Download as pdf or txt
Download as pdf or txt
You are on page 1of 17

CERT.

SAUDI ELECTRICITY COMPANY ‫الشركة السعودية للكهرباء‬


APP’D
CHK’D
DESCRIPTION

ATTACHMENT-2

Amendment Notification to Metering devices


NO.

1
3

REVISIONS

PREP. BY: HA/AMJ

DATE: 01-11-2021

CHK’D BY: NAO

APPROVED

NAWAR A. AL OTAIBI

CERTIFIED

BY: F. A. AMRO

DATE: 01.11.2021

THIS DRAWING IS NOT


TO BE USED FOR
CONSTRUCTION OR
FOR M. AL ORDERING
BY: - SAFFAR
MATERIALS
UNTILCERTIFIED AND
DATE:
DATED

PTS-21WN328, Dtd: 01/11/2021


SCOPE OF WORK & TECHNICAL SPECIFICATIONS FOR PLANT NO. INDEX DOCUMENT NO. PAGE NO. REV.
CONSTRUCTION OF UM-ALJOUD 380/110 kV BSP (WOA)
JOB ORDER NO. (Option-2) PTS 1
SE0563 A OF 01
21WN328
MAKKAH SAUDI ARABIA 13
CERT.
SAUDI ELECTRICITY COMPANY ‫الشركة السعودية للكهرباء‬
APP’D
CHK’D
DESCRIPTION

ATTACHMENT-3

Requirement of Revenue Metering System for MV


Outgoing Feeders
NO.

1
3

REVISIONS

PREP. BY: HA/AMJ

DATE: 01-11-2021

CHK’D BY: NAO

APPROVED

NAWAR A. AL OTAIBI

CERTIFIED

BY: F. A. AMRO

DATE: 01.11.2021

THIS DRAWING IS NOT


TO BE USED FOR
CONSTRUCTION OR
FOR M. AL ORDERING
BY: - SAFFAR
MATERIALS
UNTILCERTIFIED AND
DATE:
DATED

PTS-21WN328, Dtd: 01/11/2021


SCOPE OF WORK & TECHNICAL SPECIFICATIONS FOR PLANT NO. INDEX DOCUMENT NO. PAGE NO. REV.
CONSTRUCTION OF UM-ALJOUD 380/110 kV BSP (WOA)
JOB ORDER NO. (Option-2) PTS 1
SE0563 A OF 01
21WN328
MAKKAH SAUDI ARABIA 4
G. Revenue Metering System for MV Outgoing Feeders
1. Revenue Metering System as per 40-TMSS-03 (excluding
Power Quality Meters) shall be provided and installed for all MV
outgoing feeders (excluding incomers, capacitor banks feeders and
station service transformer feeders). Panels for Revenue Metering
System shall be placed in the Control Room.

Revenue Meter’s Manufacturer/CONTRACTOR shall apply the “Default


Configurations” for all MV revenue meters (attached with Data
Schedule). Also, Hand Held Unit (HHU) shall be supplied as per
standard no. 40-TMSS-03 and shall be configured for connecting and
downloading the billing data from these Revenue Meters.

1. In case of using RMUs:

Revenue Metering System as per 40-TMSS-03 (excluding


Power Quality Meters) shall be provided and installed for all MV
outgoing feeders (excluding incomers and capacitor banks feeders).
Panels for Revenue Metering System shall be placed in the Control
Room.

Revenue Meter’s Manufacturer/CONTRACTOR shall apply the “Default


Configurations” for all MV revenue meters (attached with Data
Schedule). Also, Hand Held Unit (HHU) shall be supplied as per
standard no. 40-TMSS-03 and shall be configured for connecting and
downloading the billing data from these Revenue Meters.
Default Configurations for MV Revenue Meters
Configuration features settings
Clock KSA Standard time (GMT + 3.00)
Time of Use (TOU) Setting (#1: Sat ~ Thu, #2: Fri)
Tariff 1 (TOU 1) #1: From 12:00 ~ 17:00
#1: From 08:00 ~ 12:00 and 17:00 ~ 24:00
Tariff 2 (TOU 2)
#2: From 09:00 ~ 21:00
#1: From 00:00 ~ 08:00
Tariff 3 (TOU 3)
#2: From 00:00 ~ 09:00 and 21:00 ~ 24:00
Tariff 4 (TOU 4) Not applied
When an internal clock initialization (invalid clock) occurs, all the
Tariff 5 (TOU 5)
TOU energies shall be registered in TOU #5:
TOU 6 ~ 8 or more Not applied.
Automatic EOB reset time & At 00h 00m on the first day of every month
date
Maximum demand
Integration method ‫ ܆‬Block /‫܈‬ Sliding window
Integration time 30 minutes (Default)
Sub interval 5 minutes (Fixed)
LP recording Import Active (+), Import Reactive (+)
(at least six (6) channels) Import Apparent (+)
Current Average Power Factor
CT ratio 1
VT ratio 1
The number of digits for display
Values Integer Decimal Unit
Energy and Energy 8 0 kWh, kVah, kVAh
demand Demand 8 0 W, Var, VA
Voltage 6 2 Volt
Instantaneous Current 5 3 Amp
Measurement Power 8 0 V, Var, VA
Values Power Factor 1 3 N/A
Frequency 2 2 Hz
Display and OBIS Codes
IMPORT from SEC EXPORT to SEC
Register OBIS Register OBIS
(A.B.C.D.E.F.) (A.B.C.D.E.F.)
KWH Total Import active energy 1.0.1.8.0.255 KWH Total Export active energy 1.0.2.8.0.255
KWH Total Import active energy KWH Total Export active energy
1.0.1.8.1.255 1.0.2.8.1.255
(QI+QIV) [Tariff 1] (QII+QIII) [Tariff 1]
KWH Total Import active energy KWH Total Export active energy
1.0.1.8.2.255 1.0.2.8.2.255
(QI+QIV) [Tariff 2] (QII+QIII) [Tariff 2]
KWH Total Import active energy KWH Total Export active energy
1.0.1.8.3.255 1.0.2.8.3.255
(QI+QIV) [Tariff 3] (QII+QIII) [Tariff 3]

Page 1 of 2
Default Configurations for MV Revenue Meters
KWH Total Import active energy KWH Total Export active energy
(QI+QIV) [Tariff 4] 1.0.1.8.4.255 (QII+QIII) [Tariff 4] 1.0.2.8.4.255

KWH Total Import active energy KWH Total Export active energy
1.0.1.8.5.255 1.0.2.8.5.255
(QI+QIV) [Tariff 5] (QII+QIII) [Tariff 5]
KWH Total Import active energy KWH Total Export active energy
1.0.1.8.6.255 1.0.2.8.6.255
(QI+QIV) [Tariff 6] (QII+QIII) [Tariff 6]
KWH Total Import active energy KWH Total Export active energy
1.0.1.8.7.255 1.0.2.8.7.255
(QI+QIV) [Tariff 7] (QII+QIII) [Tariff 7]
KWH Total Import active energy KWH Total Export active energy
1.0.1.8.8.255 1.0.2.8.8.255
(QI+QIV) [Tariff 8] (QII+QIII) [Tariff 8]
KVARH Total Import reactive KVARH Total Export reactive energy
1.0.3.8.0.255 1.0.4.8.0.255
energy (QI+QII) (QIII+QIV)
ɇ>ŝǀĞƌĂŐĞƉŽǁĞƌĨĂĐƚŽƌ 1.0.13.0.0.255
MAXIMUM DEMAND for Total MAXIMUM DEMAND for Total
1.0.1.6.0.255 1.0.2.6.0.255
Import active power (QI+QIV) Export active power (QII+QIII)
KVAh Total Import apparent KVAh Total Export apparent energy
1.0.9.8.0.255 1.0.10.8.0.255
energy (QI+QIV) (QII+QIII)
KVAR Total import reactive 1.0.5.8.0.255 KVAR Total Export reactive energy 1.0.7.8.0.255
energy (QI) (QIII)
KVAR Total import reactive 1.0.6.8.0.255 KVAR Total Export reactive energy 1.0.8.8.0.255
energy (QII) (QIV)