QUOTATION LOTTE CHEMICAL WP 6 16.09.23 (Sandwich Panel and Gutter)
QUOTATION LOTTE CHEMICAL WP 6 16.09.23 (Sandwich Panel and Gutter)
QUOTATION LOTTE CHEMICAL WP 6 16.09.23 (Sandwich Panel and Gutter)
Currency : Rp.
MATERIAL LABOUR EQUIPMENT EXPENSES
NO. DESCRIPTION AMOUNT REMARK
AMOUNT AMOUNT AMOUNT AMOUNT
1 SANDWICH PANEL & GUTTER WORK 159,626,176 16,311,600 600,000 4,033,231 180,571,007
TOTAL- II 185,085,282
A CANOPY UTAMA
1 Sandwich Panel (For Wall, 50MM) M2 82.606 936,288 77,343,030 120,000 9,912,720 - 23,199 1,916,377 1,079,487 89,172,126
2 Gutter Stainless Thk. 1.5mm M1 7.92 1,209,000 9,575,280 100,000 792,000 - 50,000 396,000 1,359,000 10,763,280
3 Repair Of Gutter Frame LS 1.00 - 450,000 450,000 300,000 300,000 100,000 100,000 850,000 850,000
B CANOPY BELAKANG
1 Sandwich Panel (For Wall, 50MM) M2 22.624 936,288 21,182,586 120,000 2,714,880 - 23,199 524,854 1,079,487 24,422,320
2 Gutter Stainless Thk. 1.5mm M1 7.92 1,209,000 9,575,280 100,000 792,000 - 50,000 396,000 1,359,000 10,763,280
3 ADDITION OF GUTTER FRAME LS 1.00 1,350,000 1,350,000 450,000 450,000 300,000 300,000 100,000 100,000 2,200,000 2,200,000
- Butyl Tape 50mm M 120.000 305,000 36,600,000 10,000 1,200,000 - 5,000 600,000 320,000 38,400,000
Welding
- - Sambung 3 Tempat SET 2 1,000,000 2,000,000 - 1,000,000 2,000,000
- Tutup 2 Tempat