Professional Documents
Culture Documents
Urc HIRA Laoding & Unloading
Urc HIRA Laoding & Unloading
SEVERITY LEVEL
SR NO.
DISCRIPTION
RATING
(S)
Risk Evaluation
LOW:
IMPACT RISK UPTO 30
Note:
1 In the event Severity is 5 or the legislation is "NO"- irrespective of overall low scor
SR
ACTIVITY SUB ACTIVITY HAZARDS
NO.
1.People Or Material
hit by vehicle
2. Sliding or toppling
of materials while
transport.
3. Slip,Trip and Fall
1.1 Big Vehicle coming to site hazard.
entry gate and unloading the hvac
material at loading point by
manually. 4. Lack of knowledge
and training.
5.Rash Driving.
6 Sharp edges
7.Ergonmic
Hazards
1.People Or Material
hit by vehicle
2. Sliding or toppling
of materials while
transport.
3. Slip,Trip and Fall
1.2 Loading the hvac material to
hazard.
small vehicle from loading point
near gate and entry process for
vehicle.
4. Lack of knowledge
and training.
5.Rash Driving.
6.Sharp edges
7.Ergonomic
Hazards
All aspects to
Rarely 1 Never heard in OFFICE 1 which
legislation/regul
ations applies
The existence
of
Once in month 2 Heard in offices outside 2 legislation/regul
ations has no
influence on
significance
Incident happened in
our organization /
Once in a week 3 3
company 2-3 times in a
year.
Happened in our
organization /
Once/twice a day 4 4
company 5-6 times in a
year
Happened several
Continuous 5 times in a year in our 5
sites/offices
Risk Evaluation
MODERATE: HIGH:
IMPACT RISK 31 TO 60 IMPACT RISK 61 & ABOVE
Revised on
1.Body Injuries
2. Damage to property
5 5 2 YES
/ equipment/ vehicles.
1.Body Injuries
2. Damage to property
5 5 2 YES
/ equipment/ vehicles.
1. Strained muscles
and torn ligaments.
2. Falls, slips, and 5 5 2 YES
trips
3. Material damage.
1. Strained muscles
and torn ligaments.
2. Falls, slips, and 5 5 2 YES
trips
3. Material damage.
REV-7
EGORY OF COMPLIANCE
TH LEGISLATION AND Remarks
REGULATIONS
RATING
YES Significant
NO No Significance
:
OVE
IMPACT EXISTI
RISK NG
CONTR RISK LEVEL
(SxExP) OL IN
PLACE
50 YES Moderate
50 YES Moderate
50 YES Moderate
50 YES Moderate
50 YES Moderate
ACTION MEASURE FOR RISK CONTROL
1.We will ensure that will Use signal man for Reversing
2.We will UseTraffic cones & Barriers Following signage boards
3.We will ensure that Engaged only competent driver with
license.
4.We will ensure that will provide the Good access/egress .
5.We will ensure
Job specific safety training,TBT and induction to all workers and
staff.
6 We will
ensure that.Material will be stack with sighnboard and barricade
with chain.
7.We will check the condition of the service and hoist list
before loading the material .
8.We wil ensure that will provide the
routinely break to workers.
9. We will ensure that workers will
wear All job specific PPEs – Safety helmet, Safety shoes, Safety
jacket, Face mask, Hand gloves, shoulder pads and Faceshield.
1We will ensure that. Full time supervision till the completion
of wo.rk
2.We will ensure that Job specific safety training,Induction
and TBT to all workers and staff.
3.We will ensure that permit to work and checklist system will
follow. 4. We
will ensure that Access routes will be clear to shifting of
material.