We-727622 CT List-R02

You might also like

Download as pdf or txt
Download as pdf or txt
You are on page 1of 2

CERT'D

A.M

A.M

A.M
APPR'D

A.M

A.M

A.M
CHK'D

M.A

M.A

M.A
ISSUED FOR APPOVAL

AS PER COMMENTS

AS PER COMMENTS
DESCRIPTION

CT LIST
13.8kV SWITCHGEAR ALFA-12
CONSTRUCTION OF YNB WIND 380 / 110KV BSP (YNB WIND)
MHO

MHO
M.Y
BY

30/07/2023

17/08/2023

26.10.23
DATE
REV.

00

01

02

REVISIONS

DESIGNED

BY:

DATE:

CHECKED

BY:-

DATE:-

OPRG. DEPT

BY

DATE:-

ENG'G. DEPT.

BY:-

DATE:-

CERTIFIED.

BY:-

DATE:- AS BUILT BY: DATE:

DRAWING TITLE INDEX PLANT DRAWING NO. SHEET NO. REV NO.
THIS DRAWING IS NOT TO BE
USED FOR CONSTRUCTION OR CT LIST
FOR ORDERING MATERIALS UNTIL P YNB411 WE-727622 1 of 2 02
CERTIFIED AND DATED
FOR 13.8kV SWITCHGEAR
YANBU SAUDI ARABIA CONTRACT NO: 4400018133 DCS NO.: WE-0725471
Thermal Rating (A)
SR NO. CT REF. CT Core CT Ratio CT TYPE TAG CT Sec Purpose Class Ith in kA/1sec Idyn in kA Burden (VA) Vk (V) at Tap Image @ Vk in(mA) Rct (Ohms) Manufacturer
@ 55ºC

13.8kV DIRECT CABLE INCOMER

1.2xln
CORE-2 400-200-100/1A 1A BCPU PX - 450-225-112.5 40-80-120 2.5-1.25-0.62 ALCE

1 CABLE SIDE AB17-1SLTB-A4 CT1 25 65

1.2xln
CORE-1 400-200-100/1A 1A METERING 0.2FS5 20-10-5 4-2-1 ALCE

13.8kV OG FEEDER OPTION -1

CORE-1 400-200-100/1A 1A SPARE PX - 450-225-112.5 40-80-120 2.5-1.25-0.62


2 BUSBAR SIDE AB17-1SLTB-A4 CT2 25 65 120-240-480 ALCE
CORE-2 800/1A (3s) 1A 64N GT PX - 500 25 2.5

CORE-1 800/1A 1A 87T-2 PX - 500 25 2.5


3 CABLE SIDE AB17-1SLTB-A4 CT2A 25 65 960 ALCE
CORE-2 800/1A 1A 87T-1 PX - 500 25 2.5

CT LIST

02 AS PER COMMENTS A.M 2023 43 MHO M.A NATIONAL GRID SA. 13.8kV SWITCH GEAR ALFA-12

01 AS PER COMMENTS A.M 2023 33 MHO M.A ‫الشركة الوطنية لنقل الكهرباء‬ CONSTRUCTION OF YNB WIND 380 / 110KV BSP (YNB WIND)

00 ISSUED FOR APPORVAL A.M 2023 31 M.Y M.A CONTRACT NO DCS NO. PLANT DRAWING NO. SHEET NO. REVNO.

REV. DESCRIPTION APPD. YEAR WEEK BY CHKD 4400018133 WE-0725471 YNB411 WE-727622 2 OF 2 02

You might also like