up by their own responsibilitie & they
must take sign of operator,supervisor,mechanic & quality officer.(†UKwbwkqvb I ‡KvqvwjwU
B݇c±i wbR `vwq‡Z¡ †gvKAvc •Zix K‡i †gvKAvc mx‡Ui g‡a¨ Acv‡iU‡ii, mycvifvBRvi, †gKvwbK
Ges †KvqvwjwU Awdmvi Gi mvÿi wb‡e|)
7. QI is responsible for audit all the pieces being make and once operator comes to
standard level need to put mock-up.(‡KvqvwjwU B݇c±i wbR `vwq‡Z¡ mg¯Í wcP AwWU Ki‡e Ges
hLb Acv‡iUi ÷¨vÛvW© Abyhvqx KvR Ki‡e ZLb †gvKAvc w`‡e)
8. Operator is responsible for making mock-up and Approved By: Shaikh Rezwan, Director
(RF Operation) the QI, technician mechanic and supervisor (Acv‡iUi wbR `vwq‡Z¡ †gvK Avc
•Zix Ki‡e Ges B݇c±i, mycvifvBRvi I †UKwbwkqv‡bi KvQ †_‡K G¨‡cÖvf wb‡e|)
9. Mock-up is used to (†gvKAvc mx‡U hv _vK‡e)
 Highlight SPI or SPcm,
 Seam balance
 Sewing margin
 Appearance or quality standard with actual raw material
 Need to place with mock-up sheet which will visible for operator for ease of
understanding
10. Once mock-up complete on one work station can feed next work station unless
complete current work station technician is not authority to continue line feeding .(GK
Acv‡ik‡b †gvK Avc wdwWs †k‡l Ab¨ †gwk‡b hv‡e| Z‡e H †gwk‡b ivwbs KvR _vK‡j †UKwbwkqvb jvBb
wdwWs Gi Rb¨ `vqx bq|)

This Quality Manual is the property of Rizvi Fashions Limited & all rights are reserved by RF
Page | 26
Rizvi Fashions Ltd. R-QC/SE-11
Version-01
Quality Control Department
Sewing Line feeding Sheet
Sewing Unit :-…….…………………………….. St yle Target :-…………………………..

St yle No :-……..………………………………… Line no:-……………….. PO/Cont act No:-………………………….

Feeding Start dated :-….……………………… Feeding Complete date:-………..……………


Operator First 6 Pcs result Complete Complete QC Tec. Sup. Mec.
No Operation description Target
Name 1 2 3 4 5 6 Time Date Sign Sign Sign Sign

Production Officer's Signature:… … … … … … … … … Technician's Asst. Manager/Manager:-… … … … … … …

Quality Officer's Signature… … … … … … … … … ... IE's Signature:-… … … … … … … …

QC.Asst. Manager/Manager:-… … … … … … … … …

5. Documents:
1. Line Feeding Report.
2. Mock-up sheet.

This Quality Manual is the property of Rizvi Fashions Limited & all rights are reserved by RF
Page | 27
Title: Sewing In Line Auditing Procedure. (myBs Bb jvBb AwWwUs
c×wZ)
Created: Revision : 10/12/16 Section: Quality
20/05/16 Assurance
Approved By: Shaikh Rezwan, Authorized:Manager, QC,
Rizvi Fashions Ltd Director (RF Operation) RF

Standard Operating Procedure for Quality Assurance SOP/Q - 10

Purpose (D‡Ïk¨): To improve product quality and process consistency. (c‡b¨i ¸bMZ
gv‡bi DbœwZ Ges cÖ‡m‡mi avivewnKZv iÿv Kiv|)
Scope (cÖ‡qv‡Mi ¯’vb): Sewing Area.(myBs GjvKv)
Responsibilities (ØvwqZ¡cÖvß e¨vw³): In-line Quality Inspector and Section quality officer.(Bb
jvBb †KvqvwjwU B݇c±i Ges †mKkb †KvqvwjwU Awdmvi )
Procedure (Kv‡Ri cÖwµqv):Rizvi Fashions Ltd. is following traffic light system for sewing

process quality control. (wiRfx d¨vkbm wjwg‡UW myBs cÖ‡m‡m †KvqvwjwU K‡›Uªv‡ji Rb¨ UªvwdK jvBU

wm‡÷g Aby¯^ib K‡i|)

This Quality Manual is the property of Rizvi Fashions Limited & all rights are reserved by RF
Page | 28
1. Traffic Light System Flow charts(UªvwdK jvBU wm‡÷g †d¬v PvU©|)

If Traffic Light
is Green
before audit

YES NO
QI check 10pieces of bundle Workstation
previous day top 3 QI check 7 pieces of bundle
but 100% of the first bundle if
defect ? randomly
more than 2pieces found

Sewing line start and QI


continue auditing

TWO or MORE
ONE
Number of defective
garments determined QI changes Traffic Light to
QI changes Traffic Light to
YELLOW and advice
RED and advice supervisor.
supervisor. Supervisor holds
Supervisor stop process and
bundle & requests operator to
resolve problem
repair
NONE

Traffic Light
remains
GREEN

QI update report and move


to next workstation

This Quality Manual is the property of Rizvi Fashions Limited & all rights are reserved by RF
Page | 29
2. TLS Flow chart (Yellow):
If Traffic Light
is Yellow
before audit

YES NO
QI check 10pieces of bundle Workstation
previous day top 3 QI check 7 pieces of bundle
but 100% of the first bunlde if
defect ? randomly
more than 2pieces found

Sewing line start and QI


continue auditing

TWO or MORE
ONE
Number of defective
garments determined
QI changes Traffic Light to QI changes Traffic Light to
RED and advice supervisor. RED and advice supervisor.
Supervisor stop process and Supervisor stop process and
resolve problem resolve the problem

NONE

QI change
Traffic Light to
GREEN

QI update report and move


to next workstation

This Quality Manual is the property of Rizvi Fashions Limited & all rights are reserved by RF
Page | 30
3. TLS Flow chart (Red):
If Traffic Light is Red
before audit

Sewing process is already stopped


when QI continue audit

TWO or MORE ONE


Number of defective
garments determined
QI changes Traffic Light to
QI changes Traffic Light to
RED and stop the process and
RED and stop the process and NONE advice Technical Manager,
advice Technical Manager,
Production Manager, Quality
Production Manager, Quality
Officer to resolve problem
Officer to resolve problem QI change Traffic Light
to YELLOW. Recheck in
half an hour

QI update report and move to QI update report and move to QI update report and move to
next workstation next workstation next workstation

After resolve re audit number After resolve re audit number


Number of defective
of defective garments of defective garments
garments determined
determined determined

ONE TWO or MORE


NONE

QI keeps Traffic Light RED QI keeps Traffic Light RED


and stop the process and and stop the process and
QI change Traffic Light inform to Quality Manager
inform to Quality Manager to YELLOW. (next follow
and Plant GM and Plant GM
yellow workstation
procedure)

4. Operational Standard and Specifications.


 Operation Specification
 Sewing operation standard
This Quality Manual is the property of Rizvi Fashions Limited & all rights are reserved by RF
Page | 31
5. Traffic Light Alert System:

Traffic light colors are based on Red-Yellow-Green and those colors represent
High, Medium and Low risk conditions.( UªvwdK jvB‡Ui is n‡”Q jvj njy` meyR hv
m‡e©v”P gva¨g Ges Aí SzwKc~b© wb‡`©k K‡i|

Faults Found (mgm¨v) Color Code (Kvjvi †KvW) Flag (cZvKv)

0 Yellow
0 Green
1 Yellow
0 Yellow
0 Green
1 Yellow
0 Yellow
0 Green
2 Yellow
1 Red
0 Yellow
1 Red
0 Yellow
0 Yellow
Green

 When new style start always start with Yellow and then moves either Green or Red
but not directly Red or Green.(hLb bZzb †Kvb ÷vBj ïiy nq memgq njy` w`‡q ïiy Ki‡Z n‡e
Zvic‡i meyR A_ev jvj is e¨envi Ki‡Z n‡e wKš‘ mivmwi jvj A_ev meyR is e¨envi Kiv hv‡e bv|)
 After Red traffic light, QI needs to proceeds two successive audits must pass
before traffic light system 1st change two times yellow then put one automatic green for
smoth production. (jvj UªvwdK jvB‡Ui ci †KvqvwjwU B݇c±i Aek¨B `yevi AwWU Ki‡e Ges Zv
Aek¨B cvm n‡Z n‡e| `yB evi AwWU cvm nevi ci Zv cÖ_‡g `yBwU njy` Ges c‡i GKwU mivmwi meyR
is G cwieZ©b Ki‡e|

 Yellow workstations must audit more often (half an hour intervals).(njy` IqvK©‡ókb ¯^í
mg‡qi e¨eav‡b (30 wgwb‡Ui e¨eav‡b) AwWU Ki‡Z n‡e|)
This Quality Manual is the property of Rizvi Fashions Limited & all rights are reserved by RF
Page | 32
 Auditing of critical operations more often if necessary unless it was Yellow traffic
light.(RwUj cÖ‡mm¸‡jv evievi AwWU Kivi cÖ‡qvRb Av‡Q, hw`I H ‡gwk‡b njy` UªvwdK jvBU KvW© bv
_v‡K|)
 Level of reporting of audit fails depend on the number of rejected bundles at the
particular workstation. (†dj wbf©i Ki‡Q KqUv evwÛj, Kg©¯’j/cÖ‡mm/†gwk‡b mgm¨v n‡”Q Zvi
Dci|)

 1st rejected bundle (Yellow) –QI informs the Supervisor/Officer. (1g


evi mgm¨vhy³ evwÛj
(njy`)-jvBb †KvqvwjwU †cÖvWvKkb mycvifvBRvi/Awdmvi‡K AewnZ Ki‡e|)
 2nd rejected bundle (Red) –QI informs the Production Manager, Assistant Quality
Manager and Technical Manager. (2q evi mgm¨vhy³ evwÛj (jvj)-jvBb †KvqvwjwU
†cÖvWvKkb g¨v‡bRvi, mnKvwi †KvqvwjwU g¨v‡bRvi Ges †UKwbK¨vj g¨v‡bRvi‡K AewnZ
Ki‡e|)
 3rd rejected bundle (Red) –Machine must stop and QI informs the Quality Manager &
Plant Director to Close Loop of that problem.(3q evi mgm¨vhy³ evwÛj (jvj)- †gwkb
Aek¨B eÜ n‡e|jvBb †KvqvwjwU Aek¨B †KvqvwjwU g¨v‡bRvi Ges KviLvbvi †Rbv‡ij
g¨v‡bRvi‡K AewnZ Ki‡e H mgm¨vwUi ¯’vqx mgvav‡bi Rb¨|)
 Bundles considered rejected if, evwÛj wi‡R± wnmv‡e we‡ewPZ n‡e hw`:-

 Specific bundle contains two or more defective garments.(evwÛ‡j 2 A_ev Gi AwaK


ÎywUc~b© Mv‡g©›Um _v‡K)
 Specific bundle contains 1 defective garment and following a bundle that itself
containing at least 1 defective garment.(wbw`©ó evwÛ‡j 1 wU ÎywUc~b© Mv‡g©›Um _v‡K Ges cieZx©
evwÛ‡j Kgc‡¶ 1 wU ÎywUhy³ Mv‡g©›Um _v‡K|)
 Red traffic light which stops the production will continue after QI re audit and color
changing to yellow. This second audit has to be requested by the problem solving
person or team once they satisfactorily solve the problem. (jvj UªvwdK jvBU hv †cÖvWvKkb
eÜ K‡i Zv jvBb †KvqvwjwU AwWU K‡i njy` UªvwdK jvBU e¨envi Ki‡jB †cÖvWvKkb ïiy n‡e| GB mgm¨v
mgvavbKvix `j A_ev e¨vw³ mgm¨v mgvavb Kivi ci wØZxq `dv AwWU Kivi Rb¨ jvBb †KvqvwjwU‡K
Aby‡iva Ki‡e|)

 QI should inspect 7 pieces in each visit (jvBb †KvqvwjwU cÖ‡Z¨K AwW‡U 7 wcm Mv‡g©›Um †PK
Ki‡e|)
 If workstation is previous day top 3 recorded fault must check 10 pieces per
bundle.(hw` Kg©¯’j /†gwkb/cÖ‡mm Av‡Mi w`‡b m‡e©v”P 3 ÎywU/wW‡d‡±i AšÍf©~³ _v‡K Zvn‡j jvBb
†KvqvwjwU evwÛ‡j 10 wcm †PK Ki‡e|)

This Quality Manual is the property of Rizvi Fashions Limited & all rights are reserved by RF
Page | 33
 QI must complete all documents and traffic light mark before moves to next
workstation.(jvBb †KvqvwjwU Aek¨B UªvwdK jvBU m¤úwK©Z mg¯Í WKz‡g›U Ges gvwK©s m¤úbœ K‡i c‡ii
Kg©¯’‡j/†gwk‡b/cÖ‡m‡m hv‡e|)

 The In-line auditor will audit each machine minimum four times in a day. (AwWUi w`‡b
Kgc‡ÿ Pvi evi cÖwZwU †gwkb AwWU Ki‡e|)

 Gici Acv‡iUi cÖwZ 06 wcQ Kv‡Ri ci 01 wcQ K‡i wb‡R †PK Ki‡Z _vK‡e|

 When audit result documenting QI should use standarized defect codes (AwWU ‡iRvë
†iK‡W©i Rb¨ jvBb †KvqvwjwU Aek¨B ÷¨vÛvW© wW‡d± †KvW e¨envi Ki‡e|
 Given on DCL List.

 End of the day QI is responsible for making summary report of Days top 3 defects
reports operation and defect wise before leave the premises .(w`b †k‡l jvBb †KvqvwjwU
mvgvwi wi‡cvU© Ges m‡e©v”P 3 wU wW‡d± Acv‡ikb Ges wW‡d± Abymv‡i wi‡cvU© Ki‡e|)
 Each finding production supervisor, mechanic or technician responsible for correction
and need to document the action taken in corrective action sheet .(†cÖvWvKkb mycvifvBRvi,
†gKvwbK A_ev †UKwbwkqvb cÖ‡Z¨K ÎywU mviv‡bvi Rb¨ `vqx _vK‡e Ges Zv Kv‡iKwUf G¨vKkb kx‡U
wjwce× Ki‡Z n‡e|)

Documents:

1. Traffic light sheet.

2. Highest 3 reject report.

3. Corrective action sheet.

This Quality Manual is the property of Rizvi Fashions Limited & all rights are reserved by RF
Page | 34
Sewing Quality Control Process Flow Chart:

Fail
Cut Panel
Return to
Check by
Cutting
Pattern

OK

Not OK Sewing Process


Re-Work Control by Traffic
Light 7-0 System

Repair

OK

Non Reject
100% End Table
Conformed Defect Repair
Quality Check
Box

OK

Fail
Auditing AQL 1.5

OK

Finishing

This Quality Manual is the property of Rizvi Fashions Limited & all rights are reserved by RF
Page | 35
Title: Sewing End Line Auditing Procedure (GÛ jvBb †PwKs
c×wZ)
Created: Revision : 10/12/16 Section: Quality
Assurance
Approved By: Shaikh Rezwan, Authorized: Manager,QC,
Rizvi Fashions Ltd Director (RF Operation) RF
Standard Operating Procedure for Quality Assurance SOP/Q - 11

Purpose (D‡Ïk¨):To ensure the quality garments passing out from the production
lines.(myBs jvBb †_‡K Avmv Mv‡g©›Um Gi †KvqvwjwU wbwðZ Kiv|)
Scope (cÖ‡hvR¨ ¯’vb): Sewing End Table (myBs jvB‡bi cÖvß †Uwej|)
Responsibilities (`vwqZ¡cÖvß e¨w³): End Table Quality Inspector (†Uwej †KvqvwjwU B݇c±i|)
Procedure (Kvh©cÖYvjx):

1. 100% of the complete garments need to inspect by end line table QI before goes to
AQL.(G.wKD.Gj AwWU †Uwe‡j Mv‡g©›Um hvevi Av‡MB †Uwej †KvqvwjwU B݇c±i 100% †P‡Ki gva¨‡g
†KvqvwjwU wbwðZ Ki‡e|)
2. First TQI has to check the size mistake by checking bottom band length and size
label.(cÖ_‡gB †Uwej †KvqvwjwU eUg e¨vÛ, †jš’ †g‡c Ges mvBR †j‡ej †P‡Ki gva¨‡g mvBR wgm‡UK
wbwðZ Ki‡e|)
3. End line TQI is responsible to follow checking procedure and identify the defective
garments.(†Uwej †KvqvwjwU †PwKs cÖwmwWD‡ii gva¨‡g Mv‡g©›Um †PK Ki‡e Ges mgm¨v wPwýZ Ki‡e|)
4. QI is responsible for the record all finding in end line report using 5 bar mark and hourly
defective garments has to issue to inline supervisor. Repaired garments will be checked
100% by QI & forward to AQL.TQI must use Standardize defect coding system when
marking defects.(†Uwej †KvqvwjwU wbR Øvwq‡Z¡ Ly‡R cvIqv mKj mgm¨v¸‡jv Zvi wi‡cv‡U© wjL‡e|
Ges cÖwZ N›Uvi mgm¨vhy³ Mv‡g©›Um myBs mycvifvBRvi wbR `vwq‡Z¡ mviv‡bvi Rb¨ cvVv‡e|mviv‡bv Mv‡g©›Um
¸‡jv †Uwej †KvqvwjwU AveviI 100% †P‡Ki gva¨‡g G.wKD.Gj AwW‡U cvVv‡e|)
5. End of the TQI need to calculate summary of day findings such as total defects, total
pieces reject, defect %, highest 3 defects etc. (me †k‡l †Uwej †KvqvwjwU wi‡cvU© mvgvivBR
Ki‡e, †hgb: †gvU mgm¨v, †gvU †PK †Kvqvw›UwU, cÖ_g wZbwU mgm¨v BZ¨vw`|)

This Quality Manual is the property of Rizvi Fashions Limited & all rights are reserved by RF
Page | 36
Buyer:……….………..……………… Rizvi Fashions Ltd. R-QC/SE-16
Version-01
Style No:…….………….…………… Quality Control Department Date:…………………………………….
PO/MO No:………….…………….…….. End Table 100% Inspection Report Item:…………………………………….
Colour:………….……………………. Unit:……..……….Line:……………….
Hours 1st Hr. 2nd Hr. 3rd Hr. 4th Hr. 5th Hr. 6th Hr. 7th Hr. 8th Hr. 9th Hr. 10th Hr. Total %
Inspected Qty
Good Qty
Defect Qty
Reject Qty
Defect Repair / Repair Pass

Defect Code / Defect Name

Hours 1st Hr. 2nd Hr. 3rd Hr. 4th Hr. 5th Hr. 6th Hr. 7th Hr. 8th Hr. 9th Hr. 10th Hr. Total %
In Line Quality Signature
Pro. Supervisor Signature
Quality Supervisor Signature
1st Highest Def.Qty 2nd Highest Def.Qty 3rd Highest Def.Qty 4th Highest Def.Qty 5th Highest Def.Qty Total Def. Def.%

CRITICAL MAJOR
TA01) Missing/incorrect S22) Cut
S16) Broken Stitch S13) Missing Bartack/Label/Bow S20) Hi-King S29) Reverse Attachement TA08) Wrong Shade Hook & Eye M01) Shade Variation S04) Pleat
country of origin label Damage
TA02) Missing/incorrect fiber CL01) Stain /
S17) Skip Stitch S06) Join Stitch/Gathering Stitch TR05) Raw-edge TR02) Uncut thread TA07) Incorrect Ring Slider M02) Wrong Hand Feel After Lami/Mold
content labeling Oil Spot
TA04) Missing/incorrect
S13) Missing Locking S23) Uneven Stitch S01) Tension Loose/Tight S15) Wrong Cup Size S21) Needle Hole/Cut S19) Out of Measurement
care instructions
TA05) Incorrect size label S23) Uneven Stitch S14) Over Stitch S05) Incorrect SPI F03) Line Mark S03) Wavy F06) Snagging M05) Incorrect Mold Depth/ Thickness
TA06) Poor printing label S11) Shading S02) Puckering S25) Pulling/Pointy/Curling S07) Cup Busting Tight/Loose S24) Twisted Shoulder Strap MINOR
TA 07) Hook & eye Missing CL02) Dirty Spot S23) Uneven Shearing TA07) Incorrect Wire CL03) Loose Thread Inside Cup TR01) Uneven Seam Allowance TR 02) Uncut thread ends 0-0.5cm

TA12) Insect found S17) Skip Stitch C01) Uneven Shape S18) Crease Mark S09) Incorrect Measurement TA07) Insecure Hook & Eye CL 03) Loose Thread

TA13) Nails end S13) Missing Locking S12) Yoke Slanted S08) Open Seam S28) Fabric Stretch Out S12)Slanted bartack/label/yoke etc. S 10) All Hi Low

PREPARED BY PRODUCTION OFFICER APM/PM OFFICER/SR. OFFICER (QC) ASST.MANAGER / MANAGER (QC)

Documents:
1. End line Inspection report

This Quality Manual is the property of Rizvi Fashions Limited & all rights are reserved by RF
Page | 37
Title: Sewing End Line AQL Procedure (GÛ jvBb G.wKD.Gj
cÖwmwWDi)
Created: Revision : 10/12/16 Section: Quality
20/05/16 Assurance
Approved By: Shaikh Rezwan, Authorized: Manager, QC,
Rizvi Fashions Ltd Director (RF Operation): RF
Standard Operating Procedure for Quality Assurance SOP/Q - 12

Purpose (D‡Ïk¨):To ensure the quality level of garments passing out from table QI. (†Uwej
†KvqwjwUi cvm Kiv Mv‡g©›Um Gi †KvqvwjwU †j‡fj Gi mZ¨Zv hvPvB Kiv|)
Scope (cÖ‡hvR¨ ¯’vb): AQL Area (G wKD Gj AwWU GjvKv)
Responsibilities (`vwqZ¡cÖvß e¨w³): AQL Auditor (G.wKD.Gj AwWUi|)
Procedure (Kvh©cÖYvjx):
1. All the bundle coming out from the line need to pass through the AQL Audit table before
goes to counter.(†Uwej †KvqvwjwU cvm Kiv mg¯Í evwÛj KvD›Uv‡i hvevi Av‡M G.wKD.Gj Øviv
AwW‡Ui gva¨‡g Aek¨B cvm n‡Z n‡e|)
2. AQL auditor is responsible for this process and Rizvi Fashions is use AQL 1.5 level II
for audit. (G.wKD.Gj AwWUi wbR `vwq‡Z¡ GB cÖ‡mm m¤úbœ Ki‡e Ges wiRfx d¨vkbm wjwg‡UW
G.wKD.Gj 1.5 ‡j‡fj II Abymib K‡i|)
3. AQL auditor need to collect randomly 5 pieces from each bundle and if zero defect
found AQL pass and release the goods to counter.(G.wKD.Gj AwWUi cÖwZ evwÛj †_‡K 5 wcQ
Mv‡g©›Um i¨v‡Ûvgwj wb‡e Ges hw` wR‡iv mgm¨v cvq Zvn‡j H evwÛj KvD›Uv‡i cvVv‡e|)
4. If fails return it to the respective sewing line and table QI need to re-check those
goods.(hw` †dj nq Zvn‡j H evwÛj jvB‡b P‡j hv‡e Ges †Uwej †KvqvwjwU wbR `vwq‡Z¡ wi‡PK
Ki‡e|)
5. After re-check complete AQL auditor will perform re-audit on those.(wi‡PK †k‡l G.wKD.Gj
AwWUi AveviI H evwÛj AwWU Ki‡e|)
6. Rizvi Fashions use MIL STD 105E Tables for Normal Inspection Level II single sampling
plan for AQL. In generally Rizvi fashions use 1.5 AQL systems for Major defects and 4.0
AQL for Minor defects unless specified by the customer. In general 2 minors defects will
count as one Major defect. (wiRfx d¨vkbm wjwg‡UW G.wKD.Gj AwWUi wgwjUvix ÷¨vÛvW© 105B
†Uwej bigvj B݇cKkb †j‡fj 2 wms‡Mj m¨v¤úwjs cø¨vb e¨envi K‡i| wiRfx d¨vkbm wjwg‡UW memgq
1.5 G.wKD.Gj wm‡÷g Ges 2 wU gvBbi = 1 wU †gRi wnmv‡e Mb¨ K‡i|)

This Quality Manual is the property of Rizvi Fashions Limited & all rights are reserved by RF
Page | 38
Single Sampling Plans for Normal Inspection (Level II)

Acceptable Quality Level (Normal Inspection)


Size code
Sample

Sample
letter

Size
Lot or Batch Size 0.65 1.0 1.5 2.5 4.0 6.5 10

Ac Re Ac Re Ac Re Ac Re Ac Re Ac Re Ac Re
A 2 to 8 2 0 1 0 1 0 1 0 1 0 1 0 1 0 1
B 9 to 15 3 0 1 0 1 0 1 0 1 0 1 0 1 1 2
C 16 to 25 5 0 1 0 1 0 1 0 1 0 1 1 2 1 2
D 26 to 50 8 0 1 0 1 0 1 0 1 1 2 1 2 2 3
E 51 to 90 13 0 1 0 1 0 1 1 2 1 2 2 3 3 4
F 91 to 150 20 0 1 0 1 1 2 1 2 2 3 3 4 5 6
G 151 to 280 32 0 1 1 2 1 2 2 3 3 4 5 6 7 8
H 281 to 500 50 1 2 1 2 2 3 3 4 5 6 7 8 10 11
J 501 to 1200 80 1 2 2 3 3 4 5 6 7 8 10 11 14 15
K 1201 to 3200 125 2 3 3 4 5 6 7 8 10 11 14 15 21 22
L 3201 to 10000 200 3 4 5 6 7 8 10 11 14 15 21 22 21 22
M 10001 to 35000 315 5 6 7 8 10 11 14 15 21 22 21 22 21 22
N 35001 to 150000 500 7 8 10 11 14 15 21 22 21 22 21 22 21 22
P 150001 to 500000 800 10 11 14 15 21 22 21 22 21 22 21 22 21 22
Q 500001 and over 1250 14 15 21 22 21 22 21 22 21 22 21 22 21 22

Note: In generally Rizvi Fashions use MIL STD 105E tables for Normal inspection level II
Single sampling plan AQL 1.5 systems for Major defects. In general 02 minors defects will
count as 01 Major defect and Critical defect count as = 0.

This Quality Manual is the property of Rizvi Fashions Limited & all rights are reserved by RF
Page | 39
Rizvi Fashions Ltd. QC/SE-18
Quality Control Department Version-02
Pre-Delivery Audit Report
DATE:………………………….. SECTION/LINE:……………………… AUDITOR:…………………………. CUSTOMER:……………………..
LOT
TEAM/ SHADE/TICKET SAMPLE DEFECT DEFECT DEFECT DEFECT TOTAL DEFECT TOTAL DEFECT INLINE Q.I/
STYLE SIZE COLOR LOT SIZE QTY QTY QTY QTY ACCEPT/
LINE# NO. SIZE CODE CODE CODE CODE INSPECTED % QSV
Major Minor REJECT

TOTAL GARMENTS

3 HIGHEST DEFECTS 2

CRITICAL MAJOR
TA01) Missing/incorrect S13) Missing M04) Incorrect Mold M05) Incorrect Mold Depth/
TA12) Insect found S16) Broken Stitch S02) Puckering S01) Tension Loose/Tight CL01) Oil Spot S09) Incorrect Measurement
country of origin label Bartack/Label/bow Shape Thickness
TA02) Missing/incorrect
TA13) Nails end S17) Skip Stitch S23) Uneven Shearing S05) Incorrect SPI TR02) Uncut thread S28) Fabric Stretch Out S04) Pleat TA07) Insecure Hook & Eye
fiber content labeling
TA04) Missing/incorrect S29) Reverse
S13) Missing Locking C01) Uneven Shape S24) Twisted Binding S15) Wrong Cup Size S03) Wavy S25) Pulling/Pointy/Curling MINOR
care instructions Attachement
TA05) Incorrect size S12)Slanted
S06) Join Stitch/Gathering Stc
S12) Yoke Slanted TA07) Incorrect Wire F03) Line Mark S14) Over Stitch TA08) Wrong Shade Hook & Eye TR 02) Uncut thread ends 0-0.5cm
label bartack/label/yoke
S07) Cup Busting
TA06) Poor printing label S23) Uneven Stitch S20) Hi-King S18) Crease Mark S21) Needle Hole/Cut M01) Shade Variation TA07) Incorrect Ring Slider CL 03) Loose Thread
Tight/Loose
CL03) Loose Thread M02) Wrong Hand
TA 07) Hook & eye Missing S11) Shading TR05) Raw-edge S08) Open Seam F06) Snagging TR01) Uneven Seam Allowance S 10) All Hi Low
Inside Cup Feel After Lami/Mold

Auditor Officer/SR.Officer QC APM/DPM/PM QM/SR.QM

Documents:
1. AQL report

This Quality Manual is the property of Rizvi Fashions Limited & all rights are reserved by RF
Page | 40
Title: Packing In Line Inspection Procedure (c¨vwKs Bb jvBb
B݇cKkb c×wZ)
Created: Revision : 10/12/16 Section: Quality
20/05/16 Assurance
Approved By: Shaikh Rezwan, Authorized:Manager, QC,
Rizvi Fashions Ltd Director (RF Operation) RF
Standard Operating Procedure for Quality Assurance SOP/Q - 13
Purpose (D‡Ïk¨):To ensure the packing is performed as per the customer
standard.(Mv‡g©›Um c¨vwKs hv‡Z Kv÷gv‡ii ÷¨vÛvW© Abymv‡i nq †mUv wbwðZ Kiv|)
Scope (cÖ‡qv‡Mi ¯’vb): Packing area.( c¨vwKs GjvKv)
Responsibilities (ØvwqZ¡cÖvß e¨w³): Packing Quality inspector.( c¨vwKs †KvqvwjwU B݇c±i|)
Procedure (Kvh©cÖYvjx):
1. Before start the packing the QI will insure the product quality by use AQL 1.5 (Single
Sampling plan normal inspection level II). c¨vwKs ïiæi Av‡M QI AQL 1.5 (Single Sampling
plan normal inspection level II) Abymib Ki‡e|
2. Passed goods will go for packing and failed goods will go for 100% inspection. (cvm jU
c¨vwKs Kivi Rb¨ hv‡e Ges †dj jU 100% †P‡Ki Rb¨ e¨e¯’v †b‡e|)
3. Packing QI need to have all packing method and approved packing trim card.(c¨vwKs
†KvqvwjwU B݇c±‡ii wbKU Aek¨B mKj c¨vwKs †g_W Ges Aby‡gvw`Z c¨vwKs wUªg KvW© _vK‡Z n‡e|)
4. Once first packing start QI is responsible for the conduct packing audit by hourly audit
sheet and if found any defect QI has authority to stop packing and informed to Packing
Manager/In-charge to correct it immediately. (hLb cÖ_g c¨vwKs ïiæ n‡e ZLb †KvqvwjwU
B݇c±i hourly audit c¨vwKs AwWU wk‡Ui gva¨‡g AwWU Ki‡e Ges hw` ‡Kvb mgm¨v cvq Zvn‡j c¨vwKs
gv¨v‡bRvi/BbPvR©‡K Zv AwZ`ªæZ wVK Kivi Rb¨ ej‡e|)
5. Main area focus during the audit is presentation of the garments, tags placement,
correct tags use, folding method, assortment, poly bagging & stickers placement,
hanger accuracy, carton marking, packing system etc (depend on the customer’s
requirements may vary and QI is responsible for conduct customize audits ).(AwW‡Ui mgq
†h mKj RvqMv¸‡jv‡Z AwWUi ¸iæZ¡ w`‡e Zv n‡jv Mv‡g©›Um Gi †cÖ‡R‡›Ukb, U¨vM Gi ¯’vb, mwVK U¨vM,
†dvwìs †g_W, GmU‡g›U, cwje¨vM, Ges w÷Kvi †cøm‡g›U, n¨v½vi A¨vKz‡iwÝ, KvU©yb gvwK©s, c¨vwKs wm‡÷g
BZ¨vw`|)

This Quality Manual is the property of Rizvi Fashions Limited & all rights are reserved by RF
Page | 41
Rizvi Fashions Ltd. R-QC/PK-20
Version-01
Quality Control Department
1st Carton Packing Inspection Report Date:
In Line Pre Final Final
Customer: PO:
Item & Style: Color:
Order Qty: TTL CTN:
Inspected CTN: TTL Inspected Qty:
Inspected CTN No:

Packing Trim/Accessory Specification: Country:


Carton Out Side Check Carton in Side Check
SL Description Yes No N/A SL Description Yes No N/A
1 Carton Marking Short Side-1 1 Quantity Counting
2 Carton Marking Short Side-2 2 Assortment Check
3 Carton Marking Long Side-1 3 Poly Sticker check with article
4 Carton Marking Long Side-2 4 Upc On Poly Sticker
5 Carton UPC Sticker 5 Carton Sealing
6 Carton Quality 6 Poly Marking
7 CTN Measurement 7 Silica Gel/Micro Pack super dry
8 Broken Carton 8 Hanger with article
9 Broken Carton Sticker 9 Hanger Sizer
10 Sepear with hold 10 Hanging Method
11 Holder 11 Collar Tag
12 Band poly 12 Callout Tag
13 Poly 13 Hangtag/Price Ticket
14 Assort poly mixed 14 Size Tag
15 15 Care Label
16 16 Set Pack
17 17 Color Sequence For Set Pack
18 18 Upc Check
19 19 Color Tag
20 20 Tag Position
21 21 Bar Code Number read
22 22 Tag Information
23 23 Tracking Code
24 24 Merit Tag
25 25 Tag Pin Measurement
26 26 PVC Box
27 27 In Side Card
28 28 In Side Card Sticker
Comments:-

Inspection Conclusion: Acceptable Label


Error Found
Total Error
Error Percentage
Result Pass Fail Hold

INSPECTED BY PACKING MANAGER Manager(QC)

Documents:
1. Packing hourly audit report

This Quality Manual is the property of Rizvi Fashions Limited & all rights are reserved by RF
Page | 42
Finishing Section Quality Control Process Flow Chart:

Garments Received &


Ironing

Repair

Audit AQL 1.5


Fail

Pass

Get up/Measurement
/ Pair Check
Fail

Packing Approved By GPQ


Pass

Fail
Packaging Check

Pass

Fail
Recheck Packing Audit by GPQ

Pass

Fail
Pre- Final

Pass

Fail
Ready For Final Inspection
Pass

Ready For Shipment

This Quality Manual is the property of Rizvi Fashions Limited & all rights are reserved by RF
Page | 43
Title: Pre Final Inspection Procedure (wcÖ dvBbvj B݇cKkb
cÖwmwWDi)
Created: Revision : 10/12/16 Section: Quality
20/05/16 Assurance
Approved By: Shaikh Rezwan, Authorized: Manager, QC,
Rizvi Fashions Ltd Director (RF Operation) RF
Standard Operating Procedure for Quality Assurance SOP/Q - 14

Purpose (D‡Ïk¨): The to ensure the product quality level as per AQL.(Mv‡g©›Um Gi G. wKD.
Gj. ÷¨vÛvW© Abyhvqx ¸bMZ gvb wbwðZ Kiv|)
Scope (cÖ‡qv‡Mi ¯’vb): Before final inspection.(dvBbvj B݇cKkb iæg(evqvi Abyhvqx)
Responsible Persons (`vwqZ¡cÖvß e¨w³): Customer Quality Inspector (evqvi Abyhvqx (wR. wc.
wKD)
Procedures (Kv‡Ri cÖwµqv):
1. Pre-final inspection starts with the packing audit after completion of 80% packing
(minimum requirement).(c¨vwKs AwW‡Ui cvkvcvwk Kgc‡ÿ 80% KvU©yb c¨vK nIqvi m‡½ m‡½ wR.
wc. wKD. wcÖ-dvBbvj B݇cKkb Ki‡e|)
2. Initially inspector need to collect packing lit and has to cross check it with the buyer
original purchase order (PO) for quantity, size break down etc.(B݇c±i/wR. wc. wKD.
cÖv_wgK fv‡e c¨vwKs wjó msMÖn Ki‡e Ges evqvi wc.I wm‡Ui m‡½ mvBR msL¨v BZ¨vw` †PK Ki‡e|)
3. After completion of that he will move to choose cartons. During carton choosing first has
to check the carton marking address, dimension etc is match with the customer
requirements(AZ:ci †m KvU©yb wm‡j± Ki‡e Ges cvkvcvwk KvU©yb gvwK©s, wVKvbv KvU©y‡bi •`N¨© cÖ¯’
D”PZv wVK Av‡Q wKbv evqv‡ii Pvwn`v Abyhvqx|)

4. If this fails need to informed to Finishing manager to rectify the matter immediately and
mean time continue the inspection.(hw` Dc‡iv³ †Kvb Kvi‡b †dj nq m‡½ m‡½ ফিফিফ িং
g¨v‡bRvi‡K Zv ms‡kva‡bi Rb¨ Rvbv‡e|)
5. Then will select the cartons randomly covering all sizes and colors.(AZ:ci †m ¯^vaxbfv‡e
me Kvjvi Ges mvBR cvIqv hv‡e Ggb fv‡e KvU©yb msMÖn Ki‡e|)
6. The carton selected has to open up and check the quantity and packing system done as
per the buyer requirement.(KvU©y‡bi Dc‡ii w`KUvq Lyj‡e Ges c¨vwKs wjó I evqv‡ii kZ©vejx
Abyhvqx G‡mvU‡g›U †PK Ki‡e|)
7. Next has to select the inspection quantity in this stage the auditor will follow AQL 1.5
(Single sampling plan normal inspection level II) standards. (G mg‡q AwWUi AQL 1.5
(Single sampling plan normal inspection level II) ÷¨vÛvi Abymib K‡i Mv‡g©›Um B݇cKkb
Ki‡e|
8. Next these garments has to check for the packing accuracy that is for packing method
price & other special tags etc as per the requirement .(c¨vwKs Gi mwVKZv †PK Ki‡e Ges
evqvi wiKzBqvi‡g›U Abyhvqx c¨vwKs †g‡_vW †hgb: cÖvBR wU‡KU Ges Ab¨ †Kvb †¯úkvj U¨vM Av‡Q wKbv
†PK Ki‡e|)
9. Next has to start stitching quality, shade continuity, measurements (covering all sizes)
etc. (†m Mv‡g©›Um Gi ‡mjvB‡qi †KvqvwjwU, †mW Ges †gRvi‡g›U Ki‡e me mvB‡Ri Dci|)

This Quality Manual is the property of Rizvi Fashions Limited & all rights are reserved by RF
Page | 44
10. All the finding has to mention in the report and acceptance of the lot depend on the AQL
and packing accuracy. (me¸‡jv mgm¨v wi‡cv‡U© wjL‡e Ges G.wKD.Gj †j‡fj I c¨vwKs G¨Kz‡iÝxi
Dci wbf©i Ki‡e D³ j‡Ui cvk/†dj|)
11. Finishing manager & Quality manager is responsible for correcting above finding and
offer re-inspection. (†KvqvwjwU g¨v‡bRvi I ফিফিফ িং g¨v‡bRv‡ii `vwq‡Z¡ †dj j‡Ui mgvavb A_ev
wi- B݇cKkb n‡e|)
12. During the pre-final time SIP file need to be complete and auditor will follow the SIP file
contains during pre-final (wcÖ dvBbvj B݇cKk‡bi mgq Gm AvB wc dvBj Aek¨B mwVK _vK‡Z n‡e
Ges B݇cKk‡bi mgq Zv Abymib Ki‡e|)
Rizvi Fashions Ltd. R-QC/F/PF/ST-21
Version-01
Quality Control Department
Pre-Final/Final/IQC Inspection Report

Factory/Supplier: ______________________________ Customer: __________________________________ Date: ______________________________________

Style: ________________________________ PO: _______________________________________ Delevery: ____________________________________

Description: Order Qty: ___________________________________ Colour:


AQL: Bassed on MLST 105E level-II
Total Carton Carton Pack Sample Size 1.5 2.5
Critical defect = 0
1 Shiping M ark Care / Country of Origin Price Ticket
2 Poly bag plain / print desing M ain / RN# Collar Tag
3 Flat Pack / Stand-up Pack Hang Tag M erit Tag

Size Scale : Packing Procedure :

Assortment:- i) Solid Color--Solid Size ii) Solid Color--Assort Size iii) Solid Size--Assort Color iv) Assort Size--Assort Color

CODE CHECK POINTS M AJOR M INOR CODE CHECK POINTS M AJOR M INOR CODE CHECK POINTS M AJORM INOR CRITICAL

TRIM & ACCESSORY SEWING CRITICAL DEFECTS


Missing / incorrect country of origin on
TA08 INCORRECT SHADE OF HOOK & EYE S01 IN ACCURATE STITCHING TENSION TA 01
care label.
Missing/ incorrect fiber content
TA09 INCORRECT SIZE HOOK & EYE S02 PUCKERING TA 02
labeling.
TA10 OFF SHADE ELASTIC/TAPES S03 WAVY TA 04 Missing/ incorrect care instructions
TA11 POOR KNIT ELASTIC/TAPES S04 ROPING/PLEATS SEAM S TA 05 Incorrect size label on care label
Poor printing of care label or sewing
M OLDING S07 TIGHT/LOOSE OUTER CUP SETTING TA 06
ticke
M 01 SHADE VARIATION AFTER M OLD S08 OPEN SEAM TA 07 Hook or eye missing.
M 03 WRONG M OLD SIZE S09 INACCURATE M EASUREM ENT TA- 12 Insect Found in Gmts
M 04 INCORRECT M OLDING SHAPE S10 ALL HI-LOW TA- 13 Nails end found in Gmts.
TRIM ING S11 ALL TYPES OF SHADING

TR02 UNCUT THREAD S12 SLANTED BARTACK/LABEL/YOKE ETC.

TR05 RAWEDGE S13 M ISSING BARTACK/LABEL/BOW ETC. FINISHING

FABRIC DEFECTS S14 OVER STITCHING/DOWN STITCHING FN03 GARM ENT NOT FOLD OR FINISH

F02 FOREIGN YARN/FIBER CONTAM INATION S15 WRONG CUP SIZE FN04 BAGS ARE WRONG LENGTH

F03 LINE M ARK S16 BROKEN STITCH FN05 INCORRECT PRICE ON GARM ENTS

F04 KNOTS IN KNITWEAR S17 SKIP STITCH FN07 M ISSING/INCORRECT HANG TAG

F05 DROPPED STITCH/HOLE S18 CREASE M ARK FN08 M ISSING/INCORRECT UPC LABEL

F06 SNAGGING S19 OUT OF M EASUREM ENT FN09 INCORRECT BAG OR BOX END LABEL

F10 SKWEWD OR BOWING S20 HIKING FN10 WRONG ASSORTM ENT

PRINTING DEFECTS S21 NEEDLE HOLES FN11 WRONG CARTON M ARKING

P02 M ISS-REGISTRATION OF PRINT S23 UNEVEN SHEARING FN12 INCORRECT QUANTITY CARTON/POLY

P03 OBVIOUS PRINTING M ISTAKES S24 TWISTED STRAP ATTACH FN14 INCORRECT POSITION OF TICKET

CUTTING FAULTS S25 PULLING/POINTY/CURLING CLEANLINESS


LABEL UP SIDE DOWN/WRONG SIDE
C01 UNEVEN SHAPE OF CUT S26 CL01 STAIN/OIL PATCH
ATTACH
C03 WXCESS FABRIC THAN PATTERN S28 FABRIC STRETCH OUT CL02 DIRTY SPOT

C05 INCORRECT CUT M ARK S29 REVERSED ATTACHM ENT OPERATION CL03 LOOSE THREAD

B01 INCORRECT PARTS IN BUNDLE S30 LABEL M ISTACK/WRONG LABEL ATTACH TOTAL MAJOR / MINOR / CRITICAL

B02 WRONG TRIM S IN BUNDLE TOTAL DEFECTIVE:


B03 SHADE M IX UP IN BUNDLE TOTAL ALLOWED:

COMMENTS :

INSPECTION RESULTS: ACCEPTABLE: UNACCEPTABLE: HOLD: RELEASED UNDER L/G:

INSPECTED BY: FACTORY REPRESENTATIVE:

Documents:
1. Pre final inspection Report

This Quality Manual is the property of Rizvi Fashions Limited & all rights are reserved by RF
Page | 45
Title: Measurement Procedure (†gRvi‡g›U cÖwmwWDi)
Created: Revision : 10/12/16 Section: Quality
20/05/16 Assurance
Approved By: Shaikh Rezwan, Authorized:Manager, QC,
Director (RF Operation) RF
Rizvi Fashions Ltd
Standard Operating Procedure for Quality Assurance SOP/Q - 15

Purpose (D‡Ïk¨): The to ensure the product quality, legality. (c‡b¨i †KvqvwjwU Ges wjMvwjwU
wbwðZ Kiv|)
Scope (cÖ‡qv‡Mi ¯’vb): All measurement checking area.( mKj gvb cixÿb GjvKv|)

Responsible Persons (ØvwqZ¡cÖvß e¨w³): Line QI, Sewing Quality Officer, AQL auditor,
(jvBb †KvqvwjwU, myBs †KvqvwjwU Awdmvi, G
Finishing QI and Customer Quality Inspector
wKD Gj AwWUi, wdwbwms †KvqvwjwU B݇c±i Ges wR wc wKD|)
Procedures (Kv‡Ri cÖwµqv):
1. In line QI is responsible for measure the process measurements during traffic light audit
and make corrective action with responsible persons. (Bb jvBb †KvqvwjwU B݇c±i UªvwdK
jvBU AwW‡Ui mgq cÖ‡mm †gRvi‡g›U Ki‡e Ges ØvwqZ¡cÖvß e¨w³ mnKv‡i Kv‡iw±f GKkb wb‡e|)
2. Further QI, AQL auditor and Sewing Quality Officer need to measure complete
garments minimum twice a day at least two pieces from each size that out from the line
particular day, If one size comes out from the line must check 4 pieces at time.(cieZ©x‡Z
†KvqvwjwU B݇c±i, G wKD Gj AwWUi Ges myBs †KvqvwjwU Awdmvi Kgc‡ÿ w`‡b 2 evi mg¯Í mvB‡Ri
2 wcm Mv‡g©›Um †PK Ki‡e| jvBb n‡Z GK mvBR †ei n‡j Aek¨B 4 wcm †PK Ki‡Z n‡e|)
3. For measurement auditing the responsible personals will maintain following
measurement procedure.
4. Pull 20 pcs garments representing all sizes & color at random.All measurement that go
beyond tolerance will be considering minor defect & should be given 0.5
point.Measurement that “Grade Jump” should be consider major and will be given 1.0
point.For Each garments should be scored once, taking the highest score.Refering to fit
audit AQL requirement of 10.0 point for knit, acceptable at 5 points & reject at above by
using MIL STD 105E Single sampling plan normal inspection level II.
5. If there is measurement deviation auditor need to inform relevant quality officer and take
corrective action immediately.(hw` †gRvi‡g›U ‡Wwf‡qkb nq Zvn‡j AwWUi mswkøó †KvqvwjwU
B݇c±i‡K AewnZ K‡i Aek¨B Kv‡iw±f GKkb wb‡e|)
6. All corrective actions should be record on the measurement sheet with respective
signatures. (mg¯Í Kv‡iw±f GKkb †gRvi‡g›U mswkøó mevi mvÿi mnKv‡i msiÿb Ki‡Z n‡e|)
7. For measurement each inspector should have calibrated measuring tape, customer
measurement chart & how to measure sheet. Measurement should perform in flat
surface while garments laying flat and following how to measure system .(†gRvi‡g‡›Ui
Rb¨ gvb cwi`k©K‡K Aek¨B †gRvwis †Uc K¨vwj‡eªkb Ki‡Z n‡e| Kvógv‡ii †gRvi‡g›U PvU© Ges
†gRvi‡g›U Kivi c×wZ †PK K‡i †`L‡Z n‡e| †gRvi‡g›U Aek¨B GKwU mgZj RvqMvq Ki‡Z n‡e hv‡Z
Mv‡g©›Um d¬¨vU c‡i _v‡K|)

This Quality Manual is the property of Rizvi Fashions Limited & all rights are reserved by RF
Page | 46
8. Apart from that Customer QI will conduct measurement during inline & pre-final audits
and Finishing QI will conduct measurement during random audit time, if audit fails
Quality Manager is responsible for make necessary steps to sort out the measurement
discrepancy garments. (wR. wc. wKD. Bb-jvBb Ges wcÖ dvBbvj Gi mgq †gRvi‡g›U Ki‡e Ges
wdwbwks †KvqvwjwU B݇c±i i¨vÛg B݇cKk‡bi mgq †gRvi‡g›U mgm¨vhy³ cb¨ evQvB K‡i †ei Kivi
e¨e¯’v Ki‡e|)

Rizvi Fashions Ltd. R-QC/SE-17


Version-01
Quality Control Department
Finished Garments Full Measurement Sheet
Buyer ……………………...….………. Cut.Qty……………………………….. Item….………………….………….

Order Qty……………….…………… Complete Sewing………………… DATE………………………………..

Style…………………………………… COLOUR…………………………………. UNIT:……………LINE…………....


TOL Size Size Size Size
MEASUREMENT POINT Req Req Req Req
-/+

ACTION:……………………………………………..….…………….....……………………………………………………………………...……………
….. AQL RESULT
………………………………………………………………………….………………………………………………………………..………………………….. KNIT WOVEN INSPECTED

………………………………………………………………………………………………………………………………………………...…………………….. 10 6.5 TOTAL POINT

…………………………………………………………………………………………………………………………………………………...………………….. ACCEPT REJECT


……………………………………………………………………………………………………………………………………………………..………………..

QUALITY INSPECTOR TECHNICIAN OFFICER/SR.OFFICER (Q.C) A.P.M/D.P.M/P.M ASST.MANAGER/MANAGER(QC)

Documents:
1. Measurement Report

This Quality Manual is the property of Rizvi Fashions Limited & all rights are reserved by RF
Page | 47
Title: Style File Maintain Procedure. (÷vBj dvBj †gBb‡UBb
cÖwmwWDi)
Created: Revision : 10/12/16 Section: Quality
20/05/16 Assurance
Approved By: Shaikh Rezwan, Authorized:Manager, QC,
Rizvi Fashions Ltd Director (RF Operation) RF
Standard Operating Procedure for Quality Assurance SOP/Q - 18

Purpose (D‡Ïk¨): To have central place which all the information of particular style kept
together for easy access for any person. (GKwU mywbw`©ó RvqMvq Gm AvB wc dvBj ivL‡Z n‡e| hv‡Z
Lye mn‡RB †h †Kvb e¨w³ cÖ‡qvRb Abyhvqx Z_¨ †c‡Z cv‡i|)
Scope (cÖ‡qv‡Mi ¯’vb): In all style.( mKj ÷vB†j)
Responsibilities(ØvwqZ¡cÖvß e¨w³): GPQ (wR wc wKD)
Procedure (Kv‡Ri cÖwµqv):
1. Customer Quality Inspector is responsible for maintain Style File.(wba©vwiZ evqvi wR wc wKD
÷vBj dvBj msiÿ‡bi Rb¨ KvR Ki‡e|)
2. CQI needs to collect all the information where applicable after PP meeting .(†KvqvwjwU
B݇c±i/ wR wc wKD cÖ‡qvRb Abyhvqx wc. wc wgwUs Gi ci mKj Z_¨ msMÖn Ki‡e|)
3. Style file should be present in the first out put meeting and it should be complete with
relevant information at that time (cÖ_g cÖWvKkb wgwUs Gi mgq Aek¨B ÷vBj dvB‡ji msiwÿZ
Z‡_¨i m‡½ wgwj‡q †`L‡e|)
4. Style File filing sequence guide lines are given bellow (÷vBj dvB‡j msiwÿZ Z_¨vejx
wb¤œiƒc|)
 BOM (Bill of materials)
 Sample approval comments and corresponding mails & documents
 PO sheet (buyer original)
 Technical Sheet
 Measurement sheet & How to measure
 Operation break down & lay out sheet
 Colors & approval
 Lab test reports
 Approved sewing & packing trim cards
 Approved packing method
 PP meeting minutes
 First out put meeting minutes
 Inline audit reports
 Inline measurement reports
 Garment test reports
 Packing audit report
 Packing list
 Pre-final inspection report
 Final inspection report

5. Rizvi Fashions Ltd will follow this sequence unless specify by customer. ( wiRfx d¨vkbm
wjwg‡UW Zvi wbR¯^ ÷¨vÛvW© d‡jv Ki‡e| hw` evqvi wiKzBqvi‡g›U _v‡K Zvn‡j †mUvI d‡jv Ki‡e|)

This Quality Manual is the property of Rizvi Fashions Limited & all rights are reserved by RF
Page | 48
6. After completion of the shipment this file needs keep as specify by the document control
procedure.(WKz‡g›U K‡›Uªvj wbqg Abyhvqx wmc‡g‡›Ui ci D³ dvBj evqv‡ii Pvwn`v Abyhvqx msiÿb
Ki‡e|)
7. For continuous styles Purchase Order wise (PO wise) file needs to maintain while
maintaining master style file. PO wise vary documents only be present on this file and
the contain may vary with the customer. (`xN© †gqv`x ÷vB‡ji g‡a¨ A‡bK ¸‡jv wc/I n‡j wc/I
Abyhvqx dvBj •Zix Ki‡e|)
8. PO file filing sequence guide line (wc/I Abyhvqx dvB‡j hv _vK‡e):-
 PO sheet (buyer Original)
 Colors and color approval
 Shade band
 Trim card (sewing & Packing)
 Test reports
 Packing method and approved sample
 In line audit reports
 Measurement reports
 Packing audit report
 Packing list
 Pre-final inspection report
 Final Inspection report

Documents:
1. Style File
2. PO file.

This Quality Manual is the property of Rizvi Fashions Limited & all rights are reserved by RF
Page | 49
Title: Defect Classification (wW‡d± K¬vwmwd‡Kkb)
Created: Revision : 10/12/16 Section: Quality
20/05/16 Assurance
Approved By: Shaikh Rezwan, Authorized:Manager, QC,
Director (RF Operation) RF
Rizvi Fashions Ltd
Standard Operating Procedure for Quality Assurance SOP/Q - 17

Purpose (D‡Ïk¨): To improve quality level by providing general frame work for analyze
defects (mvavib †d«gIqvK© Gi gva¨‡g wW‡d± A¨vbvjvBwmস করে c‡b¨i ¸bMZ gv‡bi DbœwZ mvab Kiv|)
Scope (cÖ‡hvR¨ ¯’vb): In all area of process.(cÖ‡m‡mi mg¯Í As‡k)
Responsibilities (`vwqZ¡cÖvß e¨w³): Quality Inspector (†KvqvwjwU B݇c±i|)
Procedure (Kv‡Ri cÖwµqv):

Types of Defects:
Defects are generally classifyed in 3 groups are 1)Critical Defect 2)Major Defect 3) Minor
Defect. (wW‡d± †K mvavibZ wZbwU fv‡M fvM Kiv nq| 1. wµwU‡Kj wW‡d±| 2. †gRi wW‡d±| 3. gvBbi
wW‡d±|)

Critical Defect: - A defect that is likely to result is hazardous or unsafe condition for an
individual in consuming the product or that is contravening against mandatory regulations .
(wµwU‡Kj wW‡d± n‡”Q †m¸‡jv hv ÿwZKviK Ges Awbivc` Ges hv Awewk¨K wbqgZ‡š¿i evB‡i|)

Major Defect:- Any defect which renders garment unacceptable by affecting the
appearance, durability, stability and / or wear ability for which a customer return will be
justified.(†gRi wW‡d± n‡”Q †mB wW‡d±¸wj †h ¸wj ewn¨K w`K †_‡K †`L‡Z Lvivc, `xN© w`b cwiavb Kiv
hvq bv GgbwK †µZviv Mv‡g©›Um µq Kivi ci †diZ cvVvq|)

Minor Defect:- Any defect, which does not render the garment to be unacceptable in the
area of justifying a customer return. Never the less, it indicates faulty workmanship and
areas requiring improvement.(gvBbi wW‡d± n‡”Q †h mgm¨¸‡jvi Rb¨ evB‡ii w`K †_‡K †`L‡Z Lvivc
, `xN© ¯’vqx‡Z¡i Rb¨ Amyweav nq bv GgbwK †µZvivI µq Kivi ci †diZ cvVvq bv|)

Rizvi Fashions Ltd classified its’ defects based on above categories in each section wise.
Further defect classification shows the degree of risk in each defect whether it is minor,
major or critical.( wiRfx d¨vkbm wjwg‡UW wewfbœ †KUvMix Abyhvqx cÖwZwU wWcvU©‡g‡›Ui Dci †gRi gvBbi
Ges wµwU‡Kj wW‡d‡±i bvg †KvW bs AvKv‡i †kªYx web¨vm Kwiqv‡Q|)

This Quality Manual is the property of Rizvi Fashions Limited & all rights are reserved by RF
Page | 50
Defect Classification

1. Trims & Accessory faults


Code Description Critical Major Minor
TA 01 Missing / incorrect country of origin on care Critical
label
TA 02 Missing/ incorrect fiber content labeling Critical
TA 03 Missing / incorrect flammability/safety labeling Critical
TA 04 Missing/ incorrect care instructions Critical
TA 05 Incorrect size label on care label Critical
TA 06 Poor printing of care label or sewing ticket Critical
TA 07 Hook or eye missing Critical
TA 08 Incorrect shade of hook & eye High Low
Major Minor
TA 09 Incorrect size hook & eye Major
TA 10 Off shade elastic/ tapes High Low
Major Minor
TA 11 Poor knit elastic / tape Major
TA 12 Insects found in garments Critical
TA 13 Nails end found in garments Critical

2. Fabric Defects
Code Description Critical Major Minor
F 01 Uneven yarn thickness A zone B Zone
F 02 Foreign yarn/fiber A Zone B Zone (One if
contamination less than 0.5mm )
F 03 Line mark Major
F 04 Knots in knitwear Major
F 05 Dropped stitch/ holes Major
F 06 Snagging A zone B Zone
F 07 Areas of loose / tight tension Major
within a panel
F 08 Yellowing Major
F 09 Fused components glazed, De- Glazed or residue
delaminated or evidence of lamination
adhesive residues
F 10 Skewed or Bowing Major

This Quality Manual is the property of Rizvi Fashions Limited & all rights are reserved by RF
Page | 51
3. Printing Defects
Code Description Critical Major Minor
P 01 Shading of whole garment outside of agreed Major
standard
P 02 Miss-registration of print Major
P 03 Obvious printing mistakes, i.e. incorrect design Major
print, spelling etc
P 04 Uneven dying or printing faults Major
P 05 Stains, result in permanent mark Major

4. Cutting Faults
Code Description Critical Major Minor
L 01 Wrinkles during laying Major
L 02 Too tight tension of the lay Major
C 01 Un even shape of cut Major
C 02 Excess cut (Panel short) Major
C 03 Excess fabric than pattern Minor
C 04 Excess cut mark Major
C 05 Incorrect cut mark Major
B 01 In correct parts in the bundle Major
B 02 Wrong trims in the bundle Major
B 03 Shade mix up in the bundle Major

5. Sewing Defects
Code Description Critical Major Minor
S 01 In accurate stitching tension Major
S 02 Puckering Major
S 03 Wavy seams Minor
S 04 Roping / pleats seams Minor
S 05 Inaccurate stitch count Major
S 06 In proper sewing / joining parts Major
S 07 Tight/Loose outer cup setting Major
S 08 Open Seam Major
S 09 Inaccurate measurement Minor
S 10 All High Low Minor
S 11 All types of shading
S 12 Slanted bar tack/Label/Yoke etc. Minor
S 13 Missing Bar tack /Label/Bow etc. Major
S 14 Over stitching/Down stitching. Minor
S 15 Wrong cup size Major
S 16 Broken stitch Chain stitch Lock stitch
This Quality Manual is the property of Rizvi Fashions Limited & all rights are reserved by RF
Page | 52
S 17 Skip stitch Chain stitch Lock stitch
S 18 Crease Mark Major
S 19 Out of measurement
S 20 Hiking Major
S 21 Needle holes Major
S 22 Cut damage Major
S 23 Uneven Sharing
S 24 Twisted strap attach Major
S 25 Pulling/Pointy/Curling Major
S 26 Label upside down/ wrong side attach Minor
S 27 Elastic Defects Logo Label
S 28 Fabric Stretchout (Operational) Major
S 29 Reversed attachment operation Major
S 30 Wrong label attach/Label Mistake Major
S 31 Insecure stitching / missing back Chain stitch Lock stitch
tack/Join Stitch

6. Trimming
Code Description Critical Major Minor
TR 01 Un cut thread ends more than 1cm Major
TR 02 Uncut thread ends 0-0.5cm Minor
TR 03 Flying thread ends Minor
TR 04 Insecure chain stitching cutting Major
TR 05 Raw edges/ ends not trim properly More than Minor
especially after bar tack 0.5mm

7. Finishing
Code Description Critical Major Minor
FN 01 No warning label on display bags Critical
FN 02 Packaging is not as agreed Major Minor
FN 03 Garment not finish or fold as required Major
FN 04 Bags are wrong length Short major Long minor
FN 05 Incorrect price on the garment Major
FN 06 Ticket or label attached untidy or Major
causing fabric damage
FN 07 Missing/ incorrect hand tag Major
FN 08 Missing/ incorrect UPC label Major
FN 09 Missing/ incorrect bag or box end Multiple Single
label pack garment
Critical major
FN 10 Wrong assortment Major
FN 11 Wrong carton marking Major
This Quality Manual is the property of Rizvi Fashions Limited & all rights are reserved by RF
Page | 53
FN 12 Incorrect quantity in side carton/ poly Major
bag
FN 13 Bags are not sealed as required Major
FN 14 Incorrect position of ticketing Minor

8. Cleanliness
Code Description Critical Major Minor
CL 01 Stains / oil patch Major
CL 02 Dirt spot Minor
CL 03 Loose thread Minor

Defect Codes

Standardize defect codes are being use by Rizvi Fashions Ltd. for the easy of understanding
and analysis. Basically these codes are use in end table inspection & traffic light audit.

This Quality Manual is the property of Rizvi Fashions Limited & all rights are reserved by RF
Page | 54
Appendix
Control Authority of the Manual

…………………………………….
Shakil Rizvi Ahmed
Managing Director
Rizvi Fashions Ltd.

………………………..
Shaikh Rezwan
Director
Rizvi Fashions Ltd.

………………………..
Md.Nannu Mia
Asst. Manager
Dept. of Technical & Quality Assuarance
Rizvi Fashions Ltd.

This Quality Manual is the property of Rizvi Fashions Limited & all rights are reserved by RF