Work Plan for The construction of Main gate at Gyalsung project, Tareythang.

Construction time period JAN 2015-DEC 2016

Years→ 2023
Months→ April May June July August Sept Oct
Weeks→ 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1###2 3 4 1
Civil Works
Mobilazation of manpower
Labour camp installation
Mobilization of Equipments at site
Surveying and main building layout
Foundation trenching
Soling ,PCC & RRM wall
RCC Work
Bricks walls & acessories fitting works
Steel work
Plumbing work
Roofing (CGI and Roofing trusses)
Finishing works
Site Development
Electrical Works
Laying of HDPE pipes
Laying of cables & fixing of switch socket with outlets
Wiring of light point, power points
Installation of fittings lamps and accessories
Installation of distribution board including
MCCB,MCBS,RCBOS etc.
Installation of main control panel board & energy meter
Laying of main cables & earthing including connection
Testing & commissioning
Handing/Taking over site
Years→
Months→ April
Weeks→ 10 11 12 13 14 15 16 17 18 19 20 21 22 23 23
Details of works↓
Civil Works
Mobilazation of manpower
Labour camp installation

Mobilization of Equipments at
site

Surveying and main building


layout

Foundation work

Ground Floor

1st Floor

2nd Floor

3rd Floor

4th Floor upto top roof level


Roofing (CGI and Roofing
trusses)

Bricks walls & acessories


fitting works

Finishing works

Sewerage & drainage work

Site Development/Retaining
wall

Electrical Works

Laying of HDPE pipes

Laying of cables & fixing of


switch socket with outlets

Wiring of light point, power


points, tv points

Installation of fittings lamps


and accessories

Installation of distribution
board including
MCCB,MCBS,RCBOS etc.

Installation of main control


panel board & energy meter
Laying of main cables &
earthing including connection

Testing & commissioning

Handing/Taking over site


Work Plan for The construction of Ma
Construction time per

2023
May
25 26 27 28 29 1###2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20
ction of Main gate at Gyalsung project, Tareythang.
on time period JAN 2015-DEC 2016

Feb March Apirl May


21 22 23 23 25 26 27 28 29 30 31 4 1 2 3 4 1 2 3 4 1 2 3 4 1
2016
May June July August Sept Oct Nov
2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2
Nov Dec
3 4 1 2 3 4