Download as pdf or txt
Download as pdf or txt
You are on page 1of 24

ZTE IBC Solution

April 2022
Part 1: ZTE IBC Solutions

Part 2: Success Cases


ZTE Indoor Solutions

3.5GHz QCell Solution

• NR 3.5GHz and 700MHz


• Compensate Indoor coverage
BBU pBridge Pico RRU

• High capacity with open area- mall/expo


• Capacity for office & residential

BBU
• Tier 1/2 city: business hall/transport hub/business 700MHz or 3.5GHz RRU
district/high traffic high value building
• Tier 2/3 city: business hall/transport hub/business
district

iMacro/Pad RRU for residential 4T/8T/32T/64T RRU/AAU for high


• 200MHz OBW @ 3.5GHz building
Overview of ZTE 5G QCell Solution

Multi-operator Capacity RAN sharing


Full
Scenario
6 PLMN 1/2/4 T/R NR OBW 100~200

Different distance Different capacity Different scenario

Flexible
Hybrid Cable 10/25Gbps PB In-build/external

Unified
QCell/Macro/multi- QCell/Macro/multi-RAT
RAT one BBU one UME
Diverse pRRU Products for Scenarios
QCell QCell Lite

R8149 T3500E R8149 M182126 R8159 M182123 R8149 M1826B/M2135B


2.7L/2.5Kg 2.7L/2.5Kg 4*250mw @2.3GHz 1.8L/1.6Kg
4*750mw@3.5G 4*500mw @2.6GHz (n41) + 2*2*250mw@1.8&2.1GHz 2*500mw @3.5Ghz
+ 2*2*250mw@1.8&2.1GHz + 2*250mw @2.1GHz

Before 2022 2023Q1 Before 2022

Better Experience & Capacity Lower Cost


Product Deployment Function

Signal Source RRU Product for New Band in DAS system

Specification R9214E S7200 Specification R9604 S35


Operating band 700 MHz Operating band 3.5GHz
IBW 200MHz
Output power 4*60W
Output power 8*50W
Volume (L) 19
Volume (L) 30
Weight (kg) 20
Weight (kg) 25
Tx/Rx 4T4R
Tx/Rx 8TR (Split 4T4R)
Interface CPRI: 2*9.8G
Interfaces CPRI: 2*10G/25G
Power supply –48V DC
Power supply –48V DC

▲ZTE Confidential
6
Part 1: ZTE IBC Floorplan

Part 2: Success Cases


DIGI GL QCell Commercial Case
Digi already deployed 300 pRRUs and 96 pBridges in 7
shopping centers in KL including the most popular shopping
center : Mid Valley / The Garden/ Sunway Pyramid ;

GUL Qcell in Mid Valley Megamall in Kuala Lumpur


n Mid Valley Megamall is one of the most popular shopping center in
Scenario
Malaysia, having 300+ shops inside, customers can buy almost
everything here.
n Crowded customers and high traffic inside the shopping center.

n Digi deployed QCell on LG floor to implement a


compassion between DAS and QCell;
n QCell supports GSM1800M and LTE1800/2600M,

to cover the LG floor, 1 BBU,8 pBridges and 38


pRRUs were deployed.
Shopping Mall

Berjaya Times Square Hotel in Kuala Lumpur


n Berjaya Times Square Hotel is one of the most popular hotel and shopping

Scenario malls in the world frequented by both locals and tourists alike in Malaysia,
having 1000+ shops inside, customers can buy almost everything here.
n Crowded customers and high traffic inside the shopping center.

n UM deployed QCell on LG/G/1/8/10/11/12/14 floors to implement a compassion between DAS and QCell;
n QCell supports LTE2100 + NR3500, to cover 8 floors 1 BBU, 4 pBridges and 26 pRRUs were deployed. Solution

QCELL
DNB 5G IBC Trial in TRX
Legend

Transmission 1 Gbps Optical


pBridge
The green dots area
DC Power Cable

Fiber Q-Cell
in the figure is the PCI
Cat5e & Above (21) within the ZTE
R8149 T3500
qcell coverage area.
pBridge
DAS
antenna pBridge
need 3th.
party to PB1125F
offer

DAS RRU
R9214E S7200W
GPS

Three MNOs RAN


Lithium Battery sharing ,total
throughput over
1.3Gbps;
BBU

V9200
DNB IBC Solution- Option 1
3.5G Qcell + 700M DAS ( only provide BBU+ RRU for signal source)

pBridge Legend

Q-Cell Transmission 10 Gbps Optical Option3 IBC Equipment List (eg: package 1)
DC Power Cable
R8149 T3500 Board N0.
Fiber
Hybrid cable VSWd1 1
pBridge
DAS antenna
VBPd0 2
need 3th. pBridge CSR BBU
party to offer VEMc1 1
PB1125F BBU
VPDc1 1
DC Power
DAS RRU System Hub PB1125F 1
R9214E S7200
GPS 700M RRU R9214E S7200 1
3.5G pico RRU R8149 S3500 5

3000w Rectifier Moduel 2


Power 100AH Lithium Battery 1
BBU

V9200 Indoor rack 1


Estimated Budget RM 650,000
ZXDU68
B301
VBPd0
VBPd0
BBU V9200
VPDc1 VEMc1 VSWd1

Note: The equipment of CSR is not included in BOQ.


DNB IBC Solution- Option 2
3.5G + 700M DAS ( only provide BBU + RRU for signal source)
Legend
Transmission 10 Gbps Optical
Option4 IBC Equipment List (eg: package 1)
DC Power Cable
RRU Fiber Board N0.
R9604 S35 Hybrid cable
VSWd1 1
DAS antenna
need 3th. CSR VBPd0 2
party to BBU
BBU VEMc1 1
offer
POI DC Power VPDc1 1
RRU System R9604 S35 1
R9214E S7200 RRU
GPS
R9214E S7200 1

3000w Rectifier Module 3


Power 100AH Lithium Battery 1

BBU Indoor rack 1

V9200
Estimated Budget RM500,000

ZXDU68 B301

VBPd0
BBU V9200 VBPd0
VPDc1 VEMc1 VSWd1

Note: The equipment of CSR is not included in BOQ.


Responsible Matrix Scope for Reference
E2E Project Management by IBC Vendor

Passive Integration,
Site Active DIS TP Approved DIS Installation
Site Survey IBC&CME Testing & Work Test Optimization Acceptance
Acquisition Design by Operator & CME Works
Design Commsioning

Network Network Network


Operator IBC Vendor IBC Vendor IBC Vendor IBC Vendor IBC Vendor Equipment IBC Vendor Equipment Equipment
Provider Provider Provider

IBC Vendor Operator IBC Vendor

• Operator • Detailed • Preparatio • Preparatio • Obtain TP • Supply of • DIS system • Perform • RF • Preparatio
fronting for site survey n of DIS n of CME approval CME integration, walk test to performan n as build
Gov agency for DIS, IBC, design as design and from material and testing & verify the ce and FAC
building, with CME per passive relevant installation. commissio design KPI. optimizatio report
support and operator DAS design stakeholder • Installation ning. n
follow-up by requireme if required and operator. of DIS
IBC vendor. nts • Operator system.
• Private sector assist for site • DIS
building to be access for equipment
SoW Responsible
managed by gov agency delivery by Network
IBC vendor buildings. network Operator IBC Vendor Equipment
provider. Provider
THANK YOU!
Creating A New Future for the 5G Indoor Service
DNB 700M DAS Connection
Product Deployment Function

Flexible BBU Connection


BBU-PBridge Connection GPS Connection
GPS

n Max 10Km for optical fiber distance

GPS power splitter

VBPc1
VBPd2

VPDC1 VEMC1 VSWd2

VBPc1
VBPd2

VPDC1 VEMC1 VSWd2

VBPc1
VBPd2

n Max 4 levels of PBridge cascading. n Max 24 PBridges with star networking VPDC1 VEMC1 VSWd2
and cascading
19 inch Cabinet
Product Deployment Function

Flexible Connection between PBridge and pRRU

Hybrid Cable: Max. distance 200m

Cat6a Max. distance 100m

Max 8 connections to n PB1124F supports 8*10Gbps interfaces to pRRUs.


PBridge
pRRU/per PBridge n PB1124F supports both Cat6a and hybrid cable
simultaneously.
n PB1125F supports 8*25Gbps interface to pRRUs.
n PB1125F supports hybrid cable only.
Product Deployment Function

Flexible Front haul Solution

Front Haul Speed for Mode/TRx Front Haul Solution Compare


Bandwidth Optical Fiber
mode TRx Speed(Gbps)
(MHz) module 1 2
Interface Power supply
LTE 20 2T2R 0.57Gbps 1GE
• Cat6a: 10G GE port • Cat6a: only 100m

NR 100 2T2R 3.07Gbps 10GE • Hybrid cable: 10G/25G CAT6a vs • Hybrid cable: 200m

optical fiber Hybrid cable


NR 100 4T4R 6.14Gbps 10GE

3 4
NR 200 2T2R 6.14Gbps 10GE Engineering Evolution
• Cat6a: limited by 10G capacity
• Cat6a:easy
NR 200 4T4R 12.28Gbps 25GE • Hybrid cable: limited by optical
• Hybrid cable: easy
module
10G port capacity: 1x4T4R@100M+5x2T2R@20M
PB1124F supports both Cat6a and hybrid cable simultaneously.
25G port capacity: 2x4T4R@100M+10x2T2R@20M
Product Deployment Function

Flexible Installation Solution

Vertical-pole mounted Concrete wall mounted Concrete ceiling mounted Removable-ceiling mounted

pole mounted wall mounted Centralized Bracket mounted Cabinet mounted


Product Deployment Function

ZTE Signal Source for 3rd Party DAS


l The existing DAS passive components usually only support 800M~2.7GHz. For 700M and 3.5G NR DAS, all the current DAS system components need to
support new band 700M and 3.5G, including combiner, splitter, antenna, etc, so all the DAS system may need to deploy again.

l ZTE is only responsible of all 4G/5G signal part, the interfaces of all passive components shall be in the charge of the operators. RRU need to support
xT/xR according to the existing DAS channel and the output power of RRU need to meet the DAS system design requirement.

Incumbent DAS 5G NR (700M and 3.5G) DAS

Adding new 1、Change or add components to support new band


Signal Source 2、Add BBU and RRU

2G/3G/4G Signal

BBU+RRU
Coupler
Combiner

Splitter

Coupler
Combiner

Splitter
Antenna
2G/3G/4G /5G Signal

Antenna
BBU+RRU
Coupler

Splitter

Coupler

Splitter
+ +
Product Deployment Function

Unified EMS, Visible and Easy Management for All Nodes


Visualized O&M of UME
• Unified EMS with macro station.

• Active system, each node is visible,


controllable and manageable.

• Monitoring for each floor, easy to


locate and solve problem.

O&M Efficiency O&M cost


improve 5 times reduces 70%

400%
Product Deployment Function

Flexibility in System Capacity Adjusting

Capacity On Demand Flexible Combine/Split

Cell split Cell split

Cell Combination Cell Combination


OMC OMC OMC
n Flexible cell combine/split within same
optical fiber

BBU BBU BBU

Indoor capacity N times RF engineering Zero


instantly touch
n Flexible cell combine/split cross optical fiber
Product Deployment Function

QCell Super MIMO Enabling Indoor Performance


Challenges of QCell cell spitting in high density scenarios Super MIMO improves both capacity and experience

QCell Cell splitting improves capacity Super MIMO improves capacity


Distributed QCell pico RRU

Non-overlapping area:
Adaptive space-division
CP1 CP2
pairing of UEs to
improve cell capacity.
CP3 CP4
Logical cell

Super MIMO improves experience


Distributed QCell pico RRU
Challenge of QCell Cell splitting
Overlapping area and
Cell1 Cell2 Cell3 cell edge:
Capacity Gain
CP2 Joint transceiving and
CP1
Interference beamforming to
CP4 improve capacity and
CP3
Logical cell user experience.
More capacity gain and less interference Inconsistent cell edge experience
can not be achieved at the same time
Product Deployment Function

5G QCell RAN Sharing Solution


MOCN up to 6 operators MORAN with 2 operators MORAN with 3 operators

CN C
CN B
CN B CN B
CN A

CN A CN A
BBU BBU BBU
Operator A Operator B Operator A Operator B Operator A Operator B Operator C

R8149 R8149 R8149 E


3300 Operator A/B/C/D 3600 3300 Operator A Operator B 3600 3300 Operator A Operator B Operator C 3600

100MHz OBW 200MHz OBW 300MHz OBW

4*250 4*250 4*250 4*250 4*250 4*250


mW mW mW mW mW mW

4*250mW 4*500mW 4*750mW

You might also like