ROAD EXCAVATION

item no:2
Earth work excavation for Foundation by mechanical means for all works & depth upto 3 m, as
per drawing and technical specifications, including setting out, shoring, strutting, barricading,
caution lights, including dressing of excavated surfaces, disposing off or levelling the excavated
earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m
including cost of labour, tools, usage of machinery & other appurtenaces required to complete
the work. In all kinds of soils Depth upto 3 m..complete with all lead and lift etc, as per
specification and direction of Engineer in charge.

Finished sub grade Depth of Width of Volume of Volume of


Chainage Ground level
road lvl lvl cutting road cutting filling
3600 944.312 943.994 943.114 0.8386 31.8
3570 944.175 944.056 943.176 0.6993 31.8 667.1322
3540 944.078 944.118 943.238 0.588 31.8 560.952
3510 943.817 944.115 943.235 0.4074 31.8 388.6596
3480 943.392 943.746 942.866 0.3682 31.8 351.2628
3450 942.988 943.296 942.416 0.4004 31.8 381.9816
3420 942.599 942.845 941.965 0.4438 31.8 423.3852
3390 942.228 942.395 941.515 0.4991 31.8 476.1414
3360 942.044 941.945 941.065 0.6853 31.8 653.7762
3330 941.769 941.495 940.615 0.8078 31.8 770.6412
3300 941.475 941.045 940.165 0.917 31.8 874.818
3270 941.069 940.595 939.715 0.9478 31.8 904.2012
3240 940.875 940.145 939.265 1.127 31.8 1075.158
3210 940.412 939.695 938.815 1.1179 31.8 1066.477
3180 939.847 939.244 938.364 1.0381 31.8 990.3474
3150 939.287 938.794 937.914 0.9611 31.8 916.8894
3120 938.814 938.344 937.464 0.945 31.8 901.53
3090 938.109 937.894 937.014 0.7665 31.8 731.241
3060 937.191 937.444 936.564 0.4389 31.8 418.7106
3030 936.346 936.994 936.114 0.1624 31.8 154.9296
3000 935.532 936.544 935.664 0.07 31.8 66.78
Total qty -Ch:3+600 to 3+000 12775.01

2940 935.291 935.907 935.027 0.264 31.8


2910 935.353 935.696 934.816 0.3759 31.8 358.6086
2880 935.429 935.485 934.605 0.5768 31.8 550.2672
Total qty -Ch:2+940 to 2+880 908.8758

2490 932.031 932.742 931.862 0.169 31.8


2460 931.94 932.384 931.504 0.3052 31.8 291.1608
Total qty -Ch:2+490 to 2+460 291.1608
Total Excavation Qty-Road 13975.05