B6. Engineering
1 a. Design/Re-design of enclosure door. - -
b. Analysis of pig trap system and enclosure door
to cater for any changes or upgrade pig trap.
c. Development or update pig trap system
operation and maintenance manual.
d. To develop the material specifications.
e. Update the related drawings and submission to
goverment authorities e.g. DOSH.
Unit of DAP Labuan
Unit Rate (RM)
DAP Labuan
Unit Rate (RM)
Delivery Lead Time
Measure (in weeks)
(UOM)
Ea
Ea
Ea
Ea
Ea
Ea
Ea
Ea
Ea
Ea
Ea
Ea
Ea
Ea
Ea
Ea
Ea
Ea
Ea
Ea
Ea
Ea
Ea
Ea
Ea
Ea
Ea
Ea
Ea
Ea
Ea
Ea
Ea
Ea
Ea
Ea
Ea
Ea
Ea
Ea
Ea
Ea
Ea
Ea
Ea
Ea
Ea
Ea
Ea
Ea
Ea
Ea
Ea
Ea
Ea
Ea
Ea
Ea
Ea
Ea
Ea
Ea
Ea
Ea
Ea
Ea
Ea
Ea
Ea
Ea
Ea
Ea
Ea
Ea
Ea
Ea
Ea
Ea
Ea
Ea
Ea
Ea
Ea
Ea
Ea
Ea
Ea
Ea
Ea
Ea
Ea
Ea
Ea
Ea
Ea
Ea
L/S