Pre-Analytical Workbook-Prefabricated Foundation System-3j - Weronika Filip

You might also like

Download as pdf or txt
Download as pdf or txt
You are on page 1of 9

Pre-analytical workbook

Prefabricated Foundation System


3rd semester
Class 3J
Weronika Filip
A3

PROJECT STAGE:
PROJECT NAME: Prefabricated foundation system CLIENT:
ITERATION: 0 1

DRAWING NAME: 3D Isometric View F18_003


PROJECT NUMBER: DRG. No. (sfB Code): (16)
DATE: 24.09.18
DRAWN BY: Weronika Filip
CHECKED BY: SCALE: 1:10
SHANE O'BRIEN 17.12.2014
1

F18_003
Elevations:south (16)
24.09.18
Weronika Filip
1:10
1

F18_003
Elevations:north (16)
24.09.18
Weronika Filip
1:10
Elevation west Elevation east

F18_003
Elevations: east, west (16)
24.09.18
Weronika Filip
1:10
Top

Bottom

F18_003
Floor plans: top and bottom (16)
24.09.18
Weronika Filip
1:10
A3

PROJECT STAGE:
PROJECT NAME: Prefabricated foundation system CLIENT:
ITERATION: 0 1

DRAWING NAME: Long section F18_003


PROJECT NUMBER: DRG. No. (sfB Code):
(16)
DATE: 24.09.18
DRAWN BY: Weronika Filip
CHECKED BY: SCALE: 1:10
SHANE O'BRIEN 17.12.2014
A3

PROJECT STAGE:
PROJECT NAME: Prefabricated foundation system CLIENT:
ITERATION: 0 1

DRAWING NAME: Short section F18_003


PROJECT NUMBER: DRG. No. (sfB Code): (16)
DATE: 24.09.18
DRAWN BY: Weronika Filip
CHECKED BY: SCALE: 1:10
SHANE O'BRIEN 17.12.2014
I A3

MATER IAl SPECIFICATIONS


IIAHRIAIIIAII� Hard Insulation R-VALUE [(m2/K)/W): 0.033-0.037
O
1 FUNCTION OF MATERIAL IN THE CONSTRUCTION: Thermal insulation, load-bearing function
RESPONSIBLE TRADE: Brick layer
c���-<..��
W BS
EXECUTION: Comes as a whole element together with steel framing and concrete outer layer. Two layers, � o« ���
one placed through the whole element, the other with 160mm spacing every 1200mm for a � �� ':,.,,�
cast in-situ concrete columns. �����
���
A
'
L-1-'�
--'-- REFERENCES (MANUFACTURER, BRl0 ETC):
''
I
''
I

I -------------------------------------------------------------------------------------------------------------------
I
---- PRECEDING TASK:

''
IIAHRIAIIIAII� Concrete, precast R-VALUE [(m2/K)/W): n/a '

O
2 FUNCTION OF MATERIAL IN THE CONSTRUCTION: Outer foundation layer, weather protection, vapour protection
RESPONSIBLE TRADE: Brick layer
c���-<..��
W BS
EXECUTION: Comes on site together with the rest of the element, max size 7200mm, 40mm concrete plate � o« ���
I!)
'<I" � �� ':,.,,�
�����
���
A
L"-1_':::,.

i/ '
Hibe.dk

-4
__1__ REFERENCES (MANUFACTURER, BRl0 ETC):
''
I
''
I

I
---- I ------------------------------------------------------------------------------------------------------------------
PRECEDING TASK:
/I
40

IIAHRIAIIIAII� Concrete, cast in-situ R-VALUE [(m /K)/W):


'
2 n/a
O
3 FUNCTION OF MATERIAL IN THE CONSTRUCTION: Structural, load-bearing system
RESPONSIBLE TRADE: Brick layer
c���-<..��
W BS
EXECUTION: Cast on site, poured into the prefab foundation, 160x160mm �6 o« ���
� � ':,.,,�
�����
���
A
L-1-�
1
__ __ REFERENCES (MANUFACTURER, BRl0 ETC): -
''
I
''
I

I -------------------------------------------------------------------------------------------------------------------
I
---- PRECEDING TASK:

IIAHRIAIIIAII� Steel R-VALUE [(m2/K)/W): n/a


O
4 FUNCTION OF MATERIAL IN THE CONSTRUCTION: Structural, framing for concrete columns
RESPONSIBLE TRADE: Brick layer
c���-<..��
W BS
EXECUTION: Comes on site with the foundation element, prefabricated, poured with concrete �� o« ���
� �� ':,.,,�
�����
���
A

-
L-1-�
__1__ REFERENCES (MANUFACTURER, BRl0 ETC):
'
I
'
I

: ---- : -------------------------------------------------------------------------------------------------------------------
PRECEDING TASK:

IIAHRIAIIIAII� Concrete, screed R-VALUE [(m2/K)/W): n/a


O
5 FUNCTION OF MATERIAL IN THE CONSTRUCTION: Levelling
RESPONSIBLE TRADE: Brick layer
c���-<..��
W BS
EXECUTION: Cast on site, levels the harsh surface of strip foundation element � o« ���
� �� ':,.,,�
�����
���
A
L-1-�
1
,,-- --, REFERENCES (MANUFACTURER, BRlO ETC): -
'' '' PRECEDING TASK:
I I

I
---- ' -------------------------------------------------------------------------------------------------------------------

PROJECT STAGE: ITERATION: 0 1

PROJECT NAME:
DRAWING NAME:
not specified
Short section, material specification
CLIENT:
F18_003 DRG. No. (sfB Code): (16) ra �i�
OJI!I�
PROJECT NUMBER:
DATE: 24.09
DRAWN BY: Weronika Filip
ii
;!Z

CHECKED BY: - SCALE: 1:10 �

I
SHANE O'BRIEN 17.12.2014

You might also like