Download as pdf or txt
Download as pdf or txt
You are on page 1of 12

Toll Plaza

Location-Singraulli
Vb- 39 mis

Zone -
I

Load Calculation -

Dead Load

lut. Factor=
1.0 & 1.05

self

Roof Sheet 12 kg/m2
=

=0.12 kNn

2 Live Load

live
↳> load on
Roof =
0.15kN/m2

3 Accidental loads =
Look (at3m above
FRL)
100k
-
(at 3-0.35 =2.65m)
From Base plate
level
875 Part(3)
4 ad Table (9) -IS
I
↑↑

1.2

12m

It 14m xI
x-
K1.8
-
- -

1.8m
M

Considering e
-

1. Overall creff. (0 0)
=
()
=
(0.3)

(-
=
(0.6)

Maxi
2. Local loff. (a) cove

wit ⑩
↑↑
R

12mabD0 . ⑳
1 I
10
1.21.8 ⑩ ⑱ ⑩
14m -xI

-

1.8m
M
Maxim cive
(D)
0 ⑭
↑I
n

1.2 -1.n

12m
E ⑪ ⑱6

I 1.2

I0
h

-
-1.4
⑭ ⑪
14m -xI
K
-
- -

1.8m

CCS Combinations
of
Maxi G)He &
Maxi Eve

8 T
a


·

1.2
↳o

12m it ⑪%6
I 1.2

I Nu
14m x-
↳-
-

1.8m
k,,k2, K3, Kn 1.0, V =
= 39m/s

V2 k,.k2.3.kn.V3 39m/s
=
=

Ka 1.0
=

kd 0-9
=

K=0.9
2

Pz 0.6V2 0.6x39
=
=

912.6
= N/m2

912..6
Pd 0.82
= x

739.21
=
Nm2

-39 Pd > kalmt


load me
Dead
-

0.12

Intermediate
1.4
0.12 x 0.168kN/m
=
->

0.138kN/m-Eave
0.12*
(9) =

=0.108kN/m ->
End
0.12 x0.9

kN -> End
0.12 x
0 =0.054

Wade e
1.0LKN/m -> Intermediate
0-75 x 14 =

0.25x(19) 0.8625kN)m
=

Eare
-

0-9=
0.675 kalm->Gnd
0.75 x

0.75 0.9 0.3375kNlm -> God


-- I
2
pri
load
d
on e

① Overall Loeff. (Max Five]


0.6
~08 ↑
-
62076

axons
0 -

mediate
- 06x a e
ne
-

-x0.9x0230.1995
I
-10.6x09x0ces=0.3990s
I
9 =

② Overall Coeff.
Max cive
o
-yo

"
Intermediate 5 0.3 x1.4x0.739=
0-31036

Save

End

End
I ⑭ Maxm

1.2

↑ Este
12m9.b
06
-14

I 1.2

I0 ⑪ ⑪
h

-
-1.4

14m --S

K
- -

1.8m
M

1.4 x 0.739x0.45 =0.466

1.4x0.139 x0.9
0-93
=

X 1.15
1.19
1.4x 0.339 =

9 X1.4 1.45
-
=

0.621
0.6x0.739 x1.4
=

0.739
1.1 x x 1.4 1-138
=
⑩N
↑↑

-
⑱ Max
Clue
12mabD0 . ⑳
12 I C
1.8 ⑱ ⑩
x-
k,-km
-
- -

1.8m
M

0.59859 =0.
1.8x0-739 x0.45
=

1.19718 11
1.8 X 0.739 x 0.9 =

1. 8X 0.739 X 1.15 1.52973=


= 1.53

0.739
1.8 X X 1.4= 1.86228 1.86
=

1.3 0-739 x0.45 0.432


=

1.3x0.739x0.9
0.865
=

1.3 x0.739 X 1. 15 = 1- 11
-

0.621
y 0.739x1.4
=

0.6

⑭39
0-41
x 14
=

-

I
Wind
-
Calculation
↳ =
-
=0.57
W
10.4

L 12
12m 1.15
=

wo
-

10.12

WALLS
-
A B cD

E G 00 0.7 -0.25-0.6-0.6

90° -0.6-0.670.7-0.25
FI

O 90
ROOF
- IF GHEG FH

0x 0.8-0.6-1.0-0.6

40 -0.8-0.6-0.92-0.6

50 -0.8-0.6-0.9-0-6
-
W
com ↓ 0.4m 1.8

wind load applied purlin


·

on

·
wind load GI dive not
is correct.

why applied
· releases on buss
u
&

steel considered for


take
off not

few members.
cap plate
·base plate & anchor bolt
design?
I
Ne
-

*
M

6
how 280,350
(Main)
considered
Why By
o
=
250 For
tubes 2

·
How check
to
0
design & deflection.
· where is steel design?

2.45kym

I
I 0.621 kN/m
x

-
↑ ↑
K- 1.2m K- 1.8m

You might also like