Professional Documents
Culture Documents
Uznemiravanje I Seksualno Uznemiravanje Na Radnom Mestu
Uznemiravanje I Seksualno Uznemiravanje Na Radnom Mestu
5. Risk management
5.1. The Center for Girls prepares a Strategic Plan every three years to define its
directions of action.
5.2. Monitoring and evaluation of the strategic plan are conducted continuously,
and risk assessment is performed during this process (risk assessment is
conducted as needed, even monthly if necessary).
5.3. In specific situations, a detailed risk assessment may be conducted before
certain specific activities such as training sessions, travel, workshops, and
similar events.
5.4. Monitoring and evaluation are conducted for each project.
5.5. Potpisivanje memoranduma sa institucijama sa kojima sarađujemo na
projektima.
5.6. Potpisivanje saglasnosti od strane roditelja dece sa kojima sarađujemo.
5.7. Adresa CZD nije dostupna javnosti.
5.8. Sva dokumenta čuvaju se u ormarima koji se zaključavaju. Ključevi ormara sa
finansijama stoje kod koordinatoke finansija. Ključevi ormara sa opremom i
materijalima stoje kod izvršne koordinatorke. Ključevi ormara sa spiskovima i
projektnom dokumentacijom stoje kod koordinatorke programa.
5.9. SOS baza podataka korisnica usluga CZD se nalazi u svesci u ormaru na
zaključavanje i u računaru sa šifrom i bez interneta. Za bazu je zadužena
koordinatorka za rad sa korisnicama.
5.10. CZD uči, konsultuje se i radi sa internim zainteresovanim stranama i spoljnim
zainteresovanim stranama – korisnice, donatori, savet, kako bi identifikovali,
analizirali i procenili rizike.
5.11. Opštu odgovornost za upravljanje rizikom u CZD-u snosi izvršna
koordinatorka.
5.12. Savet je odgovoran za procenu efikasnosti upravljanja rizikom.