SCHEDULE C : RENTAL OF EQUIPMENT/ TOOLS

Work Location : Offhsore Sarawak / Sabah (PTTEP Facilities )

C1. MOBILIZATION AND DEMOBILIZATION


- from Contractor workshop to PTTEP warehouse to Contractor workshop by land
transportation.
- small equipment/tools mobilised via toolbox or basket.
- larger items mobilised via lorry.

No. Description Unit of DDP Bintulu DAP Labuan Delivery Lead


Mearure Unit Rate Unit Rate Time
(UOM) (RM) (RM) (in weeks)

1 Lorry (1 ton) lump sum


2 Lorry (3 ton) lump sum
3 Lorry (4 - 5 ton) lump sum
4 Lorry (6 - 7 ton) lump sum
5 Lorry (8 - 10 ton) lump sum
6 Trailer - 40' feet lump sum

No Description Unit of DDP Bintulu DAP Labuan Delivery Lead


Mearure Unit Rate Unit Rate Time
(UOM) (RM) (RM) (in weeks)

C2. Spread for Pipeline Auxiliary Pumping


Diesel Driven Flooding Pump, Flowrate 500m3/hr
c/w : suitable pressure gauge & pressure recorder, inter-spool
1 connection, flow meter, 6" suction hose (40m length), 4" Day
flooding/delivery hose (60m)

Hydraulic Driven Submersible Pump, Flowrate 500m3/hr


2 c/w: HPU, hydraulic hose to connect to HPU, suitable pressure gauge, Day
flow meter, 6" flooding/delivery hose (80m)

Electrical Driven Submersible Pump Flowrate 500m3/hr


c/w power cable to connect to Generator Set, distribution board c/w
3 power cables, suitable pressure gauge, flow meter, 6" flooding/delivery Day
hose (80m)

Pneumatic driven submersible pump Flowrate 500m3/hr


4 c/w: air hose to connect to air supply, suitable pressure gauge, flow Day
meter, 6" flooding/delivery hose (80m)

Pneumatic Driven Pump, Flowrate 70m3/hr


5 c/w: air hose to connect to air supply, 4" suction hose (20mtr), 4" Day
flooding/delivery hose (40mtr)
6 Diesel Driven Generator, 110kVA, 50Hz Day
7 High Pressure Pump, 30 ltr/min Day
8 High Pressure Pump, 100 ltr/min Day
9 High Pressure Pump, 350 ltr/min Day
10 High Pressure Pump, 600 ltr/min Day
11 Air Compressor, 175 - 375 scfm Day
12 Air Compressor, 390 - 500 scfm Day
13 Chemical Injection Pump, Flowrate 0-40ltr/min Day
14 Water Break Tank Day
15 Seawater Filtration Skid 50 micron, Flowrate 300m3/hr Day
16 Test/Cabin Container Day
17 Toolbox/Open Tray Container Day
Toolbox/Open Tray Container c/w tools, fittings, valves and rigging
18 equipment Day

19 Dead Weight Tester, 0-300 bar Day


20 Dead Weight Tester, 0-600 bar Day
21 Pressure and Temperature Data Logger Day
22 Suction Hose, 6" per 20 mtr/length Day
23 Suction Hose, 4" per 20 mtr/length Day
24 Delivery/Flooding Hose, 2" per 20mtr/length Day
25 Delivery/Flooding Hose, 4" per 20mtr/length Day
26 High Pressure Hose, 1/4" per 20mtr/length Day
27 Chemical Injection Hose, 1/2" per 20mtr/length Day
28 High Pressure Hose, 1/2" per 20mtr/length Day
29 High Pressure Hose, 1" per 20mtr/length Day
30 High Pressure Hose, 2" per 20mtr/length Day
31 Air Hose, 1" per 20mtr/length Day
32 Air Hose, 2" per 20mtr/length Day
33 Quick Connect Hose Coupling, 2" Day
34 Quick Connect Hose Coupling, 4" Day
35 Oil-in-Water Meter (TD500 Infrared) Day
36 Pinger Transmitter and Receiver Set Day
37 Flood Light, 1-3kVa Day
38 3T Beam Clamp Day
39 5T Beam Clamp Day
40 1T Chain Block Day
41 3T Chain Block Day
42 5T Chain Block Day
43 Single Snatch Block (up to 3T) Day
44 2.5T Pull Hoist (Lever Block) Day
45 5T Pull Hoist (Lever Block) Day
46 1” Ball Valve, 600psi Day
47 1” Ball Valve, 3000psi and above Day
48 2” Ball Valve, 600psi Day
49 2” Ball Valve, 3000psi and above Day
50 6” Butterfly Valve, 150psi Day
51 8” Butterfly Valve, 150psi Day
52 6” Gate Valve, 150psi Day
53 8” Gate Valve, 150psi Day
54 2” Check Valve, 3000psi and above Day
55 2” Pressure Relief Valve Day
56 1” Hose Nipple Day
57 2” Hose Nipple Day
58 1” Plug Day
59 2” Plug Day
60 2” Socket Day
Pneumatic Impact Wrench (Pneumatic impact wrench, 20 - 40 mm NS
61 (3/4") drives, c/w suitable 6 point and sockets ranging from 7/8" to 1-4 Day
3/4", 30mtr long hose with fitting and connector

Hydraulic Torque Equipment come with pump pack, sockets ranging


from 1” to 4”, interconnecting hoses, adapters and necessary
62 accessories for each bolt size, 30mtr long hose with fitting and Day
connector

C3. Spread for Pipeline Commissioning Support


Air Compressor, 750 - 850 scfm
1 c/w : suitable pressure gauge & pressure recorder, temperature Day
recorder, inter-spool connection, 2" air/high pressure hose (40m)

Air Compressor, 950 - 1200 cfm


2 c/w : suitable pressure gauge & pressure recorder, temperature Day
recorder, inter-spool connection, 2" air/high pressure hose (40m)

Air Dryer, 1650 scfm, 150psi


c/w : air hose to connect to air supply, suitable pressure gauge &
3 pressure recorder, temperature recorder, dew point meter, oxygen Day
meter, inter-spool connection, 2" air/high pressure hose (20m)

Air Dryer, 2700 scfm, 350psi


c/w : air hose to connect to air supply, suitable pressure gauge &
4 pressure recorder, temperature recorder, dew point meter, oxygen Day
meter, inter-spool connection, 2" air/high pressure hose (20m)

Diesel Driven Vacuum Pump with Booster, Flowrate 1600m3/hr,


0.01mBar
5 c/w: suitable dew point meter, oxygen meter, vacuum gauge range 0- Day
1100 mbar, vacuum hose (20m)

Diesel Driven Vacuum Pump with Booster, Flowrate 2500m3/hr,


0.01mBar
6 c/w: suitable dew point meter, oxygen meter, vacuum gauge range 0- Day
1100 mbar, vacuum hose (20m)
7 Nitrogen Skid Tank, 7000 liters Day
8 Nitrogen Skid Tank, 17000 liters Day
Nitrogen Vaporizer, Ambient Type, 0-1000 Nm3/hr, 15 bar
9 c/w: nitrogen liquid cryogenic hose to connect to nitrogen skid tank Day
(20m)
Nitrogen Pallet, 144 Nm3/Pallet, 170 bar
10 c/w: nitrogen regulator, air/high pressure hose (40mtr) Day

Flow Meter (Digital, Ultrasonic Type, Clamp-on Type), suitable for


11 pipeline size 4" up to 24" Day

C4. Spread for Nitrogen Pumping


Diesel Driven 90K Nitrogen Pump
c/w : suitable pressure gauge & pressure recorder, temperature
1 recorder, inter-spool connection, flow meter, oxygen meter, 2" air/high Day
pressure hose (40m)

Diesel Driven 180K Nitrogen Pump


c/w : suitable pressure gauge & pressure recorder, temperature
2 recorder, inter-spool connection, flow meter, oxygen meter, 2" air/high Day
pressure hose (40m)
3 Over Pressure Protection Skid Day
4 Nitrogen Hose, Cryogenic, 2” per 20mtr/length Day
C5. Spread for Portable Oil Water Separator
Portable Separator Tank, 20m3
1 c/w: inter-spool & hose connection, suitable pressure gauge Day

ISO Tank, 20m3


2 c/w: inter-spool & hose connection, suitable pressure gauge Day

3 Portable Oil and Water Analyzer Day


C5. Pipe Fitter, Welding/Cutting Equipment, Rigging Gears, NDT, Safe Habitat Equipment
1 Manual PipeCutter up to 28inch day
2 10T Beam Clamp day
3 Pipe Alignment Clamp up to 28inch day
4 Automatic Pipe Cutter up to 28inch day
5 Cold Cutting Pipe Saw day
6 Cold Cutting & Bevelling Machine up to 28inch day
7 Electrode Oven day
8 Diesel Driven Welding Machine 400-600 Amp day
9 Fume Extractor complete with Collapsible Duct day
10 Ventilator/Blower day
11 L.P. Gas Heater day
12 Air Plasma Cutting Machine day
13 Ferrite Content Measuring Instrument day
14 High Pressure Water Jet Cleaner day
15 10T Chain Block day
16 Hydraulic Jack up to 10T Capacity day
17 Flange Facing Machine up to 28inch Diameter day
18 Magnetic Particle Inspection Equipment day
19 Dye Penetration Inspection Set day
20 Safe Welding Positive Pressure Enclosure (Habitat Set) day
21 Explosion Proof Ventilation Blower day
22 Automatic In Line Gas Detector with Indicator day

You might also like