Download as xlsx, pdf, or txt
Download as xlsx, pdf, or txt
You are on page 1of 1

Project:

REPLACE MAINTENANCE BLDG. IN RAS TANURA AT SOUTH TERMINAL


BI: 10-00675
THERMOPLASTIC PIPE INSTALLER QUALIFICATION Contract No. 6600033483

TRAINING LOG
ITEM
NO. NAME OF EMPLOYEE DATE OF TRAINING HOURS NAME OF INSTRUCTOR PRODUCT NAME OF MANUFACTURER REMARKS

1 LALMANI BABU RAM YADAV May 22, 2016 1 R. Pablo PVC, Class-5 Materials Neproplast, New Product Industries Co. Ltd.

2 AVADHESH KUMAR YADAV May 22, 2016 1 R. Pablo PVC, Class-5 Materials Neproplast, New Product Industries Co. Ltd.

3 x x x x x x x x x x NOTHING FOLLOWS x x x x x x x x x x

10

Prepared By: Noted By: Approved By:

ROLANDO A. PABLO ALFREDO ABUAN JR. RANDY VILLARUEL


(QC RTR/UG Piping Inspector, Q-Fisk) (QC Manager, Target) (QA Manager, Target)

You might also like