This drawing is the property of:NAGA Architects, Designers, Planners it is not allowed to reproduce this sheet's contents in any form except for the purpose for which it is intended . the consultant has a duplicate electronic file of this drawing . the contractor(s) shall assume full responsibility for any and all alterations and/ or changes on these drawings files including the resulting coordination between the trades involved . the contractor shall check and verify all dimensions and report all discrepancies to the architect and design professional whose seal is affixed to this drawing this drawing shall not be used for construction purposes until issued for construction by the design professional whose seal and signature are affixed to this drawing
VILLA C

A B C D E F G H I J K L M N
N
TRUE
LOCATION MAP
D

W E

D
3.95
G.F.L

1
S STAMPS
CONSULTANT
4.83
3.95
T.O.P
G.F.L

a r chi t e ct s de s i g n e rs planne rs
UNDERGROUND
WATER TANK P.O. BOX 73033, DUBAI, UAE
TEL.: +97143324455 FAX: +97143322113
2 3.95 E-MAIL: mail@naga.ae URL: www.naga.ae
G.F.L

0.00
G.F.L
3
4.80 4.05 4.80
C

F.F.L G.F.L F.F.L


4

C
8.70 4.80
4.80 T.O.ROOF T.O.ROOF
T.O.ROOF

5.90
T.O.P
6
ABDULLAH ABUNAYYAN
6.00
T.O.P VILLA-C
PLOT #:
4.05
T.O.ROOF RIYADH, KSA
7 0.00
G.F.L
4.25
5.00
T.O.P ARCHITECTURAL DRAWINGS
T.O.P 4.80
0.00 KEY FOR ''ISSUE FOR'' RC REVIEW & COMMENTS
F.F.L
G.F.L SD SCHEMATIC DESIGN CA CLIENT APPROVAL
DD DESIGN DEVELOPMENT PS PROGRESS SET
8 CD CONSTRUCTION
DOCUMENTS
R FOR RECORD
P PRELIMINARY
TD TENDER DOCUMENTS M MUNICIPALITY REVIEW
MEP MEP BACKGROUND
0.00
G.F.L 5.70
4.80 T.O.P
G.F.L
9
B

B
9.30
10 T.O.P 9.30
T.O.P
8.80
T.O.ROOF
100% Construction
3 07/02/11 CD-CA Documents NAGA
80% Construction
2 10/11/10 CD-PS NAGA
11 Documents
50% Construction
1 06/04/10 CD-PS NAGA
Documents
0 27/03/10 DD-CA AS PER CONTRACT NAGA
12 ISSUE ISSUE
Rev DATE FOR DESCRIPTION By
9.70
T.O.ROOF 9.70
T.O.ROOF ISSUE

Project No. 09-27 KSA

Project Arch M.Dalyr - N.Salah


13 10.80
T.O.P
Structural Designer MH
10.80
T.O.P D:\lowins revit files\09-27\CONSTRUCTION
DOCUMENTATION\VILLA C\Villa C Central
REVIT File 101014.rvt

SCALE AS SHOWN

Drawn By N.Salah - M.Dalyr

Checked By Butch

MANAGEMENT Dr. Elkady


A

A
PRINTING DATE/TIME 2/7/2011 2:52:02 PM

VC-A-001

A1 SETTING
1 : 150
OUT PLAN
SHEET TITLE
0 1 2 5m
SCALE 1:150
SETTING OUT PLAN

.
1 2 3 4 5 6 7
1 2 3 4 5 6 7

This drawing is the property of:NAGA Architects, Designers, Planners it is not allowed to reproduce this sheet's contents in any form except for the purpose for which it is intended . the consultant has a duplicate electronic file of this drawing . the contractor(s) shall assume full responsibility for any and all alterations and/ or changes on these drawings files including the resulting coordination between the trades involved . the contractor shall check and verify all dimensions and report all discrepancies to the architect and design professional whose seal is affixed to this drawing this drawing shall not be used for construction purposes until issued for construction by the design professional whose seal and signature are affixed to this drawing
A B C D E F G H I J K L M N
D

D
39900

16800 3900 9900 6600 2700


STAMPS
5400 3000 2900 4300 3000 2400 2400 2400 2400 2500 1200 4500 2600
CONSULTANT
C1
VC-A-302

0.00 a r chi t e ct s de s i g n e rs planne rs


G.F.L
VC-A-201 P.O. BOX 73033, DUBAI, UAE
TEL.: +97143324455 FAX: +97143322113
ELECTRICAL E-MAIL: mail@naga.ae URL: www.naga.ae
A1 ROOM
08 08 08 GARBAGE AND
GW GW GW 1D4 6D3 3D1 G-31
J1 CW08 GAS TANK
3
360

250
0.00 16520 KITCHEN 2530
MAID'S CW12 J1 J1 CW12

1775
R3 CORRIDOR
DB DB
1650

07

1448

1445
P2
1371

G.F.L CORRIDOR

1750

1750
R3 0.00 09 05 G-36 CW09
GW 1C 1D1 1A2 2D1 6D2
R1 G-35 R1 UP GW GW Q1 Q1
G.F.L
4 1643

248
LOBBY 6D2
1735 P3 4080 900
1662 2C2 1660 25 1613 LOBBY MAID'S LAUNDRY G-40 A2 6D2
6D2 LOBBY

1640

1640
A1 TOILET 2 6D2 A1

1045
TOILET 1 G-22 G-23
R2
P1 L2 LINE OF SHAFT ABOVE 2C1 G-17 1799 3720
VC-A-303 MAID'S LIVING G-28 G-26 R2 R2 VC-A-303
2C2 KITCHEN FRY KITCHEN
7145

G-29 P1 PREPARATION
6D1 1A1 G-15 G-16 1161 1599
R1 STAIR 2 1D2 G-19 6D2
2A2 2C1 2C1
5550

5550
750
5829

1D1

5700

5700

5200
2A1 1620 2855
5500

HOUSEKEEPING G-21 0.00 STORAGE 0.00

.00
MAID ROOM 1 MAID ROOM 2 0.00
G-20 G.F.L G-18 G.F.L

2755
LAUNDRY 0.00 G.F.L 2C1 1390
0.00 0.00 G-27 0.00 G-25 0.00

3805
G-24

3605
2C1 G.F.L
G.F.L G.F.L G.F.L 6D2 G.F.L
C

4575 3375 3375 3475 1905 3042 3405 5600 2A 3760 3720

C
13 05 FD
2C1
FD
1C1 6D2 6D2
GW GW

850
6 GROUND FLOOR KEY PLAN
6D1 06 06 6D3 P3
GW GW 6D2 6D2 6D1 6D2
A1 5337 1550 5750
VC-A-402
4800

4800
FD DINING
-0.15 CW06 0.00 G-14
-0.15
G.F.L G.F.L
0.00
G.F.L
FD WALL/MATERIAL NOTES
ABDULLAH ABUNAYYAN
7
G.F.L
WALL TYPE TAGS CONSIST OF 2 CATEGORIES OF IDENTIFIERS :
VILLA-C
- LETTERS IDENTIFY THE WALL CORE (E.G. A= 100mm C.M.U)
- NUMBERS IDENTIFY FINISHES (E.G. 1= PTD.PLASTER) PLOT #:
C1
0.00 REFLECTED
C1
(E.G. 1A1 = 100mm C.M.U. PTD. PLASTER ON BOTH SIDES ) RIYADH, KSA
G.F.L POOL 2
J1 -LEFT NUMBER CORRESPONDS TO EXTERIOR FINISH & RIGHT

12637
VC-A-301 G-39 VC-A-301
12475

TO INTERIOR FINISH
REFLECTED SYMBOL CORE WALL
ARCHITECTURAL DRAWINGS
14400

14400
WALKWAY
14040

14150
4800

4800
POOL 1
FD G-43
G-38 WALKWAY A 100mm C.M.U.
0.00 G-44 KEY FOR ''ISSUE FOR'' RC REVIEW & COMMENTS
G.F.L
A1
VC-A-203
B 150mm C.M.U. SD SCHEMATIC DESIGN CA CLIENT APPROVAL
CW07 0.00
2850 3050 4200 3215 J1 6950 G.F.L C 200mm C.M.U. DD DESIGN DEVELOPMENT PS PROGRESS SET
8 D 250mm C.M.U.
CD CONSTRUCTION R FOR RECORD

18875
DOCUMENTS P PRELIMINARY
18800

B4
LIVING ROOM E 300mm C.M.U. TD TENDER DOCUMENTS M MUNICIPALITY REVIEW
A1 FD VC-A-407 A1
G-13 MEP MEP BACKGROUND
35400

35650
VC-A-301 VC-A-301 H C.I.P. CONC.
FD 0.00
3000

G.F.L I METAL STUD WALL

0.00 SYMBOL FINISHES


4800

4800
G.F.L
A1 CW06 D1 1 PTD. PLASTER
B

VC-A-204 447

B
VC-A-401
2 TILE

1639
01
6D6 6D6 3D3 6H2 3 STONE

750.
121
1250 4750 GW G1

00
9400

9 4 STUCCO
360

3990
2525
FD
FD P1 50 1400 100 6 STONE & INSULATION

1438
7 100% Construction
2400

2400
POWDER ROOM FD WOOD SIDING & INSULATION
CW10 G-12
3 07/02/11 CD-CA Documents NAGA
STAIR -1
SLO

8 ALUM. CLADDING & INSULATION


PE

G-03 80% Construction


2 10/11/10 CD-PS NAGA
Documents
4420

10 LIFT
10 STUCCO & INSULATION
WATER H1 6H2 50% Construction
G-02 1 06/04/10 CD-PS NAGA
02 Documents
6240

6350

2850 FEATURE
2255

FOYER FD
GW CW04
G-01 0 27/03/10 DD-CA AS PER CONTRACT NAGA
5100
ISSUE ISSUE

4623
4200

4200
LINE FOR FIRST Rev DATE FOR DESCRIPTION By
0.00
A1 FLOOR ABOVE MASTER
G.F.L 3212 2500 A1
LINE OF SHAFT BEDROOM NURSES RAMP ISSUE
1875

VC-A-302 H5 DN VC-A-302
2125

2125

ABOVE G-10 P4 LAUNDRY G-45


6D1
1225 4775 1225 G-05 6D2 LINE OF SHAFT Project No. 09-27 KSA
ABOVE
11
360

2400
13800

13855

21752C2 3280 Project Arch M.Dalyr - N.Salah


1255

1355

6D6 7C1 03
6D6 2A2
COVERED 0.00 0.00 NURSE B2 GW
2400
2040

2150

2150

2400
Structural Designer MH
2400

TERRACE G2 G.F.L G.F.L C1 BATHROOM


0.00 LINE OF SHAFT ABOVE

G-37 G.F.L P1 1A1 C2 P1 1A2 LOBBY DB P1 G-06 6D2


1745

B2
1763

G-04 D:\lowins revit files\09-27\CONSTRUCTION


12 A PIVOTING HIDDEN DOOR
AND OPENING NURSE STATION 1A REVIT File
DOCUMENTATION\VILLA C\Villa C Central
600

2355 101014.rvt
0.00
773

G-09
G.F.L NURSE PANTRY P1 LINE FOR FIRST
0 1595 3760 1900 0.00 1A1 SCALE AS SHOWN
2680

2455

C1 .0 P2 1620 800 2480 C1


2375

2375

2375

2A 750 G.F.L G-08 FLOOR ABOVE


VC-A-303 2100 1870 200 2320 1C2 4900 VC-A-303 Drawn By N.Salah - M.Dalyr
6D3 1C1 6D1
03

4800

4675
MASTER NURSES
4800

4950

BATHROOM GW BEDROOM 0.00 Checked By Butch


3777

G-11 CW11 G-07 G.F.L


L1
1500

LINE OF SHAFT MANAGEMENT Dr. Elkady


3200
A

6D3 0.00 L1 0.00 04

A
2100

RAINSHOWER ON THE CEILING


6D3 OXYGEN GAS
2425

G.F.L G.F.L ABOVE TANK STORE GW PRINTING DATE/TIME 2/7/2011 2:52:06 PM


6D3
6D7

125
13
400

26º E PLAN
TRU

NN
C1
VC-A-302
A1 VC-A-101
VC-A-202

900 800 900 800 900 800 14600 4820 1980 5200 850

244º
Qibla
SHEET TITLE
5400 3000 2900 4300 3000 2400 2400 2400 2400 3700 7100
A1 GROUND FLOOR PLAN 0 1 2 4m
1 : 100 SCALE 1:100
GROUND FLOOR PLAN

.
1 2 3 4 5 6 7
1 2 3 4 5 6 7

This drawing is the property of:NAGA Architects, Designers, Planners it is not allowed to reproduce this sheet's contents in any form except for the purpose for which it is intended . the consultant has a duplicate electronic file of this drawing . the contractor(s) shall assume full responsibility for any and all alterations and/ or changes on these drawings files including the resulting coordination between the trades involved . the contractor shall check and verify all dimensions and report all discrepancies to the architect and design professional whose seal is affixed to this drawing this drawing shall not be used for construction purposes until issued for construction by the design professional whose seal and signature are affixed to this drawing
A B C D E F G H I J K L M N

39000
40075
D

D
5400 5900 4300 3000 4800 2400 2400 3700 7100

C1
VC-A-201
VC-A-302
STAMPS
A1
CONSULTANT

3
1300 400

6.00 15505 6.00 FD

1850
1650

T.O.W SLOPE SLOPE T.O.W SLOPE


4.80 4013 4.80 SLOPE
4.80 a r chi t e ct s de s i g n e rs planne rs
6D3
FD F.F.L F.F.L FD F.F.L
4 P.O. BOX 73033, DUBAI, UAE

650 340
5.90

640
FD FD FD
A3
FD
T.O.P 5.90 TEL.: +97143324455 FAX: +97143322113
1980 4950 120 750 T.O.P E-MAIL: mail@naga.ae URL: www.naga.ae
A1 A1
VC-A-303
DN 7800 VC-A-303

7600
6420 3765 1715 720 2880 SLO
PE

SLOPE
28 8

27 9

15500

E
OP
26 10

SL

5550
5550

5900

5300

5090

5700

5250
5828
25 11
PE MECHANICAL ROOF OVER SERVICE AREA

S LO
4660
SLO

PE
24 12

PE
SL O
4310

PE
STAIR 2 ROOM 4.80

SLO
23 13

22
F-20 14
F-14 F.F.L
ROOF OVER MAID'S QUARTERS

SL O
21 15 10575

PE
20 16

4.80 19 17 4.80 6D3 1020 2300 740 7535


F.F.L 18
F.F.L FD
6D3 6D3 6D3

500
500
6 6.00
FD
5.90
5.90
FD
T.O.P 1050 1675 3778 T.O.P
T.O.P
C5 2330 7546
VC-A-506
B1
VC-A-402

4800
4800
C

5.00

C
21600
T.O.P

E
SLOP
REFLECTED POOL SL
OP
E
REFLECTED POOL
FIRST FLOOR KEY PLAN
7
C1 C1
VC-A-301 ROOF OF LIVING AREA VC-A-301

12312
4.80
F.F.L WALL/MATERIAL NOTES

14025
14020
4800

4800
WALL TYPE TAGS CONSIST OF 2 CATEGORIES OF IDENTIFIERS : ABDULLAH ABUNAYYAN
FD - LETTERS IDENTIFY THE WALL CORE (E.G. A= 100mm C.M.U)
A1
VC-A-203 - NUMBERS IDENTIFY FINISHES (E.G. 1= PTD.PLASTER)
(E.G. 1A1 = 100mm C.M.U. PTD. PLASTER ON BOTH SIDES )
VILLA-C
-LEFT NUMBER CORRESPONDS TO EXTERIOR FINISH & RIGHT PLOT #:
TO INTERIOR FINISH
8 SYMBOL CORE WALL
RIYADH, KSA
A1 A1
S LO

36225
VC-A-301 PE
VC-A-301 A 100mm C.M.U.
ARCHITECTURAL DRAWINGS
E
SLOP
5.00 B 150mm C.M.U.
T.O.P
C 200mm C.M.U.
4800

4800
KEY FOR ''ISSUE FOR'' RC REVIEW & COMMENTS
D 250mm C.M.U. SD SCHEMATIC DESIGN CA CLIENT APPROVAL
A1 2330
VC-A-204 DD DESIGN DEVELOPMENT PS PROGRESS SET
E 300mm C.M.U. CD CONSTRUCTION R FOR RECORD
DOCUMENTS P PRELIMINARY

1314
FD
FD CW05
FD
H C.I.P. CONC.
FD 6D3 TD TENDER DOCUMENTS M MUNICIPALITY REVIEW
P E I METAL STUD WALL
9
360

SLO MEP MEP BACKGROUND

4315

4315
22
00
FD 4.80 SYMBOL FINISHES
LINE OF UPPER 1305 F.F.L TERRACE 3D3
DN
METAL RAILING
2400

2400
ROOF (TYPE) CW10 CW03 F-19 1 PTD. PLASTER
12
13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28
6D3
11
2 TILE
A4 10
4400

10 TERRACE
3
B

SLOPE

SLOPE

9
4.40 STONE

B
F-06 VC-A-407 8
OPEN LIFT H2
3100

7
F-16
T.O.P 4 STUCCO
4.80
6240

6200

6
OPEN OPEN
F.F.L 5
CORRIDOR
4 6 STONE & INSULATION
3
F-01
WATER FEATURE 7 WOOD SIDING & INSULATION

4048
4200

4200
2

BRIDGE 1 CW04
770 4300 1200 900 8 ALUM. CLADDING & INSULATION
A1
4.68 SLOPE OPEN A1
100% Construction
1600

4.95
1820

VC-A-302 F.F.L CW01 4.80 DN VC-A-302 10 STUCCO & INSULATION 3 07/02/11 CD-CA Documents NAGA
10 F.F.L 800 825
6D2 6D1 6400 3D1 F.F.L 6D1 80% Construction
GW FD 6D2 2 10/11/10 CD-PS NAGA
228

Documents
11 405 10 50% Construction
1305

01 3A 2148 1 06/04/10 CD-PS NAGA


1240

6950 1253 2545 1255


955

G1 1A GW Documents
GW 3640 4305
2400

2760

2150

2150

2650

2400
2A1DRESSER 1 KITCHENET L3 2A1 BATHROOM 2 0 27/03/10 DD-CA AS PER CONTRACT NAGA
BATHROOM 1 4.80 DB
1573

F-07 4.80 DRESSER 2


1000

6C2 F-08 P1 3A LOBBY F-12


B1 1E2 P2 1820 4.80 F-03 F.F.L P1 F.F.L F-11 P2 B1 6C2 ISSUE ISSUE
Rev DATE FOR DESCRIPTION By
F.F.L
12
10 LIVING CW02 TERRACE 4525 10 ISSUE
GW 1E1 F-04
G2 GW
C1 1C3 F-05 1E1 6D2 C1
14
7253

1800 SLOP
E TERRACE Project No. 09-27 KSA
VC-A-303 GW VC-A-303
E
SLOP

4.80 F-02
4.80 4.80 F.F.L 4.80 BEDROOM 2 Project Arch M.Dalyr - N.Salah
5124

BEDROOM 1
4800

4438

4548

4450

4448

4548

4548

4800
H4 F.F.L F.F.L FD F.F.L F-13 H3
F-09 6D3
TERRACE 2900 Structural Designer MH

SLOP
F-10

E
D:\lowins revit files\09-27\CONSTRUCTION
893 7125 10 DOCUMENTATION\VILLA C\Villa C Central
6E1 11
FD GW 6E1 FD
3A REVIT File 101014.rvt
GW 750
13
808

753

625
453 452 6C SCALE AS SHOWN
6C C1 A6
VC-A-302 A1 Drawn By N.Salah - M.Dalyr

Checked By Butch
903 798 14600 6800 VC-A-202 1388 800 3014 2150 846 902 MANAGEMENT Dr. Elkady
A

A
5400 3000 2900 4300 3000 2400 4800 2400 2500 1200 4500 2775 PRINTING DATE/TIME 2/7/2011 2:52:09 PM

26º E PLAN
TRU

NN VC-A-102
A1 FIRST
1 : 100
FLOOR & LOWER ROOF PLAN

SHEET TITLE

244º
Qibla
0 1 2 4m
SCALE 1:100 FIRST FLOOR PLAN

.
1 2 3 4 5 6 7
1 2 3 4 5 6 7

This drawing is the property of:NAGA Architects, Designers, Planners it is not allowed to reproduce this sheet's contents in any form except for the purpose for which it is intended . the consultant has a duplicate electronic file of this drawing . the contractor(s) shall assume full responsibility for any and all alterations and/ or changes on these drawings files including the resulting coordination between the trades involved . the contractor shall check and verify all dimensions and report all discrepancies to the architect and design professional whose seal is affixed to this drawing this drawing shall not be used for construction purposes until issued for construction by the design professional whose seal and signature are affixed to this drawing
A B C D E F G H I J K L M N

39000

5400 5900 4300 3000 2400 2400 2400 2400 3700 7100

16800 23275
D

D
C1
VC-A-201 VC-A-302

STAMPS
A1
CONSULTANT

200
3 6.00
1700

1750
T.O.P LOWER ROOF
1650

1650
a r chi t e ct s de s i g n e rs planne rs
4 FD P.O. BOX 73033, DUBAI, UAE
TEL.: +97143324455 FAX: +97143322113
A1 A1
6.00
E-MAIL: mail@naga.ae URL: www.naga.ae
VC-A-303 VC-A-303
T.O.P LOWER ROOF
4.80
5550

5550
5900

5360

5850
PE
SL O T.O.ROOF

LOWER ROOF
4.80 8.70
T.O.ROOF T.O.ROOF
ROOF LEVEL KEY PLAN
5.90
T.O.P
6
6.00
T.O.P
4800

4800
C

C
7
C1 C1
VC-A-301 VC-A-301

12312
14025
4800

4800
LOWER ROOF
4.05 4.80
A1
ABDULLAH ABUNAYYAN
F.F.L F.F.L 5.00 VC-A-203
T.O.P VILLA-C
PLOT #:
8 RIYADH, KSA
A1 A1

36300
VC-A-301 VC-A-301

TERRACE ARCHITECTURAL DRAWINGS


BELOW
4800

4800
KEY FOR ''ISSUE FOR'' RC REVIEW & COMMENTS
A1 SD SCHEMATIC DESIGN CA CLIENT APPROVAL
VC-A-204
DD DESIGN DEVELOPMENT PS PROGRESS SET

1713
5.70 CD CONSTRUCTION R FOR RECORD
T.O.P DOCUMENTS P PRELIMINARY
TD TENDER DOCUMENTS M MUNICIPALITY REVIEW
9 9.30 MEP MEP BACKGROUND
28210 T.O.P
1700
1680
2400

2400
1916 SLOP 12000 14294
E

DECORATIVE SCREEN
PANEL
10 8.80
B

B
6575

6575
T.O.ROOF

6280
6327
P E
SLO
SLOPE
4600
4200

4200
9.30
A1 T.O.P A1
VC-A-302 VC-A-302 100% Construction
3 07/02/11 CD-CA Documents NAGA
FD
80% Construction
2 10/11/10 CD-PS NAGA
11 500 953 1062 Documents
600

600

600
650

650 50% Construction


955
1100

1100

407 358 1 06/04/10 CD-PS NAGA


10.80 FD Documents
2400

2400
T.O.P 0 27/03/10 DD-CA AS PER CONTRACT NAGA
4110 940 2798 850 6908 1398 2295 1502 2053 798 2800 940 4110
ISSUE ISSUE
Rev DATE DESCRIPTION
12 FOR By
3638

3638

3138

31500
PE
ISSUE
SLO
C1 C1
8100

7300

8100
15611 7479 8410 Project No. 09-27 KSA
6650

6650

VC-A-303 VC-A-303
6200
4800

4800
SLO
Project Arch M.Dalyr - N.Salah
PE
9.70
1938

Structural Designer MH
T.O.ROOF
3063

D:\lowins revit files\09-27\CONSTRUCTION


10.80 DOCUMENTATION\VILLA C\Villa C Central
205 920

T.O.P REVIT File 101014.rvt


13 10.80
700

700
SCALE AS SHOWN
T.O.P
A1
Drawn By N.Salah - M.Dalyr

C1
Checked By Butch
VC-A-302
VC-A-202
MANAGEMENT Dr. Elkady
A

A
PRINTING DATE/TIME 2/7/2011 2:52:11 PM
16301 7139 8760 4475
26º E PLAN
5400 3000 2900 4300 3000 2400 2400 2400 2400 2500 1200 4500 2600 TRU

NN
VC-A-103

244º
Qibla
A1 ROOF PLAN SHEET TITLE
1 : 100
0 1 2 4m
SCALE 1:100 ROOF PLAN

.
1 2 3 4 5 6 7
1 2 3 4 5 6 7

This drawing is the property of:NAGA Architects, Designers, Planners it is not allowed to reproduce this sheet's contents in any form except for the purpose for which it is intended . the consultant has a duplicate electronic file of this drawing . the contractor(s) shall assume full responsibility for any and all alterations and/ or changes on these drawings files including the resulting coordination between the trades involved . the contractor shall check and verify all dimensions and report all discrepancies to the architect and design professional whose seal is affixed to this drawing this drawing shall not be used for construction purposes until issued for construction by the design professional whose seal and signature are affixed to this drawing
A5
E VC-A-104
F G VC-A-104 H I J A5
VC-A-104

VC-A-104
C3 E F G C3
14688
H I J
888 12600 860
3888 2400 2400 2400 2400 1200
5088 9600
5413 3065 2800 3070

MECHANICAL
ROOM STORAGE 3.95
G-34 G-33 GARBAGE ROOM T.O.P
G-32 DECORATIVE SCREEN
D

D
PANEL E G J
A3 A3 A3

500420 360

200

300
1 1 STAMPS

360
WATER TANK FD
FD
1 CONSULTANT

500
A1

370
B5 VC-A-104 B5 VC-A-104
VC-A-104 C5
2

4600
VC-A-104 C5
CAR PARKING

E
P
a r chi t e ct s de s i g n e rs planne rs

SLO
6100
STORAGE G-51

6100
G-30

7500

7500

7500
P.O. BOX 73033, DUBAI, UAE
7432

6531

5000

7120
4630
(1) (2) (3) 3.95
TEL.: +97143324455 FAX: +97143322113
3573
890 7200 1200
A3 A3 A3 T.O.P A3 E-MAIL: mail@naga.ae URL: www.naga.ae
FD
VC-A-104 OP
E
VC-A-104 VC-A-104 VC-A-104
SL
ROOF OVER CAR PARKING
1913

2600
2 2 3.95

1200
1200
T.O.P

3868 1220 450 2500 2500 2500 1650 LINE FOR ROOF 5398 9290

888 3000 2400 2400 2400 2400 1200 ABOVE 14688 B3


B3
14688 A5

VC-A-104 VC-A-104 VC-A-104


A5
VC-A-104

C4 SERVICE BLOCK ROOF PLAN


C

1 : 100

C
C1 SERVICE
1 : 100
BLOCK FLOOR PLAN GROUND FLOOR KEY PLAN
T.O.P
J I H G F T.O.P
5.70
E 1 5.70 2
T.O.P T.O.P T.O.P
4.80 4.87 4.80 WALL/MATERIAL NOTES

900
900
900

900
FIRST FLOOR T.O.P FIRST FLOOR T.O.P
3.95
WALL TYPE TAGS CONSIST OF 2 CATEGORIES OF IDENTIFIERS :
3.95
4800 - LETTERS IDENTIFY THE WALL CORE (E.G. A= 100mm C.M.U)

1150
4800

300 850
- NUMBERS IDENTIFY FINISHES (E.G. 1= PTD.PLASTER)
(E.G. 1A1 = 100mm C.M.U. PTD. PLASTER ON BOTH SIDES )
-LEFT NUMBER CORRESPONDS TO EXTERIOR FINISH & RIGHT
ABDULLAH ABUNAYYAN
E F G H I J TO INTERIOR FINISH
VILLA-C

5850
5850

4800
4800

SYMBOL CORE WALL


PLOT #:

3650
3650

788 3000 2400 2400 2400 2400 840 A 100mm C.M.U.


RIYADH, KSA
B 150mm C.M.U.
CLG. CLG. CLG.
HT= 3.65 HT= 3.65 HT= 3.65 C 200mm C.M.U.
GROUND FLOOR
2480

GROUND FLOOR
ARCHITECTURAL DRAWINGS

150
150
D 250mm C.M.U.
150

150

0 0
E 300mm C.M.U. KEY FOR ''ISSUE FOR'' RC REVIEW & COMMENTS
GRADE GRADE
H C.I.P. CONC. SD SCHEMATIC DESIGN CA CLIENT APPROVAL

C3 SERVICE BLOCK NORTH ELEVATION C5 SERVICE BLOCK WEST ELEVATION


1420

-150 DD DESIGN DEVELOPMENT PS PROGRESS SET


-150 I METAL STUD WALL
CD CONSTRUCTION R FOR RECORD
1 : 100 1 : 100
1 SYMBOL FINISHES
DOCUMENTS P PRELIMINARY
M MUNICIPALITY REVIEW
TD TENDER DOCUMENTS
1 PTD. PLASTER MEP MEP BACKGROUND

T.O.P 2 TILE
T.O.P
E 5.70 F G H I J 2 5.70 1 3 STONE
T.O.P T.O.P 4 STUCCO
6100

4.92 4.80
6 STONE & INSULATION
B

900

900

900
900
FIRST FLOOR FIRST FLOOR

B
T.O.P T.O.P
7
300 1300

3.95 3.95 WOOD SIDING & INSULATION


CLG. 4800 4800

300 850
HT= 3.60 8 ALUM. CLADDING & INSULATION

CLG. 10 STUCCO & INSULATION


HT= 3.65
5850

5850
2 100% Construction
4800

4800

4800
3 07/02/11 CD-CA Documents NAGA
1052

3800

3800
80% Construction
2 10/11/10 CD-PS NAGA
Documents
50% Construction

B1 SERVICE BLOCK REFLECTED CEILING PLAN 1 06/04/10 CD-PS NAGA


Documents
GROUND FLOOR GROUND FLOOR
1 : 100
150

150

150
0 27/03/10 DD-CA AS PER CONTRACT NAGA
0 0
ISSUE ISSUE
Rev DATE FOR DESCRIPTION By
GRADE GRADE
-150 B3 SERVICE
1 : 100
BLOCK SOUTH ELEVATION
-150 B5 SERVICE
1 : 100
BLOCK EAST ELEVATION ISSUE

Project No. 09-27 KSA

Project Arch M.Dalyr - N.Salah

1 2 Structural Designer MH

E T.O.P F G H I J T.O.P D:\lowins revit files\09-27\CONSTRUCTION


5.70 5.70 T.O.P DOCUMENTATION\VILLA C\Villa C Central
T.O.P T.O.P REVIT File 101014.rvt
5.09
4.92 4.82
780
900

900

900
FIRST FLOOR FIRST FLOOR SCALE AS SHOWN
T.O.P T.O.P
350 970

4800 4800
350 850
3.95 3.95 Drawn By N.Salah - M.Dalyr

Checked By Butch

MANAGEMENT Dr. Elkady


5850

5850
A

A
4800

4800
2700

PRINTING DATE/TIME 2/7/2011 2:52:18 PM


3600

26º E PLAN
TRU

NN
VC-A-104
150 900

900
GROUND FLOOR GROUND FLOOR
150

150

150

0 0GRADE
GRADE
-150
-150

244º
Qibla
SHEET TITLE
0 1 2 4m
SERVICE BLOCK PLANS,
A3 SERVICE
1 : 100
BLOCK SECTION 2 A5 SERVICE
1 : 100
BLOCK SECTION 1 SCALE 1:100
ELEVATIONS AND
SECTIONS

.
1 2 3 4 5 6 7
1 2 3 4 5 6 7

This drawing is the property of:NAGA Architects, Designers, Planners it is not allowed to reproduce this sheet's contents in any form except for the purpose for which it is intended . the consultant has a duplicate electronic file of this drawing . the contractor(s) shall assume full responsibility for any and all alterations and/ or changes on these drawings files including the resulting coordination between the trades involved . the contractor shall check and verify all dimensions and report all discrepancies to the architect and design professional whose seal is affixed to this drawing this drawing shall not be used for construction purposes until issued for construction by the design professional whose seal and signature are affixed to this drawing
D

D
A B C D E F G H I J K L M N

STAMPS
CONSULTANT

LEGEND DESCRIPTION
a r chi t e ct s de s i g n e rs planne rs

12MM THK GYPSUM BOARD. P.O. BOX 73033, DUBAI, UAE


TEL.: +97143324455 FAX: +97143322113
E-MAIL: mail@naga.ae URL: www.naga.ae
12.5MM THK MOISTURE
39000 RESISTANT GYPSUM BOARD.

5400 5900 4300 3000 2400 2400 2400 2400 3700 7100
20 MM PLASTER ON CONCRETE
SLAP ( LOWER SLAP).

60 X 60 GYPSUM BOARD.
3 CLG.
CLG. HT= 3.60
1650

? CLG.
? HT= 3.60 HT= 3.60
SPOT LIGHT.
4 LOBBY MAID'S LAUNDRY
TOILET 2 G-22 G-23
G-28 TOILET 1 KITCHEN RCP PREPARATION CHAILENDER.
G-26 G-19
C

C
CLG. CLG.
HT= 3.60 HT= 3.60
CLG.
5550

CLG. LIGHTING.
KITCHEN HT= 3.60
HT= 3.60 STORAGE
CLG.
G-15
MAID ROOM 1 CLG. G-18 HT= 3.60
LAUNDRY CLG.
G-27 HT= 3.60 G-24 HT= 3.60 AIR CONDITION SLOT

MAID ROOM 2
G-25
6 AIR CONDITION SLOT

1200 50
CLG.
HT= 3.60 LINE OF SHAFT ABOVE ABDULLAH ABUNAYYAN
VENTILATION SLOT VILLA-C
4800

PLOT #:
RIYADH, KSA
1200 3550 1200

ARCHITECTURAL DRAWINGS
7
KEY FOR ''ISSUE FOR'' RC REVIEW & COMMENTS
SD SCHEMATIC DESIGN CA CLIENT APPROVAL
DD DESIGN DEVELOPMENT PS PROGRESS SET
CD CONSTRUCTION R FOR RECORD
DOCUMENTS P PRELIMINARY
11500
4800

TD TENDER DOCUMENTS M MUNICIPALITY REVIEW


MEP MEP BACKGROUND

LIVING ROOM
G-13

8
B

35400

B
CLG. CLG. CLG.
HT= 3.60 HT= 4.00 HT= 3.60
4800

100% Construction
3 07/02/11 CD-CA Documents NAGA
53 1198

CLG.
HT= 3.60 80% Construction
FD CLG. 2 10/11/10 CD-PS NAGA
Documents
9 POWDER ROOM
HT= 3.80
1 06/04/10 CD-PS
50% Construction
NAGA
CLG. Documents
G-12 CLG.
1675

HT= 3.80
2400

HT= 3.60 0 27/03/10 DD-CA AS PER CONTRACT NAGA


FOYER CLG.
G-01 HT= 3.60 ISSUE ISSUE
Rev DATE FOR DESCRIPTION By
1200

10 765 1300 600 900 600 900 600 1550


ISSUE
STAIR -1
G-03
Project No. 09-27 KSA
CLG.
HT= 3.80
4200

Project Arch M.Dalyr - N.Salah


3280

CLG.
HT= 3.60 Structural Designer MH

D:\lowins revit files\09-27\CONSTRUCTION


DOCUMENTATION\VILLA C\Villa C Central
11 REVIT File 101014.rvt
50

CLG.
50 955

HT= 3.60 SCALE AS SHOWN


2000

MASTER Drawn By N.Salah - M.Dalyr


4320

BEDROOM NURSE STATION


50600 50

12 G-10 G-09 Checked By Butch


2975

CLG. NURSE PANTRY


600

CLG. 300 6450 50 50 4405 50 G-08 MANAGEMENT Dr. Elkady


HT= 3.80
A

HT= 3.60

A
CLG. CLG.
7200

CLG. HT= 3.60 HT= 3.60 PRINTING DATE/TIME 2/7/2011 2:52:21 PM


CLG. HT= 3.60
60050 1400 50 850 50

HT= 3.60
300

MASTER
3905

BATHROOM
3750

G-11

1850 450 4250


LINE OF SHAFT ABOVE
NURSES VC-A-151
BEDROOM
G-07
50

50

13
SHEET TITLE
0 1 2 4m
GROUND FLOOR
A1 GROUND
1 : 100
FLOOR REFLECTED CEILING PLAN SCALE 1:100
REFLECTED CEILING PLAN

.
1 2 3 4 5 6 7
1 2 3 4 5 6 7

This drawing is the property of:NAGA Architects, Designers, Planners it is not allowed to reproduce this sheet's contents in any form except for the purpose for which it is intended . the consultant has a duplicate electronic file of this drawing . the contractor(s) shall assume full responsibility for any and all alterations and/ or changes on these drawings files including the resulting coordination between the trades involved . the contractor shall check and verify all dimensions and report all discrepancies to the architect and design professional whose seal is affixed to this drawing this drawing shall not be used for construction purposes until issued for construction by the design professional whose seal and signature are affixed to this drawing
A B C D E F G H I J K L M N
D

D
39000
STAMPS
5400 5900 4300 3000 2400 2400 2400 2400 3700 7100
CONSULTANT

LEGEND DESCRIPTION
a r chi t e ct s de s i g n e rs planne rs
12MM THK GYPSUM BOARD.
3 P.O. BOX 73033, DUBAI, UAE
TEL.: +97143324455 FAX: +97143322113
1650

12.5MM THK MOISTURE


E-MAIL: mail@naga.ae URL: www.naga.ae
RESISTANT GYPSUM BOARD.
4
20 MM PLASTER ON CONCRETE
SLAP ( LOWER SLAP).
5550

60 X 60 GYPSUM BOARD.

SPOT LIGHT.

6 CHAILENDER.
C

C
LIGHTING.
4800

AIR CONDITION SLOT

AIR CONDITION SLOT


7
ABDULLAH ABUNAYYAN
VENTILATION SLOT
VILLA-C
4800

PLOT #:
RIYADH, KSA

8
ARCHITECTURAL DRAWINGS
KEY FOR ''ISSUE FOR'' RC REVIEW & COMMENTS
35400

SD SCHEMATIC DESIGN CA CLIENT APPROVAL


DD DESIGN DEVELOPMENT PS PROGRESS SET
CD CONSTRUCTION R FOR RECORD
DOCUMENTS P PRELIMINARY
4800

TD TENDER DOCUMENTS M MUNICIPALITY REVIEW


MEP MEP BACKGROUND

9
TERRACE
B

B
F-06
2400

10
100% Construction
3 07/02/11 CD-CA Documents NAGA
CLG.
HT= 3.50 80% Construction
4200

CLG. 2 10/11/10 CD-PS NAGA


CLG. Documents
HT= 3.50
HT= 3.50 50% Construction
1 06/04/10 CD-PS NAGA
Documents
0 27/03/10 DD-CA AS PER CONTRACT NAGA
11 Rev DATE
ISSUE
DESCRIPTION
ISSUE
300

CLG. DRESSER 2 CLG. FOR By


600

50 1400 50600

50 1400 50600

50 HT= 3.80 4165 F-11 HT= 3.80


CLG.
CLG. BATHROOM 2 ISSUE
1750

BATHROOM 1 HT= 3.60 LOBBY


50 1450

50 1450

CLG. F-12
CLG. F-08 HT= 3.60 50 HT= 3.60 F-03 50 90 3960 CLG. 7050 4165 CLG. 50
50 4000 50
HT= 3.60 6700 HT= 3.60 HT= 3.60
Project No. 09-27 KSA

12 CLG. CLG. CLG. CLG. CLG.


50

Project Arch M.Dalyr - N.Salah


HT= 3.60 HT= 3.80 HT= 3.80 HT= 3.80 HT= 3.60
TERRACE
7200

Structural Designer MH
3000

F-04
CLG. BEDROOM 2
4150
3650

4450

TERRACE HT= 3.60 F-13 D:\lowins revit files\09-27\CONSTRUCTION


CLG. DOCUMENTATION\VILLA C\Villa C Central
F-10 CLG.
6475 50 50 1550 600 900 600 900 600 1550 125 HT= 3.80 REVIT File 101014.rvt
HT= 3.60
625

BEDROOM 1
6435 300 SCALE AS SHOWN
F-09 LIVING
100

F-05 N.Salah - M.Dalyr


CLG. Drawn By
605

675

303

HT= 3.80
13 Checked By Butch

MANAGEMENT Dr. Elkady


A

A
PRINTING DATE/TIME 2/7/2011 2:52:23 PM

VC-A-152

A1 FIRST
1 : 100
FLOOR REFLECTED CEILING CEILING PLAN
SHEET TITLE
0 1 2 4m
SCALE 1:100
FIRST FLOOR REFLECTED
CEILING PLAN

.
1 2 3 4 5 6 7
1 2 3 4 5 6 7

This drawing is the property of:NAGA Architects, Designers, Planners it is not allowed to reproduce this sheet's contents in any form except for the purpose for which it is intended . the consultant has a duplicate electronic file of this drawing . the contractor(s) shall assume full responsibility for any and all alterations and/ or changes on these drawings files including the resulting coordination between the trades involved . the contractor shall check and verify all dimensions and report all discrepancies to the architect and design professional whose seal is affixed to this drawing this drawing shall not be used for construction purposes until issued for construction by the design professional whose seal and signature are affixed to this drawing
INSULATED EXTERIOR WALL
IN STONE CLADDING BUTT
JOINT STAGGERED
DOUBLE GLAZED FIXED
WINDOW (SEE SCHEDULE) FEATURE WALL IN SERVICES DOUBLE GLAZED WINDOW ON
STAIR SEE DETAIL POWDER COATED ALUM.
D

FRAME AS PER SCHEDULE

D
INTERIOR WALL IN
N M L K J I H G F E D C B T.O.P
A STAMPS
T.O.P 10.80
PLASTER FINISH 10.80
DOUBLE GLAZED FIXED CONSULTANT
WINDOW (SEE SCHEDULE)
T.O.P
T.O.P 9.30
1200

1200

1500

1500

1500
9.30 T.O.P
ROOF S.S.L.

2350
9.00 a r chi t e ct s de s i g n e rs planne rs
9600
P.O. BOX 73033, DUBAI, UAE

850
INSULATED EXTERIOR
WALL IN PLASTER FINISH TEL.: +97143324455 FAX: +97143322113
E-MAIL: mail@naga.ae URL: www.naga.ae
3600

3300

3300
-
VC-A-201

2450
4800

T.O.P
6.00 10 01 10
GW G1 GW GW C1
DOUBLE GLAZED WINDOW ON

300
POWDER COATED ALUM.

10800

10800
10950

FIRST FLOOR FRAME AS PER SCHEDULE


4800

8450
600 600
600
300 300 1500
6000

600
08 08 08
4800

GW GW GW INSULATED EXTERIOR
Q1 Q1
WALL IN STONE CLADDING

300 300 300


CW08 J1 08 08 08
GW GW GW
(PATTERN AS SHOWN)

600 600
08 08 08
C

KEY TO ELEVATIONS

C
GROUND FLOOR GW GW GW
150

150

0
GRADE
-150

C1 NORTH
1 : 100
ELEVATION 1 ABDULLAH ABUNAYYAN
VILLA-C
PLOT #:
RIYADH, KSA

ARCHITECTURAL DRAWINGS
KEY FOR ''ISSUE FOR'' RC REVIEW & COMMENTS
SD SCHEMATIC DESIGN CA CLIENT APPROVAL
DD DESIGN DEVELOPMENT PS PROGRESS SET
CD CONSTRUCTION R FOR RECORD
DOCUMENTS P PRELIMINARY
TD TENDER DOCUMENTS M MUNICIPALITY REVIEW
MEP MEP BACKGROUND

N M L K J I H G F E D C B A
B

B
1200

1500

ROOF S.S.L.
9600
900

100% Construction
3 07/02/11 CD-CA Documents NAGA
4800

2400

80% Construction
2 10/11/10 CD-PS NAGA
Documents
50% Construction
1 06/04/10 CD-PS NAGA
Documents
10950

0 27/03/10 DD-CA AS PER CONTRACT NAGA


1600

FIRST FLOOR ISSUE ISSUE


Rev DATE FOR DESCRIPTION By
4800
ISSUE

Project No. 09-27 KSA


4800

4400

Project Arch M.Dalyr - N.Salah

Structural Designer MH

D:\lowins revit files\09-27\CONSTRUCTION


GROUND FLOOR DOCUMENTATION\VILLA C\Villa C Central
150

150

REVIT File 101014.rvt


0
SCALE AS SHOWN
GRADE
Drawn By N.Salah - M.Dalyr
-150
Checked By Butch

MANAGEMENT Dr. Elkady


A

A1 NORTH ELEVATION 2

A
PRINTING DATE/TIME 2/7/2011 2:52:31 PM
1 : 100

VC-A-201

SHEET TITLE
0 1 2 4m
SCALE 1:100
NORTH ELEVATION

.
1 2 3 4 5 6 7
1 2 3 4 5 6 7

This drawing is the property of:NAGA Architects, Designers, Planners it is not allowed to reproduce this sheet's contents in any form except for the purpose for which it is intended . the consultant has a duplicate electronic file of this drawing . the contractor(s) shall assume full responsibility for any and all alterations and/ or changes on these drawings files including the resulting coordination between the trades involved . the contractor shall check and verify all dimensions and report all discrepancies to the architect and design professional whose seal is affixed to this drawing this drawing shall not be used for construction purposes until issued for construction by the design professional whose seal and signature are affixed to this drawing
DOUBLE GLAZED FIXED
WINDOW (SEE SCHEDULE)
D

D
DOUBLE GLAZED WINDOW ON
POWDER COATED ALUM. DOUBLE GLAZED WINDOW IN POWDER
FRAME AS PER SCHEDULE COATED ALUM. FRAME AS PER
SCHEDULE
STAMPS
METAL RAILING
CONSULTANT
A T.O.P B C D E F G H I J K L M
10.80 T.O.P
INSULATED EXTERIOR WALL 10.80
IN PLASTER FINISH
INSULATED EXTERIOR WALL a r chi t e ct s de s i g n e rs planne rs
1200 IN STONE CLADDING BUTT
1500 JOINT STAGGERED P.O. BOX 73033, DUBAI, UAE
ROOF S.S.L.
TEL.: +97143324455 FAX: +97143322113
9600 E-MAIL: mail@naga.ae URL: www.naga.ae
900

METAL RAILING
T.O.P
6.00
4800

4800
4900

4500
OPENING 10 10 11 10
3600

GW G2 GW GW GW
T.O.P
4.40
FIRST FLOOR

9300
4800
C1

INSULATED EXTERIOR WALL VC-A-202


4800
4800

4800

4800

4800
IN STONE CLADDING
C

(PATTERN AS SHOWEN)

C
KEY TO ELEVATIONS
GROUND FLOOR
150

150
0
150

GRADE
-150

ABDULLAH ABUNAYYAN
VILLA-C
C1 SOUTH
1 : 100
ELEVATION 1 PLOT #:
RIYADH, KSA

ARCHITECTURAL DRAWINGS
KEY FOR ''ISSUE FOR'' RC REVIEW & COMMENTS
SD SCHEMATIC DESIGN CA CLIENT APPROVAL
DD DESIGN DEVELOPMENT PS PROGRESS SET
CD CONSTRUCTION R FOR RECORD
DOCUMENTS P PRELIMINARY
TD TENDER DOCUMENTS M MUNICIPALITY REVIEW
A B C D E F G H I J K L M N MEP MEP BACKGROUND
B

ROOF S.S.L.

B
9600
900

100% Construction
4800

4800
4900

4500
3 07/02/11 CD-CA Documents NAGA
10 10 11 10
GW G2 GW GW GW 80% Construction
2 10/11/10 CD-PS NAGA
Documents
50% Construction
1 06/04/10 CD-PS NAGA
Documents
FIRST FLOOR
9300

0 27/03/10 DD-CA AS PER CONTRACT NAGA


4800
8400

ISSUE ISSUE
Rev DATE FOR DESCRIPTION By

ISSUE
4800

4800

4800

4800
Project No. 09-27 KSA

Project Arch M.Dalyr - N.Salah

Structural Designer MH
GROUND FLOOR
150

150
D:\lowins revit files\09-27\CONSTRUCTION
0 DOCUMENTATION\VILLA C\Villa C Central
150

REVIT File 101014.rvt


GRADE
SCALE AS SHOWN
-150
Drawn By N.Salah - M.Dalyr

Checked By Butch

MANAGEMENT Dr. Elkady


A

A1 SOUTH ELEVATION 2

A
PRINTING DATE/TIME 2/7/2011 2:52:37 PM
1 : 100

VC-A-202

SHEET TITLE
0 1 2 4m
SCALE 1:100
SOUTH ELEVATION

.
1 2 3 4 5 6 7
1 2 3 4 5 6 7

This drawing is the property of:NAGA Architects, Designers, Planners it is not allowed to reproduce this sheet's contents in any form except for the purpose for which it is intended . the consultant has a duplicate electronic file of this drawing . the contractor(s) shall assume full responsibility for any and all alterations and/ or changes on these drawings files including the resulting coordination between the trades involved . the contractor shall check and verify all dimensions and report all discrepancies to the architect and design professional whose seal is affixed to this drawing this drawing shall not be used for construction purposes until issued for construction by the design professional whose seal and signature are affixed to this drawing
INSULATED EXTERIOR WALL
IN STONE CLADDING BUTT
D

JOINT STAGGERED

D
DOUBLE GLAZED WINDOW IN
POWDER COATED ALUM. T.O.P 8 7 6 4 3
FRAME AS PER SCHEDULE 13 10.80 12 11 10 9 STAMPS
T.O.P
9.30 T.O.P CONSULTANT
9.00
1200

1500

1500
ROOF S.S.L.
9600 DOUBLE GLAZED CURTAIN
900

900
DECORATIVE SCREEN WALL IN POWDER COATED a r chi t e ct s de s i g n e rs planne rs

300
METAL RAILING ALUM. FRAME AS PER
PANEL SEE DETAILS T.O.P P.O. BOX 73033, DUBAI, UAE
SCHEDULE 6.00
T.O.P TEL.: +97143324455 FAX: +97143322113
4800

2500
H3 T.O.P 5.90 E-MAIL: mail@naga.ae URL: www.naga.ae
5.70
INSULATED EXTERIOR
T.O.P T.O.P WALL IN STUCCO FINISH
4800

4800
5.00 5.00
10800

1100
FIRST FLOOR C1
VC-A-203
4800
INSULATED
EXTERIOR WALL

5700
IN STONE CLADDING
4800

4800
(PATTERN AS
CW07
3600

3600

SHOWN) H5 R3

KEY TO ELEVATIONS
GROUND FLOOR
C

C
GRADE
-150

C1 EAST
1 : 100
ELEVATION 1
ABDULLAH ABUNAYYAN
VILLA-C
PLOT #:
RIYADH, KSA

ARCHITECTURAL DRAWINGS
KEY FOR ''ISSUE FOR'' RC REVIEW & COMMENTS
SD SCHEMATIC DESIGN CA CLIENT APPROVAL
DD DESIGN DEVELOPMENT PS PROGRESS SET
CD CONSTRUCTION R FOR RECORD
DOCUMENTS P PRELIMINARY
13 12 11 10 9 8 7 6 4 3 TD TENDER DOCUMENTS M MUNICIPALITY REVIEW
MEP MEP BACKGROUND
1200

1500

ROOF S.S.L.
9600
B

900

B
4800

3600

100% Construction
3 07/02/11 CD-CA Documents NAGA
10950

80% Construction
FIRST FLOOR 2 10/11/10 CD-PS NAGA
Documents
50% Construction
4800 1 06/04/10 CD-PS NAGA
1200

Documents
0 27/03/10 DD-CA AS PER CONTRACT NAGA
ISSUE ISSUE
Rev DATE FOR DESCRIPTION By
4800

3600

ISSUE

Project No. 09-27 KSA

GROUND FLOOR Project Arch M.Dalyr - N.Salah


150

150

0 Structural Designer MH

GRADE
D:\lowins revit files\09-27\CONSTRUCTION
-150 REVIT File
DOCUMENTATION\VILLA C\Villa C Central
101014.rvt

SCALE AS SHOWN

Drawn By N.Salah - M.Dalyr

A1 EAST
1 : 100
ELEVATION 2 Checked By Butch

MANAGEMENT Dr. Elkady


A

A
PRINTING DATE/TIME 2/7/2011 2:52:43 PM

VC-A-203

SHEET TITLE
0 1 2 4m
SCALE 1:100
EAST ELEVATION

.
1 2 3 4 5 6 7
1 2 3 4 5 6 7

This drawing is the property of:NAGA Architects, Designers, Planners it is not allowed to reproduce this sheet's contents in any form except for the purpose for which it is intended . the consultant has a duplicate electronic file of this drawing . the contractor(s) shall assume full responsibility for any and all alterations and/ or changes on these drawings files including the resulting coordination between the trades involved . the contractor shall check and verify all dimensions and report all discrepancies to the architect and design professional whose seal is affixed to this drawing this drawing shall not be used for construction purposes until issued for construction by the design professional whose seal and signature are affixed to this drawing
D

D
STAMPS
CONSULTANT
INSULATED EXTERIOR INSULATED EXTERIOR WALL
WALL IN STUCCO FINISH DOUBLE GLAZED CURTAIN WALL IN IN STONE CLADDING BUTT
POWDER COATED ALUM. FRAME JOINT STAGGERED
AS PER SCHEDULE
a r chi t e ct s de s i g n e rs planne rs

P.O. BOX 73033, DUBAI, UAE


3 4 6 7 8 9 10 11 12
T.O.P
13 TEL.: +97143324455 FAX: +97143322113
10.80
E-MAIL: mail@naga.ae URL: www.naga.ae
DOUBLE GLAZED WINDOW IN
T.O.P
POWDER COATED ALUM. FRAME
1200

9.30

1500
ROOF S.S.L. AS PER SCHEDULE
9600 C1
VC-A-204
METAL RAILING
CONCRETE RAILING
2700
4800

T.O.P

4500
6.00 T.O.P H4
5.70 CW10 CW01
T.O.P
5.00
10950

KEY TO ELEVATIONS
FIRST FLOOR
4800

1200
C

C
6000
4800

02 INSULATED EXTERIOR WALL


07 GW IN STONE CLADDING

3600
GW J1 J1 G2
(PATTERN AS SHOWN)

GROUND FLOOR
150

0 ABDULLAH ABUNAYYAN
GRADE
VILLA-C
-150
PLOT #:
GLASS RAILING RIYADH, KSA
C1 WEST
1 : 100
ELEVATION 1
ARCHITECTURAL DRAWINGS
KEY FOR ''ISSUE FOR'' RC REVIEW & COMMENTS
SD SCHEMATIC DESIGN CA CLIENT APPROVAL
DD DESIGN DEVELOPMENT PS PROGRESS SET
CD CONSTRUCTION R FOR RECORD
DOCUMENTS P PRELIMINARY
TD TENDER DOCUMENTS M MUNICIPALITY REVIEW
MEP MEP BACKGROUND
B

B
3 4 6 7 8 9 10 11 12 13
1200

1200

ROOF S.S.L. 100% Construction


3 07/02/11 CD-CA Documents NAGA
9600
900

80% Construction
2 10/11/10 CD-PS NAGA
Documents
50% Construction
1 06/04/10 CD-PS NAGA
Documents
4800

0 27/03/10 DD-CA AS PER CONTRACT NAGA


3900

ISSUE ISSUE
Rev DATE FOR DESCRIPTION By
10950

ISSUE
FIRST FLOOR
Project No. 09-27 KSA
4800
Project Arch M.Dalyr - N.Salah

Structural Designer MH
4800

4800

D:\lowins revit files\09-27\CONSTRUCTION


DOCUMENTATION\VILLA C\Villa C Central
REVIT File 101014.rvt

SCALE AS SHOWN
GROUND FLOOR Drawn By N.Salah - M.Dalyr
150

150

0
Checked By Butch
GRADE
MANAGEMENT Dr. Elkady
A

A
-150 PRINTING DATE/TIME 2/7/2011 2:52:49 PM

A1 WEST
1 : 100
ELEVATION 2
VC-A-204

SHEET TITLE
0 1 2 4m
SCALE 1:100
WEST ELEVATION

.
1 2 3 4 5 6 7
1 2 3 4 5 6 7

This drawing is the property of:NAGA Architects, Designers, Planners it is not allowed to reproduce this sheet's contents in any form except for the purpose for which it is intended . the consultant has a duplicate electronic file of this drawing . the contractor(s) shall assume full responsibility for any and all alterations and/ or changes on these drawings files including the resulting coordination between the trades involved . the contractor shall check and verify all dimensions and report all discrepancies to the architect and design professional whose seal is affixed to this drawing this drawing shall not be used for construction purposes until issued for construction by the design professional whose seal and signature are affixed to this drawing
D

D
STAMPS

A B C D E F G H I J K L M N CONSULTANT
T.O.P
ROOF S.S.L. 9.00

9600
900

a r chi t e ct s de s i g n e rs planne rs
R.C MONOULITHIC
WALL METAL RAILING P.O. BOX 73033, DUBAI, UAE
TEL.: +97143324455 FAX: +97143322113
INSULATED EXTERIOR WALL DOUBLE GLAZED CURTAIN WALL IN
T.O.P COMBO ROOF AS PER T.O.P E-MAIL: mail@naga.ae URL: www.naga.ae
4800

IN STONE CLADDING BUTT POWDER COATED ALUM. FRAME AS


6.00 SPECS 6.00
JOINT STAGGERED PER SCHEDULE
T.O.P
C1
5710

T.O.P 5.00 A-303


4.25 T.O.P
FIRST FLOOR 4.05 A1
9750

4800 INSULATED EXTERIOR A-303


WALL IN STONE CLADDING
BUTT JOINT STAGGERED

6000
4800

REFLECTIVE POOL
1490

CW06 P3 CW07
KEY TO SECTIONS
06 06 T.O.P
150 900 600

GW GW 0.00
WALL/MATERIAL NOTES
GROUND FLOOR
C

150

C
WALL TYPE TAGS CONSIST OF 2 CATEGORIES OF IDENTIFIERS :
0 - LETTERS IDENTIFY THE WALL CORE (E.G. A= 100mm C.M.U)
- NUMBERS IDENTIFY FINISHES (E.G. 1= PTD.PLASTER)
(E.G. 1A1 = 100mm C.M.U. PTD. PLASTER ON BOTH SIDES )
GRADE -LEFT NUMBER CORRESPONDS TO EXTERIOR FINISH & RIGHT
-150 TO INTERIOR FINISH
SYMBOL CORE WALL
REFLECTIVE POOL COMPACTED GRANULAR FILL ONE COAT BITUMINOUS COATING
A 100mm C.M.U.
B 150mm C.M.U.
C 200mm C.M.U. ABDULLAH ABUNAYYAN
C1 BUILDING SECTION 1 D 250mm C.M.U.
VILLA-C
1 : 100 E 300mm C.M.U.
H C.I.P. CONC. PLOT #:
RIYADH, KSA
I METAL STUD WALL

SYMBOL FINISHES

1 PTD. PLASTER ARCHITECTURAL DRAWINGS


2 TILE KEY FOR ''ISSUE FOR'' RC REVIEW & COMMENTS
3 STONE SD SCHEMATIC DESIGN CA CLIENT APPROVAL
DD DESIGN DEVELOPMENT PS PROGRESS SET
DECORATIVE SCREEN DOUBLE GLAZED DOOR IN 4 STUCCO CD CONSTRUCTION R FOR RECORD
PANEL SEE DETAILS POWDER COATED ALUM. DOCUMENTS P PRELIMINARY
FRAME AS PER SCHEDULE DOUBLE GLAZED WINDOW IN 6 STONE & INSULATION
TD TENDER DOCUMENTS M MUNICIPALITY REVIEW
POWDER COATED ALUMINIUM 7 WOOD SIDING & INSULATION MEP MEP BACKGROUND
CONCRETE RAILING FRAME AS PER SCHEDULE
8 ALUM. CLADDING & INSULATION
10 STUCCO & INSULATION

M L K J I H G F E D C B A
T.O.P
B

B
10.80

T.O.P
1200
1500

1500

9.30
ROOF S.S.L. INSULATED EXTERIOR WALL
2350

2400
9600 IN STONE CLADDING BUTT 100% Construction
JOINT STAGGERED 3 07/02/11 CD-CA Documents NAGA
900

80% Construction
2 10/11/10 CD-PS NAGA
T.O.P Documents
DOUBLE GLAZED FIXED 50% Construction
4.80 1 06/04/10 CD-PS NAGA
4800

T.O.P WINDOW (SEE SCHEDUAL) Documents


T.O.P
10 A4 10
3600

3600
5.00 5.70 0 27/03/10 DD-CA AS PER CONTRACT NAGA
GW GW
4400

VC-A-310
INSULATED EXTERIOR WALL ISSUE ISSUE
IN STONE CLADDING Rev DATE FOR DESCRIPTION By
T.O.P
10950

FIRST FLOOR T.O.P 4.25 (PATTERN AS SHOWEN)


4.05 ISSUE
9400

4800
1200

Project No. 09-27 KSA

Project Arch M.Dalyr - N.Salah

Structural Designer MH
4800

4950

GLASS RAILING OPEN TO LIVING ROOM


01 REFLECTED POOL
3600

G-13 G1
FOYER GW ONE COAT BITUMINOUS COATING D:\lowins revit files\09-27\CONSTRUCTION
DOCUMENTATION\VILLA C\Villa C Central
T.O.P REVIT File
REFLECTED POOL 0.00
T.O.P 101014.rvt
0.00
GROUND FLOOR SCALE AS SHOWN
150
150

0 Drawn By N.Salah - M.Dalyr

Checked By Butch
GRADE
MANAGEMENT Dr. Elkady
-150
A

A
PRINTING DATE/TIME 2/7/2011 2:52:54 PM

COMPACTED GRANULAR FILL

VC-A-301
A1 BUILDING
1 : 100
SECTION 2

SHEET TITLE

BUILDING SECTION 1 & 2

.
1 2 3 4 5 6 7
1 2 3 4 5 6 7

This drawing is the property of:NAGA Architects, Designers, Planners it is not allowed to reproduce this sheet's contents in any form except for the purpose for which it is intended . the consultant has a duplicate electronic file of this drawing . the contractor(s) shall assume full responsibility for any and all alterations and/ or changes on these drawings files including the resulting coordination between the trades involved . the contractor shall check and verify all dimensions and report all discrepancies to the architect and design professional whose seal is affixed to this drawing this drawing shall not be used for construction purposes until issued for construction by the design professional whose seal and signature are affixed to this drawing
COMBO ROOF AS PER
SPECS
GYPSUM FALSE CEILING
D

POWDER COATED DOUBLE

D
GLAZED CURTAIN WALL
INSULATED EXTERIOR WALL T.O.P
IN STONE CLADDING 13 10.80
T.O.P
9.60 12 11 10 9 8 7 6 4 3
(PATTERN AS SHOWN)
STAMPS
A1 T.O.P
INSULATED EXTERIOR WALL IN CONSULTANT
T.O.P 9.30
1500
VC-A-311 T.O.P
ROOF S.S.L. 8.80 STONE CLADDING BUTT JOINT 8.70
STAGGERED C1
9600

500

900
A-301
DOUBLE GLAZED CURTAIN a r chi t e ct s de s i g n e rs planne rs
WALL IN POWDER COATED R.C. MONOLITHIC WALL
ALUM. FRAME AS PER P.O. BOX 73033, DUBAI, UAE
4800

TEL.: +97143324455 FAX: +97143322113


4500

4500

2700
TERRACE SCHEDULE
F-04 E-MAIL: mail@naga.ae URL: www.naga.ae

3600
P1 DECORATIVE
14 T.O.P T.O.P
SCREEN PANEL 5.00 FEATURE WALL IN
GW 4.80
SERVICES STAIR SEE
CW10

900
CW01 6D3 DETAIL
FIRST FLOOR
4800
1200

8400
800
1A1
STAIR -1
G-03
A1
4800

4800
4950

NURSE STATION DINING


G-09
CW06 LIVING ROOM A-301
3600

3600
3D3 G-14 R3
6D1 G-13
J1 J1

GROUND FLOOR KEY TO SECTIONS


150
150

0GRADE
C

WALL/MATERIAL NOTES

C
-150 WALL TYPE TAGS CONSIST OF 2 CATEGORIES OF IDENTIFIERS :
- LETTERS IDENTIFY THE WALL CORE (E.G. A= 100mm C.M.U)
- NUMBERS IDENTIFY FINISHES (E.G. 1= PTD.PLASTER)
(E.G. 1A1 = 100mm C.M.U. PTD. PLASTER ON BOTH SIDES )
-LEFT NUMBER CORRESPONDS TO EXTERIOR FINISH & RIGHT
TO INTERIOR FINISH
WATER FEATURE
COMPACTED GRANULAR FILL ONE COAT BITUMINOUS COATING SYMBOL CORE WALL

C1 BUILDING SECTION 3 A 100mm C.M.U.


1 : 100 B 150mm C.M.U. ABDULLAH ABUNAYYAN
C 200mm C.M.U.
D 250mm C.M.U.
VILLA-C
E 300mm C.M.U. PLOT #:
RIYADH, KSA
H C.I.P. CONC.
I METAL STUD WALL

SYMBOL FINISHES ARCHITECTURAL DRAWINGS


1 PTD. PLASTER KEY FOR ''ISSUE FOR'' RC REVIEW & COMMENTS
2 TILE SD SCHEMATIC DESIGN CA CLIENT APPROVAL
DD DESIGN DEVELOPMENT PS PROGRESS SET
3 STONE CD CONSTRUCTION R FOR RECORD
4 STUCCO DOCUMENTS P PRELIMINARY
TD TENDER DOCUMENTS M MUNICIPALITY REVIEW
6 STONE & INSULATION MEP MEP BACKGROUND
7 WOOD SIDING & INSULATION

A B C D E F G H I J K L M N 8 ALUM. CLADDING & INSULATION


10 STUCCO & INSULATION

INSULATED EXTERIOR WALL COMBO ROOF AS PER DOUBLE GLAZED WINDOW IN


B

SPECS

B
IN STONE CLADDING BUTT DECORATIVE SCREEN GYPSUM FALSE CEILING CONCRETE RAILING POWDER COATED ALUM. DECORATIVE SCREEN COMBO ROOF AS PER SPECS
T.O.P T.O.P
JOINT STAGGERED 9.30 T.O.P PANEL FRAME AS PER SCHEDULE PANEL
T.O.P 9.30
ROOF S.S.L. 8.80 GLASS PARTITION 8.80
300

9600 FOR ELEVATOR


500

500
100% Construction
3 07/02/11 CD-CA Documents NAGA
80% Construction
2 10/11/10 CD-PS NAGA
4800

T.O.P T.O.P Documents


T.O.P
6.00 T.O.P CW05 5.90 50% Construction
5.70 1 06/04/10 CD-PS NAGA
5.70 Documents
WATER FEATURE
CORRIDOR 0 27/03/10 DD-CA AS PER CONTRACT NAGA
F-01 ISSUE ISSUE
FIRST FLOOR Rev DATE FOR DESCRIPTION By
9750

2100

8800
8750

4800
8150

ISSUE

Project No. 09-27 KSA

INSULATED EXTERIOR Project Arch M.Dalyr - N.Salah


4800

FOYER
MASTER
BEDROOM G-01 WALL IN PLASTER FINISH
G1 Structural Designer MH
G-10
06 06 P3 TEMPERED SAFETY
STAIR -1
GW GW G-03 GLASS RAILING D:\lowins revit files\09-27\CONSTRUCTION
1100

DOCUMENTATION\VILLA C\Villa C Central


GROUND FLOOR REVIT File 101014.rvt
150

150

0 SCALE AS SHOWN
GRADE
Drawn By N.Salah - M.Dalyr
-150
Checked By Butch

MANAGEMENT Dr. Elkady


A

A
PRINTING DATE/TIME 2/7/2011 2:52:58 PM
ONE COAT BITUMINOUS COATING
A1 BUILDING
1 : 100
SECTION 4
COMPACTED GRANULAR FILL
VC-A-302

SHEET TITLE
0 1 2 4m
SCALE 1:100
BUILDING SECTION 3 & 4

.
1 2 3 4 5 6 7
1 2 3 4 5 6 7

This drawing is the property of:NAGA Architects, Designers, Planners it is not allowed to reproduce this sheet's contents in any form except for the purpose for which it is intended . the consultant has a duplicate electronic file of this drawing . the contractor(s) shall assume full responsibility for any and all alterations and/ or changes on these drawings files including the resulting coordination between the trades involved . the contractor shall check and verify all dimensions and report all discrepancies to the architect and design professional whose seal is affixed to this drawing this drawing shall not be used for construction purposes until issued for construction by the design professional whose seal and signature are affixed to this drawing
GLAZED CORNER FIXED
WINDOW(SEE SCHEDULE) DOUBLE GLASS DOOR IN
GYPSUM FALSE CEILING
POWDER COUTED ALUM. COMBO ROOF AS PER SPECS
FRAME AS PER SCHEDULE
INSULATED EXTERIOR
D

D
WALL IN STONE CLADDING A B C D E F G H I J K L M N
(PATTERN AS SHOWN) T.O.P
10.80 INSULATED EXTERIOR WALL
IN STONE CLADDING BUTT STAMPS
T.O.P
A1 JOINT STAGGERED

1100
9.60
1200

CONSULTANT
1500

VC-A-310
ROOF S.S.L.
9600
GLAZED CORNER FIXED
900

WINDOW (SEE SCHEDULE) a r chi t e ct s de s i g n e rs planne rs


A1
BEDROOM 1
01 A-302 P.O. BOX 73033, DUBAI, UAE
4800
2600

F-09
GW
LIVING TERRACE T.O.P TEL.: +97143324455 FAX: +97143322113
F-05 F-04 5.90
E-MAIL: mail@naga.ae URL: www.naga.ae
10 CW02 10
G2
TERRACE GW BEDROOM 2 GW 200mm THK CONCRETE BEAM AS
10950

1000

FIRST FLOOR F-10 F-13 PER STRUCTURAL DRAWINGS


4800
C1
A-302

KEY TO SECTIONS
4800
4800

MASTER MASTER
BATHROOM 01 BEDROOM NURSE STATION NURSE PANTRY
G1 C2
G-11 GW G-10 G-09 G-08 NURSES
BEDROOM WALL/MATERIAL NOTES
P1
G-07
WALL TYPE TAGS CONSIST OF 2 CATEGORIES OF IDENTIFIERS :
GROUND FLOOR - LETTERS IDENTIFY THE WALL CORE (E.G. A= 100mm C.M.U)
- NUMBERS IDENTIFY FINISHES (E.G. 1= PTD.PLASTER)
150
150

0 (E.G. 1A1 = 100mm C.M.U. PTD. PLASTER ON BOTH SIDES )


C

-LEFT NUMBER CORRESPONDS TO EXTERIOR FINISH & RIGHT

C
GRADE TO INTERIOR FINISH
-150 SYMBOL CORE WALL
COMPACTED GRANULAR FILL ONE COAT BITUMINUOS COATING A 100mm C.M.U.
B 150mm C.M.U.
C 200mm C.M.U.
D 250mm C.M.U.
E 300mm C.M.U.
ABDULLAH ABUNAYYAN
C1 BUILDING
1 : 100
SECTION 5 H C.I.P. CONC.
I METAL STUD WALL VILLA-C
SYMBOL FINISHES
PLOT #:
1 PTD. PLASTER RIYADH, KSA
2 TILE
INSULATED EXTERIOR WALL
R.C MONOLITHIC DOUBLE GLAZED WINDOW IN 3 STONE
IN STONE CLADDING BUTT
JOINT STAGGERED WALL POWDER COATED ALUM. 4 STUCCO
ARCHITECTURAL DRAWINGS
FRAME AS PER SCHEDULE
6 STONE & INSULATION KEY FOR ''ISSUE FOR'' RC REVIEW & COMMENTS
SD SCHEMATIC DESIGN CA CLIENT APPROVAL
7 WOOD SIDING & INSULATION
N M L K J I H G F E D C B T.O.P
A DD DESIGN DEVELOPMENT PS PROGRESS SET
8 ALUM. CLADDING & INSULATION CD CONSTRUCTION R FOR RECORD
CONCRETE COLUMN 10.80 DOCUMENTS P PRELIMINARY
10 STUCCO & INSULATION
M MUNICIPALITY REVIEW
TD TENDER DOCUMENTS
MEP MEP BACKGROUND
1200

1500

ROOF S.S.L. T.O.P


2400

8.70
300 300

9600 DOUBLE GLAZED FIXED


900

WINDOW (SEE SCHEDUAL)


B

B
GYPSUM FALSE COMBO ROOF AS PER
4800

CEILING
2500

SPECS
INTERIOR WALL IN 10 01 10
3600

3600

G1
GW 6D3 CW05 GW
CERAMIC FINISH GW
T.O.P T.O.P T.O.P INSULATED EXTERIOR
2100

4.80 100% Construction


4.80 4.80 WALL IN STONE CLADDING 3 07/02/11 CD-CA Documents NAGA
10950

1200
1100

FIRST FLOOR T.O.P


4.05
(PATTERN AS SHOWN) 80% Construction
2 10/11/10 CD-PS NAGA
4800 Documents
1200

1200

50% Construction
1 06/04/10 CD-PS NAGA
Documents
0 27/03/10 DD-CA AS PER CONTRACT NAGA
1D2
ISSUE ISSUE
4800
4800

4800
OPEN TO Rev DATE FOR DESCRIPTION By
6D2 PREPARATION LOBBY FRY KITCHEN 6D2 6D2 2C2 1C1 MAID'S LIVING 6D1
3600

3600

G-19 P1 G-17 G-16 DINING KITCHEN


G-29
AREA G-15 06 06 ISSUE
GW GW
Project No. 09-27 KSA
GROUND FLOOR
150
150

Project Arch M.Dalyr - N.Salah


0
Structural Designer MH
GRADE
-150 D:\lowins revit files\09-27\CONSTRUCTION
DOCUMENTATION\VILLA C\Villa C Central
REVIT File 101014.rvt

SCALE AS SHOWN
ONE COAT BITUMINOUS COATING
COMPACTED GRANULAR FILL Drawn By N.Salah - M.Dalyr

Checked By Butch

MANAGEMENT Dr. Elkady


A

A
PRINTING DATE/TIME 2/7/2011 2:53:03 PM

A1 BUILDING
1 : 100
SECTION 6
VC-A-303

SHEET TITLE
0 1 2 4m
SCALE 1:100
BUILDING SECTION 5 & 6

.
1 2 3 4 5 6 7
1 2 3 4 5 6 7

This drawing is the property of:NAGA Architects, Designers, Planners it is not allowed to reproduce this sheet's contents in any form except for the purpose for which it is intended . the consultant has a duplicate electronic file of this drawing . the contractor(s) shall assume full responsibility for any and all alterations and/ or changes on these drawings files including the resulting coordination between the trades involved . the contractor shall check and verify all dimensions and report all discrepancies to the architect and design professional whose seal is affixed to this drawing this drawing shall not be used for construction purposes until issued for construction by the design professional whose seal and signature are affixed to this drawing
L K
C5
T.O.P
10.80 A-410AD
STONE COMBO ROOF. SEE
COPING(TYP.) MANUF. SPECS. (TYP.)

STONE
(TYP.)
D

D
1200

1200

STAMPS
ROOF S.S.L. CONSULTANT
9600
300

a r chi t e ct s de s i g n e rs planne rs

P.O. BOX 73033, DUBAI, UAE


TEL.: +97143324455 FAX: +97143322113

900
CONC. SLAB AS PER E-MAIL: mail@naga.ae URL: www.naga.ae
STRUCTURAL(TYP.)

200
STONE (TYP.)

RIGID INSULATION
PER SPECS. (TYP.)

12.5mm THK
GYPSUM
CEILING BOARD ON
SUSPENDED
LIGHT GAUGE MTL.
STRUCTURE(TYP.)
4800

F E
4500
C

DOUBLE GLAZED

C
SLIDING DOOR ON 11 COMBO ROOF. SEE
POWDER CAOTED GW MANUF. SPECS. (TYP.)
ALUMINUM FRAMEAS
PER SCHEDULE
STONE FINISH AS
PER SPECS
50 mm. DIA TERRACE
ALUMINUM F-02
HANDRAIL IN T.O.P
POWDER COAT 5.00
SMOOTH STUCCO
FINISH FIN. (TYP.)
T.O.P
4.80
ABDULLAH ABUNAYYAN

200

200
FIRST FLOOR
20mm. DIA SOLID
ALUMINUM RAILS
4800 VILLA-C

550
FLOOR FIN. PER PLOT #:
SCHEDULE RIYADH, KSA
T.O.P
4.05

200
FIRST FLOOR STONE FINISH
AS PER SPECS
ARCHITECTURAL DRAWINGS

450
4800 KEY FOR ''ISSUE FOR'' RC REVIEW & COMMENTS
SD SCHEMATIC DESIGN CA CLIENT APPROVAL
DD DESIGN DEVELOPMENT PS PROGRESS SET
STEEL FRAMING CD CONSTRUCTION R FOR RECORD
AS PER STRUCTURAL DOCUMENTS P PRELIMINARY
1200

TD TENDER DOCUMENTS M MUNICIPALITY REVIEW


MEP MEP BACKGROUND
FIBER CEMENT BOARD
CEILING

DOUBLE GLAZED WINDOW


B

B
ON POWDER COATED

4800
2500
STRUCTURAL BEAM ALUMINUM FRAMES AS PER
SCHEDULE

12.5mm THK GYPSUM


CEILING BOARD(M.R.
ON EXT.) ON SUSPENDED STRUCTURAL 100% Construction
LIGHT GAUGE MTL. G1 TIE BEAM 3 07/02/11 CD-CA Documents NAGA
STRUCTURE(TYP.) 80% Construction
2 10/11/10 CD-PS NAGA
4800

Documents
50% Construction
1 06/04/10 CD-PS NAGA
Documents
STONE FINISH AS TEMPERED SAFETY
NURSES
GLASS RAILING 0 27/03/10 DD-CA AS PER CONTRACT NAGA
PER SPECS BEDROOM
G-07 ISSUE ISSUE
Rev DATE FOR DESCRIPTION By
3600

PAVERS OVER CONC.


ISSUE
BEDDING OVER
COMPACTED FILL.

1100
Project No. 09-27 KSA

Project Arch M.Dalyr - N.Salah


ONE COAT BITUMINOUS GROUND FLOOR
VAPOR BARRIER COATING Structural Designer MH
OVER BLINDING CONCRETE 0
OVER POLYTHENE SHEET
OVER COMPACTED D:\lowins revit files\09-27\CONSTRUCTION

150
GRADE DOCUMENTATION\VILLA C\Villa C Central

300
GRANULAR REVIT File 101014.rvt
FILL (TYP.) -150
SCALE AS SHOWN

Drawn By N.Salah - M.Dalyr


GROUND FLOOR
Checked By Butch
0
ONE COAT BITUMINOUS
MANAGEMENT Dr. Elkady
150

150

GRADE
A

VAPOR BARRIER COATING

A
OVER BLINDING CONCRETE PRINTING DATE/TIME 2/7/2011 2:53:05 PM
-150 OVER POLYTHENE SHEET
OVER COMPACTED GRANULAR
FILL (TYP.)

STRUCTURAL TIE BEAM) VC-A-310

SHEET TITLE
A1 WALL
1 : 25
SECTION 1 A4 WALL
1 : 25
SECTION 2
0 0.2 0.4 0.8m
SCALE 1:20
WALL SECTION 1 & 2

.
1 2 3 4 5 6 7
1 2 3 4 5 6 7

This drawing is the property of:NAGA Architects, Designers, Planners it is not allowed to reproduce this sheet's contents in any form except for the purpose for which it is intended . the consultant has a duplicate electronic file of this drawing . the contractor(s) shall assume full responsibility for any and all alterations and/ or changes on these drawings files including the resulting coordination between the trades involved . the contractor shall check and verify all dimensions and report all discrepancies to the architect and design professional whose seal is affixed to this drawing this drawing shall not be used for construction purposes until issued for construction by the design professional whose seal and signature are affixed to this drawing
A3 Sim
A-605. TILE OVER
COMBO ROOF
13
PER MANUF. SPECS STONE CAPPING (TYP.)
12
T.O.P
10.80
9
CONC. SLAB AS PER
STRUCTURAL(TYP.)

ROOF S.S.L.
D

D
T.O.P 9600

300

300
1200

1200

1200
9.30 TILE OVER
COMBO ROOF

1500
PER MANUF. SPECS
STAMPS

500
STONE COPING
(TYP.) CONSULTANT
ROOF S.S.L.
9600

300
STONE CLADDING (TYP.)
a r chi t e ct s de s i g n e rs planne rs
STONE CLADDING (TYP.)
P.O. BOX 73033, DUBAI, UAE
TEL.: +97143324455 FAX: +97143322113
E-MAIL: mail@naga.ae URL: www.naga.ae

CONC. SLAB AS PER

3600
STRUCTURAL(TYP.)

50mm DIA ALUMINUM


HANDRAIL IN
DOUBLE GLAZED FIXED POWDER COAT

4500
WINDOW ON POWDER COATED FINISH
ALUMINUM FRAME AS PER
SCHEDULE

3600
20mm DIA SOLID ALUMINUM RAIL
4800

4800
4500

STONE COPING
C

(TYP.)

C
50mm DIA ALUMINUM
HANDRAIL IN POWDER COAT
FINISH

SMOOTH STUCCO (TYP.)

1000
20mm DIA SOLID ALUMINUM

900
RAILS

ABDULLAH ABUNAYYAN
FIRST FLOOR
VILLA-C
4800
PLOT #:
RIYADH, KSA
900

1000
FLOOR FIN. PER
T.O.P SCHEDULE T.O.P
4.80 4.80
FIRST FLOOR
RIGID INSULATION
ARCHITECTURAL DRAWINGS
4800 PER SPECS. (TYP.) KEY FOR ''ISSUE FOR'' RC REVIEW & COMMENTS
RIGID INSULATION SD SCHEMATIC DESIGN CA CLIENT APPROVAL

200
PER SPECS. (TYP.) STRUCTURAL BEAM DD DESIGN DEVELOPMENT PS PROGRESS SET
CD CONSTRUCTION R FOR RECORD
DOCUMENTS P PRELIMINARY
1200

12.5mm THK GYPSUM


CEILING BOARD(M.R. TD TENDER DOCUMENTS M MUNICIPALITY REVIEW
ON EXT.) ON SUSPENDED MEP MEP BACKGROUND
LIGHT GAUGE MTL.
STRUCTURE(TYP.)
STONE CLADDING (TYP.)
B

B
12.5mm THK GYPSUM
CEILING BOARD(M.R.

4800
ON EXT.) ON SUSPENDED
DOUBLE GLAZED WINDOW LIGHT GAUGE MTL.
ON POWDER COATED STRUCTURE(TYP.)
ALUMINUM FRAMEAS PER 02
SCHEDULE 100% Construction
GW DOUBLE GLAZED WINDOW ON POWDER 3 07/02/11 CD-CA Documents NAGA
COATED ALUMINUM FRAME AS PER

3600
SCHEDULE 80% Construction
2 10/11/10 CD-PS NAGA
Documents
4800
4950

FLOOR FINISH PER 50% Construction


1 06/04/10 CD-PS NAGA
PTD. SMOOTH SCHEDULE (TYP.) Documents
PLASTER (TYP.) 0 27/03/10 DD-CA AS PER CONTRACT NAGA
ISSUE ISSUE
Rev DATE FOR DESCRIPTION By
3600

ISSUE
ALUMINUM LOUVERS TEMPERED SAFETY
AS PER SCHEDULE GLASS RAILING Project No. 09-27 KSA

Project Arch M.Dalyr - N.Salah

Structural Designer MH
FLOOR FINISH PER GROUND FLOOR
SCHEDULE (TYP.) D:\lowins revit files\09-27\CONSTRUCTION
0 DOCUMENTATION\VILLA C\Villa C Central
REVIT File
PAVERS OVER CONC.
GRADE 101014.rvt

BEDDING OVER -150 SCALE AS SHOWN


COMPACTED FILL.
Drawn By N.Salah - M.Dalyr
GROUND FLOOR
Checked By Butch
0
MANAGEMENT Dr. Elkady
A

150

150

GRADE

A
PRINTING DATE/TIME 2/7/2011 2:53:06 PM
-150

ONE COAT BITUMINOUS VAPOR


BARRIER COATING OVER BLINDING
CONCRETE OVER POLYTHENE
SHEET OVER COMPACTED
VC-A-311
ONE COAT BITUMINOUS GRANULAR FILL (TYP.)
VAPOR BARRIER COATING
OVER BLINDING CONCRETE
A4 WALL SECTION 4
A1 WALL SECTION 3 OVER POLYTHENE SHEET 1 : 25
OVER COMPACTED GRANULAR SHEET TITLE
1 : 25
FILL (TYP.)
0 0.2 0.4 0.8m
SCALE 1:20
WALL SECTION 3 & 4

.
1 2 3 4 5 6 7
1 2 3 4 5 6 7

This drawing is the property of:NAGA Architects, Designers, Planners it is not allowed to reproduce this sheet's contents in any form except for the purpose for which it is intended . the consultant has a duplicate electronic file of this drawing . the contractor(s) shall assume full responsibility for any and all alterations and/ or changes on these drawings files including the resulting coordination between the trades involved . the contractor shall check and verify all dimensions and report all discrepancies to the architect and design professional whose seal is affixed to this drawing this drawing shall not be used for construction purposes until issued for construction by the design professional whose seal and signature are affixed to this drawing
9 10 H G F
F H
ROOF S.S.L. ROOF S.S.L.
9600 9600
800

800
500

500
D

D
50mm. DIA. SOLID
WOOD HAND STAMPS
RAIL
OUTLINE OF HANDRAIL CONSULTANT
3500

3500
12mm THK.
LAMINATED
TEMPERED
12mm. THK LAMINATED GLASS RAILING 9 a r chi t e ct s de s i g n e rs planne rs

1050 mm.
TEMPERED GLASS RAILING C2

T.O.P A-601 P.O. BOX 73033, DUBAI, UAE


4.80 TEL.: +97143324455 FAX: +97143322113
FIRST FLOOR FIRST FLOOR 28 10

9600
28 E-MAIL: mail@naga.ae URL: www.naga.ae
9750

27 27
4800 26 4800 26
25 25
24 24
23 MARBLE FINISH 23
22 TREAD WITH 22
DIVIDED INTO 28eq RISERS @ 171.4 mm each

FIRST FLOOR KEY PLAN

DIVIDED INTO 28eq RISERS @ 171.4mm each


21 21
20
SAND BLASTED 20
19 50mm. DIA. SOLID WOOD NOSING 19
18 18
HAND RAIL SMOOTH 270

1050 mm.
17 C2 17
16 PLASTERED 16
A-601

171
15 15
CONCRETE 14
4800

4800
14
13 12mm. THK LAMINATED STAIR IN PAINT 13
12 TEMPERED GLASS RAILING FINISH 12
11
10 MARBLE TREAD WITH
9
8
SANDBLASTED NOSING
7
C

C
5 SMOOTH
4
3 PLASTERED
2 CONCRETE STAIR IN
1 PAINT FINISH
GROUND FLOOR GROUND FLOOR
150

0 0
GRADE GRADE
-150 -150
ABDULLAH ABUNAYYAN
A1 STAIR
1 : 50
-1 SECTION 1
VILLA-C
A3 STAIR
1 : 50
-1 SECTION 2
PLOT #:
RIYADH, KSA

ARCHITECTURAL DRAWINGS
KEY FOR ''ISSUE FOR'' RC REVIEW & COMMENTS
SD SCHEMATIC DESIGN CA CLIENT APPROVAL
DD DESIGN DEVELOPMENT PS PROGRESS SET
CD CONSTRUCTION R FOR RECORD
DOCUMENTS P PRELIMINARY
TD TENDER DOCUMENTS M MUNICIPALITY REVIEW
MEP MEP BACKGROUND

F G H
F G H
5662 5620
B

B
1260 4360 1300 4320
16 EQ. STEPS @ 270 mm. O.C. 16 EQUAL PARTS @ 270mm O.C.

A3
A3
VC-A-401 MARBLE TREAD W/
VC-A-401 SAND BLASTED 100% Construction
NOSING 3 07/02/11 CD-CA Documents NAGA
80% Construction
OUTLINE OF STAIR 2 10/11/10 CD-PS NAGA
Documents
9 TO FIRST FLOOR 9 1 06/04/10 CD-PS
50% Construction
NAGA
Documents
A1 A1
0 27/03/10 DD-CA AS PER CONTRACT NAGA
VC-A-401 MARBLE VC-A-401
1300

TREAD/ ISSUE ISSUE


1501

1481

CW10 DN Rev DATE FOR DESCRIPTION By


LANDING W/
2400

SANDBLASTED TO GROUND FLOOR


13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 NOSING 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 ISSUE
4.80
12 FIRST FLOOR 12 F.F.L
DIVIDE INTO 11 EQUAL PARTS @ 270 mm. O.C.

DIVIDE INTO 11 EQUAL PARTS @ 270mm O.C.

11 LINE ABOVE 11 Project No. 09-27 KSA

10 10 D2 Project Arch M.Dalyr - N.Salah


OUTLINE OF
4471

10 10
4451

9 9 VC-A-405

8
RAILING 8
Structural Designer MH
ELEVATOR LIFT 600 x 600mm
7 7 F-16 PORCELAIN TILES D:\lowins revit files\09-27\CONSTRUCTION
2970

2970

6 6 DOCUMENTATION\VILLA C\Villa C Central


D1 REVIT File 101014.rvt
2251

5 5
A-601 D1
4 4 SCALE AS SHOWN
VC-A-405
3 3 12mm THK LAMINATED TEMPERED Drawn By N.Salah - M.Dalyr
MARBLE TREAD W/
SANDBLASTED 2 2 GLASS RAILING
NOSING Checked By Butch
1 1
0.00
UP TO FIRST FLOOR MANAGEMENT Dr. Elkady
A

G.F.L

A
PRINTING DATE/TIME 2/7/2011 2:53:12 PM

D1 STAIR-1
1 : 50
ENLARGED PLAN @ GROUND FLOOR C1 STAIR-1
1 : 50
ENLARGED PLAN @ FIRST FLOOR
VC-A-401

SHEET TITLE

0 0.5 1 2m
STAIR-1 ENLARGED PLANS
SCALE 1:50
& SECTIONS

.
1 2 3 4 5 6 7
1 2 3 4 5 6 7

This drawing is the property of:NAGA Architects, Designers, Planners it is not allowed to reproduce this sheet's contents in any form except for the purpose for which it is intended . the consultant has a duplicate electronic file of this drawing . the contractor(s) shall assume full responsibility for any and all alterations and/ or changes on these drawings files including the resulting coordination between the trades involved . the contractor shall check and verify all dimensions and report all discrepancies to the architect and design professional whose seal is affixed to this drawing this drawing shall not be used for construction purposes until issued for construction by the design professional whose seal and signature are affixed to this drawing
G F 6 4
T.O.P
5.94 F H
50mm. DIA. TUBULAR T.O.P

86.03°
85.52°
STEEL HANDRAIL W/ 5.00

1120
POWDER COAT FINISH T.O.P
FIRST FLOOR 4.80
FIRST FLOOR °
4800 .41 28
T.O.P 50mm. DIA. TUBULAR T.O.P 32 27
4800 4.23 26

10 EQ RISERS
4.05 STEEL HANDRAIL W/ STAIR 2
25

10 EQ RISERS
POWDER COAT FINISH 24 4 G-21

1714
D

23

1714

D
DIVIDE INTO 28 EQ RISERS @ 171.4mm O.C.
22

DIVIDE INTO 28 EQ RISERS @ 171.4 mm O.C.


21
20
LANDING

86.86°
18 LANDING 19
17
16
18
17 D1
6 STAMPS

89.80°
84.76°
15 16 A-601
15

4800
14 CONSULTANT
14

4800
13
12 13 CONCRETE
11 12 PLASTERED

18 EQ RISERS
10 11

18 EQ RISERS
A2 10 TREAD & RISER

3086
9
CONCRETE PLASTERED W/ EPOXY PAINT

32°
9

3086
8 a r chi t e ct s de s i g n e rs planne rs
7 RISER & TREAD W/ 8
FINISH
6 EPOXY PAINT FINISH 7 P.O. BOX 73033, DUBAI, UAE
5 6
4 5 TEL.: +97143324455 FAX: +97143322113
3 4 E-MAIL: mail@naga.ae URL: www.naga.ae
2 3
2
GROUND FLOOR 1
GROUND FLOOR
0
0 GROUND FLOOR KEY PLAN
ONE COAT BITUMINOUS COATING

C1 STAIR 2 3D VIEW C3 STAIR


1 : 50
-2 SECTION 1
COMPACTED GRANULA FILL
C5 STAIR
1 : 50
-2 SECTION 2 COMPACTED GRANULAR FILL ONE COAT
BITUMINUOS COATING

C5
F G
VC-A-402
F F F
C

C
4 4 4 0.00 4
G.F.L
300

C3
VC-A-402
505 38
8.55 70
INSULATED CAST IN .30
1440

1440

8166.
TO GROUND
4.80 PLACE CONCRETE WALL INSULATED CAST IN 71
F.F.L INSULATED CAST IN
FLOOR IN STUCCO FINISH PLACE CONCRETE WALL 6503 4863
.15 PLACE CONCRETE WALL
DN IN STUCCO FINISH
IN STUCCO FINISH
.86 ABDULLAH ABUNAYYAN
DIVIDE INTO 10 EQ TREADS @ 270mm O.C.

4364.9
28
27
8
9
0 6067.9
9 VILLA-C
4364.90
5.67
T.O.P 26 10 50mm. DIA. TUBULAR PLOT #:
25 STEEL HANDRAIL W/ RIYADH, KSA
5050

11
24 POWDER COAT FINISH
2700

12
3610

23 13
22 14 5057.64 ARCHITECTURAL DRAWINGS
21 15 CONCRETE PLASTERED KEY FOR ''ISSUE FOR'' RC REVIEW & COMMENTS
8
20 16 STEPS W/ EPOXY PAINT 5303.8 SD SCHEMATIC DESIGN CA CLIENT APPROVAL
FINISH .64 64 DD DESIGN DEVELOPMENT PS PROGRESS SET
19 17 4845 4845. 5291
.37
4.28 CD CONSTRUCTION R FOR RECORD
.74
T.O.P 18
4242 DOCUMENTS P PRELIMINARY
2.74
424
910

TD TENDER DOCUMENTS M MUNICIPALITY REVIEW


LANDING MEP MEP BACKGROUND
200

6 6 6 6
220 940 140 920 180
B

B
WALL FEATURE 2 DETAIL @ 1000mm. HT. WALL FEATURE 2 DETAIL @ 2000mm. HT. WALL FEATURE 2 DETAIL @ 3000mm. HT.
B3 1 : 50 B4 1 : 50 B5
B1 STAIR 2 PLAN @ FIRST FLOOR 1 : 50
1 : 50

100% Construction
3 07/02/11 CD-CA Documents NAGA
C5
F VC-A-402 G 2 10/11/10 CD-PS
80% Construction
NAGA
F F F Documents
50% Construction
1303 1097 1 06/04/10 CD-PS NAGA
Documents
4 0.00 UP TO FIRST FLOOR
G.F.L
1 4 4 4 0 27/03/10 DD-CA AS PER CONTRACT NAGA
C3 C3 ISSUE ISSUE
2 Rev DATE FOR DESCRIPTION By
VC-A-402 VC-A-402
3
A2 ISSUE
1740

DIVIDE INTO 17 EQ TREADS @ 270mm O.C.

4
5 9329.3
INSULATED CAST IN 1 Project No. 09-27 KSA
PLACE CONCRETE WALL 940 CONCRETE PLASTERED 6067 11864.58
6
INSULATED CAST IN .99 INSULATED CAST IN 5058
IN STUCCO FINISH TREAD W/ EPOXY .55 INSULATED CAST IN 7990.9
Project Arch M.Dalyr - N.Salah
7 PLACE CONCRETE WALL PLACE CONCRETE WALL 6067. 6
PAINT FINISH 9DN PLACE CONCRETE WALL
DIVIDE INTO 10 EQ TREADS @ 270mm O.C.

9 DN
28 8 IN STUCCO FINISH DN5361 IN STUCCO FINISH 6067.9
Structural Designer MH
6503.15 .59 IN STUCCO FINISH 9
4590

27 9 50mm. DIA. TUBULAR D:\lowins revit files\09-27\CONSTRUCTION


270

26 10 STEEL HANDRAIL W/ 8479.19 DOCUMENTATION\VILLA C\Villa C Central


5470

REVIT File 101014.rvt


25 11 POWDER COAT FINISH
24
2700

12 SCALE AS SHOWN
4160

23 13
5470.75 Drawn By N.Salah - M.Dalyr
22 14 5508.40
21 15 Checked By Butch
OUTLINE OF STAIR
4845.64 20 TO FIRST FLOOR 1 8
16
5164.2 5303.8 MANAGEMENT Dr. Elkady
A

A
19 .09
17
.88 5027 08 PRINTING DATE/TIME 2/7/2011 2:59:56 PM
.88 5303 .34 5299.
18 5303 5359
910

880

VC-A-402
200

6
940 140 920 6 6 FD
6
220 180
C5
SHEET TITLE
VC-A-402
WALL FEATURE 2 DETAIL @ 5500mm. HT. WALL FEATURE 2 DETAIL @ 6200mm. HT. WALL FEATURE 2 DETAIL @ 8200mm. HT. STAIR-2 ENLARGED PLANS
A3 A4 A5 0 0.5 1 2m
A1 STAIR -2 PLAN @ GROUND FLOOR 1 : 50 1 : 50 1 : 50
1 : 50 SCALE 1:50 & SECTIONS / WALL
FEATURE DETAILS

.
1 2 3 4 5 6 7
1 2 3 4 5 6 7

This drawing is the property of:NAGA Architects, Designers, Planners it is not allowed to reproduce this sheet's contents in any form except for the purpose for which it is intended . the consultant has a duplicate electronic file of this drawing . the contractor(s) shall assume full responsibility for any and all alterations and/ or changes on these drawings files including the resulting coordination between the trades involved . the contractor shall check and verify all dimensions and report all discrepancies to the architect and design professional whose seal is affixed to this drawing this drawing shall not be used for construction purposes until issued for construction by the design professional whose seal and signature are affixed to this drawing
F F G H I
G H I
6840
B D E F H L
2220 2400 2400
4820 2020
ROOF S.S.L.

12 9600
CW02
G2
D

D
2475

14 TERRACE
GW F-04
CL 50mm DIA. ALUM.
HANDRAIL IN POWDER
CW02 COAT FINISH
STAMPS
9 TERRACE
FD G2 TERRACE CONSULTANT

50
50mm ALUMINUM F F F F F-10 F-06
HANDRAIL IN B5
OUTLINE OF SOLID C3 POWDER COAT
ALUMINUM VC-A-403
50mm DIA ALUMINUM HANDRAIL FINISH 20mm DIA. SOLID ALUM.
HORIZONTAL RAILS IN POWDER COAT FINISH 1200 1200 1200 1200 1000 1000 HORIZONTAL RAILS 11 TERRACE
F-02
VC-A-403 SOLID ALUMINUM a r chi t e ct s de s i g n e rs planne rs
HORIZONTAL
D1 TERRACE 1 TERRACE
RAILS P.O. BOX 73033, DUBAI, UAE
F-04
1 : 50
0 0.5 1 2m
13 TEL.: +97143324455 FAX: +97143322113

1000
40mm DIA. ALUM. E-MAIL: mail@naga.ae URL: www.naga.ae
SCALE 1:50 POST SPACED AS
FIRST FLOOR SHOWN ON PLAN FIRST FLOOR KEY PLAN

DIVIDE INTO 8 EQ. PARTS @ 125mm O.C.


4800
ALUMINUM POST

C3 TERRACE 1 ELEVATION 1 TERRACE FLOOR FINISH


K L 1 : 50

1000 mm.
0 0.5 1 2m
SCALE 1:50

12 12 180
1800 10
10
50mm DIA ALUMINUM
HANDRAIL IN
50mm DIA SOLID
ALUMINUM HANDRAIL
GW 9 10 11 ALUM. BASE
CAPPING
GW 175 1800
POWDER COAT IN POWDER COAT
EPOXY GROUT
FINISH FINISH
TO FIX POST
OUTLINE OF
SOLID ALUMINUM CONTINUE EXTERIOR
C

FINISH TO TOP OF

C
HORIZONTAL TERRACE
RAILS F-10 LEDGE & SKIRTING
VC-A-403
A5
BALCONY FLOOR FIN.
ROOF S.S.L. AS PER SCHEDULE
4438

4438
4800

4438

4438

H4
H3
A3 VC-A-403 9600
5480
5600

OUTLINE OF
SOLID ALUMINUM
HORIZONTAL RAILS

ALUM. SLEEVE ABDULLAH ABUNAYYAN


FIXED TO CONC. W/
FD FD EXPANSION BOLT VILLA-C
11
PLOT #:
183

GW
13 13 RIYADH, KSA
863

50mm DIA ALUMINUM


680
800

HANDRAIL IN POWDER
622

620

COAT FINISH C.I.P. CONCRETE SLAB


F F
120

B5
VC-A-403 ARCHITECTURAL DRAWINGS
50mm DIA ALUMINUM HANDRAIL IN 1568 2865 1768 KEY FOR ''ISSUE FOR'' RC REVIEW & COMMENTS
B1 TERRACE 2 B2 TERRACE 3
POWDER COAT FINISH TERRACE FLOOR
FINISH SD SCHEMATIC DESIGN CA CLIENT APPROVAL
1 : 50 1 : 50 DD DESIGN DEVELOPMENT PS PROGRESS SET
1000

CD CONSTRUCTION R FOR RECORD


OUTLINE OF SOLID ALUMINUM
B5 GLASS RAILING DETAILED SECTION DOCUMENTS P PRELIMINARY
HORIZONTAL RAILS
FIRST FLOOR 1:5 TD TENDER DOCUMENTS M MUNICIPALITY REVIEW
MEP MEP BACKGROUND
4800
ALUMINUM POST

0
SCALE 1:50
0.5 1 2m 0 0.5
SCALE 1:50
1 2m
B3 TERRACE
1 : 50
4 ELEVATION 1 SOLID ALUMINUM
HORIZONTAL RAILS
0 0.5
SCALE 1:50
1 2m 0 0.05 0.1 0.2 m

SCALE 1:5
B

B
D E F
7790 13 12 12 13 100% Construction
3 07/02/11 CD-CA Documents NAGA
490 4300 3000 80% Construction
2 10/11/10 CD-PS NAGA
Documents
50% Construction
1 06/04/10 CD-PS NAGA
Documents
9
200

0 27/03/10 DD-CA AS PER CONTRACT NAGA


ISSUE ISSUE
OUTLINE OF SOLID FD FD ROOF S.S.L. Rev DATE FOR DESCRIPTION
ROOF S.S.L. By
ALUMINUM HORIZONTAL
RAILS 9600 9600 ISSUE

Project No. 09-27 KSA

TERRACE Project Arch M.Dalyr - N.Salah


F-06
Structural Designer MH
10
D:\lowins revit files\09-27\CONSTRUCTION
DOCUMENTATION\VILLA C\Villa C Central
REVIT File 101014.rvt
6220

50mm. DIA ALUMINUM SCALE AS SHOWN


VC-A-403 HANDRAIL IN POWDER 50mm DIA ALUMINUM
B3 F F H4
COAT FINISH HANDRAIL IN POWDER F F
COAT FINISH Drawn By N.Salah - M.Dalyr
B5 B5
50mm DIA ALUMINUM VC-A-403 VC-A-403 Checked By Butch
HANDRAIL IN POWDER 1100 1100 1100 1100
COAT FINISH 398 1000 1000 1000 1000 MANAGEMENT Dr. Elkady
A

A
TERRACE FLOOR
PRINTING DATE/TIME 2/7/2011 2:53:30 PM
FINISH
1000
1000

WATER FEATURE FIRST FLOOR


F-15
FIRST FLOOR

FD 4800 4800 VC-A-403


ALUMINUM POST ALUMINUM POST

11 SOLID ALUMINUM
HORIZONTAL RAILS SOLID ALUMINUM
SHEET TITLE
HORIZONTAL RAILS

A1 TERRACE
1 : 50
4 0 0.5 1 2m
A3 TERRACE
1 : 50
2 ELEVATION 1 0 0.5 1 2m
A5 TERRACE
1 : 50
3 ELEVATION 1 0 0.5 1 2m RAILING DETAIL
SCALE 1:50 SCALE 1:50 SCALE 1:50

.
1 2 3 4 5 6 7
1 2 3 4 5 6 7

This drawing is the property of:NAGA Architects, Designers, Planners it is not allowed to reproduce this sheet's contents in any form except for the purpose for which it is intended . the consultant has a duplicate electronic file of this drawing . the contractor(s) shall assume full responsibility for any and all alterations and/ or changes on these drawings files including the resulting coordination between the trades involved . the contractor shall check and verify all dimensions and report all discrepancies to the architect and design professional whose seal is affixed to this drawing this drawing shall not be used for construction purposes until issued for construction by the design professional whose seal and signature are affixed to this drawing
I J K L F G H
6100 5060
650 1750 2500 850 350 300 2100 2400 260 B C D E I J L
6 9

200

180
FD 4700 A3
A3
VC-A-408
B C D E C5
VC-A-408

2220
10200 -0.15
VC-A-506
G.F.L
3000 2900 4300 A5
D

D
VC-A-408
6 6

4660
5100

4420
4600
10
10100 STAMPS
LIFT
G-02
7 REFLECTED
POOL 2 REFLECTED CONSULTANT
0.00 G-39 POOL 1
FD

2260
G.F.L G-38
A3 8 WATER
FEATURE 1
VC-A-408
a r chi t e ct s de s i g n e rs planne rs
9
4800

P.O. BOX 73033, DUBAI, UAE


FD 7 0.00 TEL.: +97143324455 FAX: +97143322113
A1
G.F.L A1
10 E-MAIL: mail@naga.ae URL: www.naga.ae
VC-A-408

D5 WATER FEATURE 1 PLAN


VC-A-408

1 : 50
GROUND FLOOR KEY PLAN
A1
VC-A-408

7 D E F
9400

9400

14003
4800
0.00
REFLECTED G.F.L
POOL 1
G-38

12400
C

C
-0.15
G.F.L
4800

FD

19000

18800
B1 8
VC-A-408
REFLECTED FD WATER FEATURE
0.00
-0.15 POOL 2 10 F-15
G.F.L G-39
G.F.L

11 ABDULLAH ABUNAYYAN
19000

A5
VC-A-408
2850 3050 4200
4587 513 VILLA-C
18800

8 PLOT #:

4800
FIRST FLOOR KEY PLAN RIYADH, KSA

FD
A3 ARCHITECTURAL DRAWINGS
VC-A-408
3000

KEY FOR ''ISSUE FOR'' RC REVIEW & COMMENTS


SD SCHEMATIC DESIGN CA CLIENT APPROVAL
DD DESIGN DEVELOPMENT PS PROGRESS SET
CD CONSTRUCTION R FOR RECORD
DOCUMENTS P PRELIMINARY
4800

0.00 M MUNICIPALITY REVIEW


TD TENDER DOCUMENTS
9 G.F.L MEP MEP BACKGROUND
0.00
G.F.L

POWDER ROOM
2400

G-12
B

B
0.00
G.F.L
9400

9 FD
10
100% Construction
3 07/02/11 CD-CA Documents NAGA
80% Construction
2 10/11/10 CD-PS NAGA
Documents
2400

FD
2200

0.00 50% Construction


1 06/04/10 CD-PS NAGA
G.F.L Documents
B1
0 27/03/10 DD-CA AS PER CONTRACT NAGA
VC-A-408
ISSUE ISSUE
Rev DATE FOR DESCRIPTION By
10 0.00 ISSUE
G.F.L
Project No. 09-27 KSA

B4 WATER FEATURE 2 PLAN


2200

Project Arch M.Dalyr - N.Salah


1 : 50
Structural Designer MH

D:\lowins revit files\09-27\CONSTRUCTION


DOCUMENTATION\VILLA C\Villa C Central
REVIT File 101014.rvt

D E SCALE AS SHOWN
A1
VC-A-408 6700 Drawn By N.Salah - M.Dalyr
300 4000 2400 Checked By Butch
300 4300 1200 900

A1 WATER FEATURE 3 PLAN 4.80 MANAGEMENT Dr. Elkady


A

A
1 : 50 F.G.L PRINTING DATE/TIME 2/7/2011 3:00:45 PM
150

A1
VC-A-408
VC-A-407
1600

1600

A1 WATER FEATURE 4.95


2000

VC-A-408 F-15
F.G.L
4.68
FD F.G.L
150
400

SHEET TITLE
11
B3
WATER FEATURE
A4 WATER FEATURE 4 PLAN VC-A-408

1 : 50 0 1 2 4m
SCALE 1:100
ENLARGED PLANS

.
1 2 3 4 5 6 7
1 2 3 4 5 6 7

This drawing is the property of:NAGA Architects, Designers, Planners it is not allowed to reproduce this sheet's contents in any form except for the purpose for which it is intended . the consultant has a duplicate electronic file of this drawing . the contractor(s) shall assume full responsibility for any and all alterations and/ or changes on these drawings files including the resulting coordination between the trades involved . the contractor shall check and verify all dimensions and report all discrepancies to the architect and design professional whose seal is affixed to this drawing this drawing shall not be used for construction purposes until issued for construction by the design professional whose seal and signature are affixed to this drawing
40 50
(MIN.)
50 mm DIA. L
D2 S.S. TUBULAR
HANDRAIL
D2 VC-A-404

VC-A-404
HANDRAIL

15 mm DIA SOLID
S.S. BRACKET
FULLY WELDED
TO HANDRAIL
D

50 mm DIA.

D
WALL ENCLOSE
S.S. TUBULAR
HANDRAIL

900
1:12 SLOPE MAX. S.S. ESCUTHEON
FASTENER/ STAMPS
LEVEL OF WALL FIXING
LANDING

OF SLOPE
HEIGHT
PTD. PLASTER CONSULTANT
FFL CONC. WALL
OR C.M.U.

METALSLEEVE
10 RAMP
G-45
a r chi t e ct s de s i g n e rs planne rs

D1 ACCESS
1 : 20
RAMP ELEVATION
0 0.02 0.04 0.08 D2 HANDRAIL
1:2
BLOW UP DETAIL
0 0.02 0.04 0.08
11
P.O. BOX 73033, DUBAI, UAE
TEL.: +97143324455 FAX: +97143322113
SCALE 1:2
E-MAIL: mail@naga.ae URL: www.naga.ae
SCALE 1:2

GROUND FLOOR KEY PLAN

RAILING

900
1:12 SLOPE
(MAXIMUM)
900
C

C
LANDING
FFL

AS PER
PLAN
FFL LANDING

900 2400 900

ABDULLAH ABUNAYYAN
VILLA-C
C1 ACCESS
1 : 20
RAMP SIDE ELEVATION 2
0 0.2 0.4 0.8m
PLOT #:
SCALE 1:20 RIYADH, KSA

ARCHITECTURAL DRAWINGS
KEY FOR ''ISSUE FOR'' RC REVIEW & COMMENTS
SD SCHEMATIC DESIGN CA CLIENT APPROVAL
DD DESIGN DEVELOPMENT PS PROGRESS SET
RAILING CD CONSTRUCTION R FOR RECORD
DOCUMENTS P PRELIMINARY
TD TENDER DOCUMENTS M MUNICIPALITY REVIEW
MEP MEP BACKGROUND
900

1:12 SLOPE
685

(MAXIMUM)
900
B

B
685

LANDING
FFL
AS PER
PLAN

LANDING FFL

100% Construction
3 07/02/11 CD-CA Documents NAGA
80% Construction
2 10/11/10 CD-PS NAGA
900 2400 900 Documents
RAMP LENGHT HORIZONTAL PROJECTION 50% Construction
1 06/04/10 CD-PS NAGA
Documents
0 27/03/10 DD-CA AS PER CONTRACT NAGA
B1 ACCESS
1 : 20
RAMP SIDE ELEVATION 1
0 0.2 0.4 0.8m Rev DATE
ISSUE
FOR DESCRIPTION
ISSUE
By
SCALE 1:20
ISSUE

50mm DIA STAINLESS STEEL HANDRAIL B1 Project No. 09-27 KSA

VC-A-404
AS PER PLAN Project Arch M.Dalyr - N.Salah

900 2400 900 Structural Designer MH

300 2400 300


D:\lowins revit files\09-27\CONSTRUCTION
15

DOCUMENTATION\VILLA C\Villa C Central


REVIT File 101014.rvt
50

SCALE AS SHOWN

B1 B1 Drawn By N.Salah - M.Dalyr

VC-A-404 VC-A-404 Checked By Butch


1:12 SLOPE MAX.
940

LANDING RAMP UP LANDING MANAGEMENT Dr. Elkady


A

A
C1 C1 PRINTING DATE/TIME 2/7/2011 2:53:36 PM
VC-A-404 VC-A-404
50

VC-A-404
40

B1
WALL ENCLOSE HANDRAIL VC-A-404

SHEET TITLE

A1 ACCESS
1 : 20
RAMP ENLARGED PLAN
0 0.2 0.4 0.8m
SCALE 1:20
ACCESS RAMP DETAIL

.
1 2 3 4 5 6 7
1 2 3 4 5 6 7

This drawing is the property of:NAGA Architects, Designers, Planners it is not allowed to reproduce this sheet's contents in any form except for the purpose for which it is intended . the consultant has a duplicate electronic file of this drawing . the contractor(s) shall assume full responsibility for any and all alterations and/ or changes on these drawings files including the resulting coordination between the trades involved . the contractor shall check and verify all dimensions and report all discrepancies to the architect and design professional whose seal is affixed to this drawing this drawing shall not be used for construction purposes until issued for construction by the design professional whose seal and signature are affixed to this drawing
F H
H
1827
H A1
A1
1827 VC-A-405
VC-A-405
600

600
937

937
10 10 .59
.59
2232.73

2232.73
887.59

1000

1000
2233.98

2233.98
D

B3 VC-A-405 9 B3 VC-A-405

D
7.5
1432

1432
B1 B1 88
VC-A-405 ELEVATOR CAR VC-A-405 ELEVATOR CAR

STAMPS

STAIR -1
CONSULTANT
G-03

9
D1 LIFT
1 : 50
@ GROUND FLOOR PLAN D2 LIFT @ FIRST FLOOR PLAN
1 : 50
a r chi t e ct s de s i g n e rs planne rs

P.O. BOX 73033, DUBAI, UAE


10 TEL.: +97143324455 FAX: +97143322113
0 0.5 1 2m 0 0.5 1 2m E-MAIL: mail@naga.ae URL: www.naga.ae
SCALE 1:50 SCALE 1:50

H FIRST FLOOR KEY PLAN


10
ROOF S.S.L.
9600
ROOF S.S.L.
800

9600

900
350

MACHINE OVER
HOISTWAY

400
TEMPERED SAFETY HOIST CABLES
GLASS
AS PER ELEVATOR GUIDE RAIL TEMPERED SAFETY
GLASS AS PER ELEVATOR

700
SPECIALIST
C

MANUFACTURER'S SPECS

C
ELEVATOR CAR
SUPPORT
STRUCTURE

4800
3650

50mm. DIA. SOLID WOOD ELEVATOR DOOR AS


HAND RAIL PER MANUFACTURER'S

1700
ELEVATOR CAR SPECS

12 mm. THK. LAMINATED


TEMPERED GLASS RAILING
A3
FIRST FLOOR
VC-A-405 ABDULLAH ABUNAYYAN

1100
4800 VILLA-C
FIRST FLOOR
GUIDE RAIL PLOT #:
4800
SUPPORT BRACKET 1200 RIYADH, KSA
@ EACH FLOOR (MIN.)

CEILING LINE
TEMPERED SAFETY
ARCHITECTURAL DRAWINGS
GLASS AS PER ELEVATOR KEY FOR ''ISSUE FOR'' RC REVIEW & COMMENTS
800

MANUFACTURER'S SPECS
SD SCHEMATIC DESIGN CA CLIENT APPROVAL
4800

COUNTERWEIGHT DD DESIGN DEVELOPMENT PS PROGRESS SET


CD CONSTRUCTION R FOR RECORD
ELEVATOR DOOR AS DOCUMENTS P PRELIMINARY
4950

PER MANUFACTURER'S M MUNICIPALITY REVIEW


TD TENDER DOCUMENTS
SPECS MEP MEP BACKGROUND

SERVICE STEEL
2800

LADDER

A3
B

B
VC-A-405
GROUND FLOOR
150

0
GROUND FLOOR
GRADE
150

BUFFER 0
-150
OUTLINE OF 100% Construction
GRADE 3 07/02/11 CD-CA Documents NAGA
ELEVATOR PIT
-150 80% Construction
2 10/11/10 CD-PS NAGA
Documents
50% Construction
1 06/04/10 CD-PS NAGA
Documents

B1 ELEVATOR SECTION 1 B3 ELEVATOR ELEVATION 0 27/03/10 DD-CA AS PER CONTRACT NAGA


1 : 50 1 : 50 ISSUE ISSUE
Rev DATE FOR DESCRIPTION By
0 0.5 1 2m 0 0.5 1 2m
SCALE 1:50 SCALE 1:50 ISSUE

Project No. 09-27 KSA

PART OF LOBBY OUTLINE OF Project Arch M.Dalyr - N.Salah


ELEVATOR CAR
10 FLOOR FINISH AS Structural Designer MH
WALL FINISH AS PER STAINLESS STEEL
5 PER SCHUDLE
SCHUDLE PANEL AS PER
SPECIFICATION METAL ASSEMBLY D:\lowins revit files\09-27\CONSTRUCTION
AS PER MFTR. SPECS DOCUMENTATION\VILLA C\Villa C Central
REVIT File 101014.rvt
TOP OF SUPPORT SILL
JAMB DETAIL

SCALE AS SHOWN
°
.5

ELEVATOR LOBBY
80

320

SIDE SIDE Drawn By N.Salah - M.Dalyr

Checked By Butch

MANAGEMENT Dr. Elkady


A

A
PRINTING DATE/TIME 2/7/2011 2:53:41 PM

STEEL ANGLE AS VC-A-405


PER MFTR. SPECS
PART OF ELEVATOR C.I.P. CONCRETE SLAB
AS PER STRUCTURAL
DRAWING
SHEET TITLE

A1 ELEVATOR
1 : 10
JAMB DETAIL 0 0.1 0.2 0.4 m
A3 ELEVATOR
1 : 10
DOOR SILL DETAIL 0 0.1 0.2 0.4 m ELEVATOR DETAIL
SCALE 1:10 SCALE 1:10

.
1 2 3 4 5 6 7
1 2 3 4 5 6 7

This drawing is the property of:NAGA Architects, Designers, Planners it is not allowed to reproduce this sheet's contents in any form except for the purpose for which it is intended . the consultant has a duplicate electronic file of this drawing . the contractor(s) shall assume full responsibility for any and all alterations and/ or changes on these drawings files including the resulting coordination between the trades involved . the contractor shall check and verify all dimensions and report all discrepancies to the architect and design professional whose seal is affixed to this drawing this drawing shall not be used for construction purposes until issued for construction by the design professional whose seal and signature are affixed to this drawing
STAINLESS STEEL
STAINLESS STEEL 2
ACCESS PANEL/ DOOR D
ACCESS PANEL / DOOR C D
30 x 30 cm CERAMIC 30 x 30 cm CERAMIC WALL TILES
WALL TILES 1
200 700 2100 200 700 3020
GROUND FLOOR
GROUND FLOOR

150
0
0 2
GRADE GRADE WATER TANK
-150 -150

500
500
D

D
WATER LEVEL
WATER LEVEL
STAMPS
NON-TOXIC ELASTOMERIC
WATER PROOFING CONSULTANT

STAINLESS STEEL
LADDER
a r chi t e ct s de s i g n e rs planne rs

4000
P.O. BOX 73033, DUBAI, UAE
STAINLESS STEEL TEL.: +97143324455 FAX: +97143322113
NON -TOXIC ELASTOMERIC LADDER E-MAIL: mail@naga.ae URL: www.naga.ae
WATERPROOFING
GROUND FLOOR KEY PLAN

SLOPE

SUMP PIT
C

C
ONE COAT BITUMINOUS 600

600
ONE COAT BITUMINOUS
VAPOR BARRIER COATING
VAPOR BARRIER COATING
OVER BLINDING CONCRETE
OVER BUILDING CONCRETE
OVER POLYTHENE SHEET
OVER POLYTHENE SHEET
OVER COMPACTED
OVER GRANULAR FILL (TYP.)
GRANULAR FILL (TYP.)

ABDULLAH ABUNAYYAN
C1 WATER
1 : 25
TANK SECTION 1 C4 WATER
1 : 25
TANK SECTION 2
VILLA-C
PLOT #:
RIYADH, KSA

ARCHITECTURAL DRAWINGS
C4 D KEY FOR ''ISSUE FOR'' RC REVIEW & COMMENTS
VC-A-406
SD SCHEMATIC DESIGN CA CLIENT APPROVAL
1395 1685 DD DESIGN DEVELOPMENT PS PROGRESS SET
CD CONSTRUCTION R FOR RECORD
DOCUMENTS P PRELIMINARY
290 3000 290
TD TENDER DOCUMENTS M MUNICIPALITY REVIEW
MEP MEP BACKGROUND
250

70 x 70 cm STAINLESS STEEL
B

ACCESS PANEL / DOOR

B
700

C1 700 C1
VC-A-406 VC-A-406 100% Construction
3 07/02/11 CD-CA Documents NAGA
80% Construction
2 10/11/10 CD-PS NAGA
Documents
50% Construction
1 06/04/10 CD-PS NAGA
Documents
0 27/03/10 DD-CA AS PER CONTRACT NAGA
30 x 30 cm CERAMIC ISSUE ISSUE
Rev DATE FOR DESCRIPTION By
FLOOR TILES
4000

4000

ISSUE

Project No. 09-27 KSA

Project Arch M.Dalyr - N.Salah


PE
SL O

Structural Designer MH

D:\lowins revit files\09-27\CONSTRUCTION


DOCUMENTATION\VILLA C\Villa C Central
REVIT File 101014.rvt

SCALE AS SHOWN

Drawn By N.Salah - M.Dalyr

Checked By Butch

SUMP PIT MANAGEMENT Dr. Elkady


A

A
PRINTING DATE/TIME 2/7/2011 2:53:46 PM
250
428

2
VC-A-406
C4
VC-A-406

SHEET TITLE

A1 WATER
1 : 25
TANK ENLARGED PLAN
0 0.2 0.4 1m
SCALE 1:25
WATER TANK DETAIL

.
1 2 3 4 5 6 7
1 2 3 4 5 6 7

This drawing is the property of:NAGA Architects, Designers, Planners it is not allowed to reproduce this sheet's contents in any form except for the purpose for which it is intended . the consultant has a duplicate electronic file of this drawing . the contractor(s) shall assume full responsibility for any and all alterations and/ or changes on these drawings files including the resulting coordination between the trades involved . the contractor shall check and verify all dimensions and report all discrepancies to the architect and design professional whose seal is affixed to this drawing this drawing shall not be used for construction purposes until issued for construction by the design professional whose seal and signature are affixed to this drawing
D

D
STAMPS
CONSULTANT

a r chi t e ct s de s i g n e rs planne rs

P.O. BOX 73033, DUBAI, UAE


TEL.: +97143324455 FAX: +97143322113
E-MAIL: mail@naga.ae URL: www.naga.ae
C

C
STEEL CHANNEL
STAINLESS STEEL GLASS RAILING WOOD BOARD ON EPOXY PAINT
BRACKET FIXED W/ WELDED ON BRACKET
EXPANSION BOLT
CL SLIDING DOOR
MARBLE FLOOR AS PER SCHEDULE
CERAMIC FINISH CERAMIC
AS PER PLAN STAINLESS STEEL

150
WALL TILES WALL TILES
WATER LEVEL CEMENT MORTAR WATER LEVEL
BRACKET FIXED W/
EXPANSION BOLT
ABDULLAH ABUNAYYAN
MARBLE FLOOR VILLA-C
100

FINISH
20

20

70 50 70 50 PLOT #:
CEMENT MORTAR RIYADH, KSA
200

200
180

180

MEMBRANE MEMBRANE
ARCHITECTURAL DRAWINGS
WATERPROOFING WATERPROOFING KEY FOR ''ISSUE FOR'' RC REVIEW & COMMENTS
FLOOR DRAIN FLOOR DRAIN SD SCHEMATIC DESIGN CA CLIENT APPROVAL
WHERE OCCURS WHERE OCCURS DD DESIGN DEVELOPMENT PS PROGRESS SET
CD CONSTRUCTION R FOR RECORD
DOCUMENTS P PRELIMINARY
ABC COMPACTED ABC COMPACTED M MUNICIPALITY REVIEW
TO 95% TO 95% TD TENDER DOCUMENTS
MEP MEP BACKGROUND
COMPACTED FILL COMPACTED FILL
@ 95% DENSITY @ 95% DENSITY

UNDERWATER UNDERWATER
POOL LIGHT POOL LIGHT
B

B
B1 WF
1 : 10
DETAIL-4 B3 WF
1 : 10
DETAIL-5

100% Construction
3 07/02/11 CD-CA Documents NAGA
80% Construction
2 10/11/10 CD-PS NAGA
Documents
50% Construction
1 06/04/10 CD-PS NAGA
Documents
0 27/03/10 DD-CA AS PER CONTRACT NAGA
ISSUE ISSUE
Rev DATE FOR DESCRIPTION By
EXTERIOR INTERIOR
ISSUE
WALL FINISH AS PER
STAINLESS STEEL SCHEDULE STAINLESS STEEL STAINLESS STEEL
SKIRTING AS PER ID Project No. 09-27 KSA
BRACKET FIXED W/ BRACKET FIXED W/ CURTAIN WALL
EXPANSION BOLT CMU AS PER PLAN PORCELAIN TILE EXPANSION BOLT LOCATION AS PER PLAN
MARBLE FLOOR Project Arch M.Dalyr - N.Salah
CERAMIC FINISH FINISH CERAMIC
WALL TILES CEMENT MORTAR CEMENT MORTAR WALL TILES MARBLE FLOOR
Structural Designer MH

WATER LEVEL 1% SLOPE CERAMIC WALL TILES WATER LEVEL FINISH


D:\lowins revit files\09-27\CONSTRUCTION
2cm GAP CEMENT MORTAR
100

100

DOCUMENTATION\VILLA C\Villa C Central


REVIT File 101014.rvt
WATER LEVEL
20

20

70 50 70 50
SCALE AS SHOWN
100
200

200
180

180

Drawn By N.Salah - M.Dalyr


20
300

Checked By Butch
200

WATER
MEMBRANE FEATURE MEMBRANE MANAGEMENT Dr. Elkady
A

WATERPROOFING WATERPROOFING

A
PRINTING DATE/TIME 2/7/2011 2:53:55 PM
FLOOR DRAIN FLOOR DRAIN
WHERE OCCURS MEMBRANE WHERE OCCURS
WATERPROOFING

ABC COMPACTED ABC COMPACTED


TO 95% TO 95% VC-A-408
COMPACTED FILL ABC COMPACTED COMPACTED FILL
@ 95% DENSITY TO 95% @ 95% DENSITY

UNDERWATER COMPACTED FILL UNDERWATER


POOL LIGHT @ 95% DENSITY POOL LIGHT SHEET TITLE

A1 WF
1 : 10
DETAIL-1 A3 WF
1 : 10
DETAIL-2 A5 WF
1 : 10
DETAIL-3 0 0.1 0.2 0.4 m WATER FEATURE DETAIL
SCALE 1:10

.
1 2 3 4 5 6 7
1 2 3 4 5 6 7

This drawing is the property of:NAGA Architects, Designers, Planners it is not allowed to reproduce this sheet's contents in any form except for the purpose for which it is intended . the consultant has a duplicate electronic file of this drawing . the contractor(s) shall assume full responsibility for any and all alterations and/ or changes on these drawings files including the resulting coordination between the trades involved . the contractor shall check and verify all dimensions and report all discrepancies to the architect and design professional whose seal is affixed to this drawing this drawing shall not be used for construction purposes until issued for construction by the design professional whose seal and signature are affixed to this drawing
TOLERANCE GAP AS PER REQUIRED STEEL PLATE
WELDED TO DOWEL AND
EMBEDDED TO CONCRETE
C E G J
GRC SCREEN PANEL
C BY SPECIALIST
C3
VC-A-409 EXPANSION BOLT 1
1989 749 BLOCKING MATERIAL
STEEL PLATE DOWEL

300
G.R.C SCREEN PANEL
BY SPECIALIST WELDED TO GRC PANEL AND 2
FULLY WELDED TO
D

D
CONTINOUS STEEL ANGLE
BRACKET

100
300 CONTINOUS COMPRESSIVE
FILLER STAMPS
475

50

FINISH FACE OF WALL / BEAM CONSULTANT


SEALANT (COLOR TO
MATCH COLOR OF PANEL)
125

54.4°
10
.7°
125.6° D3 CONNECTION
1:5
DETAIL 1 0 0.05 0.1 0.2 m 0 0.5 1 2m
37 SCALE 1:5 SCALE 1:50 10 a r chi t e ct s de s i g n e rs planne rs

P.O. BOX 73033, DUBAI, UAE


10 11 11 TEL.: +97143324455 FAX: +97143322113
E-MAIL: mail@naga.ae URL: www.naga.ae
154.4°

ROOF S.S.L.
B3 B3 G.R.C SCREEN PANEL
9600
13
VC-A-409 VC-A-409 BY SPECIALIST
REINFORCED CONCRETE REINFORCED CONCRETE WALL ROOF KEY PLAN
AS PER STRUCTURAL 4600

850
25.6°
54.4°

125.6° 600 4200


STRUCTURAL BEAM
4620

87.9
°
154.4°

300
°
4000

92.1

154.4°

STEEL PLATE
DOWEL
D3
C

54.4°

VC-A-409

C
54.4°

87.9
°
37
.7° C3 SHADE
1 : 25
DETAIL SECTION 2
0 0.2 0.4 1m
SCALE 1:25

ROOF S.S.L. ABDULLAH ABUNAYYAN


9600 GRC SCREEN PANEL

F E D C BY SPECIALIST VILLA-C
PLOT #:
RIYADH, KSA
850

C1 SHADE DETAIL 2 STEEL PLATE DOWEL 3000 4300 2900 1989 REINFORCED CONCRETE
1 : 25 D3 AS PER STRUCTURAL
12000
C3
LINE OF STEEL PLATE VC-A-409 T.O.P
8.75
ARCHITECTURAL DRAWINGS
VC-A-409 KEY FOR ''ISSUE FOR'' RC REVIEW & COMMENTS
STRUCTURAL BEAM
SD SCHEMATIC DESIGN CA CLIENT APPROVAL

300
DD DESIGN DEVELOPMENT PS PROGRESS SET
BLOCKING MATERIAL CD CONSTRUCTION R FOR RECORD
DOCUMENTS P PRELIMINARY
STEEL PLATE DOWEL TD TENDER DOCUMENTS M MUNICIPALITY REVIEW
CASTED IN GRC PANEL MEP MEP BACKGROUND
D3 AND FULLY WELDED TO
CONTINOUS STEEL

B3 SHADE DETAIL SECTION 1 VC-A-409


ANGLE BRACKET
0 0.2 0.4 1m
0 0.2 0.4 1m 1 : 20
SCALE 1:25
SCALE 1:25
B

B
B C C3 D E F G H I J
VC-A-409
REINFORCED CONCRETE GRC SCREEN PANEL
7200 BY SPECIALIST
AS PER STRUCTURAL 3000 2900 4300 3000 2400 2400 2400
REINFORCED CONCRETE 100% Construction
200 170 3 07/02/11 CD-CA Documents NAGA
AS PER STRUCTURAL
9 2 10/11/10 CD-PS
80% Construction
NAGA
1 100 Documents
50% Construction
12000 1 06/04/10 CD-PS NAGA
25.6° Documents
3000 3000 3000 3000 ° 0 27/03/10 DD-CA AS PER CONTRACT NAGA
63.3
2400

ISSUE ISSUE

116
154.4° Rev DATE FOR DESCRIPTION By

.7°
154.4°
C1 ISSUE
VC-A-409
Project No. 09-27 KSA

10

54.4°
4700
4600

Project Arch M.Dalyr - N.Salah


125.6°
25.6° °
125.7° Structural Designer MH
92.1

D:\lowins revit files\09-27\CONSTRUCTION


DOCUMENTATION\VILLA C\Villa C Central
REVIT File 101014.rvt
.7°
37
4600

SCALE AS SHOWN
4000

Drawn By N.Salah - M.Dalyr


B3 B3
Checked By Butch
VC-A-409 VC-A-409
153 745 MANAGEMENT Dr. Elkady
A

A
PRINTING DATE/TIME 2/7/2011 2:54:02 PM
1400
2600

2 VC-A-409
A A A A
G.R.C SCREEN PANEL
1200

BY SPECIALIST C3
VC-A-409

A1 SHADE DETAIL 1 SHEET TITLE


1 : 50

0 0.5 1 2m A4 SHADE
1 : 50
DETAIL PLAN @ SERVICE BLOCK 0 0.5 1 2m SHADES DETAIL
SCALE 1:50 SCALE 1:50

.
1 2 3 4 5 6 7
1 2 3 4 5 6 7

This drawing is the property of:NAGA Architects, Designers, Planners it is not allowed to reproduce this sheet's contents in any form except for the purpose for which it is intended . the consultant has a duplicate electronic file of this drawing . the contractor(s) shall assume full responsibility for any and all alterations and/ or changes on these drawings files including the resulting coordination between the trades involved . the contractor shall check and verify all dimensions and report all discrepancies to the architect and design professional whose seal is affixed to this drawing this drawing shall not be used for construction purposes until issued for construction by the design professional whose seal and signature are affixed to this drawing
D

D
STAMPS
CONSULTANT
WALL/MATERIAL NOTES
WALL TYPE TAGS CONSIST OF 2 CATEGORIES OF IDENTIFIERS :
- LETTERS IDENTIFY THE WALL CORE (E.G. A= 100mm C.M.U) a r chi t e ct s de s i g n e rs planne rs
- NUMBERS IDENTIFY FINISHES (E.G. 1= PTD.PLASTER)
(E.G. 1A1 = 100mm C.M.U. PTD. PLASTER ON BOTH SIDES ) P.O. BOX 73033, DUBAI, UAE
-LEFT NUMBER CORRESPONDS TO EXTERIOR FINISH & RIGHT TEL.: +97143324455 FAX: +97143322113
TO INTERIOR FINISH
E-MAIL: mail@naga.ae URL: www.naga.ae
SYMBOL CORE WALL

A 100mm C.M.U.
MEP CONSULTANT
B 150mm C.M.U.
C 200mm C.M.U.
NAME
D 250mm C.M.U.
ADDRESS
E 300mm C.M.U.
H C.I.P. CONC.
I METAL STUD WALL

SYMBOL FINISHES

1 PTD. PLASTER
2 TILE
3
C

STONE

C
4 STUCCO
6 STONE & INSULATION
7 WOOD SIDING & INSULATION
8 ALUM. CLADDING & INSULATION
10 STUCCO & INSULATION

ABDULLAH ABUNAYYAN
VILLA-C
RIYADH, K.S.A.

Key for ''Issue for'' RC Review and Comment


SHEET NOTE:
SD Schematic Design CA Client Approval
DD Design Development PS Progress Set
1. FOR WALL TYPE TAGS,THE NUMBER LEFT OF CORE WALL
CD Construction Documents R For Record
SYMBOL IS EXTERIOR FINISH, WHILE THE NUMBER ON THE RIGHT
IS INTERIOR FINISH. TD Tender Documents P Preliminary
M Municipality review
2. WALL TYPE TAGS CONSIST OF 2 CATEGORIES OF IDENTIFIERS:
- LETTERS IDENTIFY THE WALL CORE (E.G. A=100mm C.M.U.)
- NUMBERS IDENTIFY FINISHES (E.G. 1 = PTD. PLASTER)
(E.G. 1A1 = 100mm C.M.U. PLASTER ON BOTH SIDES)

C.I.P. CONCRETE 3. THIS DRAWING IS TO BE READ IN CONJUNCTION WITH RELEVANT


WALL SEE STRUCT. SPECIFICATION SECTIONS AS FOLLOWS:
DRAWINGS FOR METAL STUD
THICKNESS 030130 - MAINTENANCE OF CAST-IN-PLACE CONCRETE
B

040120 - MAINTENANCE OF UNIT MASONRY

B
SEE PLAN FOR 092400 - PORTLAND CEMENT PLASTERING
SEE PLAN FOR 093000 - TILING
FINISHING CODE FINISHING CODE 099113 - EXTERIOR PAINTING
099123 - INTERIOR PAINTING

A 27/03/10 DD-CA AS PER CONTRACT NAGA

B1 WALL
1:5
CORE H B3 WALL
1:5
CORE J
Rev* DATE ISSUE DESCRIPTION ISSUE
FOR BY

ISSUE

Project No. 09-27 KSA

Project Arch M.Dalyr - N.Salah

Structural Designer MH

D:\lowins revit files\09-27\CONSTRUCTION


DOCUMENTATION\VILLA C\Villa C Central
REVIT File 101014.rvt

SCALE AS SHOWN

150mm THK. C.M.U. 200mm THK. C.M.U. 250mm THK. C.M.U. Drawn By GMBR
100mm THK. C.M.U. 300mm THK.
C.M.U. Checked By JH/FV

SEE PLAN FOR SEE PLAN FOR SEE PLAN FOR MANAGEMENT
A

SEE PLAN FOR SEE PLAN FOR

A
FINISHING CODE FINISHING CODE FINISHING CODE
FINISHING CODE FINISHING CODE PRINTING DATE/TIME 2/7/2011 2:54:04 PM

VC-A-410

0 0.05 0.1 0.2 m


SHEET TITLE

A1 WALL
1:5
CORE A A2 WALL
1:5
CORE B A3 WALL
1:5
CORE C A4 WALL
1:5
CORE D A5 WALL
1:5
CORE E SCALE 1:5

WALL TYPES

.
1 2 3 4 5 6 7
1 2 3 4 5 6 7

This drawing is the property of:NAGA Architects, Designers, Planners it is not allowed to reproduce this sheet's contents in any form except for the purpose for which it is intended . the consultant has a duplicate electronic file of this drawing . the contractor(s) shall assume full responsibility for any and all alterations and/ or changes on these drawings files including the resulting coordination between the trades involved . the contractor shall check and verify all dimensions and report all discrepancies to the architect and design professional whose seal is affixed to this drawing this drawing shall not be used for construction purposes until issued for construction by the design professional whose seal and signature are affixed to this drawing
F H
STORAGE
E F 1 G-30

E F E F
888 3000

888 3000 888 3000 2


202

202

202
D

1 1

D
STAMPS
40
CONSULTANT

40
23
.00

23
.00

40
23
.00
360
5.8
2 363
7. 77 a r chi t e ct s de s i g n e rs planne rs
3573.0
6100

0
P.O. BOX 73033, DUBAI, UAE
TEL.: +97143324455 FAX: +97143322113

6100

6100
E-MAIL: mail@naga.ae URL: www.naga.ae
.26
81

.2 1
16

1817
GROUND FLOOR KEY PLAN

.23
1231.26 2

25
6.09 5.2

13
43
173 1
191
2.5

2
3

8
0 .6
2362.53

204
9
1982.3
2 2
1132

2362
2390.

.5 3
40
1150
C

C
C1 FEATURED
1 : 50
WALL PLAN @ 0mm LEVEL C3 FEATURED
1 : 50
WALL @ 1000mm LEVEL C5 FEATURED
1 : 50
WALL @ 2000mm LEVEL
ABDULLAH ABUNAYYAN
VILLA-C
PLOT #:
RIYADH, KSA

ARCHITECTURAL DRAWINGS
KEY FOR ''ISSUE FOR'' RC REVIEW & COMMENTS
SD SCHEMATIC DESIGN CA CLIENT APPROVAL
DD DESIGN DEVELOPMENT PS PROGRESS SET
E F E F CD CONSTRUCTION R FOR RECORD
DOCUMENTS
E F TD TENDER DOCUMENTS
P PRELIMINARY
M MUNICIPALITY REVIEW
5088 MEP MEP BACKGROUND
888 3000
888 3000 888 3000 1200
200

200

300
1 1 4.80
202

1
B

FD T.O.P

B
402

2681
3.0
0
402

100% Construction
3.

3 07/02/11 CD-CA Documents NAGA


00

3616
369 80% Construction
6.9 2 10/11/10 CD-PS NAGA

.40
366 6 Documents
8.0 50% Construction
8 1 06/04/10 CD-PS NAGA
Documents
3616 0 27/03/10 DD-CA AS PER CONTRACT NAGA
6100

6100
.40
ISSUE ISSUE
6100

5.70 Rev DATE FOR DESCRIPTION By

7432
7500
T.O.P

EP
SLO

1661.54
ISSUE
7 3616.40
0.9

.26
4.88
197

81
T.O.P Project No. 09-27 KSA
.67

16
94

4
18

1654.6 Project Arch M.Dalyr - N.Salah


.48
1530
Structural Designer MH

4519
5.25 D:\lowins revit files\09-27\CONSTRUCTION

.97
T.O.P DOCUMENTATION\VILLA C\Villa C Central

14

231
REVIT File

19
101014.rvt

6.9
6
.69

2164

2 2 SCALE AS SHOWN
2102

2493.44

.75

2
2464.

4.92 Drawn By N.Salah - M.Dalyr


1180

1200
35

T.O.P
Checked By Butch
1169

MANAGEMENT Dr. Elkady


A

A
5.03
T.O.P PRINTING DATE/TIME 2/7/2011 2:54:10 PM

888 3000 1510

VC-A-411..
A3 FEATURED WALL @ 4000mm LEVEL
A1 FEATURED WALL @ 3000mm LEVEL A5 FEATURED WALL ROOF PLAN
1 : 50
1 : 50 1 : 50
SHEET TITLE

0 0.5 1 2m FEATURED WALL 1


SCALE 1:50

.
1 2 3 4 5 6 7
1 2 3 4 5 6 7

This drawing is the property of:NAGA Architects, Designers, Planners it is not allowed to reproduce this sheet's contents in any form except for the purpose for which it is intended . the consultant has a duplicate electronic file of this drawing . the contractor(s) shall assume full responsibility for any and all alterations and/ or changes on these drawings files including the resulting coordination between the trades involved . the contractor shall check and verify all dimensions and report all discrepancies to the architect and design professional whose seal is affixed to this drawing this drawing shall not be used for construction purposes until issued for construction by the design professional whose seal and signature are affixed to this drawing
DOORS GENERAL NOTES TYPES OF FRAMES GRADE 10 WINDOWS GENERAL NOTES HINGE WIDTH GLOSSARY
Fire-rated door frames can be factory or field assembled. All frames Minimum security level; adequate for single family residential 1. Coordinator-a device used on a pair of doors to insure that the
MATERIALS must be adequately anchored at the jambs and floor per the buildings located in stable, comparatively low crime areas. WINDOW FORCED ENTRY DESIGN CRITERIA THICKNESS OF CLEARANCE OPEN WIDTH inactive leaf is permitted to close before the active leaf.
Hollow metal doors are available in various steel gauges according to manufacturers' specifications. DOOR (IN.) REQUIRED (IN.) OF HINGES
where and how they will be used. The following gradings should be GRADE 20 1. EXTERIOR DESIGN ELEMENTS 2. Cylinder (of a lock) -the cylindrical shaped assembly containing
used only as guidelines in selecting doors for a particular project. 1. Wood: head and jamb members, with or without solid transom Low to medium security level; provides security for residential a. The following items should be considered when designing and 1 1/4 3 1/2 the tumbler mechanism and the keyway, which can be actuated
1 3/8
Local codes and governing authorities establish minimum gauges, panel (20 minute maximum rating). buildings located in average crime rate areas or for apartments in selecting windows: 1 3/4 4 only by the correct keys.
D

which should always be consulted. both low and average crime rate areas. - Location: if accessible (residential: 12 ft vertical, 6 ft horizontal; 1 4

D
2. Light gauge metal frame: head and jamb members with or without commercial: 18 ft vertical, 10 ft horizontal and hidden from public 3. Cylinder Lock- a lock in which the locking mechanism is
1 1/2 4 1/2
Grade Gauge transom panel made from aluminum (45 minute maximum rating) or GRADE 30 view, a higher grade is required). controlled by a cylinder.
1 3/4 2 1/2 5
light gauge steel (1 hour maximum rating). frame is installed over Medium to high security level; provides security for residential
Residential 20 Gauge and Lightter finished wall. buildings located in higher than average crime rate areas or for - Protected: if windows are protected by a detection device (such as 3 6 4. Deadbolt (of a lock) - a lock bolt having no spring action or STAMPS
Commercial 16 and 18 Gauge small commercial buildings in average or low crime rate areas. shutters, security screens, or bars), the window grade could be bevel, anti which is operated by a key or a turn piece. door bolt-a
Industrial 12 and 14 Gauge 3. Pressed steel (hollow metal): head and jamb members, with or irrelevant. if security screens, bars, or shutters are used; 1 4 1/2 manually operated rod or bar attached to a door providing means CONSULTANT
High Quality Steel Plate without solid or glazed transoms or sidelights made from 18 gauge GRADE 40 requirements for fire exiting must be met. 2 1 1/2 5 of locking.
or heavier steel (3 hour maximum rating). this frame is required for High security level; provides security for commercial buildings 2 1/2 6
Some manufacturers will custom make moldings and muntins to meet most metal doors. located in medium to high crime rate areas. b. The existence of windbreaks near a building may provide cover 1 5. Door Holder - a device to hold a door open at selected
5
a specific design, as long as there is sufficient quantity involved. For for intruders. 2 1/4 positions. a r chi t e ct s de s i g n e rs planne rs
security, the exterior moldings on exterior doors should be welded 2 6
into the door and all exposed fasteners should be tamperproof. For HARDWARE SLIDING DOOR UNITS a. The use of shades and window coverings may deter intruders, 3/4 5 6. Door Stop - a device to stop the swing or movement of a door P.O. BOX 73033, DUBAI, UAE
fire ratings of hollow metal doors and requirements for fire doors see Door hardware is either provided by the builder or furnished by the Sliding glass doors are a particular concern in securing a building. depending on the ease of removal of these devices or the noise 2 1/2 at a certain point. TEL.: +97143324455 FAX: +97143322113
1 3/4 6
other pages in this series. manufacturer. Generally the door and frame must be prepared to Performance requirements specified in the NILECJ-STD-0318, from breakage. the use of lockable shutters or roll down blinds is E-MAIL: mail@naga.ae URL: www.naga.ae
receive hardware by the manufacturer to insure that the integrity of physical security of sliding glass door units should be complied with. very effective. 3/4 6 7. Electric Strike - an electrical device that permits releasing of the
the fire-rated assembly is maintained. Fire doors are hung on steel 3 2 3/4 8 door from a remote control.
FINISH ball bearing hinges. A fire door must close and latch at the time of a The locking devices should include vertical rod, or lever bolts, at top b. Window units: window units should at least comply with 4 3/4 10
Hollow metal doors should receive at least one shop coat of rust fire. Labeled automatic latches and door closers can be self- and bottom; the frame should be solid or reinforced at the locking ANSI/ASTM F 588-79. standard test methods for resistance of 8. Exit Device-a door locking device which grants instant exit by
inhibitive primer before they are delivered to the job site. In very operated or controlled by failsafe devices that activate in a fire points; the stile must also be reinforced at the lock points. The window assemblies to forced entry for a minimum grade * Note: clearance is computed for door flush with casing. pressing on a crossbar to release the locking bolt or latch.
corrosive atmospheres, such as saltwater beach locations, it is situation. Pairs of doors require coordinators with astragals to operating panels should be designed so that they cannot be lifted performance and with NILnilecj-std-0316, physical security of
advisable to have the doors and frames hot dipped galvanized for ensure both doors close. Gasketing to seal the head and iambs out of their tracks when in the locked position. window units, for higher-grade performance. HINGE HEIGHT 9. Flush Bolt - a door bolt set flush with the face or edge of the
additional protection. Doors are available from several manufacturers; should be provided where smoke control is required. door.
with factory applied paint finishes in various colors. Glazing and other components should be installed from the inside so c. As with a door assembly, the security of a window does not rely
THICKNESS WIDTH OF
that entry cannot be gained by disassembly. As with windows and on the lock alone. HEIGHT OF HINGES 10. Hand (of a lock, etc.) - a term used to indicate the direction of
OF DOOR (IN.) DOOR (IN.)
GENERAL NOTES other doors, a hidden location requires a higher grade. swing or movement, and locking security side of a door.
GLAZING For all wood doors: 2. FRAME DESIGN ELEMENTS
The size and type of glass permitted in fire rated doors is determined a. A rigid frame and sash is important to resist prying and should be Doors 11. Lock Set - a lock, complete with trim, such as knobs,
by local building codes and governing authorities having jurisdiction. 1. Kiln dried wood, moisture content @ 6-12%. removable from the inside only. 3/4 to 1 1/8 To 24 2 1/2 escutcheons, or handles.
The following table should only be used as a guide: Cabinet
C

2. Type I doors: fully waterproof bond ext. and int. b. The quality of the hardware and its placement and anchorage are 12. Mortise - a cavity made to receive a lock or other hardware;

C
7/8 to 1 1/8
Door Rating Glazing Requirements critical to security. Exposed removable hinges should not be used. also the act of making such a cavity.
Screen or To 36 3
3. Type 11 doors: water resistant bond. interior only.
Combination
* A - 3 HR. No Glazing permitted c. Special attention must be given to the use of weather stripping, 13. Mortise Lock (or latch) - a lock designed to be installed in a
4. Tolerances: height, width, thickness, squareness and warp per since this can permit insertion of wires to unlock windows. To 32 3 1/2 - 4 mortise rather than applied to the door's surface. rabbet-the
* B - 1 1/2 HR. 100 sq. in of Glazing per door leaf (nwma) standards and vary with solid vs. built-up construction. 1 3/8 Over 32 abutting edges of a pair of doors or windows, shaped to provide a
4 - 4 1/2
100 sq. in of Glazing per light 3. GLAZING DESIGN ELEMENTS tight fit.
5. Prefit: doors @ 3/i6" less in width and i/s" less in height than a. Multiple glazing systems provide a greater hazard to entry/exit To 36 *4 1/2
* C - 3/4 HR. Max. dim per light = 54 in. nominal size, +/- 1/32" tolerance, with vertical edges eased. through broken-out windows. 1 3/4 Over 36 To 48 *5 14. Reversible Lock - a lock which, by reversing the latch bolt,
Min. dim per light = 3 in. Over 36 To 48 *6 may be used by any hand. on certain types of locks, other parts
6. Premachining: doors mortised for locks and cut out for hinges b. Reflective glazing impedes outside daytime surveillance. must also be changed. ABDULLAH ABUNAYYAN
* D - 1 1/2 HR. No Glazing Permitted when so specified. 2, 2 1/4 To 42 5 Heavy
and 2 1/2 Over 42 6 Weight 15. Rose - a trim plate attached to the door under the knob. it
VILLA-C
* E - 3/4 HR. 720 sq. in of Glazing per light 7. PREMIUM: for transparent finish. GOOD/CUSTOM: for paint or MATERIALS AND METHODS FOR WINDOWS Transoms sometimes acts as a knob bearing. PLOT #:
Max. dim. per light = 54 in. transparent finish. SOUND: for paint, with 2 coats completely 1. GRADE 40: very heavy fixed frames with laminated glass over 1/4 RIYADH, KSA
covering defects. in. thick or security screen, bars, or shutters with special locking 1 1/4 & 1 3/4 3 16. Shank (of a Knob) - the projecting stem of knob into which the
Note: available on composite doors only. A, B, and D doors are device. 1 3/4 3 1/2 spindle is fastened.
available with heat transmission ratings of 250f or 650f, or are not 2, 2 1/4 & 2 1/2 4
rated. FLUSH WOOD DOORS CORE MATERIAL 2. GRADE 30: heavy-duty sash with laminated glass over 1/4 in. 17. Spindle (of a Knob)-the bar or tube connected with the knob or ARCHITECTURAL DRAWINGS
thick or polycarbonate glazing 1/4 in. thick. Lock should include at * Note: heavy weight hinges should be specified for heavy lever handle that passes through the hub of the lock or otherwise KEY FOR ''ISSUE FOR'' RC REVIEW & COMMENTS
1. SOLID CORES: least two heavy-duty dead locking bolts. doors and for doors where high frequency is expected. engages the mechanism to transmit the knob action to the bolt(s). SD SCHEMATIC DESIGN CA CLIENT APPROVAL
TYPES OF OPENINGS Wood block, single specie, @ 2'/2 " max. width, surfaced two sides, The heavy weight hinges should be of 4 1/2 in., 5 in. and 6 DD DESIGN DEVELOPMENT PS PROGRESS SET
1. Class A (3-hour doors): openings in firewalls and in walls that without spaces or defects impairing strength or visible thru HDWD. 3. GRADE 20: heavy duty sash with laminated glass or in. sizes as shown in table. 18. Stop (of a Lock)-the button, or other small device, which CD CONSTRUCTION R FOR RECORD
divide a single building into fire areas. veneer facing. polycarbonate glazing; if wood, sash must be rein- forced or heavy; serves to lock the latch bolt against the outside knob or thumb DOCUMENTS P PRELIMINARY
double locks required. piece or unlock it if locked. Another type holds the bolt retracted. TD TENDER DOCUMENTS M MUNICIPALITY REVIEW
HINGE TYPE MEP MEP BACKGROUND
2. Class B (1 - or i 1/2-hour doors): openings in enclosures of vertical 2. HOLLOW CORES:
communications through buildings and in 2-hour rated partitions Wood, wood derivative, or class a insulation board. 4. GRADE 10: Regular glazing in commercial sashes with double TYPE OF BUILDING ESTIMATED FREQUENCY HINGE TYPE 19. Strike-a metal plate or box, which is pierced or recessed, to
providing horizontal fire separations. locks; can be wood frame. & DOOR DAILY YEARLY receive the bolt or latch when projected. Sometimes called
3. TYPES OF WOOD FACES: "keeper."
3. Class C (3/4-hour door): openings in walls or partitions between Standard thickness face veneers @ 'IIC "-'/32", bonded to High Frequency
rooms and corridors having a fire resistance rating of 1 hour or less. hardwood, crossband @ 1/10" - 1/16". Most economical and widely SUGGESTED MATERIALS AND METHODS 20. Three-point lock- a device sometimes required on three- hour
B

Large Department

B
used, inhibits checking, difficult to refinish or repair face damage, for FOR DOORS Store Entrance 5000 1,500,000 fire doors to lock the active leaf of a pair of doors at three points.
4. Class D (1 1/2-hour door): openings in exterior walls subject to use on all cores. 1/8" sawn veneers, bonded to crossband, easily 1. GRADE 40: hollow metal steel doors, 16gauge.
severe fire exposure from outside of the building. refinished and repaired. Large Office
For use on staved block and stile and rail solid cores. '/4" sawn 2. GRADE 30: hollow metal, 18 gauge; flush wood. lumber core, Building Entrance 4000 1,200,000 NOTES
5. Class E (3/4-hour door): openings in exterior walls subject to veneers - same as 1/8" but without crossband on stile and rail solid 1in. thick. School Entrance 1250 225,000 Heavy 1. Face the outside of the door to determine its hand. The outside
moderate or light fire exposure from out- side of the building. cores with horizontal blocks. Decorative grooves can be cut into Weight of the door is the "key side" or that side, which would be secured, 100% Construction
School Toilet Door 1250 225,000 3 07/02/11 CD-CA Documents NAGA
faces. 3.GRADE 20: Flush wood, particle core; 1¾ in. thick, lock block of should a lock be used. This would usually be the exterior of an
1/2- and 1/3-hour doors are used for smoke control in corridor walls. dense solid wood at least 6 in. wide x 24 in. high. hinge blocks, 6 in. Store or Bank entrance or the corridor side of an office door. 2 10/11/10 CD-PS
80% Construction
NAGA
Entrance 500 150,000 Documents
wide x 12 in. high.
50% Construction
GRADE SELECTION FACTORS 2. Residential sliding door dimensions shown are nominal stock 1 06/04/10 CD-PS
Documents
NAGA
The following items should be considered when designing and Office Building
TYPES OF DOORS 4. GRADE 10: Flush wood, particle core, 1in. thick; wood panel door 400 118,000 sizes. Custom sizes are available in accordance with individual
Typical construction for swinging fire doors: selecting components for an entrance door: with minimum thickness of panel at ½in. including rebate, stiles Toilet Door manufacturing limitations and availability of glass sizes. 0 27/03/10 DD-CA AS PER CONTRACT NAGA
minimum dimension 1 x 6 in. Average Frequency ISSUE ISSUE
Rev DATE FOR DESCRIPTION By
1. Composite: fire doors consist of wood, steel, or plastic sheets 1. Location: if the doorway is hidden from public view, or if security 3. Details shown are for wood frame construction. Interior and
bonded to and supported by a solid core material. lighting is not provided, a higher grade is required than that normally FRAME School Corridor exterior finishes and trim are optional. See manufacturer's data for
80 15,000 Standard Weitgh ISSUE
used in the area. The stiffness of the bucks is critical; wood should be minimum of 2 Door typical installation.
2. Hollow metal fire doors are of flush or panel de- sign with not less in. thick and have solid secure shims for 24 in. At the locking point Office Building Project No. 09-27 KSA
than 20 gauge steel face. 2. Access: if entry is controlled by a guard or protected by a and 12 in. At each hinge point; stops should be of milled integral 75 22,000 AntifrictionBearing 4. Tempered glass should always be used to reduce the chance of
Corridor Door
Project Arch M.Dalyr - N.Salah
detection device, a lower grade should be adequate. with the buck; wood bucks for grade 20 should be of hard wood Store Toilet Door breakage and to avoid dangerous glass shards if breakage occurs.
60 18,000 (Except on
3. Metal clad fire doors are of flush or panel design consisting of premium grade; grade 20 bucks should be 16 gauge steel; grade 40
Dwelling Entrance 40 15,000 Heavy Doors) Structural Designer MH
metal covered wood cores or stiles and rails and insulated panels 3. Use: if the doorway provides access to particularly valuable or should be 15 gauge steel; all steel bucks should be grouted full. 5. Screens are available for all doors. Details show screens on the
covered with steel of 24 gauge or lighter. desirable property, a higher grade is required. Low Frequency exterior for both the metal and wood doors. Consult individual D:\lowins revit files\09-27\CONSTRUCTION
Plain Bearing manufacturer's literature to determine if screens are interior only, DOCUMENTATION\VILLA C\Villa C Central
Dwelling Toilet Door 25 9,000 REVIT File 101014.rvt
4. Sheet metal fire doors are formed of 22 gauge or lighter steel and 4. Type: in a double door, each door should be tested. if the door Hinges exterior only, or available either way.
are corrugated, flush sheet, or panel design. has solid or glazed panels make sure they meet the test SCALE AS SHOWN
requirements; mail slots are not recommended in the door. Dwelling Corridor Door 10 3,600 May be Used 6. Energy conservation is enhanced through the use of structural
5. Tinclad fire doors consist of a wood core with a terne plate or On Light thermal breaks in aluminum sliding doors along with windproof Drawn By N.Salah - M.Dalyr
galvanized steel facing (#30 or #24 gauge). Dwelling Closet Door 6 2,200 Corridors mounting fins and double-glazing. Standard aluminum sliding doors
Checked By Butch
are also available.
6. Wood core-type doors consist of wood, hardboard, or plastic face MANAGEMENT Dr. Elkady
A

A
sheets bonded to a wood block or wood particleboard core material 7. See manufacturer's data for special sizes, lorking devices, PRINTING DATE/TIME 2/7/2011 2:54:11 PM
with untreated wood edges. finishes, and specific limitations.

VC-A-501

SHEET TITLE

DOORS & WINDOWS


GENERAL NOTES

.
1 2 3 4 5 6 7
1 2 3 4 5 6 7

This drawing is the property of:NAGA Architects, Designers, Planners it is not allowed to reproduce this sheet's contents in any form except for the purpose for which it is intended . the consultant has a duplicate electronic file of this drawing . the contractor(s) shall assume full responsibility for any and all alterations and/ or changes on these drawings files including the resulting coordination between the trades involved . the contractor shall check and verify all dimensions and report all discrepancies to the architect and design professional whose seal is affixed to this drawing this drawing shall not be used for construction purposes until issued for construction by the design professional whose seal and signature are affixed to this drawing
DIVISION 08 DOOR SCHEDULE DIVISION 08 DOOR SCHEDULE
Dimensions From Dimensions From
Room: Room:
Door Type Width (cm) Height (cm) Door Material Frame Material Hardware Number From Room: Name Comments Door Type Width (cm) Height (cm) Door Material Frame Material Hardware Number From Room: Name Comments

GROUND FLOOR P2 900 3600 Wood Wood G-36 KITCHEN CORRIDOR


A1 1100 3000 Wood Wood G-30 STORAGE P3 1100 3600 Wood Wood G-36 KITCHEN CORRIDOR
A2 700 3000 Wood Wood G-21 STAIR 2 P3 1100 3600 Wood Wood G-14 DINING
A3 900 2700 Wood Wood G-34 MECHANICAL ROOM P4 1700 3600 Wood Wood G-03 STAIR -1
D

D
A3 900 2700 Wood Wood G-33 STORAGE Q1 798 3000 Aluminum & Glass Aluminum G-36 KITCHEN CORRIDOR
A3 900 2700 Wood Wood G-32 GARBAGE ROOM Q1 798 3000 Aluminum & Glass Aluminum G-19 PREPARATION
B2 800 3000 Glass Aluminum G-06 NURSE BATHROOM R1 898 3000 Wood Wood G-27 MAID ROOM 1
STAMPS
B2 800 3000 Glass Aluminum G-06 NURSE BATHROOM R1 898 3000 Wood Wood G-35 MAID'S CORRIDOR
C1 750 3000 Wood Wood G-05 NURSES LAUNDRY R1 898 3000 Wood Wood G-22 LOBBY CONSULTANT
C2 2400 3600 Wood Wood G-09 NURSE STATION R2 698 3000 Wood Wood G-25 MAID ROOM 2
G1 2500 3600 Glass Aluminum G-10 MASTER BEDROOM R2 698 3000 Wood Wood G-28 TOILET 2
G2 2000 3600 Aluminum & Glass Aluminum G-10 MASTER BEDROOM R2 698 3000 Wood Wood G-23 MAID'S LAUNDRY a r chi t e ct s de s i g n e rs planne rs
H1 1600 3000 Glass Aluminum G-02 LIFT R3 624 3000 Wood Wood G-29 MAID'S LIVING
P.O. BOX 73033, DUBAI, UAE
J1 1175 3500 Glass Aluminum G-40 LOBBY R3 624 3000 Wood Wood G-35 MAID'S CORRIDOR TEL.: +97143324455 FAX: +97143322113
J1 1450 3500 Glass Aluminum G-36 KITCHEN CORRIDOR E-MAIL: mail@naga.ae URL: www.naga.ae
J1 1450 3500 Glass Aluminum G-36 KITCHEN CORRIDOR FIRST FLOOR
J1 2391 3518 Glass Aluminum G-14 DINING A3 900 2700 Wood Wood F-14 MECHANICAL ROOM
J1 2391 3518 Glass Aluminum G-14 DINING B1 800 2700 Glass Aluminum F-08 BATHROOM 1
L1 1500 3600 Glass Aluminum G-10 MASTER BEDROOM B1 800 2700 Aluminum & Glass Aluminum F-12 BATHROOM 2
L1 1500 3600 Glass Aluminum G-11 MASTER BATHROOM G1 2500 3600 Aluminum & Glass Aluminum F-15 WATER FEATURE
L2 1000 3600 Glass Aluminum G-16 FRY KITCHEN G2 2000 3600 Aluminum & Glass Aluminum F-01 CORRIDOR
P1 1000 3600 Wood Wood G-07 NURSES BEDROOM H2 1600 3600 Aluminum & Glass Aluminum F-16 LIFT
P1 1000 3600 Wood Wood G-04 LOBBY H3 4000 3600 Aluminum & Glass Aluminum F-13 BEDROOM 2
P1 1000 3600 Wood Wood G-17 LOBBY H4 4400 3600 Aluminum & Glass Aluminum F-09 BEDROOM 1
P1 1000 3600 Wood Wood G-12 POWDER ROOM H5 1750 3550 Glass Aluminum G-01 FOYER
P1 1000 3600 Wood Wood G-07 NURSES BEDROOM L3 1200 3600 Wood Wood F-01 CORRIDOR
P1 1000 3600 Wood Wood G-15 KITCHEN P1 1000 3600 Wood Wood F-05 LIVING
C

C
P1 1000 3600 Wood Wood G-10 MASTER BEDROOM P1 1000 3600 Wood Wood F-11 DRESSER 2
P2 900 3600 Wood Wood G-09 NURSE STATION P2 900 3600 Wood Wood F-08 BATHROOM 1
P2 900 3600 Wood Wood F-11 DRESSER 2 w/ Transom

ABDULLAH ABUNAYYAN
VILLA-C
AS PER SCHEDULE PLOT #:
AS PER SCHEDULE AS PER SCHEDULE AS PER SCHEDULE
EQ. EQ. AS PER SCHEDULE AS PER SCHEDULE RIYADH, KSA

ARCHITECTURAL DRAWINGS
KEY FOR ''ISSUE FOR'' RC REVIEW & COMMENTS
SD SCHEMATIC DESIGN CA CLIENT APPROVAL

AS PER SCHEDULE
AS PER SCHEDULE

AS PER SCHEDULE

AS PER SCHEDULE

AS PER SCHEDULE

AS PER SCHEDULE
DD DESIGN DEVELOPMENT PS PROGRESS SET
CD CONSTRUCTION R FOR RECORD
F F DOCUMENTS P PRELIMINARY
TD TENDER DOCUMENTS M MUNICIPALITY REVIEW
MEP MEP BACKGROUND
B

B
FFL FFL FFL FFL FFL FFL
SINGLE PANEL DOOR SINGLE GLASS DOOR SLIDING GLASS DOOR DOUBLE SLIDING GLASS DOOR CURTAIN WALL PANEL SLIDING DOOR SINGLE POCKET DOOR

DOOR TYPE "A" DOOR TYPE "C" DOOR TYPE "G" DOOR TYPE "H" DOOR TYPE "J" DOOR TYPE "L"

100% Construction
3 07/02/11 CD-CA Documents NAGA
80% Construction
2 10/11/10 CD-PS NAGA
Documents
AS PER SCHEDULE AS PER SCHEDULE AS PER SCHEDULE 50% Construction
1 06/04/10 CD-PS NAGA
Documents
0 27/03/10 DD-CA AS PER CONTRACT NAGA
ISSUE ISSUE
600

600

F F Rev DATE FOR DESCRIPTION By

ISSUE

Project No. 09-27 KSA


AS PER SCHEDULE

Project Arch M.Dalyr - N.Salah


AS PER SCHEDULE

AS PER SCHEDULE

Structural Designer MH

D:\lowins revit files\09-27\CONSTRUCTION


DOCUMENTATION\VILLA C\Villa C Central
REVIT File 101014.rvt

SCALE AS SHOWN

Drawn By N.Salah - M.Dalyr

Checked By Butch
PIVOT DOOR SINGLE ALUMINUM GLASS DOOR W/ TRANSOM SINGLE PANEL DOOR W/ TRANSOM
MANAGEMENT Dr. Elkady
A

DOOR TYPE "P" DOOR TYPE "Q" DOOR TYPE "R"

A
PRINTING DATE/TIME 2/7/2011 2:54:14 PM

VC-A-502

SHEET TITLE

DOOR SCHEDULE &


ELEVATIONS

.
1 2 3 4 5 6 7
1 2 3 4 5 6 7

This drawing is the property of:NAGA Architects, Designers, Planners it is not allowed to reproduce this sheet's contents in any form except for the purpose for which it is intended . the consultant has a duplicate electronic file of this drawing . the contractor(s) shall assume full responsibility for any and all alterations and/ or changes on these drawings files including the resulting coordination between the trades involved . the contractor shall check and verify all dimensions and report all discrepancies to the architect and design professional whose seal is affixed to this drawing this drawing shall not be used for construction purposes until issued for construction by the design professional whose seal and signature are affixed to this drawing
DIVISION 08 WINDOW SCHEDULE
DIMENSIONS From
Window Width Height Head Room:
Type (mm) (mm) Height Sill Height Number From Room: Name Comments

GROUND FLOOR
01 4300 3600 3600 0 G-10 MASTER BEDROOM
02 6200 3600 3600 0 G-10 MASTER BEDROOM
D

03 600 1500 2500 1000 G-06 NURSE BATHROOM

D
03 600 1500 2500 1000 G-08 NURSE PANTRY
04 2100 3600 3600 0 G-07 NURSES BEDROOM
05 1000 3600 3600 0 G-16 FRY KITCHEN STAMPS
05 1000 3600 3600 0 G-36 KITCHEN CORRIDOR
CONSULTANT
06 2700 600 1500 900 G-27 MAID ROOM 1
06 2700 600 1500 900 G-25 MAID ROOM 2
07 1350 3600 3600 0 G-29 MAID'S LIVING
a r chi t e ct s de s i g n e rs planne rs
08 600 600 900 300 G-29 MAID'S LIVING
08 600 600 900 300 G-29 MAID'S LIVING P.O. BOX 73033, DUBAI, UAE
08 600 600 900 300 G-29 MAID'S LIVING TEL.: +97143324455 FAX: +97143322113
E-MAIL: mail@naga.ae URL: www.naga.ae
08 600 600 1800 1200 G-29 MAID'S LIVING
08 600 600 1800 1200 G-29 MAID'S LIVING
08 600 600 1800 1200 G-29 MAID'S LIVING
08 600 600 2700 2100 G-29 MAID'S LIVING
08 600 600 2700 2100 G-29 MAID'S LIVING
08 600 600 2700 2100 G-29 MAID'S LIVING
09 2100 600 1600 1000 G-36 KITCHEN CORRIDOR
13 1000 3000 3000 0 G-40 LOBBY

FIRST FLOOR
01 4300 3600 3600 0 F-15 WATER FEATURE
10 800 3600 3600 -0 F-12 BATHROOM 2
C

10 800 3600 3600 0 F-08 BATHROOM 1

C
10 800 3600 3600 0 F-08 BATHROOM 1
10 800 3600 3600 0 F-13 BEDROOM 2
10 800 3600 3600 0 F-02 TERRACE
11 2150 3600 3600 0 F-13 BEDROOM 2
14 1500 3600 3600 0 F-04 TERRACE

ABDULLAH ABUNAYYAN
VILLA-C
PLOT #:
RIYADH, KSA

4300 6200
1000
ARCHITECTURAL DRAWINGS
4 EQUAL PARTS 4 EQUAL PARTS 2100
KEY FOR ''ISSUE FOR'' RC REVIEW & COMMENTS
SD SCHEMATIC DESIGN CA CLIENT APPROVAL
DD DESIGN DEVELOPMENT PS PROGRESS SET
CD CONSTRUCTION R FOR RECORD
DOCUMENTS P PRELIMINARY
TD TENDER DOCUMENTS M MUNICIPALITY REVIEW
MEP MEP BACKGROUND
2700
3600

3600

3600

3600

600
1500

F
B

B
1500
1000

FFL FFL FFL FFL FFL FFL


100% Construction
3 07/02/11 CD-CA Documents NAGA
01 02 03 04 05
06 80% Construction
GW GW GW GW GW 2 10/11/10 CD-PS NAGA
Documents
GW
50% Construction
1 06/04/10 CD-PS NAGA
2150 Documents
0 27/03/10 DD-CA AS PER CONTRACT NAGA
ISSUE ISSUE
730

Rev DATE FOR DESCRIPTION By


800 1500
1350 2150 ISSUE

1000 Project No. 09-27 KSA


1750
Project Arch M.Dalyr - N.Salah

Structural Designer MH
600

600 2100
F F
D:\lowins revit files\09-27\CONSTRUCTION
F DOCUMENTATION\VILLA C\Villa C Central
3600

3600

REVIT File
3600

3600
600

600

101014.rvt
F F
F
3000

SCALE AS SHOWN
(verify on plan)

Drawn By N.Salah - M.Dalyr


VARIES

1500

Checked By Butch

MANAGEMENT Dr. Elkady


A

A
FFL FFL FFL FFL FFL FFL FFL PRINTING DATE/TIME 2/7/2011 2:54:19 PM

07 08 09 10 11 12 13 14
GW GW GW GW GW GW GW GW
VC-A-503

SHEET TITLE

WINDOW SCHEDULE &


ELEVATIONS

.
1 2 3 4 5 6 7
1 2 3 4 5 6 7

This drawing is the property of:NAGA Architects, Designers, Planners it is not allowed to reproduce this sheet's contents in any form except for the purpose for which it is intended . the consultant has a duplicate electronic file of this drawing . the contractor(s) shall assume full responsibility for any and all alterations and/ or changes on these drawings files including the resulting coordination between the trades involved . the contractor shall check and verify all dimensions and report all discrepancies to the architect and design professional whose seal is affixed to this drawing this drawing shall not be used for construction purposes until issued for construction by the design professional whose seal and signature are affixed to this drawing
CURTAIN WALL SCHEDULE
Type Mark Width Height Room no. Room Name Comments

CW01 1800 4800 F-01 CORRIDOR


CW02 4800 3600 F-03 LOBBY 7100mm.
CW03 2080 3600 F-01 CORRIDOR
CW04 4120 8400 G-01 FOYER
CW05 7100 2700 F-01 CORRIDOR
DOUBLE GLAZED FIXED
CW06 14000 3600 G-14 DINING WINDOW ON POWDER
CW07 14000 3600 G-13 LIVING ROOM COATED ALUMINUM
D

D
CW08 3900 3600 G-40 LOBBY FRAMES

2700
CW09 1400 3600 G-31 ELECTRICAL ROOM F

CW10 1600 8450 G-03 STAIR


CW11 4400 3600 G-09 NURSE STATION 4120mm. STAMPS
CW12 6600 3600 G-36 KITCHEN CORRIDOR CONSULTANT
4800 2000

1800

900
a r chi t e ct s de s i g n e rs planne rs
FIRST FLOOR
DOUBLE GLAZED P.O. BOX 73033, DUBAI, UAE
FIXED WINDOW ON 4800
POWDER COATED
TEL.: +97143324455 FAX: +97143322113

3600
ALUMINUM FRAMES F F E-MAIL: mail@naga.ae URL: www.naga.ae
F DOUBLE GLAZED FIXED

F F F F
WINDOW ON POWDER
COATED ALUMINUM
FRAMES
CW05
3600
3600

1400
3900
DOUBLE GLAZED
FIXED WINDOW ON FIRST FLOOR
POWDER COATED DOUBLE GLAZED
F ALUMINUM FRAMES 4800 FIXED WINDOW ON DOUBLE GLAZED
POWDER COATED 2650 1250 FIXED WINDOW ON
F F

1200
ALUMINUM FRAMES POWDER COATED
FIRST FLOOR ALUMINUM FRAMES
FIRST FLOOR 4800
4800

3700
F
CW02 F

3600
F
1200
C

STORE FRONT DOUBLE

C
2080mm. DOOR

3600
H5 F
POCKET DOOR
GROUND FLOOR GROUND FLOOR
0 0

ABDULLAH ABUNAYYAN
3600

F
DOUBLE GLAZED FIXED
CW08 CW09
3600

WINDOW ON POWDER
COATED ALUMINUM GROUND FLOOR VILLA-C
FRAMES
0 PLOT #:
RIYADH, KSA

GROUND FLOOR
0
FIRST FLOOR 4400mm. ARCHITECTURAL DRAWINGS
4800
CW04 KEY FOR ''ISSUE FOR'' RC REVIEW & COMMENTS

CW01 SD SCHEMATIC DESIGN


DD DESIGN DEVELOPMENT
CA CLIENT APPROVAL
PS PROGRESS SET
CW03 DOUBLE GLAZED
FIXED WINDOW ON
F F F F
CD CONSTRUCTION
DOCUMENTS
R FOR RECORD
P PRELIMINARY
TD TENDER DOCUMENTS M MUNICIPALITY REVIEW
POWDER COATED MEP MEP BACKGROUND
14000mm. ALUMINUM FRAMES

3600
995 1200 1200 1205 4800 1200 1200 1200 935
F F F F
1600
B

B
DOUBLE GLAZED F F F F F F F F
FIXED WINDOW ON
POWDER COATED
ALUMINUM FRAMES
GROUND FLOOR
DOUBLE GLAZED 0
FIXED WINDOW ON 100% Construction
3600

F F F F J1 J1 3 07/02/11 CD-CA Documents NAGA


F F F F POWDER COATED
ALUMINUM FRAMES F 80% Construction

3650
2 10/11/10 CD-PS NAGA
CW11 1 06/04/10 CD-PS
Documents
50% Construction
Documents
NAGA

0 27/03/10 DD-CA AS PER CONTRACT NAGA


ISSUE ISSUE
GROUND FLOOR Rev DATE FOR DESCRIPTION By
0
FIRST FLOOR ISSUE

CW06 4800
6600
Project No. 09-27 KSA
8450

F Project Arch M.Dalyr - N.Salah


1800

14000mm. Structural Designer MH

1000 1200 1200 1200 1200 1200 1200 1200 1205 1200 1200 998 DOUBLE GLAZED
FIXED WINDOW ON D:\lowins revit files\09-27\CONSTRUCTION
POWDER COATED 1800 3000 1800 DOCUMENTATION\VILLA C\Villa C Central
REVIT File 101014.rvt
ALUMINUM FRAMES
DOUBLE GLAZED F F F F F F F F F F F F SCALE AS SHOWN
FIXED WINDOW ON
POWDER COATED Drawn By N.Salah - M.Dalyr
ALUMINUM FRAMES

3600
F F
Checked By Butch

F MANAGEMENT Dr. Elkady


3000
A

3600

3600

A
PRINTING DATE/TIME 2/7/2011 2:54:27 PM

F F F F F F F F F F F F

GROUND FLOOR
GROUND FLOOR VC-A-504
0
GROUND FLOOR 0
0
SHEET TITLE

CW10 CW12
CW07 CURTAIN WALL SCHEDULE
& ELEVATIONS

.
1 2 3 4 5 6 7
1 2 3 4 5 6 7

This drawing is the property of:NAGA Architects, Designers, Planners it is not allowed to reproduce this sheet's contents in any form except for the purpose for which it is intended . the consultant has a duplicate electronic file of this drawing . the contractor(s) shall assume full responsibility for any and all alterations and/ or changes on these drawings files including the resulting coordination between the trades involved . the contractor shall check and verify all dimensions and report all discrepancies to the architect and design professional whose seal is affixed to this drawing this drawing shall not be used for construction purposes until issued for construction by the design professional whose seal and signature are affixed to this drawing
SCHEDULE OF INTERIOR FINISHES SCHEDULE OF INTERIOR FINISHES
Wall Finish Wall Finish
Room No. Room Name Floor Finish Skirting Finish N E S W Ceiling Finish Room No. Room Name Floor Finish Skirting Finish N E S W Ceiling Finish
GROUND FLOOR G-31 ELECTRICAL ROOM CERAMIC TILES CERAMIC TILES PAINT PAINT PAINT PAINT 60 X 60 CEILING
G-01 FOYER MARBLE MARBLE GYPSUM BOARD 60x60cm
G-02 LIFT G-32 GARBAGE ROOM EPOXY PAINT PAINT PAINT PAINT PAINT
G-03 STAIR -1 MARBLE MARBLE GYPSUM BOARD G-33 STORAGE EPOXY PAINT PAINT PAINT PAINT PAINT
G-04 LOBBY PORCELAIN TILES STAINLESS STEEL STONE PAINT STONE GYPSUM BOARD G-34 MECHANICAL ROOM EPOXY PAINT PAINT PAINT PAINT PAINT
60x60cm G-35 MAID'S CORRIDOR CERAMIC TILES CERAMIC TILES PAINT PAINT PAINT PORCELAIN TILES GYPSUM BOARD
G-05 NURSES LAUNDRY CERAMIC TILES CERAMIC TILES 60x CERAMIC TILES CERAMIC TILES 60 x CERAMIC TILES 60 x GYPSUM BOARD 60x60cm 45x45cm
60x60cm 60cm 60x60cm 60cm 60cm G-36 KITCHEN CORRIDOR PORCELAIN TILES STONE PAINT STONE PAINT GYPSUM BOARD
D

D
G-06 NURSE BATHROOM PORCELAIN TILES PORCELAIN TILES PORCELAIN PORCELAIN TILES PORCELAIN TILES GYPSUM BOARD 60x60cm
60x60cm 60x60cm TILES 60x60cm 60x60cm 60x60cm G-37 COVERED TERRACE PORCELAIN TILES STONE CURTAIN WALL STONE GYPSUM BOARD
G-07 NURSES BEDROOM PORCELAIN TILES STAINLESS STEEL PAINT PAINT PAINT PAINT GYPSUM BOARD 60x60cm
60x60cm G-38 REFLECTED POOL 1 CERAMIC TILES 30 CERAMIC TILES 30 x CERAMIC TILES CERAMIC TILES 30 x CERAMIC TILES 30 x STAMPS
G-08 NURSE PANTRY PORCELAIN TILES PORCELAIN TILES PORCELAIN PORCELAIN TILES PORCELAIN TILES GYPSUM BOARD x 30 cm 30cm 30 x 30cm 300cm 30cm
60x60cm 60x60cm TILES 60x60cm 60x60cm 60x60cm G-39 REFLECTED POOL 2 CERAMIC TILES 30 CERAMIC TILES 30 x CERAMIC TILES CERAMIC TILES 30 x CERAMIC TILES 30 x CONSULTANT
G-09 NURSE STATION PORCELAIN TILES STAINLESS STEEL PAINT PAINT CURTAIN WALL PAINT GYPSUM BOARD x 30 cm 30cm 30 x 30cm 300cm 30cm
60x60cm G-40 LOBBY PORCELAIN TILES STAINLESS STEEL CURTAIN WALL STUCCO STONE GYPSUM BOARD
G-10 MASTER BEDROOM RUBBER FLOOR STAINLESS STEEL CURTAIN WALL WOOD STONE STONE GYPSUM BOARD 60x60cm
G-11 MASTER BATHROOM RUBBER FLOOR MARBLE STONE STONE STONE STONE GYPSUM BOARD G-45 RAMP EPOXY PAINT STONE CURTAIN WALL GYPSUM BOARD a r chi t e ct s de s i g n e rs planne rs

G-12 POWDER ROOM MOSAIC TILES / MOSAIC TILES MOSAIC TILES MOSAIC TILES MOSAIC TILES GYPSUM BOARD FIRST FLOOR
P.O. BOX 73033, DUBAI, UAE
PORCELAIN TILES F-01 CORRIDOR PORCELAIN TILES STAINLESS STEEL CURTAIN WALL CURTAIN WALL CURTAIN WALL CURTAIN WALL GYPSUM BOARD TEL.: +97143324455 FAX: +97143322113
60x60cm 60x60cm E-MAIL: mail@naga.ae URL: www.naga.ae
G-13 LIVING ROOM PORCELAIN TILES STAINLESS STEEL STONE CURTAIN WALL STONE CURTAIN WALL GYPSUM BOARD F-02 TERRACE PORCELAIN TILES PROCELAIN TILES STONE STONE CURTAIN WALL GYPSUM BOARD
60x60cm 60x60cm
G-14 DINING PORCELAIN TILES STAINLESS STEEL STONE CURTAIN WALL STONE CURTAIN WALL GYPSUM BOARD F-03 LOBBY CERAMIC TILES STAINLESS STEEL STONE STONE CURTAIN WALL STONE GYPSUM BOARD
60x60cm 60x60cm
G-15 KITCHEN CERAMIC TILES CERAMIC TILES 60x CERAMIC TILES CERAMIC TILES 60 x CERAMIC TILES 60 x 60 X 60 CEILING F-04 TERRACE PORCELAIN TILES CURTAIN WALL STONE STONE GYPSUM BOARD
60x60cm 60cm 60x60cm 60cm 60cm 60x60cm
G-16 FRY KITCHEN CERAMIC TILES CERAMIC TILES 60x CERAMIC TILES CERAMIC TILES 60 x CERAMIC TILES 60 x 60 X 60 CEILING F-05 LIVING PORCELAIN TILES MARBLE CURTAIN WALL WALL COVER WALL COVER WALL COVER GYPSUM BOARD
60x60cm 60cm 60x60cm 60cm 60cm 60x60cm
G-17 LOBBY PORCELAIN TILES PAINT CERAMIC TILES CERAMIC TILES 60 x CERAMIC TILES 60 x 60 X 60 CEILING F-06 TERRACE PORCELAIN TILES STONE CURTAIN WALL GYPSUM BOARD
60x60cm 60x60cm 60cm 60cm 60x60cm
G-18 STORAGE CERAMIC TILES PAINT PAINT PAINT PAINT 60 X 60 CEILING F-07 DRESSER 1 PORCELAIN TILES STAINLESS STEEL PAINT PAINT PAINT PAINT GYPSUM BOARD
60x60cm 60x60cm
G-19 PREPARATION CERAMIC TILES CERAMIC TILES 60x CERAMIC TILES CERAMIC TILES 60 x CERAMIC TILES 60 x 60 X 60 CEILING F-08 BATHROOM 1 PORCELAIN TILES PORCELAIN TILES PORCELAIN PORCELAIN TILES PORCELAIN TILES GYPSUM BOARD
60x60cm 60cm 60x60cm 60cm 60cm 60x60cm 45x45cm TILES 45x45cm 45x45cm 45x45cm
G-20 HOUSEKEEPING CERAMIC TILES CERAMIC TILES PAINT PAINT PAINT PAINT GYPSUM BOARD F-09 BEDROOM 1 CERAMIC TILES STAINLESS STEEL WALL COVER WALL COVER WALL COVER CURTAIN WALL GYPSUM BOARD
C

C
60x60cm 60x60cm
G-21 STAIR 2 PORCELAIN TILES PAINT PAINT PAINT PAINT GYPSUM BOARD F-10 TERRACE PORCELAIN TILES STONE CURTAIN WALL GYPSUM BOARD
60x60cm 60x60cm
G-22 LOBBY CERAMIC TILES CERAMIC TILES PAINT PAINT PAINT PAINT GYPSUM BOARD F-11 DRESSER 2 PORCELAIN TILES STAINLESS STEEL PAINT PAINT PAINT PAINT GYPSUM BOARD
G-23 MAID'S LAUNDRY CERAMIC TILES CERAMIC TILES 60x CERAMIC TILES CERAMIC TILES 60 x CERAMIC TILES 60 x 60 X 60 CEILING 60x60cm
60x60cm 60cm 60x60cm 60cm 60cm F-12 BATHROOM 2 PORCELAIN TILES PORCELAIN TILES PORCELAIN PORCELAIN TILES PORCELAIN TILES GYPSUM BOARD
G-24 LAUNDRY CERAMIC TILES CERAMIC TILES 60x CERAMIC TILES CERAMIC TILES 60 x CERAMIC TILES 60 x 60 X 60 CEILING 60x60cm 60x60cm TILES 60x60cm 60x60cm 60x60cm
60x60cm 60cm 60x60cm 60cm 60cm F-13 BEDROOM 2 PORCELAIN TILES PROCELAIN TILES WALL COVER CURTAIN WALL WALL COVER WALL COVER GYPSUM BOARD
G-25 MAID ROOM 2 CERAMIC TILES CERAMIC TILES PAINT PAINT PAINT PAINT GYPSUM BOARD 60x60cm 60x60cm
60x60cm F-14 MECHANICAL ROOM EPOXY PAINT STONE STONE STONE PAINT
ABDULLAH ABUNAYYAN
G-26 TOILET 1 CERAMIC TILES CERAMIC TILES 60x CERAMIC TILES CERAMIC TILES 60 x CERAMIC TILES 60 x 60 X 60 CEILING F-15 WATER FEATURE CERAMIC TILES 30 CERAMIC TILES 30 x CERAMIC TILES CERAMIC TILES 30 x CERAMIC TILES 30 x VILLA-C
60x60cm 60cm 60x60cm 60cm 60cm x 30 cm 30cm 30 x 30cm 300cm 30cm
G-27 MAID ROOM 1 CERAMIC TILES CERAMIC TILES PAINT PAINT PAINT PAINT GYPSUM BOARD F-16 LIFT PORCELAIN TILES PLOT #:
60x60cm 60x60cm RIYADH, KSA
G-28 TOILET 2 CERAMIC TILES CERAMIC TILES 60x CERAMIC TILES CERAMIC TILES 60 x CERAMIC TILES 60 x 60 X 60 CEILING F-19 TERRACE CERAMIC TILES
60x60cm 60cm 60x60cm 60cm 60cm 60x60cm
G-29 MAID'S LIVING CERAMIC TILES CERAMIC TILES PAINT PAINT PAINT PAINT GYPSUM BOARD F-20 STAIR 2 EPOXY PAINT PAINT PAINT PAINT PAINT ARCHITECTURAL DRAWINGS
60x60cm
KEY FOR ''ISSUE FOR'' RC REVIEW & COMMENTS
G-30 STORAGE CERAMIC TILES CERAMIC TILES PAINT PAINT PAINT PAINT GYPSUM BOARD SD SCHEMATIC DESIGN CA CLIENT APPROVAL
60x60cm DD DESIGN DEVELOPMENT PS PROGRESS SET
CD CONSTRUCTION R FOR RECORD
DOCUMENTS P PRELIMINARY
TD TENDER DOCUMENTS M MUNICIPALITY REVIEW
MEP MEP BACKGROUND
B

B
100% Construction
3 07/02/11 CD-CA Documents NAGA
80% Construction
2 10/11/10 CD-PS NAGA
Documents
50% Construction
1 06/04/10 CD-PS NAGA
Documents
0 27/03/10 DD-CA AS PER CONTRACT NAGA
ISSUE ISSUE
Rev DATE FOR DESCRIPTION By

ISSUE

Project No. 09-27 KSA

Project Arch M.Dalyr - N.Salah

Structural Designer MH

D:\lowins revit files\09-27\CONSTRUCTION


DOCUMENTATION\VILLA C\Villa C Central
REVIT File 101014.rvt

SCALE AS SHOWN

Drawn By N.Salah - M.Dalyr

Checked By Butch

MANAGEMENT Dr. Elkady


A

A
PRINTING DATE/TIME 2/7/2011 2:54:29 PM

VC-A-505

SHEET TITLE

SCHEDULE OF INTERIOR
FINISHES

.
1 2 3 4 5 6 7
1 2 3 4 5 6 7

This drawing is the property of:NAGA Architects, Designers, Planners it is not allowed to reproduce this sheet's contents in any form except for the purpose for which it is intended . the consultant has a duplicate electronic file of this drawing . the contractor(s) shall assume full responsibility for any and all alterations and/ or changes on these drawings files including the resulting coordination between the trades involved . the contractor shall check and verify all dimensions and report all discrepancies to the architect and design professional whose seal is affixed to this drawing this drawing shall not be used for construction purposes until issued for construction by the design professional whose seal and signature are affixed to this drawing
D

D
STAMPS
CONSULTANT

a r chi t e ct s de s i g n e rs planne rs

P.O. BOX 73033, DUBAI, UAE


TEL.: +97143324455 FAX: +97143322113
E-MAIL: mail@naga.ae URL: www.naga.ae
C

C
ABDULLAH ABUNAYYAN
VILLA-C
PLOT #:
RIYADH, KSA

ARCHITECTURAL DRAWINGS
KEY FOR ''ISSUE FOR'' RC REVIEW & COMMENTS
SD SCHEMATIC DESIGN CA CLIENT APPROVAL
DD DESIGN DEVELOPMENT PS PROGRESS SET
CD CONSTRUCTION R FOR RECORD
DOCUMENTS P PRELIMINARY
TD TENDER DOCUMENTS M MUNICIPALITY REVIEW
MEP MEP BACKGROUND
B

B
100% Construction
3 07/02/11 CD-CA Documents NAGA
80% Construction
2 10/11/10 CD-PS NAGA
Documents
50% Construction
1 06/04/10 CD-PS NAGA
Documents
0 27/03/10 DD-CA AS PER CONTRACT NAGA
ISSUE ISSUE
Rev DATE FOR DESCRIPTION By

ISSUE

Project No. 09-27 KSA

Project Arch M.Dalyr - N.Salah

Structural Designer MH

D:\lowins revit files\09-27\CONSTRUCTION


DOCUMENTATION\VILLA C\Villa C Central
REVIT File 101014.rvt

SCALE AS SHOWN

Drawn By N.Salah - M.Dalyr

Checked By Butch

MANAGEMENT Dr. Elkady


A

A
PRINTING DATE/TIME 2/7/2011 2:54:30 PM

VC-G-002

SHEET TITLE

PERSPECTIVE VIEWS

.
1 2 3 4 5 6 7
1 2 3 4 5 6 7

This drawing is the property of:NAGA Architects, Designers, Planners it is not allowed to reproduce this sheet's contents in any form except for the purpose for which it is intended . the consultant has a duplicate electronic file of this drawing . the contractor(s) shall assume full responsibility for any and all alterations and/ or changes on these drawings files including the resulting coordination between the trades involved . the contractor shall check and verify all dimensions and report all discrepancies to the architect and design professional whose seal is affixed to this drawing this drawing shall not be used for construction purposes until issued for construction by the design professional whose seal and signature are affixed to this drawing
BUILT-UP AREA

LIVING AREA

SERVICES

STAIRS

SHAFTS
COVERED TERRACE &
CORRDIOR
D

D
UNCOVERED TERRACE &
CORRDIOR
ELEVATOR
STAMPS
MEP
A B C D E F G H I J K L M N CONSULTANT

SERVICE BLOCK 2
23 m² GROUND FLOOR (SHAFTS) GROUND FLOOR (LIVING)
MECHANICAL Number Name Area (m²) Area (ft²) Number Name Area (m²) Area (ft²) a r chi t e ct s de s i g n e rs planne rs
ROOM STORAGE GARBAGE ROOM
G-34 G-33 G-32
P.O. BOX 73033, DUBAI, UAE
GS-02 SHAFT 0.40 m² 4.31 ft² G-01 FOYER 15.42 m² 165.98 ft²
TEL.: +97143324455 FAX: +97143322113
GS-01 SHAFT 0.40 m² 3.01 ft² G-04 LOBBY 4.92 m² 52.85 ft² E-MAIL: mail@naga.ae URL: www.naga.ae
1 GS-03 SHAFT 0.25 m² 2.69 ft² G-05 NURSES 1.32 m² 14.21 ft²
GS-04 SHAFT 0.50 m² 5.38 ft² LAUNDRY
GS-05 SHAFT 0.25 m² 2.69 ft² G-06 NURSE 6.87 m² 73.95 ft²
SERVICE BLOCK 1 GS-06 SHAFT 0.30 m² 3.23 ft² BATHROO
STORAGE
103 m² M
2.10 m² 21.31 ft²
G-30
CAR PARKING G-07 NURSES 22.66 m² 244.77 ft²
G-51 BEDROOM
GROUND FLOOR (COVERED AREA)
G-08 NURSE 3.23 m² 34.77 ft²
2 Number Name Area (m²) Area (ft²) PANTRY
G-09 NURSE 19.90 m² 214.63 ft²
G-35 MAID'S 12.26 m² 132 ft² STATION
CORRIDO G-10 MASTER 94.22 m² 987.70 ft²
R BEDROOM
C

WALKWAY G-36 KITCHEN 23.48 m² 225 ft²

C
G-41 G-11 MASTER 19.73 m² 212.37 ft²
CORRIDO BATHROO
R M
G-37 COVERED Not 173 ft² G-12 POWDER 10.41 m² 112.05 ft²
TERRACE Enclosed ROOM
ELECTRICAL
ROOM G-43 WALKWAY Not 984 ft² G-13 LIVING Redundan 718.28 ft²
3 G-31 Enclosed ROOM t Room
SHAFT SHAFT MAID'S SHAFT SHAFT KITCHEN G-45 RAMP 3.75 m² 40 ft² G-14 DINING 99.41 m² 351.87 ft²
CORRIDOR GS-03 CORRIDOR
GS-01 GS-02
G-35
GS-04
G-36 39.49 m² 1554 ft² 298.08 m² 3183.43 ft² ABDULLAH ABUNAYYAN
4
MAID'S LIVING
TOILET 2 TOILET 1 LOBBYMAID'S LAUNDRY LOBBY GROUND FLOOR (UNCOVERED AREA) VILLA-C
G-28 G-26 G-22 G-23
G-29 G-17 Number Name Area (m²) Area (ft²)
PLOT #:
LOBBY HOUSEKEEPING KITCHEN FRY KITCHEN
G-40 G-15 G-16 PREPARATION RIYADH, KSA
MAID ROOM 2 G-20 STAIR 2
MAID ROOM 1 LAUNDRY
G-21 STORAGE
G-19 G-38 REFLECTE 85.86 m² 914.07 ft² GROUND FLOOR (SERVICES)
G-27 G-25 G-24
G-18 D POOL 1 Number Name Area (m²) Area (ft²)
6
G-39 REFLECTE 136.03 m² 1464.21 ft² ARCHITECTURAL DRAWINGS
SHAFT D POOL 2
GS-05
G-29 MAID'S 31.08 m² 31.08 m² KEY FOR ''ISSUE FOR'' RC REVIEW & COMMENTS
G-41 WALKWAY 34.97 m² 375.45 ft² LIVING SD SCHEMATIC DESIGN CA CLIENT APPROVAL
G-44 WALKWAY 21.00 m² 226.04 ft² G-19 PREPARATI 17.67 m² 17.66 m² DD DESIGN DEVELOPMENT PS PROGRESS SET
CD CONSTRUCTION R FOR RECORD
DINING 277.86 m² 2979.77 ft² ON DOCUMENTS P PRELIMINARY
G-14
G-18 STORAGE 12.31 m² 12.31 m² TD TENDER DOCUMENTS M MUNICIPALITY REVIEW
MEP MEP BACKGROUND
7 GROUND FLOOR (ELEVATOR) G-17 LOBBY 4.75 m² 4.75 m²
Number Name Area (m²) Area (ft²) G-16 FRY 25.19 m² 25.16 m²
REFLECTED
REFLECTED POOL 1 KITCHEN
POOL 2 G-38
G-39 GROUND FLOOR AREA WALKWAY G-02 LIFT 3.20 m² 34.44 ft² G-15 KITCHEN 16.02 m² 16.02 m²
WALKWAY
B

811 m² G-44 3.20 m² 34.44 ft² G-30 STORAGE 18.86 m² 18.76 m²

B
G-43

G-28 TOILET 2 2.59 m² 2.59 m²


8 G-24 LAUNDRY 11.02 m² 11.02 m²
LIVING ROOM GROUND FLOOR (MEP)
G-13 Number Name Area (m²) Area (ft²) G-23 MAID'S 3.19 m² 3.19 m²
LAUNDRY
100% Construction
G-31 ELECTRIC 3.34 m² 35.20 ft² G-22 LOBBY 2.99 m² 2.99 m² 3 07/02/11 CD-CA Documents NAGA

AL ROOM G-26 TOILET 1 2.59 m² 2.59 m² 2 10/11/10 CD-PS


80% Construction
NAGA
Documents
9 POWDER ROOM
G-50 ELECTRIC 0.66 m² 7.10 ft² G-27 MAID ROOM 13.73 m² 13.74 m²
1 06/04/10 CD-PS
50% Construction
NAGA
AL SHAFT 1 Documents
STAIR -1 G-12
G-03 3.99 m² 42.30 ft² G-25 MAID ROOM 13.74 m² 13.74 m² 0 27/03/10 DD-CA AS PER CONTRACT NAGA
10 LIFT 2
Rev DATE
ISSUE
DESCRIPTION
ISSUE
G-02 FOR By
FOYER GROUND FLOOR BUA G-32 GARBAGE 5.21 m² 5.21 m²
G-01
Name Area Area (sq.ft.) ROOM ISSUE
ELECTRICAL
SHAFT RAMP G-33 STORAGE 5.06 m² 5.06 m²
G-50 G-45 Project No. 09-27 KSA
GROUND FLOOR 811.39 m² 9584.40 ft² G-34 MECHANIC 5.20 m² 5.20 m²
11 COVERED
NURSES
LAUNDRY NURSE
AREA AL ROOM Project Arch M.Dalyr - N.Salah
TERRACE LOBBY BATHROOM G-40 LOBBY 22.87 m² 22.86 m²
G-04
G-05 SERVICE BLOCK 1 103.43 m² 1113.31 ft² Structural Designer MH
G-37 MASTER G-06
BEDROOM SERVICE BLOCK 2 22.52 m² 242.40 ft² G-51 CAR Not 7.19 m²
12 G-10
NURSE STATION
G-09 NURSE PANTRY SHAFT 937.33 m² 10940.12 ft² PARKING Enclosed D:\lowins revit files\09-27\CONSTRUCTION
DOCUMENTATION\VILLA C\Villa C Central
G-08 GS-06 G-20 HOUSEKEE 7.19 m² 7.19 m² REVIT File 101014.rvt

MASTER
NURSES PING
BEDROOM SCALE AS SHOWN
BATHROOM 221.26 m² 228.31 m²
G-07
G-11 Drawn By N.Salah - M.Dalyr
GROUND FLOOR (STAIR)
Checked By Butch
13 BUILT UP AREA Number Name Area (m²) Area (ft²)
MANAGEMENT Dr. Elkady
Name Area Area (sq.ft.)
A

A
PRINTING DATE/TIME 2/7/2011 2:54:45 PM
G-03 STAIR -1 26.34 m² 283.41 ft²
GROUND FLOOR G-21 STAIR 2 6.54 m² 70.07 ft²

A1 GROUND
1 : 150
FLOOR GROUND FLOOR
AREA
811.39 m² 9584.40 ft² 32.89 m² 353.49 ft²
VC-G-003
SERVICE BLOCK 1 103.43 m² 1113.31 ft²
SERVICE BLOCK 2 22.52 m² 242.40 ft²
FIRST FLOOR
FIRST FLOOR 443.77 m² 4776.70 ft² SHEET TITLE
0 1 2 5m SERVICE BLOCK 49.07 m² 528.19 ft²
SCALE 1:150
Grand total 1430.17 m² 16245.00 ft² GROUND FLOOR
CALCULATIONS AREA

.
1 2 3 4 5 6 7
1 2 3 4 5 6 7

This drawing is the property of:NAGA Architects, Designers, Planners it is not allowed to reproduce this sheet's contents in any form except for the purpose for which it is intended . the consultant has a duplicate electronic file of this drawing . the contractor(s) shall assume full responsibility for any and all alterations and/ or changes on these drawings files including the resulting coordination between the trades involved . the contractor shall check and verify all dimensions and report all discrepancies to the architect and design professional whose seal is affixed to this drawing this drawing shall not be used for construction purposes until issued for construction by the design professional whose seal and signature are affixed to this drawing
BUILT-UP AREA

LIVING AREA

SERVICES

STAIRS

SHAFTS
A B C D E F G H I J K L M N COVERED TERRACE &
CORRDIOR
D

D
UNCOVERED TERRACE &
CORRDIOR
ELEVATOR
STAMPS
MEP
CONSULTANT

1
FIRST FLOOR BUA FIRST FLOOR (LIVING)
Name Area Area (sq.ft.) Number Name Area (m²) Area (ft²) a r chi t e ct s de s i g n e rs planne rs

P.O. BOX 73033, DUBAI, UAE


FIRST FLOOR 443.77 m² 4776.70 ft² F-01 CORRIDO 26.47 m² 130.14 ft² TEL.: +97143324455 FAX: +97143322113
SERVICE BLOCK 49.07 m² 528.19 ft² R E-MAIL: mail@naga.ae URL: www.naga.ae
492.84 m² 5304.89 ft² F-03 LOBBY Redundant 150.48 ft²
Room
2 F-05 LIVING 42.41 m² 456.71 ft²
F-07 DRESSER 7.75 m² 83.42 ft²
1
F-08 BATHROO 9.02 m² 97.09 ft²
BUILT UP AREA M1
Name Area Area (sq.ft.) F-09 BEDROOM 30.85 m² 331.64 ft²
1
GROUND FLOOR F-11 DRESSER 8.13 m² 87.51 ft²
GROUND FLOOR 811.39 m² 9584.40 ft² 2
AREA F-12 BATHROO 9.21 m² 64.15 ft²
3 SERVICE BLOCK 1 103.43 m² 1113.31 ft² M2
C

C
MECH. WALKWAY
SERVICE BLOCK 2 22.52 m² 242.40 ft² F-13 BEDROOM 30.23 m² 325.50 ft²
F-21 FIRST FLOOR 2
4 FIRST FLOOR 443.77 m² 4776.70 ft² 164.06 m² 1726.64 ft²
DN SERVICE BLOCK 49.07 m² 528.19 ft²
SHAFT
MECHANICAL
TERRACE
Grand total 1430.17 m² 16245.00 ft² FIRST FLOOR (STAIR)
STAIR 2
FS-08 F-22
F-20 Number Name Area (m²) Area (ft²)
SERVICE BLOCK
49 m² F-20 STAIR 2 7.42 m² 75.78 ft²
ABDULLAH ABUNAYYAN
6 7.42 m² 75.78 ft² VILLA-C
PLOT #:
RIYADH, KSA
FIRST FLOOR (SHAFT)
Number Name Area (m²) Area (ft²)
7 ARCHITECTURAL DRAWINGS
FS-01 SHAFT 0.25 m² 2.69 ft²
KEY FOR ''ISSUE FOR'' RC REVIEW & COMMENTS
FS-02 SHAFT 0.39 m² 4.20 ft² SD SCHEMATIC DESIGN CA CLIENT APPROVAL
FS-03 SHAFT 0.43 m² 4.63 ft² DD DESIGN DEVELOPMENT PS PROGRESS SET
CD CONSTRUCTION R FOR RECORD
FS-04 SHAFT 0.48 m² 5.17 ft² DOCUMENTS P PRELIMINARY
FS-05 SHAFT 0.34 m² 3.66 ft² TD TENDER DOCUMENTS M MUNICIPALITY REVIEW
8 FS-06 SHAFT 0.25 m² 2.69 ft²
MEP MEP BACKGROUND

FS-07 SHAFT 3.34 m² 35.95 ft²


FS-08 SHAFT 3.64 m² 32.61 ft²
9.11 m² 91.60 ft²
B

B
9 TERRACE FIRST FLOOR (COVERED)
F-19
TERRACE
Number Name Area (m²) Area (ft²)
F-06
10 LIFT
F-16 CORRIDOR F-02 TERRACE 7.34 m² 79.04 ft² 100% Construction
F-01 3 07/02/11 CD-CA Documents NAGA
F-04 TERRACE 14.93 m² 160.71 ft²
80% Construction
F-06 TERRACE 38.77 m² 429.05 ft² 2 10/11/10 CD-PS NAGA
SHAFT SHAFT WATER FEATURE SHAFT SHAFT Documents
SHAFT SHAFT
FS-01 FS-02 F-15 FS-05 FS-06 F-10 TERRACE 7.41 m² 76.85 ft² 50% Construction
FS-03 FS-04 1 06/04/10 CD-PS NAGA
Documents
11 F-15 WATER 10.24 m² 110.22 ft²
0 27/03/10 DD-CA AS PER CONTRACT NAGA
BATHROOM 1
FEATURE
DRESSER 1 LOBBY DRESSER 2 BATHROOM 2 ISSUE ISSUE
F-08 F-07 FIRST FLOOR F-03 F-11 F-12 78.69 m² 855.87 ft² Rev DATE FOR DESCRIPTION By
12 444 m²
ISSUE
TERRACE FIRST FLOOR (UNCOVERED) Project No. 09-27 KSA
TERRACE LIVING F-04 BEDROOM 2 TERRACE
F-10 BEDROOM 1 F-05 F-13 F-02 Number Name Area (m²) Area (ft²)
F-09 Project Arch M.Dalyr - N.Salah

F-19 TERRACE 10.46 m² 112.59 ft² Structural Designer MH

13 10.46 m² 112.59 ft²


D:\lowins revit files\09-27\CONSTRUCTION
DOCUMENTATION\VILLA C\Villa C Central
SHAFT REVIT File 101014.rvt
FS-07
FIRST FLOOR (ELEVATOR)
Number Name Area (m²) Area (ft²) SCALE AS SHOWN

Drawn By N.Salah - M.Dalyr


F-16 LIFT 3.22 m² 34.66 ft² Checked By Butch
3.22 m² 34.66 ft²
MANAGEMENT Dr. Elkady
A

A
FIRST FLOOR (MEP)
A1 FIRST FLOOR PRINTING DATE/TIME 2/7/2011 2:54:58 PM

1 : 150 Number Name Area (m²) Area (ft²)

F-21 MECH. 26.06 m² 280.51 ft²


WALKWAY VC-G-004
F-22 MECHANIC 56.29 m² 593.52 ft²
AL
TERRACE
SHEET TITLE
82.35 m² 874.03 ft²
0 1 2 5m
SCALE 1:150
FIRST FLOOR
CALCULATIONS AREA

.
1 2 3 4 5 6 7
1 2 3 4 5 6 7

This drawing is the property of:NAGA Architects, Designers, Planners it is not allowed to reproduce this sheet's contents in any form except for the purpose for which it is intended . the consultant has a duplicate electronic file of this drawing . the contractor(s) shall assume full responsibility for any and all alterations and/ or changes on these drawings files including the resulting coordination between the trades involved . the contractor shall check and verify all dimensions and report all discrepancies to the architect and design professional whose seal is affixed to this drawing this drawing shall not be used for construction purposes until issued for construction by the design professional whose seal and signature are affixed to this drawing
SERVICE BLOCK 2
23 m²

SUMMARY FOR BUILT UP AREA


LEVEL AREA (SQ. M) AREA (SQ. FT)

SERVICE BLOCK 1
103 m² BASEMENT FLOOR : 00.00 SQ.M. 00.00 SQ.FT.
D

D
GROUND FLOOR: 937.33 SQ.M. 10940.12 SQ.FT.

FIRST FLOOR: 492.84 SQ.M. 5304.89 SQ.FT.


STAMPS
CONSULTANT
ROOF FLOOR: 00.00 SQ.M. 00.00 SQ.FT.

SERVICE/SUBSTATION: 00.00 SQ.M. 00.00 SQ.FT. a r chi t e ct s de s i g n e rs planne rs

UP P.O. BOX 73033, DUBAI, UAE


TEL.: +97143324455 FAX: +97143322113
TOTAL AREA & NUMBER 1430.17 SQ.M. 16245.01 SQ.FT. E-MAIL: mail@naga.ae URL: www.naga.ae

SUMMARY FOR AREA RATIOS


UNIT RESIDENCES PLOT/AREA RATIO

BASEMENT FLOOR -- %

GROUND FLOOR -- %

FIRST FLOOR -- %

ALLOWABLE PLOT AREA RATIO -- %

PROPOSED PLOT AREA RATIO


C

-- %
GROUND FLOOR AREA

C
811 m²

SUMMARY FOR GARBAGE

CALCULATIONS : ( 2901.297 /1000) x 12 KGS

WEIGHT ( 34.8 /250 KGS) = 0.14

NO. OF CONTAINERS REQUIRED: 1 GARBAGE BINS


ABDULLAH ABUNAYYAN
GROUND FLOOR BUA NO. OF CONTAINERS PROVIDED: 1 GARBAGE BINS
VILLA-C
Name Area Area (sq.ft.) PLOT #:
RIYADH, KSA
GROUND FLOOR 811.39 m² 9584.40 ft²
AREA SUMMARY FOR PARKING
SERVICE BLOCK 1 103.43 m² 1113.31 ft²
UNIT RESIDENCES
ARCHITECTURAL DRAWINGS
SERVICE BLOCK 2 22.52 m² 242.40 ft² KEY FOR ''ISSUE FOR'' RC REVIEW & COMMENTS
937.33 m² 10940.12 ft² CALCULATIONS SD SCHEMATIC DESIGN CA CLIENT APPROVAL
DD DESIGN DEVELOPMENT PS PROGRESS SET
NUMBER OF RESIDENTIAL UNITS: 1 NO. OF VILLAS CD CONSTRUCTION R FOR RECORD
DOCUMENTS P PRELIMINARY
PARKING REQUIRED: 1 SLOT PER RES'L UNIT 1 CARS M MUNICIPALITY REVIEW
B1 GROUND FLOOR AREA TD TENDER DOCUMENTS
MEP MEP BACKGROUND
1 : 200 TOTAL PARKING PROVIDED: 4 CARS
B

B
DN

SERVICE BLOCK 100% Construction


3 07/02/11 CD-CA Documents NAGA
49 m²
80% Construction
2 10/11/10 CD-PS NAGA
Documents
50% Construction
1 06/04/10 CD-PS NAGA
Documents
0 27/03/10 DD-CA AS PER CONTRACT NAGA
ISSUE ISSUE
Rev DATE FOR DESCRIPTION By

ISSUE

Project No. 09-27 KSA

Project Arch M.Dalyr - N.Salah

Structural Designer MH

D:\lowins revit files\09-27\CONSTRUCTION


DOCUMENTATION\VILLA C\Villa C Central
REVIT File 101014.rvt

SCALE AS SHOWN

Drawn By N.Salah - M.Dalyr

Checked By Butch

MANAGEMENT Dr. Elkady


A

A
PRINTING DATE/TIME 2/7/2011 2:55:05 PM

FIRST FLOOR
444 m² FIRST FLOOR BUA
Name Area Area (sq.ft.) VC-G-005
FIRST FLOOR 443.77 m² 4776.70 ft²
SERVICE BLOCK 49.07 m² 528.19 ft² SHEET TITLE
492.84 m² 5304.89 ft²

A1 FIRST
1 : 200
FLOOR AREA BUILT UP AREA
CALCULATIONS

.
1 2 3 4 5 6 7
1 2 3 4 5 6 7

This drawing is the property of:NAGA Architects, Designers, Planners it is not allowed to reproduce this sheet's contents in any form except for the purpose for which it is intended . the consultant has a duplicate electronic file of this drawing . the contractor(s) shall assume full responsibility for any and all alterations and/ or changes on these drawings files including the resulting coordination between the trades involved . the contractor shall check and verify all dimensions and report all discrepancies to the architect and design professional whose seal is affixed to this drawing this drawing shall not be used for construction purposes until issued for construction by the design professional whose seal and signature are affixed to this drawing
DRAWING LIST
Sheet Number Sheet Name COMMENTS

01 GENERAL DRAWINGS
VC-G-001 COVER SHEET
VC-G-002 PERSPECTIVE VIEWS
VC-G-003 GROUND FLOOR CALCULATIONS AREA
VC-G-004 FIRST FLOOR CALCULATIONS AREA
VC-G-005 BUILT UP AREA CALCULATIONS
D

D
VC-G-101 LIST OF DRAWINGS
03 ARCHITECTURAL DRAWINGS
VC-A-001 SETTING OUT PLAN
VC-A-101 GROUND FLOOR PLAN STAMPS
VC-A-102 FIRST FLOOR PLAN CONSULTANT
VC-A-103 ROOF PLAN
VC-A-104 SERVICE BLOCK PLANS, ELEVATIONS AND SECTIONS
VC-A-201 NORTH ELEVATION
a r chi t e ct s de s i g n e rs planne rs
VC-A-202 SOUTH ELEVATION
P.O. BOX 73033, DUBAI, UAE
VC-A-203 EAST ELEVATION
TEL.: +97143324455 FAX: +97143322113
VC-A-204 WEST ELEVATION E-MAIL: mail@naga.ae URL: www.naga.ae
VC-A-301 BUILDING SECTION 1 & 2
VC-A-302 BUILDING SECTION 3 & 4
VC-A-303 BUILDING SECTION 5 & 6
VC-A-310 WALL SECTION 1 & 2
VC-A-311 WALL SECTION 3 & 4
04 ARCH DETAIL DRAWINGS
VC-A-401 STAIR-1 ENLARGED PLANS & SECTIONS
VC-A-402 STAIR-2 ENLARGED PLANS & SECTIONS / WALL FEATURE DETAILS
VC-A-403 RAILING DETAIL
VC-A-404 ACCESS RAMP DETAIL
VC-A-405 ELEVATOR DETAIL
VC-A-406 WATER TANK DETAIL
C

C
VC-A-407 WATER FEATURE ENLARGED PLANS
VC-A-408 WATER FEATURE DETAIL
VC-A-409 SHADES DETAIL
VC-A-410 WALL TYPES
VC-A-411.. FEATURED WALL 1
05 ARCH SCHEDULES
VC-A-501 DOORS & WINDOWS GENERAL NOTES
VC-A-502 DOOR SCHEDULE & ELEVATIONS ABDULLAH ABUNAYYAN
VC-A-503 WINDOW SCHEDULE & ELEVATIONS
VC-A-504 CURTAIN WALL SCHEDULE & ELEVATIONS
VILLA-C
VC-A-505 SCHEDULE OF INTERIOR FINISHES PLOT #:
RIYADH, KSA

ARCHITECTURAL DRAWINGS
KEY FOR ''ISSUE FOR'' RC REVIEW & COMMENTS
SD SCHEMATIC DESIGN CA CLIENT APPROVAL
DD DESIGN DEVELOPMENT PS PROGRESS SET
CD CONSTRUCTION R FOR RECORD
DOCUMENTS P PRELIMINARY
TD TENDER DOCUMENTS M MUNICIPALITY REVIEW
MEP MEP BACKGROUND
B

B
100% Construction
3 07/02/11 CD-CA Documents NAGA
80% Construction
2 10/11/10 CD-PS NAGA
Documents
50% Construction
1 06/04/10 CD-PS NAGA
Documents
0 27/03/10 DD-CA AS PER CONTRACT NAGA
ISSUE ISSUE
Rev DATE FOR DESCRIPTION By

ISSUE

Project No. 09-27 KSA

Project Arch M.Dalyr - N.Salah

Structural Designer MH

D:\lowins revit files\09-27\CONSTRUCTION


DOCUMENTATION\VILLA C\Villa C Central
REVIT File 101014.rvt

SCALE AS SHOWN

Drawn By N.Salah - M.Dalyr

Checked By Butch

MANAGEMENT Dr. Elkady


A

A
PRINTING DATE/TIME 2/7/2011 2:55:07 PM

VC-G-101

SHEET TITLE

LIST OF DRAWINGS

.
1 2 3 4 5 6 7