Download as xlsx, pdf, or txt
Download as xlsx, pdf, or txt
You are on page 1of 10

F01(EXP-P-05)

Format for claiming reimbursement on account of official travel

Period of Claim: __*******


(Monthly only)
Mode of Distance in Amount
S. No. Date of travel From To Reason for travel Total (Km) Claim Rate
Travel (Km) (Rs.)

1 01.07.22

2 01.07.22

3 01.07.22
4 02.07.22
5 02.07.22
6 02.07.22
7 02.07.22
8 02.07.22
9 02.07.22
10 02.07.22
11 02.07.22
12 02.07.22
13 03.07.22
14 03.07.22
15 03.07.22
16 03.07.22
17 03.07.22
18 03.07.22
19 03.07.22
20 04.07.22
21 04.07.22
22 04.07.22
23 04.07.22
24 04.07.22
25 05.07.22
26 05.07.22
27 05.07.22
28 05.07.22
29 06.07.22
30 06.07.22
31 06.07.22
32 06.07.22
33 06.07.22
34 06.07.22
35 06.07.22
36 08.07.22
37 08.07.22
38 08.07.22
39 08.07.22
40 08.07.22
41 08.07.22
42 09.07.22
43 09.07.22
44 09.07.22
45 09.07.22
46 09.07.22
47 10.07.22
48 10.07.22
49 10.07.22
50 10.07.22
51 10.07.22
52 11.07.22
53 11.07.22
54 11.07.22
55 16.07.22
56 16.07.22
57 16.07.22
58 16.07.22
59 16.07.22
60 16.07.22
61 16.07.22
62 16.07.22
63 16.07.22
64 16.07.22
65 17.07.22
66 17.07.22
67 17.07.22
68 17.07.22
69 17.07.22
70 17.07.22
71 17.07.22
72 17.07.22
73 17.07.22
74 18.07.22
75 18.07.22
76 18.07.22
77 18.07.22
78 18.07.22
79 18.07.22
80 18.07.22
81 18.07.22
82 18.07.22
83 19.07.22
84 19.07.22
85 19.07.22
86 19.07.22
87 19.07.22
88 19.07.22
89 19.07.22
90 20.07.22
91 20.07.22
92 20.07.22
93 20.07.22
94 20.07.22
95 20.07.22
96 20.07.22
97 20.07.22
98 21.07.22
99 21.07.22
100 21.07.22
101 21.07.22
102 21.07.22
103 21.07.22
104 21.07.22
105 21.07.22
106 21.07.22
107 21.07.22
108 21.07.22

47
48
Total 0
Amount in words : ********

I declare that I am maintaining a 2/4 wheeler(Tick applicable) with Signature of Employee :


Reg. No. ____ for performing the official duties.
Name of Employee:
Employee No.:
Approved By: Designation: RETAINER
Signature : Department:
Name : Date of Claim :
Emp. No. : Account No: **********
Designation : Bank Name: )********
Official Address of Claiment:
Notes:
1. Claims to be made twice a month only i.e 1 to 15th and 16 to 31st of the month
2. Amount would be credited directly to individual account by Accounts department
3. All claims to verified by Deptt head not below the level of Manager
4. Please furnish all above information

C:\Hariom\Form
F01(EXP-P-05)

Format for claiming reimbursement on account of official travel

Period of Claim: __*******


(Monthly only)
Mode of Distance in Amount
S. No. Date of travel From To Reason for travel Total (Km) Claim Rate
Travel (Km) (Rs.)
F2 HAL 220 kv varthur road, jawahar nagar for
1 01.04.22 Marath halli S17 Sub division bike 13 13 5 65
UG cable laying.
F2 HAL Manjunath colony, Yemalur Village,
2 02.04.22 Marath halli S17 Sub division Kempapura, Kariyammana Agrahara for bike 15 15 5 75
observations.
F2 HAL Sanjay Nagar, Manjunatha Colony for
3 04.04.22 Marath halli S17 Sub division bike 7 7 5 35
UG cable laying.
F2 HAL sanjay Nagar, Manjunatha Nagar, RJ
4 05.04.22 Marath halli S17 Sub division Garden for UG cable laying, observations bike 10 10 5 50
finding of total feeder.
F12 Yemalur village, F13 Doddenekundi,
Vibhuti pura, Gururaja layout, Pragathi layout,
5 07.04.22 Marath halli S17 Sub division bike 20 20 5 100
balaji layout, F8 Hal route, for notice
observations, F10 for RMU erection.
6 08.04.22 Marath halli S17 F12 Yemalur village work not started bike 5 5 5 25
S17 F13 Near outer ring road,
7 08.04.22 S17 F12 Yemalur village
Doddenekundi for RMU erection bike 5 5 5 25

S17 F13 Near outer ring went with TKC person to discuss
8 08.04.22 road, Doddenekundi
F2 feeder, Ramanjaneya layout bike 5 5 5 25
cable route.
F2 feeder, Ramanjaneya
9 08.04.22 layout
S17 F12 Yemalur village for RMU erection near Govt School bike 6 6 5 30
10 08.04.22 S17 F12 Yemalur village TPC OFFICE: Indira nagar To attend the meeting bike 7 7 5 35
to meet Prabhu for to know the location of
11 09.04.022 Marath halli F2 feeder, Ramanjaneya layout bike 4 4 5 20
F13 feeder CAPEX work location

12 09.04.022
F2 feeder, Ramanjaneya F13 HAL for to notice CAPEX For to notice observations CAPEX bike 4 4 5 20
layout observations work
13 09.04.022
F2 feeder, Ramanjaneya
Vignan Nagar, Mangesh palya
F08 HAL For to notice observations bike 7 7 5 35
layout CAPEX work
14 09.04.022
Vignan Nagar, Mangesh
basava nagar Road, Mangesh palya
For to notice observations CAPEX bike 3 3 5 15
palya work
basava nagar Road, F17 HAL for to notice CAPEx work
15 09.04.022 Ramesh Nagar, Mangesh Palya road bike 4 4 5 20
Mangesh palya observations
Ramesh Nagar, Mangesh
16 09.04.022 Nisarga Layout, Doddenekundi F13 HAL for to notice CAPEX observations bike 7 7 5 35
Palya road
17 11.04.22 Marath halli F12 Yemalur Bridge to attend observations bike 5 5 5 25
CaPEX work(misguided address by AFTL
18 11.04.22 F12 Yemalur Bridge Kauvery Garden, BTP Park bike 10 10 5 50
person)
19 11.04.22 Kauvery Garden, BTP Park BTP Substation CaPEX work observatipns bike 5 5 5 25
20 11.04.22 BTP Substation F12 Yemalur Bridge to attend observations bike 7 7 5 35
21 11.04.22 F12 Yemalur Bridge F2 feeder, Sanjay Nagar S/T joint work bike 4 4 5 20
22 11.04.22 F2 feeder, Sanjay Nagar F2 feeder, Anand nagar Open trench, S/T joint work bike 2 2 5 10
23 11.04.22 F2 feeder, Anand nagar Marath halli bike 3 3 5 15
24 13.04.22 Marath halli S17 sub division office, HAL Road To Meet AEE sir regarding CAPEX work bike 9 9 5 45
S17 sub division office,
25 13.04.22 TPC OFFICE: Indira nagar bike 0 5 0
HAL Road
26 13.04.22 TPC OFFICE: Indira nagar corporate office, To submit the weekly, monthely reports. bike 12 12 5 60
27 13.04.22 corporate office, S17 sub division office, HAL Road To submit the monthely reports. bike 12 12 5 60
S17 sub division office,
28 13.04.22 S7 sub division office To submit the monthely reports. bike 9 9 5 45
HAL Road
29 13.04.22 S7 sub division office Marath halli To submit the monthely reports. bike 4 4 5 20
30 14.04.22 Marath halli 4th block, koramangala S16 Sub division CAPEX work inventory bike 15 15 5 75
31 14.04.22 4th block, koramangala Cauvery colony, koramangala S16 Sub division CAPEX work inventory bike 3 3 5 15
Cauvery colony,
32 14.04.22 6th block, koramangala S16 Sub division CAPEX work inventory bike 3 3 5 15
koramangala
33 14.04.22 6th block, koramangala 8 th block, 4th cross, koramangala S16 Sub division CAPEX work inventory bike 2 2 5 10
8 th block, 4th cross,
34 14.04.22 Ejpura junction S16 Sub division CAPEX work inventory bike 4 4 5 20
koramangala
35 14.04.22 Ejpura junction Maruthi nagar, BTM layout S4 Sub division CAPEX work inventory bike 4 4 5 20
36 14.04.22 Maruthi nagar, BTM layout Palamgrove layout S4 Sub division CAPEX work inventory bike 4 4 5 20
37 14.04.22 Palamgrove layout Marath halli 10 10
38 17.04.22 Marathahalli Sakra Hospital, kadubeesanahalli. S17 F4 for UG cable laying bike 6 6 5 30
39 17.04.22 Sakra hospital GOVT school, Yemalur S17 F13 indoor Termination kits bike 5 5 5 25
40 17.04.22 GOVT school, Yemalur Sakra Hospital, kadubeesanahalli. S17 F4 for UG cable laying bike 5 5 5 25
Sakra Hospital,
41 17.04.22 Marathahalli S17 F4 for UG cable laying bike 6 6 5 30
kadubeesanahalli.
42 18.04.22 Marathahalli Four pole structure, Yemalur road S17 F08 KCV for S/T, I/D &O/d works bike 6 6 5 30
Four pole structure, Yemalur
43 18.04.22 Yemalur junction near S17 F18 KCV for S/T, I/D &O/d works bike 2 2 5 10
road
44 18.04.22 Yemalur junction near Sakra Hospital, kadubeesanahalli. S17 F4 RMZ feeder for UG cable visiting bike 5 5 5 25
Sakra Hospital, 77 Degree Town centre, Yemalur
45 18.04.22 S17 F08 KCV for S/T, I/D &O/d works bike 5 5 5 25
kadubeesanahalli. Raod
77 Degree Town centre,
46 18.04.22 Four pole structure, Yemalur road S17 F18 KCV for S/T, I/D &O/d works bike 2 2 5 10
Yemalur Raod
Four pole structure, Yemalur
47 18.04.22 Marathahalli bike 6 6 5 30
road
conversion of DP structure to SPMT GOS
48 19.04.22 Marathahalli Krushak layout, HAL quarters bike 4 4 5 20
structure work
Krushak layout, HAL
49 19.04.22 Four pole structure, Yemalur road S17 F08 for commissioning bike 4 4 5 20
quarters
Four pole structure, Yemalur conversion of DP structure to SPMT GOS
50 19.04.22 Krushak layout, HAL quarters bike 4 4 5 20
road structure work
Krushak layout, HAL
51 19.04.22 Yemalur junction near S17 F18 for commissioning bike 3 3 5 15
quarters
52 19.04.22 Yemalur junction near Marathahalli bike 4 4 5 20
53 20.04.22 Marathahalli Yemalur village S17 F12 KCV RMU-4 for S/T , O/D, I/D works. bike 6 6 5 30
54 20.04.22 Yemalur village Kempapura, yemalur S17 F12 KCV RMU-1 for S/T , O/D, I/D works. bike 2 2 5 10
55 20.04.22 Kempapura, yemalur Ramesh Nagar, Mangesh Palya road S17 F8 HAL for CAPEX work inventory bike 8 8 5 40
Ramesh Nagar, Mangesh
56 20.04.22 Vignan Nagar, Mangesh palya S17 F8 HAL for CAPEX work inventory bike 3 3 5 15
Palya road
Vignan Nagar, Mangesh
57 20.04.22 BTP Substation, Basava nagar S17 F15 for CAPEx work inventory bike 3 3 5 15
palya
BTP Substation, Basava
58 20.04.22 Nisarga Layout, Doddenekundi S17 F13 HAL CAPEX work invtory bike 9 9 5 45
nagar
Nisarga Layout,
59 20.04.22 Kempapura, yemalur S17 F12 KCV RMU-3 for S/T , O/D, I/D works. bike 7 7 5 35
Doddenekundi
60 20.04.22 Kempapura, yemalur GOVT school, Yemalur village S17 F12 KCV RMU-5 for S/T , O/D, I/D works. bike 2 2 5 10
GOVT school, Yemalur
61 20.04.22 Marathahalli bike 5 5 5 25
village
Grururaja layout, Doddenkeundi Bus S17 F13 HAL RMU-3 for S.T, I/D, O/D looping
62 21.04.22 Marathahalli bike 6 6 5 30
stop and rising works
Grururaja layout, S17 F13 HAL for S.T, I/D, O/D looping and
63 21.04.22 Pragathi layout, Doddenekundi bike 3 3 5 15
Doddenkeundi Bus stop rising works
Pragathi layout, Grururaja layout, Doddenkeundi Bus S17 F13 HAL RMU-3 for S.T, I/D, O/D looping
64 21.04.22 bike 3 3 5 15
Doddenekundi stop and rising works
Grururaja layout,
65 21.04.22 Marathahalli bike 6 6 5 30
Doddenkeundi Bus stop
S17 F12 KCV for OFC network with OFC
66 23.04.22 Marathahalli Kempapura, yemalur bike 6 6 5 30
Persong(sreekanth)
S17 F12 KCV for OFC network with OFC
67 23.04.22 Kempapura, yemalur Kariyammana Agrahara village bike 4 4 5 20
Persong(sreekanth)
Kariyammana Agrahara S17 F12 KCV for OFC network with OFC
68 23.04.22 Prestige Apt,HAL Yemalur bike 4 4 5 20
village Persong(sreekanth)
69 23.04.22 Prestige Apt, Yemalur Marathahalli bike 6 6 5 30
70 24.04.22 Marathahalli 1 st cross, Anand nagar S17 F2 HAL for cable commissioning. bike 5 5 5 25
71 24.04.22 1 st cross, Anand nagar Marathahalli S17 F2 HAL for cable commissioning. bike 5 5 5 25
72 26.04.22 Marathahalli SBR palace, Tulsi theatre road S17 F10 KBH for FMU-1 I/D termination work bike 4 4 5 20
SBR palace, Tulsi theatre
73 26.04.22 Manjunath layout, Marathahalli S17 F10 KBH for RMU-2 I/D termination work bike 3 3 5 15
road
Manjunath layout, KIA show room, Kariyammana S17 F15 EXORA for OFC chamber
74 26.04.22 bike 4 4 5 20
Marathahalli Agrahara village observations notice with OFC person
KIA show room,
Patel school, Kariyammana Agrahara S17 F15 EXORA for OFC chamber
75 26.04.22 Kariyammana Agrahara bike 4 4 5 20
village observations notice with OFC person
village
Patel school, Kariyammana S17 F15 EXORA for OFC chamber
76 26.04.22 Sarjapur road, kadubeesanahalli bike 3 3 5 15
Agrahara village observations notice with OFC person
Sarjapur road,
77 26.04.22 SBR palace, Tulsi theatre road S17 F10 KBH for FMU-1 I/D termination work bike 3 3 5 15
kadubeesanahalli
SBR palace, Tulsi theatre
78 26.04.22 Manjunath layout, Marathahalli S17 F10 KBH for RMU-2 I/D termination work bike 3 3 5 15
road
Manjunath layout,
79 26.04.22 wasa layout, Doddenekundi S17 F13 HAL for UG cable laying bike 5 5 5 25
Marathahalli
80 26.04.22 wasa layout, Doddenekundi Jawahar Nagar, HAL quarters S17 F2 & F13 HAL for S/T joint works bike 4 4 5 20
Jawahar Nagar, HAL Lake view layout, railway gate, S17 F13 HAL for OFC chamber observations
81 26.04.22 bike 4 4 5 20
quarters Doddenekundi notice with OFC person
Lake view layout, railway S17 F13 HAL for OFC chamber observations
26.04.22 Marathahalli bike 5 5
gate, Doddenekundi notice with OFC person
82 27.04.22 Marathahalli Jawahar Nagar, HAL quarters S17 F2 & F13 HAL for S/T joint works bike 4 4 5 20
Jawahar Nagar, HAL
83 27.04.22 wasa layout, Doddenekundi S17 F13 HAL for UG cable laying bike 3 3 5 15
quarters
Balaji layout, vibhutipura ext, S17 F13 HAL for OFC chamber observations
84 27.04.22 wasa layout, Doddenekundi bike 5 5 5 25
Doddenekundi notice with OFC person
Balaji layout, vibhutipura
85 27.04.22 Jawahar Nagar, HAL quarters S17 F2 & F13 HAL for S/T joint works bike 3 3 5 15
ext, Doddenekundi
Jawahar Nagar, HAL
86 27.04.22 Marathahalli S17 F2 & F13 HAL for S/T joint works bike 4 4 5 20
quarters
S17 F13 HAL for UG cable laying(only earthing
87 28.04.22 Marathahalli wasa layout, Doddenekundi bike 5 5 5 25
pits done)
S17 F13 HAL for UG cable laying(only earthing
88 28.04.22 wasa layout, Doddenekundi Jawahar Nagar, HAL quarters bike 3 3 5 15
pits done)
Jawahar Nagar, HAL S17 F13 HAL for UG cable laying(only earthing
89 28.04.22 Marathahalli bike 4 4 5 20
quarters pits done)
90 29.04.22 Marathahalli SBR palace, Tulsi theatre road S17 F10 KBH for cable commissioning bike 4 4 5 20
SBR palace, Tulsi theatre
91 29.04.22 Manjunath layout, Marathahalli S17 F10 KBH for cable commissioning bike 2.5 2.5 5 12.5
road
Manjunath layout, S17 F15 EXORA for Hard rock sample with
92 29.04.22 Kadubeesanahalli, KIA showroom bike 5.2 5.2 5 26
Marathahalli Pmu
Kadubeesanahalli, KIA
93 29.04.22 SBR palace, Tulsi theatre road S17 F10 KBH for cable commissioning bike 3 3 5 15
showroom
SBR palace, Tulsi theatre
94 29.04.22 Manjunath layout, Marathahalli S17 F10 KBH for cable commissioning bike 2.5 2.5 5 12.5
road
Manjunath layout,
95 29.04.22 Marathahalli S17 F10 KBH for cable commissioning bike 5 5 5 25
Marathahalli
96 30.04.22 Marathahalli Manjunath layout, Marathahalli S17 F10 KBH with TKC person regarding work bike 4 4 5 20
Manjunath layout, S17 F15 EXORA for RMU Indoor termination
97 30.04.22 Kadubeesanahalli, KIA showroom bike 4 4 5 20
Marathahalli work
Kadubeesanahalli, KIA S17 F15 EXORA for RMU Indoor termination
98 30.04.22 Marathahalli bike 5 5 5 25
showroom work
99
100
0 0
Total 2511
Amount in words : ********

I declare that I am maintaining a 2/4 wheeler(Tick applicable) with Signature of Employee :


Reg. No. ____ for performing the official duties.
Name of Employee:
Employee No.:
Approved By: Designation: RETAINER
Signature : Department:
Name : Date of Claim :
Emp. No. : Account No: **********
Designation : Bank Name: )********
Official Address of Claiment:
Notes:
1. Claims to be made twice a month only i.e 1 to 15th and 16 to 31st of the month
2. Amount would be credited directly to individual account by Accounts department
3. All claims to verified by Deptt head not below the level of Manager
4. Please furnish all above information

C:\Hariom\Form
Daily progress format - PMC works

Date 09.09.2022 Division Koramangala S/d S16 Feeder

Descripti
OFC CABLE/
Type of on/
OFC DUCT/
W.O no 24 works/ Works Works
END CAPS/
of the day carried
MAN HOLES
out

Total Executed qty


till Quality
3cx95 sq.mm 3cx95 sq.mm
date(Survey/Executi Observations
on)

Progress of the NA NA
day
(Survey/Execut
ed)

PPE's not
3cx400 sq.mm 3cx400 sq.mm
used
Safety
NA NA observati
ons
Meetings Indira Meeting
Discussio
attended details Location attendees
Nagar n details
(If any) details
progress format - PMC works

ALL FEEDER TPC representative YOGESH

UG CABLE LAYING, earth pit


Work order qty
digging

1. 5471
Document
Remarks
ation/
Data 510
updation
work.
2.
Preparatio
n&
upload
PPT PRE
POST
ANALYSI
S sheet of
08 no’s
LT feeders
of S16. 5520

47

PPE"s used partially .


94

PMU/O&M officials inspected details of the day


85
2035

440

5.093

0.089
PMC- TATADWPOWER -Weekly progress
A Location Progress for week ( to )
Site survey photos
Sl No cost Agency Circle Division S/d Feeder Surveyed details (HT LENTGH OF THE CABLE TPC representative Remarks
From To Date DTC details AB Cable S/T KITS End Termination Kits link
(crs UG/LT ABC/RMU) LAID(KM'S)
) OPEN TRENCH:
3CX95+1C OFC DUCT
3CX400 3C X 95 MTRS
X70+1CX1 3CX400 SQ,MM 3CX95SQ,MM 3CX400 SQ,MM 3C X 95 SQ.MM
SQ,MM SQ.MM
6
At RMU-4, F12 KC Rally road crossing AE sir
1 V R PATIL SOUTH KORAMANGALA S17 F12 RMU-4 RMU-5 04.09.21 0 0 PRAVEEN ATTACHED proposed open trench due to underground
utlities.
2 V R PATIL SOUTH KORAMANGALA S17 F12 RMU-4 RMU-5(AT SCHOOL) 05.09.21 UG CABLE LAYING 0.078 PRAVEEN ATTACHED Cable rollers are not used
F13(CHANGEOVER
3 V R PATIL SOUTH KORAMANGALA S17 F12 F12 06.09.21 UG CABLE LAYING 0.07 PRAVEEN ATTACHED PPE'S not used properly.
CABLE
ARAVIND CHALLAGATTA ROAD CROSSING AT OPEN TRENCH, CABLE At this point excess of existing cables is there,
4 SOUTH KORAMANGALA S17 F07 07.09.21 0.02 PRAVEEN ATTACHED
ELE VILLAGE SPANDANA VIHAR LAYING so depth maintained at 0.7 mtr
F13(CHANGEOVER OPEN TRENCH, CABLE
5 V R PATIL SOUTH KORAMANGALA S17 F12 F12 08.09.21 0.01 PRAVEEN ATTACHED GI pipe not used.
CABLE LAYING
KARIYAMMA
6 V R PATIL SOUTH KORAMANGALA S17 F15 AGRAHARA RMU-3 08.09.21 EARTH PITS PRAVEEN ATTACHED 4 NOS EARTH PITS DONE
VILLAGE
RAMACHANDRAP KARIYAMMA
7 V R PATIL SOUTH KORAMANGALA S17 F15 09.09.21 UG CABLE LAYING 0.282 PRAVEEN ATTACHED DEPTH MAINTAINED .9 MTR
PA BUILDING AGRAHARA ROAD
NEAR HELIOS KARIYAMMA 50 MM:188 MTRS, DEPTH MAINTAINED 1.6 MTR DUE TO
8 V R PATIL SOUTH KORAMANGALA S17 F15 13.09.21 UG CABLE LAYING 0.228 PRAVEEN ATTACHED
BUSINESS PARK AGRAHARA ROAD 40MM:188 MTRS WATER PIPE LINE, PARTIAL PPE'S USED.
Near Patel school,and KARIYAMMA 50 MM:281 MTRS, cable rollers has to be use, and properly
9 V R PATIL SOUTH KORAMANGALA S17 F15 14.09.21 UG CABLE LAYING 0.328 PRAVEEN ATTACHED
RMU-3 to opp PSS AGRAHARA ROAD 40MM:281 MTRS handled
Oracle velocity to TC
KARIYAMMA 50 MM:421 MTRS,
10 V R PATIL SOUTH KORAMANGALA S17 F15 114, Near Patel public 15.09.21 UG CABLE LAYING 0.421 PRAVEEN ATTACHED End caps not provided.
AGRAHARA ROAD 40MM:421 MTRS
school to TC no
KADUBEESAANAH 50 MM:200 MTRS,
11 V R PATIL SOUTH KORAMANGALA S7 F3 PANATHUR 16.09.21 UG CABLE LAYING 0.301 PRAVEEN ATTACHED cable rollers not used, PPE"s not maintained.
ALLI 40MM:200 MTRS
KARIYAMMA
12 V R PATIL SOUTH KORAMANGALA S17 F15 Bellandur 16.09.21 Open Trench digging PRAVEEN ATTACHED due to water pipe line depth not properly digged.
AGRAHARA ROAD
Bellandur, kariyamma open trench closing, UG 50 MM:90 MTRS, due to excess water pipe line depth maintaned
13 V R PATIL SOUTH KORAMANGALA S17 F15 Nagrajuna green woods 17.09.21 0.09 PRAVEEN ATTACHED
agr rd cable laying by HDD 40MM:90 MTRS 0.6 mtr. At open trench
2nd cross road, 50 MM:120 MTRS,
14 V R PATIL SOUTH KORAMANGALA S17 F12 Kempapura Main Road 17.09.21 UG CABLE LAYING 0.25 PRAVEEN ATTACHED PPE'S not used properly.
kempapura 40MM:120 MTRS
50 MM:178 MTRS, 4" drill bit used, cable not properly handled,
15 V R PATIL SOUTH KORAMANGALA S17 F12 Near Yelamur bridge Kempapura Main Road 18.09.21 UG CABLE LAYING 0.346 PRAVEEN ATTACHED
40MM:178 MTRS PPE'S not used properly.
OPEN TRENCH:5 They didn’t intimate while doing of S/T joint
16 V R PATIL SOUTH KORAMANGALA S17 F12 Near Yelamur bridge Kempapura Main Road 19.09.21 S/T KITS, OPEN TRENCH 5 PRAVEEN ATTACHED
MTRS kits.
50 MM:120 MTRS,
17 V R PATIL SOUTH KORAMANGALA S17 F12 Near Yelamur bridge Kempapura Main Road 20.09.21 UG CABLE LAYING 0.386 PRAVEEN ATTACHED PPE'S not used properly.
40MM:120 MTRS
50 MM:280MTRS,
18 V R PATIL SOUTH KORAMANGALA S17 F12 Near Yelamur bridge Kempapura Main Road 20.09.21 UG CABLE LAYING 0.383 1 PRAVEEN ATTACHED cable not properly handled
40MM:280 MTRS
block -d, prestige
19 V R PATIL SOUTH KORAMANGALA S17 F15 kadubeesanhalli 21.09.21 Earth Pits PRAVEEN ATTACHED 5 no's earth pits done, PPE'S not used properly.
silver crest
20 V R PATIL SOUTH KORAMANGALA S17 F12 Ittiana Anai apt Kempapura Main Road 22.09.21 Earth Pits, S/T joint 1 PRAVEEN ATTACHED 5 no's earth pits done, PPE'S not used properly.
block -d, prestige UG CABLE 50 MM:64MTRS,
21 V R PATIL SOUTH KORAMANGALA S17 F15 kadubeesanhalli 22.09.21 0.084 PRAVEEN ATTACHED about 66 kv UG, change over cable b/w F9 to F15
silver crest LAYING,Earth Pits 40MM:64 MTRS
UG CABLE 50 MM:226 MTRS,
22 V R PATIL SOUTH KORAMANGALA S17 F12 Kempapura Road Kempapura 23.09.21 0.353 PRAVEEN ATTACHED cable rollers not used, PPE"s not maintained.
LAYING,Earth Pits 40MM:226 MTRS
KADUBEESAANAH UG CABLE 50 MM:94MTRS, Due to 66 kv calbe depth maintained 0.7 to 1 mtr
23 V R PATIL SOUTH KORAMANGALA S17 F15 Ring Road 23.09.21 0.094 PRAVEEN ATTACHED
ALLI LAYING,Earth Pits 40MM:94 MTRS depth.
24 V R PATIL SOUTH KORAMANGALA S17 F12 Kempapura Road Kempapura 24.09.21 S/T KITS, Earth pit digging 1 PRAVEEN ATTACHED with out intimation S/T joint done.
KADUBEESAANAH Due to 66 kv calbe depth maintained 0.7 to 1 mtr
25 V R PATIL SOUTH KORAMANGALA S17 F15 Ring Road 24.09.21 Earth pit digging PRAVEEN ATTACHED
ALLI depth.
KADUBEESAANAH UG cable laying, end 50 MM:150MTRS, Due to 66 kv calbe depth maintained 0.6 to 1 mtr
26 V R PATIL SOUTH KORAMANGALA S17 F15 Ring Road 25.09.21 0.19 6 PRAVEEN ATTACHED
ALLI termination kits. 40MM:150 MTRS depth.
UG CABLE 50 MM:187MTRS,
27 V R PATIL SOUTH KORAMANGALA S17 F12 Kempapura Road Kempapura 26.09.21 0.26 54 mtrs PRAVEEN ATTACHED cable not properly handled
LAYING,Earth Pits 40MM:187 MTRS
KARIYAMMA
Near Oracle valence tech UG CABLE 50 MM:54MTRS, Due to 66 kv calbe depth maintained 0.6 mtr
28 V R PATIL SOUTH KORAMANGALA S17 F15 AGRAHARA 26.09.21 0.054 PRAVEEN ATTACHED
park LAYING,Open trench 40MM:54 MTRS depth.
VILLAGE
UG CABLE 50 MM:115MTRS,
29 V R PATIL SOUTH KORAMANGALA S17 F12 Kempapura Road Kempapura 27.09.21 0 0.131 PRAVEEN ATTACHED cable not properly handled
LAYING,Earth Pits 40MM:115 MTRS
UG cable laying, end 50 MM:105MTRS, Due to 66 kv calbe depth maintained 0.6 mtr
30 V R PATIL SOUTH KORAMANGALA S17 F15 sarj pur kadubeesanhalli 27.09.21 0.108 4 PRAVEEN ATTACHED
termination kits. 40MM:105 MTRS depth.
50 MM:113MTRS, Gloves not used who handled the Hand braker
31 V R PATIL SOUTH KORAMANGALA S17 F12 Raju colony Yemalur 28.09.21 UG cable laying 0.113 PRAVEEN ATTACHED
40MM:113 MTRS manchine
Kariyamma Agrahara UG cable laying, S/T joint 50 MM:133MTRS, with out intimation S/T joint done, and not
32 V R PATIL SOUTH KORAMANGALA S17 F15 Bellandur 28.09.21 0.133 1 PRAVEEN ATTACHED
Raad work 40MM:133 MTRS properly done, and then rectified.
50 MM:224TRS, Gloves not used who handled the Hand braker
33 V R PATIL SOUTH KORAMANGALA S17 F12 Raju colony Yemalur 29.09.21 UG cable laying 0.224 PRAVEEN ATTACHED
40MM:224 MTRS manchine
Venkappa building, Earth pits 2 No's Safety barricading not provide for
34 V R PATIL SOUTH KORAMANGALA S17 F12 Yemalur 30.09.21 earth pit digging PRAVEEN ATTACHED earth pits
sri sai homes road
Kariyamma Agrahara 50 MM:140TRS, Cable rollers are not used while laying on
35 V R PATIL SOUTH KORAMANGALA S17 F15 Bellandur 30.09.21 UG cable laying 0.139 PRAVEEN ATTACHED surface.
Raad 40MM:140 MTRS

UG cable laying, S/T joint 50 MM:135MTRS, Cable rollers are not used while laying on
36 V R PATIL SOUTH KORAMANGALA S17 F12 Yemalur Bellandur 01.10.21 0.157 1 PRAVEEN ATTACHED surface.
work 40MM:135 MTRS
Kariyamma Agrahara 50 MM:155TRS, at open trench due to 66 kv UG cable depth
37 V R PATIL SOUTH KORAMANGALA S17 F15 Bellandur 01.10.21 UG cable laying 0.201 20 mtrs PRAVEEN ATTACHED
Raad 40MM:155 MTRS maintained 0.7 mtrs
Kariyamma Agrahara UG cable laying, S/T joint 50 MM:120TRS, cable not properly handled
38 V R PATIL SOUTH KORAMANGALA S17 F12 Bellandur 02.10.21 0.122 PRAVEEN ATTACHED
Raad work 40MM:120 MTRS
50 MM:154TRS, Cable rollers are not used while laying on
39 V R PATIL SOUTH KORAMANGALA S17 F12 Shan boga colony Yemalur 04.010.21 UG cable laying 0.406 PRAVEEN ATTACHED surface.
40MM:154 MTRS
Me and Mr. Yogesh sir(VR PATIL) sir both
40 V R PATIL SOUTH KORAMANGALA S17 F02 & F13 HAL 220 Kv SS Sanjay nagar 05.10.21 Feeder visit PRAVEEN ATTACHED
visited feeders.
41 V R PATIL SOUTH KORAMANGALA S17 F02 Tulasi theatre road Marathahalli 07.10.21 Earth pit digging PRAVEEN ATTACHED Earth Pits: 4 Nos, PPE'S not used properly.
42 V R PATIL SOUTH KORAMANGALA S17 F10 KBR complex Sarj Pur, Outer ring road 07.10.21 Earth pit digging PRAVEEN ATTACHED Earth Pits: 1 Nos, PPE'S not used properly.
43 V R PATIL SOUTH KORAMANGALA S17 F10 Kaveri layout Marathahalli village 08.10.21 Earth pit digging PRAVEEN ATTACHED Earth Pits: 2 Nos, PPE'S not used properly.
44 V R PATIL SOUTH KORAMANGALA S17 F8 Near Karnataka bank Yemalur Main Road 08.10.21 Earth pit digging PRAVEEN ATTACHED Earth Pits: 3Nos, PPE'S not used properly.
50 MM:112TRS, PPEs not properly used,cable not properly
45 V R PATIL SOUTH KORAMANGALA S17 F2 Aakash Viahar Marathahalli Main road 08.10.21 UG cable laying 0.11 PRAVEEN ATTACHED handled
40MM:112 MTRS
50 MM:314TRS,
46 V R PATIL SOUTH KORAMANGALA S17 F2 Aakash Viahar Marathahalli Main road 09.10.21 UG cable laying 0.31 PRAVEEN ATTACHED cable not properly handled, PPE's used partially.
40MM:314 MTRS
50 MM:342TRS,
47 V R PATIL SOUTH KORAMANGALA S17 F10 Kaveri layout Marathahalli village 09.10.21 UG cable laying 0.336 PRAVEEN ATTACHED AT entry and exit pits depth maintained low.
40MM:342 MTRS
Should have been more careful while handgling
48 V R PATIL SOUTH KORAMANGALA S17 F10 Kaveri layout Marathahalli village 10.10.21 UG cable laying 0.22 PRAVEEN ATTACHED
drum.
50 MM:104TRS, PPE'S not used properly, Depth not maintained
49 V R PATIL SOUTH KORAMANGALA S17 F2 Ashwath nagar Subbaih reddy colony 11.10.21 UG cable laying 0.13 PRAVEEN ATTACHED
40MM:104 MTRS properly at entry & exit pits.
50 MM:230TRS, Cable not properly handled, end caps not
50 V R PATIL SOUTH KORAMANGALA S17 F10 Kaveri layout Marathahalli village 11.10.21 UG cable laying 0.146 0.206 PRAVEEN ATTACHED
40MM:230 MTRS provided.
51 V R PATIL SOUTH KORAMANGALA S17 F8 Raju colony Yelamur road 11.10.21 Earth pit digging PRAVEEN ATTACHED PPE's not maintained properly.
50 MM:124TRS,
52 V R PATIL SOUTH KORAMANGALA S17 F2 Ramanjaneya layout sanjay nagar 13.10.21 UG cable laying 0.155 PRAVEEN ATTACHED
40MM:124 MTRS
50 MM:172TRS, Depth not maintained properly at entry & exit
53 V R PATIL SOUTH KORAMANGALA S17 F10 SBR palace Opp Kaveri Layout 13.10.21 UG cable laying 0.123 0.196 PRAVEEN ATTACHED
40MM:172 MTRS pits.
Depth not maintained properly at entry & exit
54 V R PATIL SOUTH KORAMANGALA S17 F10 Kaveri Layout Thulasi Theatre Road 18.10.21 UG cable laying 0.172 0.067 PRAVEEN ATTACHED
pits.
55 V R PATIL SOUTH KORAMANGALA S17 F12 Venugopal Residency Yemalur 18.10.21 Earth pit digging PRAVEEN ATTACHED No. of earth pits:2 no's PPE's not used.
Depth not maintained properly at entry & exit
56 V R PATIL SOUTH KORAMANGALA S17 F10 Kaveri Layout Thulasi Theatre Road 19.10.21 UG cable laying 0.172 PRAVEEN ATTACHED
pits.
57 V R PATIL SOUTH KORAMANGALA S17 F12 Venugopal Residency Yemalur 19.10.21 Earth pit digging PRAVEEN ATTACHED No. of earth pits:5 no's PPE's not used.
58 V R PATIL SOUTH KORAMANGALA S17 F2 Ramanjaneya layout sanjay nagar 19.10.21 UG cable laying 0.088 PRAVEEN ATTACHED
59 V R PATIL SOUTH KORAMANGALA S17 F12 YPR Residency Yemalur 20.10.21 UG cable laying 0.619 Monoj Sir
60 V R PATIL SOUTH KORAMANGALA S17 F2 Ramanjaneya layout sanjay nagar 20.10.21 UG cable laying 0.08 Monoj Sir
61 V R PATIL SOUTH KORAMANGALA S17 F12 YPR Residency Yemalur 21.10.21 UG cable laying 0.614 PRAVEEN ATTACHED cable not properly handled, PPE's used partially.
62 V R PATIL SOUTH KORAMANGALA S17 F13 Doddenakundi Vibhuti Nagar 21.10.21 Earth pit digging PRAVEEN ATTACHED PPE's used Partially
63 V R PATIL SOUTH KORAMANGALA S17 F13 Doddenakundi Vibhuti Nagar 22.10.21 UG cable laying 0.214 PRAVEEN ATTACHED cable not properly handled, PPE's used partially.
64 V R PATIL SOUTH KORAMANGALA S17 F13 Doddenakundi Vibhuti Nagar 24.10.21 Earth pit digging PRAVEEN ATTACHED Gas pipe line rectifying work, earth pits:2 no's
GO'S ERECTED:3 NO'S, Cable commissioned
ARAVIND AB cable laying,
65 SOUTH KORAMANGALA S03 F03 Vannarpet Yerappa Garden 26.10.21 0.060(loop) 0.48 1 4 PRAVEEN ATTACHED from RMU-2 VL-2 to DTC -199 to DTC-02.,
ELE Commssioning of UG cable
GO's :3 No's
ARAVIND Shrinivagulu tank bed
66 SOUTH KORAMANGALA S03 F17 New friends colony 26.10.21 UG cable laying 0.06 PRAVEEN ATTACHED PPE's used Partially
ELE colony
67 V R PATIL SOUTH KORAMANGALA S17 F13 Doddenakundi Pragathi Layout 27.10.21 UG cable laying 0.088 PRAVEEN ATTACHED PPE's used Partially
Kariyammana UG cable laying, open
68 V R PATIL SOUTH KORAMANGALA S17 F15 PANATHUR 27.10.21 0.02 PRAVEEN ATTACHED Open Trench:0.010kms, PPE's used Partially.
agrahara road trench
69 V R PATIL SOUTH KORAMANGALA S17 F13 Doddenakundi Pragathi Layout 28.10.21 UG cable laying 0.244 PRAVEEN ATTACHED un nececarry joint occurred, PPE's used partilly.
70 V R PATIL SOUTH KORAMANGALA S17 F10 Kaveri layout marathahalli 28.10.21 UG cable laying 0.128 PRAVEEN ATTACHED PPE's used Partially
71 V R PATIL SOUTH KORAMANGALA S17 F13 Doddenakundi Pragathi Layout 29.10.21 UG cable laying 0.172 PRAVEEN ATTACHED At starting pit depth is low.
72 V R PATIL SOUTH KORAMANGALA S17 F10 Kaveri layout marathahalli 29.10.21 UG cable laying 0.129 PRAVEEN ATTACHED PPE's used Partially
Doddenakundi main 50 MM:240TRS,
73 V R PATIL SOUTH KORAMANGALA S17 F13 Guru raja lay out 30.10.21 UG cable laying 0.255 PRAVEEN ATTACHED PPE's used Partially
raod 40MM:240 MTRS
RMU Plinths:2 no's(plinth pillers damaged while
74 V R PATIL SOUTH KORAMANGALA S17 F10 Tulasi theatre road Marathahalli village 30.10.21 UG cable laying 0.137 PRAVEEN ATTACHED
erecting)
50 MM:254MTRS, Cable not Propelry Handled, PPE's not used
75 V R PATIL SOUTH KORAMANGALA S17 F13 GBJ colony Jawahar Nagar 31.10.21 UG cable laying 0.26 PRAVEEN ATTACHED
40MM:254MTRS properly.
76 V R PATIL SOUTH KORAMANGALA S17 F10 Tulasi theatre road Marathahalli village 31.10.21 UG cable laying 0.176 PRAVEEN ATTACHED AT entry and exit pits depth maintained low.
77 V R PATIL SOUTH KORAMANGALA S17 F13 GBJ colony Jawahar Nagar 02.11.21 UG cable laying 0.241 0.214 PRAVEEN ATTACHED PPE's used Partially
78 V R PATIL SOUTH KORAMANGALA S17 F10 Tulasi theatre road Marathahalli village 02.11.21 UG cable laying 0.075 PRAVEEN ATTACHED PPE's used Partially
50 MM:620TRS,
79 V R PATIL SOUTH KORAMANGALA S17 F13 Doddenekundi Vibhuti pura Extension 08.11.21 UG cable laying 0.688 PRAVEEN ATTACHED Cable not protected at entry pit.
40MM:620MTRS
sri ranamanjaneya
80 V R PATIL SOUTH KORAMANGALA S17 F10 Thulasi Theatre Road 08.11.21 UG cable laying 0.102 PRAVEEN ATTACHED Cable not properly handled.
building
81 V R PATIL SOUTH KORAMANGALA S17 F02 HAL quarters GAL Township 08.11.21 UG cable laying 0.086 PRAVEEN ATTACHED PPE's used Partially
50 MM:188 MTRS,
82 V R PATIL SOUTH KORAMANGALA S17 F13 Doddenekundi Vibhuti pura Extension 09.11.21 UG cable laying 0.18 PRAVEEN ATTACHED 4 " Drill bit used,Cable not properly handled.
40MM:188MTRS
sri ranamanjaneya 4" drill bit used, cable not properly handled,
83 V R PATIL SOUTH KORAMANGALA S17 F10 Thulasi Theatre Road 09.11.21 UG cable laying 0.208 PRAVEEN ATTACHED
building PPE'S not used properly.
UG cable laying, S/T joint 50 MM:125 MTRS,
84 V R PATIL SOUTH KORAMANGALA S17 F02 HAL quarters GAL Township 09.11.21 0.125 1 PRAVEEN ATTACHED without intimation S/T done, PPE's not used
work 40MM:125MTRS
UG cable laying, S/T joint 50 MM:110 MTRS, New 3cx95 sq.mm cable damaged, cable not
85 V R PATIL SOUTH KORAMANGALA S17 F13 prakash reddy layout Doddenekundi 10.11.21 0.137 1 PRAVEEN ATTACHED
work 40MM:110MTRS proeprly handleld, PPE's not used.
50 MM:410MTRS, Cable not properly Handled, Less depth at cable
86 V R PATIL SOUTH KORAMANGALA S17 F10 SBR palace Opp Thulasi Theatre Road 10.11.21 UG cable laying 0.388 PRAVEEN ATTACHED
40MM:410MTRS drum side.
Mantri Commercio KARIYAMMA
87 V R PATIL SOUTH KORAMANGALA S17 F4 10.11.21 Earth pit digging PRAVEEN ATTACHED PPE's Not used
Tower A AGRAHARA ROAD
50 MM:125 MTRS,
88 V R PATIL SOUTH KORAMANGALA S17 F2 HAL quarters GAL Township 10.11.21 UG cable laying 0.147 PRAVEEN PPE's Not used
40MM:125MTRS
89 V R PATIL SOUTH KORAMANGALA S17 F02 HAL quarters GAL Township 11.11.21 UG cable laying 0.134 PRAVEEN PPE's Not used
50 MM:330MTRS,
90 V R PATIL SOUTH KORAMANGALA S17 F13 prakash reddy layout Doddenekundi 11.11.21 UG cable laying 0.326 PRAVEEN PPE's Not used
40MM:330MTRS
91 V R PATIL SOUTH KORAMANGALA S17 F8 Raju colony Yemaljur main Road 12.11.21 Earth pit digging PRAVEEN ATTACHED Earth pit :3 No's, PPE's not used.
50 MM:198MTRS, End caps not provided, cable not propelry
92 V R PATIL SOUTH KORAMANGALA S17 F13 Parakash reddy layout Guru raja lay out 13.11.21 UG cable laying 0.192 1 PRAVEEN ATTACHED
40MM:198MTRS handled, PPE's not used.
Kariayammana
93 V R PATIL SOUTH KORAMANGALA S17 F8 Yemalur road 13.11.21 UG cable laying 0.272 PRAVEEN ATTACHED At dril bit depth is low, PPE's not used
Agrahara road
Marathahalli outer ringo 50 MM:160MTRS, With out intimation End termiantion done, PPE;s
94 V R PATIL SOUTH KORAMANGALA S17 F10 Ramanjaneya layout 13.11.21 UG cable laying 0.154 1 PRAVEEN ATTACHED
road 40MM:160MTRS used partially.
Nagarjuna green KARIYAMMA G0S erection and end Veritical GOS:4 nos, Horizontal GOS: 1 No's,
95 V R PATIL SOUTH KORAMANGALA S17 F15 13.11.21 4 PRAVEEN ATTACHED
woods AGRAHARA ROAD termination kits PPE' not properly used.
96 V R PATIL SOUTH KORAMANGALA S17 F02 HAL quarters GAL Township 14.11.21 S/T Joint work 1 1 PRAVEEN ATTACHED Without sand and tiles pit closed
UG cable laying, S/T joint Without sand and tiles pit closed, PPE's not used,
97 V R PATIL SOUTH KORAMANGALA S17 F13 Gururaja layout Doddenekundi 14.11.21 0.25 1 PRAVEEN ATTACHED
work Earth not covered with barricading.
Kariyammana Veritical GOS:4 nos, Horizontal GOS: 4 No's,
98 V R PATIL SOUTH KORAMANGALA S17 F15 Sree casa grand 15.11.21 G0S erection PRAVEEN ATTACHED
agrahara road PPE' not properly used.
99 V R PATIL SOUTH KORAMANGALA S17 F02 Sanjay Nagar Marathahalli 15.11.21 UG cable laying PRAVEEN ATTACHED PPE's Not used
100 V R PATIL SOUTH KORAMANGALA S17 F13 Gururaja layout Doddenekundi 15.11.21 UG cable laying 0.374 PRAVEEN ATTACHED At dril bit depth is low, PPE's not used
50 MM:160MTRS, Drill bit is low at starting of the pits, cable not
101 V R PATIL SOUTH KORAMANGALA S17 F02 Sanjay Nagar Marathahalli 16.11.21 UG cable laying 0.155 PRAVEEN ATTACHED
40MM:160MTRS properly handled, PPE's not used.
50 MM:230MTRS,
102 V R PATIL SOUTH KORAMANGALA S17 F13 Shan boga layout Vibhutipura 16.11.21 UG cable laying 0.222 PRAVEEN ATTACHED cable not properly handled, PPE's not used
40MM:230MTRS
G0S erection, End Veritical GOS:3 nos, Horizontal GOS: 2 No's,
103 V R PATIL SOUTH KORAMANGALA S17 F12 Kempapura Road Yemalur road 16.11.21 8 PRAVEEN ATTACHED
termination kits PPE' not properly used.
50 MM:267MTRS, cable not properly handled, PPE's not used,Drill
104 V R PATIL SOUTH KORAMANGALA S17 F02 Vishwapriya Laoyout Sanjay nagar 17.11.21 UG cable laying 0.315 PRAVEEN ATTACHED
40MM:267MTRS bit depth is low at starting of the pit
50 MM:415MTRS, cable not properly handled, PPE's not used,Drill
105 V R PATIL SOUTH KORAMANGALA S17 F13 Balaji enclave Amrutha residency 17.11.21 UG cable laying 0.521 PRAVEEN ATTACHED
40MM:415MTRS bit depth is low at starting of the pit
50 MM:146MTRS, Cable not Propelry Handled, PPE's not used
106 V R PATIL SOUTH KORAMANGALA S17 F02 Ramanjaneya layout Sanjay nagar 19.11.21 UG cable laying 0.195 PRAVEEN ATTACHED
40MM:146MTRS properly.
cable not properly handled, they have tried to
50 MM:330MTRS,
107 V R PATIL SOUTH KORAMANGALA S17 F13 Gururaja layout Doddenekundi 19.11.21 UG cable laying 0.483 PRAVEEN ATTACHED pullout the cablr from earth pit through Hydra
40MM:330MTRS
manchine, PPE not properly used.
50 MM:142MTRS, Open trench: 140 Mtrs, Depth maintained low
108 V R PATIL SOUTH KORAMANGALA S17 F15 chandana kadubeesanhalli 19.11.21 UG cable laying 0.065 0.075 PRAVEEN ATTACHED
40MM:142MTRS 0.8 mtrs
50 MM:266MTRS, Cable not Propelry Handled, PPE's not used
109 V R PATIL SOUTH KORAMANGALA S17 F02 Ashwath nagar Vibhuthipur Extension 20.11.21 UG cable laying 0.313 PRAVEEN ATTACHED
40MM:266MTRS properly.
50 MM:221MTRS, 4"bit used instead of 6" bit, end caps not
110 V R PATIL SOUTH KORAMANGALA S17 F13 Gururaja layout Ashwath nagar 20.11.21 UG cable laying 0.188 0.277 PRAVEEN ATTACHED
40MM:221MTRS provided, PPE's not used.
50 MM:170MTRS, Drill bit is low at starting of the pits, cable not
111 V R PATIL SOUTH KORAMANGALA S17 F13 Gururaja layout Rajanna layout 21.11.21 UG cable laying 0.218 PRAVEEN ATTACHED
40MM:170MTRS properly handled, PPE's not used.
Veritical 3GOS:4 nos, Horizontal 3GOS: 2 No's,
112 V R PATIL SOUTH KORAMANGALA S17 F12 Kempapura Road Yemalur road 21.11.21 G0S erection PRAVEEN ATTACHED Horizontal SPMT 4Gos:1 no'sPPE' not properly
used.
50 MM:362MTRS, Drill bit is low at starting of the pits, cable not
113 V R PATIL SOUTH KORAMANGALA S17 F02 RJ gardens Anand Nagar 23.11.21 UG cable laying 0.593 PRAVEEN ATTACHED
40MM:362MTRS properly handled, PPE's not used.
50 MM:190MTRS, Drill bit is low at starting of the pits, end caps not
114 V R PATIL SOUTH KORAMANGALA S17 F13 Gururaja layout Vibhutipura 23.11.21 UG cable laying 0.056 0.362 PRAVEEN ATTACHED
40MM:190MTRS provided, PPE's not used.
KARIYAMMA 50 MM:123MTRS, 4"bit used instead of 6" bit, end caps not
115 V R PATIL SOUTH KORAMANGALA S17 F12 Near Ganesh Temple 23.11.21 UG cable laying 0.171 PRAVEEN ATTACHED
AGRAHARA ROAD 40MM:123MTRS provided, PPE's not used.
50 MM:410MTRS, Drill bit is low at starting of the pits, end caps not
116 V R PATIL SOUTH KORAMANGALA S17 F13 Pragathi layout Balaji enclave 24.11.21 UG cable laying 0.28 0.293 PRAVEEN ATTACHED
40MM:410MTRS provided, PPE's not used.
50 MM:462MTRS, Drill bit is low at starting of the pits, end caps not
117 V R PATIL SOUTH KORAMANGALA S17 F13 Vibhutipura extension Doddenekundi 25.11.21 UG cable laying 0.755 PRAVEEN ATTACHED
40MM:462MTRS provided, PPE's not used.
118 V R PATIL SOUTH KORAMANGALA S17 F13 Vibhutipura extension Doddenekundi 27.11.21 UG cable laying 0.065 PRAVEEN ATTACHED PPE's not used.
50 MM:186MTRS, Drill bit is low at starting of the pits, cable not
119 V R PATIL SOUTH KORAMANGALA S17 F08 Yemalur HAL Airport road 27.11.21 UG cable laying 0.21 PRAVEEN ATTACHED
40MM:186MTRS properly handled, PPE's not used.
Drill bit is low at starting of the pits, cable not
120 V R PATIL SOUTH KORAMANGALA S17 F18 Yemalur HAL Airport road 27.11.21 UG cable laying 0.3 PRAVEEN ATTACHED
properly handled, PPE's not used.
Sri kodandarama
121 V R PATIL SOUTH KORAMANGALA S17 F13 Doddenekundi 28.11.21 UG cable laying 0.063 PRAVEEN ATTACHED PPE's not used.
temple
50 MM:220MTRS, End caps not provided, cable not propelry
122 V R PATIL SOUTH KORAMANGALA S17 F10 Nagarjuna serene Thulasi Theatre Road 28.11.21 UG cable laying 0.457 PRAVEEN ATTACHED
40MM:220MTRS handled, PPE's partially used.
UG cable laying, GOS 50 MM:82MTRS, Veritical GOS:4 nos, Horizontal GOS: 1 No's,
123 V R PATIL SOUTH KORAMANGALA S17 F12 Kempapura Road Yemalur road 30.11.21 0.205 PRAVEEN ATTACHED
erection 40MM:82MTRS PPE' not properly used.
50 MM:138MTRS, Depth maintaned low due to Gas and water
124 V R PATIL SOUTH KORAMANGALA S17 F08 Yemalur HAL Airport road 01.12.21 UG cable laying 0.174 PRAVEEN ATTACHED
40MM:138MTRS pipeline, PPE's not used.
125 V R PATIL SOUTH KORAMANGALA S17 F18 Yemalur HAL Airport road 01.12.21 UG cable laying 0.163 PRAVEEN ATTACHED

Horizontal 3 G0s Structure: 2 nos, verical


3GOS Structure: 2 No's, Horizontal 4 GOS
Kariyammana structure:1 No's, Spun Pole erection:1 nos,
126 V R PATIL SOUTH KORAMANGALA S17 F15 Bellandur 02.12.21 GOS, Spun Pole erection PRAVEEN ATTACHED
agrahara road Rusted material used, in one GOS erection
existing HG fuse set used, painting not done for
spun pole.

Horizontal 3 G0s Structure: 2 nos, verical


127 V R PATIL SOUTH KORAMANGALA S17 F12 Kempapura Road Yemalur road 03.12.21 GOS erection PRAVEEN ATTACHED 3GOS Structure: 3 No's, Rusted material used,
PPE's used partially.
Kariyammana
128 V R PATIL SOUTH KORAMANGALA S17 F15 Bellandur 03.12.21 S/T Joint work 1 PRAVEEN ATTACHED PPE's not used.
agrahara road

50 MM:314MTRS,
129 V R PATIL SOUTH KORAMANGALA S17 F10 Tulasi theatre road Marathahalli 04.12.21 UG cable laying 0.506 PRAVEEN ATTACHED PPE's partially used.
40MM:314MTRS

Horizontal 3 G0s Structure: 1 nos, verical


3GOS Structure: 8 No's, Horizontal 4 GOS
130 V R PATIL SOUTH KORAMANGALA S17 F10 Tulasi theatre road Marathahalli 06.12.21 GOS erection PRAVEEN ATTACHED structure:1 No's,Rusted material used, in two
GOS erection existing HG fuse set used, PPE's
used partially.
Open trench: 20 mtrs(Partial), PPE's used
131 V R PATIL SOUTH KORAMANGALA S17 F12 Kempapura Road Yemalur road 07.12.21 Open Trench PRAVEEN ATTACHED
partially.

Horizontal 3 G0s Structure: 0 nos,


verical 3GOS Structure: 5 No's,
132 V R PATIL SOUTH KORAMANGALA S17 F2 Ashwath nagar Marathahalli 08.12.21 GOS erection PRAVEEN ATTACHED
Horizontal 4 GOS structure: 1 No's,Rusted
material used.
depth maintained 0.9 Mtr, PPE's used
133 V R PATIL SOUTH KORAMANGALA S17 F15 Outerring road kadubeesanhalli 10.12.21 UG cable laying 0.6 PRAVEEN ATTACHED
partially.
134 V R PATIL SOUTH KORAMANGALA S17 F2 Jawahar nager Marathahalli 10.12.21 UG cable laying 0.025 0.015 PRAVEEN ATTACHED PPE's not used
50 MM:15MTRS,
135 V R PATIL SOUTH KORAMANGALA S17 F13 Jawahar nager Marathahalli 10.12.21 UG cable laying 0.015 PRAVEEN ATTACHED PPE's not used
40MM:15MTRS
Kariyammanana 12 no's DTC Cable looping and earthing not properly done,
136 V R PATIL SOUTH KORAMANGALA S17 F15 kadubeesanhalli 16.12.21 UG cable commissiong PRAVEEN ATTACHED
agrahara road commissioned PPE's not used

50 MM:567MTRS, Depth maintaned low due to Gas and water


137 V R PATIL SOUTH KORAMANGALA S17 F10 Tulasi theatre road Marathahalli 16.12.21 UG cable laying 0.676 PRAVEEN ATTACHED
40MM:567MTRS pipeline, PPE's used Partially.

50 MM:248MTRS,
138 V R PATIL SOUTH KORAMANGALA S17 F2 Jawahar nager Marathahalli 21.12.21 UG cable laying 0.178 0.243 PRAVEEN ATTACHED Cable not properly handled, PPE's used partially.
40MM:248MTRS
139 V R PATIL SOUTH KORAMANGALA S17 F13 Jawahar nager Marathahalli 21.12.21 UG cable laying 0.178 PRAVEEN ATTACHED Cable not properly handled, PPE's used partially.
Near chowdeshwari 50 MM:282MTRS, The drill bit size is 4'' instead of 6', after
140 V R PATIL SOUTH KORAMANGALA S17 F18 yemalur 21.12.21 UG cable laying 0.34 PRAVEEN ATTACHED
Temple 40MM:282MTRS instructed they have changed.
50 MM:80MTRS,
141 V R PATIL SOUTH KORAMANGALA S17 F2 Jawahar nager Marathahalli 22.12.21 UG cable laying 0.076 PRAVEEN ATTACHED PPE's used PaRTIALLY.
40MM:80MTRS
50 MM:304MTRS,
142 V R PATIL SOUTH KORAMANGALA S17 F2 Jawahar nager Marathahalli 23.12.21 UG cable laying 0.298 PRAVEEN ATTACHED PPE's used PaRTIALLY.
40MM:304MTRS
143 V R PATIL SOUTH KORAMANGALA S17 F13 Jawahar nager Marathahalli 23.12.21 UG cable laying 0.098 PRAVEEN ATTACHED PPE's used Partially
Kariyammanana 50 MM:630MTRS,
144 V R PATIL SOUTH KORAMANGALA S17 F4 Bellandur 23.12.21 UG cable laying 0.976 PRAVEEN ATTACHED PPE's not used
agrahara road 40MM:630MTRS

50 MM:102MTRS,
145 V R PATIL SOUTH KORAMANGALA S17 F12 Maduramma temple Yemalur 23.12.21 UG cable laying 0.122 PRAVEEN ATTACHED 4" bit used instead of 6", PPE's not used.
40MM:122MTRS
Earthing :9no's, vertical spmt 3 Go's structures: 2
Earthing, Gos erection, nos, earth pipe hammered, earth strip thefted and
146 V R PATIL SOUTH KORAMANGALA S17 F15 varthur main road kadubeesanhalli 23.12.21 PRAVEEN ATTACHED
cable raising. cable raised, tiles and sand not used in cable
looping.
Kariyammanana 50 MM:130MTRS,
147 V R PATIL SOUTH KORAMANGALA S17 F12 Yemalur 25.12.21 UG cable laying 0.15
agrahara road 40MM:130MTRS
Vertical 3 GOS structures:5 nos Vertical 4 GOS
HAL central town
148 V R PATIL SOUTH KORAMANGALA S17 F2 Marathahalli Main road 30.12.21 GOS erection PRAVEEN ATTACHED structures:1 no's, rusted nut bolts used, PPE's not
ship
used.
50 MM:180MTRS,
149 V R PATIL SOUTH KORAMANGALA S17 F8 yemalur main road HAL Airport road 30.12.21 UG cable laying 0.178 PRAVEEN ATTACHED cable not properly handled, PPE's not used.
40MM:180MTRS
150 V R PATIL SOUTH KORAMANGALA S17 F18 yemalur main road HAL Airport road 30.12.21 UG cable laying 0.156 PRAVEEN ATTACHED cable not properly handled, PPE's not used.
95 sq.mm s/t joint not in stright, sand and tiles
151 V R PATIL SOUTH KORAMANGALA S17 F10 Tulasi theatre road Marathahalli 30.12.21 S/T Joint work 2 1 PRAVEEN ATTACHED
not used in s/t pits, ppe's not used.
400 sq.mm s/t joint not in stright, sand and tiles
152 V R PATIL SOUTH KORAMANGALA S17 F10 Tulasi theatre road Marathahalli 31.12.21 Open trench, S/T joint work 0.02 1 2 PRAVEEN ATTACHED
not used in s/t pits, ppe's not used.

50 MM:256MTRS,
153 V R PATIL SOUTH KORAMANGALA S17 F2 Aakash Viahar Sanjay nagar 02.01.22 UG cable laying 0.251 PRAVEEN ATTACHED cable not properly handled, PPE's not used.
40MM:256MTRS

50 MM:490MTRS,
154 V R PATIL SOUTH KORAMANGALA S17 F13 Pragathi layout Doddenekundi 02.01.22 UG cable laying 0.484 PRAVEEN ATTACHED At starting pit depth is low, PPE's not used.
40MM:490MTRS

Horizontal 3GOS w/o TF:1 no's, Horizontal 3


GOS erection, Spun Pole Gos with TF seating:1 no's, Horizontal 4Gos w/o
155 V R PATIL SOUTH KORAMANGALA S17 F12 Yemalur KempapurA 03.01.22 PRAVEEN ATTACHED
erection TF seating: 2 no's, Earthing not properly done,
Earth pit not digged properly for spun pole.
50 MM:290MTRS,
156 V R PATIL SOUTH KORAMANGALA S17 F13 Pragathi layout Doddenekundi 03.01.22 UG cable laying 0.393 PRAVEEN ATTACHED PPE's not used.
40MM:290MTRS
50 MM:240MTRS,
157 V R PATIL SOUTH KORAMANGALA S17 F13 04.01.22 UG cable laying 0.399 PRAVEEN ATTACHED Cable not properly hanbdled, PPE's not used.
40MM:240MTRS
50 MM:265MTRS,
158 V R PATIL SOUTH KORAMANGALA S17 F2 Aakash Viahar Sanjay nagar 04.01.22 UG cable laying 0.261 PRAVEEN ATTACHED Cable not properly hanbdled, PPE's not used.
40MM:265MTRS
Rusted material used, earthing not properly done,
spun conceting not properly odne, Horizontal 3
UG cable laying,GOS 50 MM:210MTRS,
159 V R PATIL SOUTH KORAMANGALA S17 F8 yemalur main road HAL Airport road 04.01.22 0.048 0.307 PRAVEEN ATTACHED Gos with T/F seating:2 no's Horizontal 3 Gos
erection 40MM:210MTRS
without T/F seating:1 no's vertical 3 Gos with
T/F seating:2 no's
160 V R PATIL SOUTH KORAMANGALA S17 F18 yemalur main road HAL Airport road 04.01.22 UG cable laying 0.269 PRAVEEN ATTACHED with out earth pit HDD done,
50 MM:53MTRS,
161 V R PATIL SOUTH KORAMANGALA S17 F13 Vibhutipura extension Doddenekundi 05.01.22 UG cable laying 0.14 PRAVEEN ATTACHED Cable not properly hanbdled, PPE's not used.
40MM:53MTRS
50 MM:210MTRS,
162 V R PATIL SOUTH KORAMANGALA S17 F2 shome Paradise Brookfield 05.01.22 UG cable laying 0.214 PRAVEEN ATTACHED end caps not provided.
40MM:210MTRS
Horizontal 4 Gos without T/F seating:2 no's
Horizontal 3 Gos without T/F seating:1 no's
50 MM:190MTRS,
163 V R PATIL SOUTH KORAMANGALA S17 F10 Manjunatha layout Marathahalli 05.01.22 UG cable laying 0.24 PRAVEEN ATTACHED vertical 4 Gos with T/F seating:1 no's vertical 3
40MM:190MTRS
Gos with T/F seating:1 no's, Rusted material
used, PPE's not used.
50 MM:454MTRS,
164 V R PATIL SOUTH KORAMANGALA S17 F10 Manjunatha layout Marathahalli 06.01.22 UG cable laying 0.506 PRAVEEN ATTACHED At starting pit depth is low, PPE's not used.
40MM:454MTRS
50 MM:360MTRS,
165 V R PATIL SOUTH KORAMANGALA S17 F13 Vibhutipura extension Doddenekundi 06.01.22 UG cable laying 0.122 0.356 PRAVEEN ATTACHED Cable not properly hanbdled, PPE's not used.
40MM:360MTRS
50 MM:265MTRS,
166 V R PATIL SOUTH KORAMANGALA S17 F10 Manjunatha layout Marathahalli 07.01.22 UG cable laying 0.371 PRAVEEN ATTACHED Cable not properly hanbdled, PPE's not used.
40MM:265MTRS
50 MM:195MTRS,
167 V R PATIL SOUTH KORAMANGALA S17 F13 Vibhutipura extension Doddenekundi 07.01.22 UG cable laying 0.345 PRAVEEN ATTACHED Cable not properly hanbdled, PPE's not used.
40MM:195MTRS
50 MM:612MTRS,
168 V R PATIL SOUTH KORAMANGALA S17 F10 Manjunatha layout Marathahalli 10.01.22 UG cable laying 0.923 PRAVEEN ATTACHED At starting pit depth is low, PPE's not used.
40MM:612MTRS
Horizontal SPMT 3 GOS with T/F seating:1 no's,
169 V R PATIL SOUTH KORAMANGALA S17 F08 HAL airport HAL area 10.01.22 GOS erection PRAVEEN ATTACHED
Spun Pole: 1 no's, PPE's not used.
Horizontal SPMT 3 GOS wiout T/F seating:1
GOS erection, End
170 V R PATIL SOUTH KORAMANGALA S17 F15 Salarpuria KIA motors 10.01.22 2 1 PRAVEEN ATTACHED no's, Vartical SPMT 3 GOS without T/F
Termination kits
seating:1 no's, PPE's not used.
Horizontal SPMT 3 GOS with T/F seating:1 no's,
Horizontal SPMT 3 GOS without T/F seating:1
no's, Horizontal SPMT 4 GOS with T/F seating:1
no's,Vertical SPMT 3 GOS with T/F seating:1
UG cable laying, GOS 50 MM:240MTRS,
171 V R PATIL SOUTH KORAMANGALA S17 F10 vinayaka layout marathahalli 11.01.22 0.274 PRAVEEN ATTACHED no's, Vertical SPMT 3 GOS without T/F
erection 40MM:240MTRS
seating:1 no's, Earthing not properly done,
charcoal and salt not used as per ration, Pole
concreting not done properly, Spun Pole: 3 no's,
PPE's not used.
50 MM:174MTRS,
172 V R PATIL SOUTH KORAMANGALA S17 F2 G BJ school rd Sanjay nagar 11.01.22 UG cable laying 0.17 PRAVEEN ATTACHED Cable not properly hanbdled, PPE's not used.
40MM:174MTRS
Horizontal SPMT 3 GOS with T/F seating:1
173 V R PATIL SOUTH KORAMANGALA S17 F13 vasudha enclave Doddenekundi 12.01.22 GOS erection PRAVEEN ATTACHED no's,Vertical SPMT 3 GOS without T/F seating:1
no's, SPUN pole : 1 No's, PPE's not used.
50 MM:115MTRS,
174 V R PATIL SOUTH KORAMANGALA S17 F2 G BJ school rd Sanjay nagar 12.01.22 UG cable laying 0.113 PRAVEEN ATTACHED PPE's not used.
40MM:115MTRS
50 MM:196MTRS,
175 V R PATIL SOUTH KORAMANGALA S17 F2 G BJ school rd Sanjay nagar 13.01.22 UG cable laying 0.194 PRAVEEN ATTACHED PPE's not used.
40MM:196MTRS
Cable looping raising, end
Earthing not propelry done, GI pipe : 53 mtrs
176 V R PATIL SOUTH KORAMANGALA S17 F12 Venkateshwara nilaya Kempapura 13.01.22 termination kits, earthing, 0.117 7 0.03 PRAVEEN ATTACHED
used
GI pipe
Lakshminarayana 50 MM:146MTRS,
177 V R PATIL SOUTH KORAMANGALA S17 F2 Sanjay nagar 15.01.22 UG cable laying 0.144 PRAVEEN ATTACHED Cable not properly hanbdled, PPE's not used.
layout 40MM:146MTRS
178 V R PATIL SOUTH KORAMANGALA S17 F2 club house Sanjay nagar 17.01.22 S/T Joint work 1 PRAVEEN ATTACHED earth pits;3 nos. PPE's not used
Vertical SPMT 3 GOS without T/F seating: 5
179 V R PATIL SOUTH KORAMANGALA S17 F13 Gururaja layout Doddenekundi 20.01.22 GOS erection PRAVEEN ATTACHED
no's, PPE's partially used.
Horizontal SPMT 3 GOS without T/F seating:3
GOS, Spun Pole erection,
no's, Spun pole erection: 3 no's,GI pipe: 42 mts,
180 V R PATIL SOUTH KORAMANGALA S17 F10 Tulasi theatre road Marathahalli 21.01.22 S/T joint, cable looping 1 1 PRAVEEN ATTACHED
rusted material used, sand and tiles not used in
rising
S/T joint pits, PPE's used partially.
Horizontal SPMT 3 GOS without T/F seating: 1
GOS, spun pole, cable no's, Spun pole erection: 1 no's,GI pipe: 93 mts,
181 V R PATIL SOUTH KORAMANGALA S17 F12 Yemalur shanboga colony 22.01.22 PRAVEEN ATTACHED
looping and rising. earthing not properly done, charcoal and salt not
used in proper ratio, PPE's not used,
Horizontal SPMT 3 GOS without T/F seating: 4
no's, Spun pole erection: 1 no's,vertical SPMT 3
GOS without T/F seating: 3 no's, charcaol, salt
182 V R PATIL SOUTH KORAMANGALA S17 F13 Gururaja layout Doddenekundi 24.01.22 GOS erection PRAVEEN ATTACHED
not used in as per ratio, pole painting not
properly done, depth of pit digging for spun pole
is low.
Horizontal SPMT 4 GOS without T/F seating:1
no's, Vertical 3 GOS structure without T/F
seating: 01 no's, Spun pole erection: 1 no's,GI
GOS, Spun Pole erection,
183 V R PATIL SOUTH KORAMANGALA S17 F10 Tulasi theatre road Marathahalli 25.01.22 PRAVEEN ATTACHED pipe: 24 mts, Pole paitning not properly done, in
cable looping rising
earthing charcoal and salt not used as per ratio
except one earthing, sand and tiles not used in
cable looping pits, PPE's not used.
3c x 95 sq.mm cable laid throgh open trench is
86 mtrs, GI pipe didn’t use as per requirement,
Sri chowdeshwari
184 V R PATIL SOUTH KORAMANGALA S17 F08 Yemalur 26.01.22 Open trench, road crossing 43 PRAVEEN ATTACHED road crossing and opentrench depth maintained
mata temple
0.7 mtr depth due to existing water, cables, and
also sand not used in open trench.
S/T joint in Stright condition, lopp not provided,
185 V R PATIL SOUTH KORAMANGALA S17 F12 Rangappa layout Yemalur 28.01.22 UG cable laying 0.024 2 12 PRAVEEN ATTACHED sand and tiles not used in open trench closing,
PPE's used partially.
At starting pit drill bit depth is low, PPE's not
186 V R PATIL SOUTH KORAMANGALA S7 F17(EPIP) chinapanahalli Doddenekundi ext 31.01.22 UG cable laying 0.35 0.186 35 PRAVEEN ATTACHED
used.

Horizontal SPMT 3, GOS without T/F seating:2


no's, Vertical 3 GOS structure without T/F
187 V R PATIL SOUTH KORAMANGALA S7 F05(EPIP) AECS layout marathahalli 31.01.22 GOS, spun pole erection. PRAVEEN ATTACHED seating: 07 no's, Spun pole erection: 2 no's,
rusted H-Frame, Horizontal cross arm used,
PPE's used partially.

UG cable by using Open At some length depht is low due to existing


188 V R PATIL SOUTH KORAMANGALA S17 F13(HAL 220KV) Vibhutipura Doddenekundi 01.02.22 0.01 0.01 10 PRAVEEN ATTACHED
trench cables, sand, tiles not used.
28 no's DTC commissioned,spun pole painting
189 V R PATIL SOUTH KORAMANGALA S7 F9(DVS) Munnelollal Green garden layout 02.02.22 UG cable commissiong PRAVEEN ATTACHED not done properly, earthing should done properly
with nutbolts, PPE's not used properly.
190 V R PATIL SOUTH KORAMANGALA S17 F13(HAL 220KV) Doddenekundi 03.02.22 LT Survey PRAVEEN LT survey in DTC-325,325,&2
LT survey in DTC-30,68,lake view TC,
191 V R PATIL SOUTH KORAMANGALA S17 F13(HAL 220KV) Doddenekundi 04.02.22 LT Survey PRAVEEN
1023,582 & 151
192 V R PATIL SOUTH KORAMANGALA S17 F13(HAL 220KV) Doddenekundi 05.02.22 LT Survey PRAVEEN LT survey in DTC-54,98,278 & 133
193 V R PATIL SOUTH KORAMANGALA S17 F13(HAL 220KV) Doddenekundi 07.02.22 LT Survey PRAVEEN LT survey in DTC-38.68,152,18 & 100
LT survey in DTC-37,97,908, TC- N/A
194 V R PATIL SOUTH KORAMANGALA S17 F13(HAL 220KV) Doddenekundi 08.02.22 LT Survey PRAVEEN
(Raghavendra Math), & TC N/A(Park)
Horizontal SPMT 3 GOS without T/F seating:7
no's,Horizontal SPMT 4 GOS without T/F
KADUBEESAANAH seating:1 no's, Vertical 3 GOS structure without
195 V R PATIL SOUTH KORAMANGALA S7 F3(CESNA) PANATHUR 10.02.22 GOS erection PRAVEEN ATTACHED
ALLI T/F seating: 01 no's, split pin not used, existing
flat earthing not connected GOS structures,
PPE's used partially.
Existing DTC shifting, Horizontal SPMT 3 GOS without T/F seating:1
KADUBEESAANAH
196 V R PATIL SOUTH KORAMANGALA S7 F3(CESNA) PANATHUR 11.02.22 GOS erection 2 1 PRAVEEN ATTACHED no's, Spun pole -1 nos, Span 3cx 95 sq.mm
ALLI
commissioning charged.
KARIYAMMA End caps not provided, depth maintained 0.9
197 V R PATIL SOUTH KORAMANGALA S17 F15 KBH chandana 12.02.22 UG Cabla laying 0.056 35 PRAVEEN ATTACHED
AGRAHARA ROAD mtrs.
50 MM:320MTRS,
198 V R PATIL SOUTH KORAMANGALA S7 F2(CESNA) Devarabisnahalli Bellandur 13.02.22 UG Cabla laying 0.32 PRAVEEN ATTACHED cable not properly handled, PPE's not used.
40MM:320MTRS
Horizontal SPMT 3 GOS without T/F seating:4
no's,Horizontal SPMT 4 GOS without T/F
GOS erection, Cable
199 V R PATIL SOUTH KORAMANGALA S7 F3(CESNA) Kaverappa Layout PANATHUR 14.02.22 PRAVEEN ATTACHED seating:1 no's, Vertical 3 GOS structure without
commissioning
T/F seating: 01 no's, 3c x 95 sq.mm
commissionied_441 mtrs.
Horizontal SPMT 3 GOS without T/F seating:1
Lakshminarayana no's, vertical SPMT 3 GOS without T/F seating:1
200 V R PATIL SOUTH KORAMANGALA S7 F3(KBH) Thumabarahalli 14.02.22 GOS erection PRAVEEN ATTACHED
layout no's, Rusted material has bring after intimation
they have changed, PPE' s used partially.
Open trench , UG
201 V R PATIL SOUTH KORAMANGALA S17 F18 (KC Vally) Yemalur Bellandur 15.02.22 0.058 23 PRAVEEN ATTACHED depth maintained 0.9 Mtr, PPE's used partially.
cablelaying
Open trench , UG
202 V R PATIL SOUTH KORAMANGALA S17 F08 (KC Vally) Yemalur Bellandur 16.02.22 0.05 0.05 25 PRAVEEN ATTACHED depth maintained 0.8 Mtr, PPE's used partially.
cablelaying
Horizontal SPMT 3 GOS without T/F seating:2
no's, Horizontal SPMT 4 GOS without T/F
203 V R PATIL SOUTH KORAMANGALA S7 F3(CESNA) Kaverappa Layout PANATHUR 18.02.22 GOS erection 6 PRAVEEN ATTACHED seating:1 no's,vertical SPMT 3 GOS without T/F
seating:6 no's, Rusted material has used, PPE' s
used partially.
Horizontal SPMT 3 GOS without T/F seating:1
204 V R PATIL SOUTH KORAMANGALA S7 F13(KBH) Kasavanahalli Maruthi layout 18.02.22 GOS erection PRAVEEN ATTACHED no's,vertical SPMT 3 GOS without T/F seating:2
no's, PPE's not used properly.
3c x 95 sq.mm : 120 mtrs looping done, GI
KADUBEESAANAH
205 V R PATIL SOUTH KORAMANGALA S7 F3(CESNA) PANATHUR 19.02.22 Cable looping PRAVEEN ATTACHED pipe : 24 mtrs, sand & tiles not used in cable
ALLI
looping, PPE's used partially.
KADUBEESAANAH No work done, existing cable damaged, HYPOT
206 V R PATIL SOUTH KORAMANGALA S7 F2(CESNA) PANATHUR 19.02.22 PRAVEEN
ALLI test done for damaged cable.
Open trench , UG
207 V R PATIL SOUTH KORAMANGALA S17 F08 (KC Vally) Yemalur Bellandur 20.02.22 0.04 10 PRAVEEN ATTACHED depth maintained 0.8 Mtr, PPE's used partially.
cablelaying
50 MM:160MTRS, At starting pit drill bit depth is low, PPE's used
208 V R PATIL SOUTH KORAMANGALA S7 F9(KBH) Ashwath nagar Marathahalli 21.02.22 UG Cabla laying 0.156 PRAVEEN ATTACHED
40MM:160MTRS partially.
KADUBEESAANAH
V R PATIL SOUTH KORAMANGALA S7 F2(CESNA) PANATHUR 22.02.22 Inventory PRAVEEN F2 CESNA for inventory
ALLI
Kariayammana went to office F15 Exora for preparation of pole
V R PATIL SOUTH KORAMANGALA S17 F15(EXORA) kadubeesanhalli 23.02.22 Pole schedule preparation PRAVEEN schedule.
Agrahara road
209 V R PATIL SOUTH KORAMANGALA S17 F13(HAL 220KV) Vibhuthipura ext Doddenekundi 24.02.22 UG Cabla laying 0.074 34 PRAVEEN ATTACHED Sand, tiles not used, PPE's used partially.
Horizontal SPMT 4 GOS without T/F seating:2
Thimmappa reddy no's, Horizontal SPMT 3 GOS without T/F
210 V R PATIL SOUTH KORAMANGALA S17 F13(HAL 220KV) Doddenekundi 28.02.22 GOS erection PRAVEEN ATTACHED
layout seating:1 no's, vertical SPMT 3 GOS without T/F
seating:3 no's, Split pin not used, PPE's not used.
Outdoor Termination, S?T
211 V R PATIL SOUTH KORAMANGALA S7 F9(KBH) Balaji layout Marathahalli 28.02.22 1 21 PRAVEEN ATTACHED PPE's not used.
joint works
212 V R PATIL SOUTH KORAMANGALA S17 F15 01.03.22 Inventory PRAVEEN Inventory details prepared with sand and tiles .
KARIYAMMA Due to unavailabilty of GI pipe trench was not
213 V R PATIL SOUTH KORAMANGALA S17 F18 yemalur main road 02.03.22 open trench 5 PRAVEEN ATTACHED
AGRAHARA ROAD closed, PPE's used partially.
DTC NO's: 325, 326, 02, N/A(Lake TC), 30
214 V R PATIL SOUTH KORAMANGALA S17 F13 03.03.22 LT Drawing Preparation PRAVEEN
drawings prepared.
215 V R PATIL SOUTH KORAMANGALA S17 F8 Chellagatta Bellandur 04.03.22 UG Cabla laying 0.045 PRAVEEN ATTACHED Depth is low cable starting pit, PPE's not used.
Earthing nut bolt not used to connect with GI
UG cable commissiong,
wire and cable earth strip, PPE's not used, cable
216 V R PATIL SOUTH KORAMANGALA S17 F12 Kempapura Road Yemalur 04.03.22 outdoor termination, S/T 0.015 1 13 7 PRAVEEN ATTACHED
commissioned from TC-507 to TC-58, TC(N/A)
joint work
Neev ACADEMY to TC-729 , TC13 to TC-229.
4" drill bit used, vertical SPMT 3 GOS without
UG cable laying, GOS
217 V R PATIL SOUTH KORAMANGALA S17 F10 Sri sannidi marathahalli 05.03.22 0.07 2 3 PRAVEEN ATTACHED T/F seating:1 no's, Spun Pole:1 no's ,cable not
erection
properly handled, PPE'S not used properly.
Kariyammana
Kariyammana Agrahara
Agrahara Road, Earthing, End termination F-8: RMU-2,7,9, F-18: RMU-3, F12: RMU-2, 4,
218 V R PATIL SOUTH KORAMANGALA S17 F8,F12,F18, and F15 Road, Kempapura, 06.03.22 4 PRAVEEN ATTACHED
Kempapura, Yemalur kits 6&7, F-15: RMU-1,& 3.
Yemalur road
road
S/T Joint, End termination
219 V R PATIL SOUTH KORAMANGALA S17 F12 YPR Residency NMR Arcade 07.03.22 2 4 PRAVEEN ATTACHED Sand, tiles not used, PPE's used partially.
work
Sriram Spandana Open trench, UG cable Depth mantained 0.6 mtrs due to Existing power
220 V R PATIL SOUTH KORAMANGALA S17 F08 Chellagatta 07.03.22 0.02 11 PRAVEEN ATTACHED
APT laying cables
UG cabla laying, RMU RMU-1, RMU-2 erected, cable not properly
221 V R PATIL SOUTH KORAMANGALA S17 F10 Manjunatha layout Marathahalli 08.03.22 0.613 PRAVEEN ATTACHED
erection handled, PPE's not used properly.
222 V R PATIL SOUTH KORAMANGALA S17 F12 Near Govt school Yemalur 08.03.22 End termination kits 14 PRAVEEN ATTACHED cable not properly handled, PPEs not used.
50 MM:102MTRS, At one pit drill bit depth is low, PPE's not used
223 V R PATIL SOUTH KORAMANGALA S17 F2 Deepa Nursing home HAL 10.09.22 UG cable laying 0.142 PRAVEEN ATTACHED
40MM:102MTRS properly.
224 AFTL SOUTH KORAMANGALA S17 F8(HAL 220KV) malleshpalya Basava Nagar raod 10.09.22 Structure work PRAVEEN ATTACHED Pole painting not done, PPE's not used.
HAL central town 50 MM:156MTRS, cable not properly handled, PPE's not used
225 V R PATIL SOUTH KORAMANGALA S17 F2 Marathahalli 11.03.22 UG cable laying 0.156 PRAVEEN ATTACHED
ship 40MM:156MTRS properly
226 V R PATIL SOUTH KORAMANGALA S17 F10 Tulasi theatre road Marathahalli 11.03.22 End termination kits 6 PRAVEEN ATTACHED PPE's not used.
Joint done on bridge, so looping done before the
Kariyammana RMU flat earthing, S/T
227 V R PATIL SOUTH KORAMANGALA S17 F15 kadubeesanhalli 13.03.22 1 PRAVEEN ATTACHED bridge, washer not properly used in RMU flat
agrahara bridge joint
earthing.
228 AFTL SOUTH KORAMANGALA S17 F8(HAL 220KV) malleshpalya Basava Nagar raod 14.03.22 Commissioning, AB cable 0.09 PRAVEEN ATTACHED One structure commissioned, PPEs not used.
229 V R PATIL SOUTH KORAMANGALA S17 F12 Opp. AF SW D Kempapura 14.03.22 Indoore Terminations 1 1 PRAVEEN ATTACHED PPE's used Partially
UG cable laying, I/D, End
230 V R PATIL SOUTH KORAMANGALA S17 F12 Near Neev Academy Kempapura 15.03.22 0.035 2 4 PRAVEEN ATTACHED PPE's used Partially
Termination work
Cable not sidened after end termination work,
231 V R PATIL SOUTH KORAMANGALA S17 F10 9th, 10 th Main raod Tulsi Theratre Raod 15.03.22 End termination kits 29 PRAVEEN ATTACHED
PPE's not used, RMU foundation:1 no's.
Nut bolts not used to connect cable earth strip to
232 V R PATIL SOUTH KORAMANGALA S17 F12 Yemalur Bellandur 16.03.22 Cable commissioned PRAVEEN ATTACHED
earthing GI wire earthing, PPE's not used.
3c x 400 sq.mm, 3c x 95 sq.mm 1 VL inventory
233 V R PATIL SOUTH KORAMANGALA S17 F12 Yemalur Bellandur 17.03.22 Inventory PRAVEEN
completed.
234 V R PATIL SOUTH KORAMANGALA S17 F12 Yemalur Bellandur 18.03.22 Inventory PRAVEEN 3c x 95 sq.mm 5 VL completed inventory.
235 V R PATIL SOUTH KORAMANGALA S17 F12 Yemalur Bellandur 19.03.22 F12 Drawings preparation PRAVEEN F12 feeder inventory drawings prepared.
236
F12 pole schedule
237 V R PATIL SOUTH KORAMANGALA S17 F12 Office Indira Nagar 21.03.22 Praveen poles schedule preparation.
preparation
F12 pole schedule
238 V R PATIL SOUTH KORAMANGALA S17 F12 Office Indira Nagar 22.03.22 Praveen poles schedule preparation.
preparation
Depth maintaned 0.6 mtrs due to existting cables,
239 V R PATIL SOUTH KORAMANGALA S17 f08 marathahalli challagatta 23.03.22 UG cable laying 0.012 PRAVEEN Attached
PPE's not used.
240 V R PATIL SOUTH KORAMANGALA S17 F18 HAL Main Raod Yemalur 24.03.22 Inventory Praveen Inventory completed.
50 MM:225MTRS,
241 V R PATIL SOUTH KORAMANGALA S17 F2 HAL 220kv Varthur road Jawahar Nagar 01.04.22 UG cable laying 0.223 0.094 PRAVEEN Attached Cable not properly handled, PPE's used partially.
40MM:225MTRS
UG cable laying, Notify the Work not done in F2 HAL, F12, F15 and F18
242 V R PATIL SOUTH KORAMANGALA S17 F2 HAL 220kv Varthur road Jawahar Nagar 02.04.22
obsevations observations noted with photographs.
At starting of drill bit earth pit not digged
243 V R PATIL SOUTH KORAMANGALA S17 F2 HAL 220kv Sanjay Nagar Manjunath nagar 04.04.22 UG cable laying 0.08 PRAVEEN Attached
properly, PPE's used partially.
244 V R PATIL SOUTH KORAMANGALA S17 F2 HAL 220kv Sanjay Nagar Manjunath nagar 05.04.22 UG cable laying, S/T joint 0.12 1 PRAVEEN Attached End caps not provided, PPE's used partially.
RMU's erected in Feeder-10: 5 way :1no's, 4
Yemalur, Doddenekundi, RMU erection, observations way:1 no's, Feeder - 13 : 5 way : 2no's, feeder
245 V R PATIL SOUTH KORAMANGALA S17 F12, F13, F8, F2 Marathahalli 07.04.22 PRAVEEN Attached
Tulsi theatre raod identification 18: 3 way :1 no's., observations noted in F8 and
F2 feeder.
Yemalur, RMU's erected in Feeder-13: 5 way :1no's,
246 V R PATIL SOUTH KORAMANGALA S17 F12, F13 marathahalli 08.04.22 RMU erection PRAVEEN Attached
Doddenekudndi Feeder - 12 : 5 way : 1no's, PPE's not used.
F13(HAL), F8
Nisarga Layout, Mangeshpalya, vignan
247 AFTL SOUTH KORAMANGALA S17 (HAL), & 09.04.22 CAPEX work Observations Praveen CAPEX work observations noticed and prepared.
Ramesh Nagar Nagar.
F17(HAL)
One number S/T joint not done properly, sand
Ramanjaneya layout,
248 V R PATIL SOUTH KORAMANGALA S17 F2 HAL 220kv Ashwath Nagar 11.4.22 UG cable laying, S/T joint 0.085 4 25 PRAVEEN Attached and tiles not used in opent trench closing, PPE's
Anand Nagar
not used.
CAPEX work inventory with ajay in S4,S16 sub
249 AFTL SOUTH KORAMANGALA S4,S16 Marathahalli Koramangla 13.04.22 Inventory
divisions
To meet AEE S17 regarding CAPEX work, and
TPC office, went to corporate and
250 SOUTH KORAMANGALA S17 Marathahalli 14.04.22 went to corporate, Sub division offices to submit
koramanangala division offices
monthly, weekly reports.
TPC office, observations prepared feederwise and uploaded
251 SOUTH KORAMANGALA S17 Marathahalli 15.04.22 preparation of observations
koramanangala in drive and mail sent.
TPC office,
252 SOUTH KORAMANGALA S17 F13 HAL Marathahalli 16.04.22 LT drawing preparation 3 no's TC LT drawings prepared
koramanangala
50 MM:115MTRS,
253 V R PATIL SOUTH KORAMANGALA S17 F4 RMZ Marathahalli Kadubisanahalli. 17.04.22 UG cable laying 0.111 PRAVEEN Attached Cable not properly handled, PPE's used partially.
40MM:115MTRS
Kariyammana UG cable laying, S/T joint, Sand and tiles not used in open trench, cable
254 V R PATIL SOUTH KORAMANGALA S17 F08 KCV Yemalur 18.04.22 0.12 4 1 10 6 115 PRAVEEN Attached
Agrahara road I/D, O/D Termination work looping.
Kariyammana UG cable laying, S/T joint, Sand and tiles not used in open trench, cable
255 V R PATIL SOUTH KORAMANGALA S17 F18 KCV Yemalur 18.04.22 0.058 1 2 7 7 25 PRAVEEN Attached
Agrahara road I/D, O/D Termination work looping.
3C X 400 SQ.MM CABLE COMMISSIONED:
500 mtrs
3C X 95 SQ.MM CABLE COMMISSIONED;
Kariyammana 1.8 kms
256 V R PATIL SOUTH KORAMANGALA S17 F08 KCV Yemalur 19.04.22 Cable commissioning PRAVEEN Attached
Agrahara road 3 WAY RMU COMMISSIONED: 2 no's
4 WAY RMU COMMISSIONED; 01 no's
5 WAY RMU COMMISSIONED:
3C X 400 SQ.MM CABLE COMMISSIONED:
800 mts
3C X 95 SQ.MM CABLE COMMISSIONED;
Kariyammana 1.2 kms
257 V R PATIL SOUTH KORAMANGALA S17 F18 KCV Yemalur 19.04.22 Cable commissioning PRAVEEN Attached
Agrahara road 3 WAY RMU COMMISSIONED: 1 no's
4 WAY RMU COMMISSIONED; 1 no's
5 WAY RMU COMMISSIONED:

Horizontal SPMT 3 GOS with T/F seating:1 no's,


258 V R PATIL SOUTH KORAMANGALA S17 F2 HAL 220kv GBJ school Sanjay nagar 19.04.22 GOS erection PRAVEEN Attached Horizontal SPMT 3 GOS without T/F seating:1
no's, Spun pole: 1 no's, PPE's used partially.
3C X 400 SQ.MM CABLE COMMISSIONED:
1.6kms.
3C X 95 SQ.MM CABLE COMMISSIONED;
UG cable commissioning,
6.050 kms
S/T joint, I/D, O/D
259 V R PATIL SOUTH KORAMANGALA S17 F12 KCV Yemalur Kempapura 20.04.22 1 1 3 5 PRAVEEN Attached 3 WAY RMU COMMISSIONED: 2 no's
Termination work, GOS
4 WAY RMU COMMISSIONED; no's
erection.
5 WAY RMU COMMISSIONED: 1 no's
Horizontal SPMT 3 GOS without T/F seating:1
no's, HG fuse set not erected.
CAPEX work Joint invntory done with AFTL
AFTL SOUTH KORAMANGALA S17 CAPEX work Basava Nagar Doddenekundi 20.04.22 Inventory PRAVEEN Attached
person.
UG cable looping, I/D, Cable rised at 18 poles, cable looping not
260 V R PATIL SOUTH KORAMANGALA S17 F13 HAL Gururaja Layout Pragathi Layout 21.04.22 O/D, S/T joint, and rising 2 6 3 PRAVEEN Attached properly done, in some locations without looping
works cable rised on to pole, PPE's not used.
TPC office, CAPEX work inventory CAPEX work inventory pole schedule and
261 AFTL SOUTH KORAMANGALA S17 CAPEX work marathahalli 22.04.22 PRAVEEN Attached
koramanangala and drawings preparation drawings prepared.
S17 F12 KCV feeder visited with New OFC
TPC office, OFC work, to attend
262 V R PATIL SOUTH KORAMANGALA S17 marathahalli 23.04.22 person(Sreekanth) to shown OFC network, went
koramanangala meeting
to TPC office for to attend the meeting.
3c x 95 sq.mm cable commisisoned:
263 V R PATIL SOUTH KORAMANGALA S17 F2 HAL 220kv Anand Nagar Ashwath Nagar 24.04.22 Cable commissioning PRAVEEN Attached Earthing : 1 no's, cable loop buried not properly,
in earthing salt not used.
264 V R PATIL SOUTH KORAMANGALA S17 F2 & F13 HAL Jawahar Nagar Doddenekundi 26.04.22 I/D, O/D, S/T joint 2 1 PRAVEEN Attached S/T joint not in Strait condition.
SBR palace, Tulsi
265 V R PATIL SOUTH KORAMANGALA S17 F10 KBH Manjunath layout 26.04.22 I/D, O/D, S/T joint 4 2 PRAVEEN Attached Cable looping not properly done.
theatre road
266 V R PATIL SOUTH KORAMANGALA S17 F2 & F13 HAL Jawahar Nagar Doddenekundi 27.04.22 I/D, O/D, S/T joint 3 PRAVEEN Attached Cable loop not provided for S/T joints.
267 V R PATIL SOUTH KORAMANGALA S17 F13 HAL Wasa layout Doddenekundi 29.04.22 cable laying Praveen work not done, only earth pits done.
3c x 95 sq.mm cable commissioned: 2.5 kms,
Vertical SPMT 3 GOS structure without
SBR palace, Tulsi Transformer seating: 1 no's, Vertical SPMT 4
268 V R PATIL SOUTH KORAMANGALA S17 F10 KBH Manjunath layout 29.04.22 Cable commissioning PRAVEEN Attached
theatre road GOS structure without Transformer seating: 1
no's, Rusted material used in GOS erection,
PPE's not used.
TPC office, Capex work JMC
269 AFTL SOUTH KORAMANGALA S17 CAPEX work marathahalli 30.04.22
koramanangala preparation
SBR palace, Tulsi F10 feeder inventory done with PMU and with
270 V R PATIL SOUTH KORAMANGALA S17 F10 KBH Manjunath layout 07.05.22 Inventory
theatre road TKC people.
271 V R PATIL SOUTH KORAMANGALA S17 F10 KBH marathahalli Manjunath layout 09.05.22 Inventory Praveen PMU team and TATA team verified F10 feeder
Yemalur, K.A village, Laid cable cross went to these feeders with TATA team for laid
272 V R PATIL SOUTH KORAMANGALA S17 F13, F10, F8, F18 marathahalli 10.05.22 Praveen
SBR palace. verification cable verification.
Pending work status F15 EXORA, F8, F18 KCV for to collect
273 V R PATIL SOUTH KORAMANGALA S17 F15, F8, F18, F10 marathahalli Yemalur 11.05.22 Praveen
collecting Pending work status.
F8 KCv chalagatta, F12 KCv for to collect
Pending work status
274 V R PATIL SOUTH KORAMANGALA S17 F8, F12 marathahalli challagatta 12.05.22 Praveen pending work status, after that went to office to
collecting
prepare details.
275 V R PATIL SOUTH KORAMANGALA S17 F10 KBH marathahalli Tulsi theatre road 13.05.22 Inventory F10 feeder for cable inventory\
276 V R PATIL SOUTH KORAMANGALA S17 F10 KBH marathahalli Tulsi theatre road 14.05.22 Inventory F10 feeder for cable inventory\
277 V R PATIL SOUTH KORAMANGALA S17 F10 KBH marathahalli Tulsi theatre road 16.05.22 Inventory F10 feeder for cable inventory\
went ot Indira nagar office for F10 cable
278 V R PATIL SOUTH KORAMANGALA S17 F10 KBH marathahalli Tulsi theatre road 17.05.22 Inventory
schedule preparation
F8 feeder : 2 no's flat earthing, F12 1 no's RMU
279 V R PATIL SOUTH KORAMANGALA S17 F8, F12 marathahalli Yemalur 18.05.22 RMU flat earthing Praveen Attached flat earthing done, F10 feeder fo cable continuity
testing
280 V R PATIL SOUTH KORAMANGALA S17 F10 KBH marathahalli Tulsi theatre road 20.05.22 cable schedule preparation F10 feeder cable schedule preparion
281 V R PATIL SOUTH KORAMANGALA S17 F10 KBH marathahalli Tulsi theatre road 21.05.22 cable schedule preparation F10 feeder cable schedule preparation done.
Kariyammana agrahara 3cx400 sq.mm cable 1.5 km commissioned,
282 V R PATIL SOUTH KORAMANGALA S17 F12 KCV Yemalur 23.05.22 Cable commissioning Praveen Attached
raod cable rised at LRC without GI pipe.
283 V R PATIL SOUTH KORAMANGALA S17 F2 HAL 220kv Anand Nagar Marathahalli 25.05.22 cable laying Praveen cable laying not done, only pit digging done.
Cable not properlu handled, PPE 's used
284 V R PATIL SOUTH KORAMANGALA S17 F2 HAL 220kv Anand Nagar Marathahalli 26.05.22 cable laying 0.13 Praveen Attached
partially.
285 V R PATIL SOUTH KORAMANGALA S17 F2 HAL 220kv Anand Nagar Marathahalli 27.05.22 cable laying Praveen only earth pits 2no's done, cable laying not done.
Govt, School,
286 V R PATIL SOUTH KORAMANGALA S17 F12, F8, F18 HAL air port road 27.05.22 RMU flat earthing Praveen Attached F12 : 1no's, F8: 1 no's, F18 : 1 no's
Yemalur
287 V R PATIL SOUTH KORAMANGALA S17 F13 HAL Gururaja Layout Pragathi Layout 27.05.22 RMU flat earthing Praveen Attached F13: 3 no's, F15: 1no's, F12:2no's
288 V R PATIL SOUTH KORAMANGALA S17 F2 HAL 220kv Anand Nagar Marathahalli 28.05.22 cable laying 0.124 Praveen Attached cable not properly handled, PPE;s not used.
went to office to attend the meeting, F10 feeder
289 V R PATIL SOUTH KORAMANGALA S17 F10 KBH Indira Nagar Koramangla 30.05.22 observation preparation Praveen
observations prepared.
Horizontal SPMT 4 GOS without T/F seating:1
cable laying, cable no's, vertical SPMT 3 GOS without T/F seating:2
Tulsi theatre road,
290 V R PATIL SOUTH KORAMANGALA S17 F10 KBH Marathahalli 31.05.22 commisioning, GOS 0.09 1 11 10 Praveen Attached no's, Spun pole: 1 no's, 3c x 95 sq.mm cable
chowdeshwari temple
erection commissioned: 450 mtrs, PPE's used partially,
sand and tiles not used in open trench.
For submission of inventory details to PMU AEE
291 V R PATIL SOUTH KORAMANGALA S17 F10 KBH Corporate office 01.06.22 inventory details Praveen
madam
Tulsi theatre road, 3c x 95 sq.mm cable commissioned: 5.5 km,
292 V R PATIL SOUTH KORAMANGALA S17 F10 KBH Marathahalli 02.06.22 Cable commissioning Praveen Attached
chowdeshwari temple cable looping not properly done, PPE's not used.
Coyote conudctor : 2.481km, Rabbit: 0.453 km,
293 V R PATIL SOUTH KORAMANGALA S17 F8 KCV HAL air port road Yemalur 02.06.22 Conductor dismantling Praveen Attached span to span they have cuts the conductor, PPE's
not used.
Coyote conudctor : 2.481km, span to span they
294 V R PATIL SOUTH KORAMANGALA S17 F18 KCV HAL air port road Yemalur 02.06.22 Conductor dismantling Praveen Attached
have cuts the conductor, PPE's not used.
Coyote conudctor : 2.024.3km, Rabbit: 2.1813
Kariyammana agrahara km, Weasel concutor: 0.126km, 11 kv AB cable:
295 V R PATIL SOUTH KORAMANGALA S17 F12 KCV Yemalur village 03.06.22 Conductor dismantling Praveen Attached
raod 0.2KM, span to span they have cuts the
conductor, PPE's not used.
Kariyammana Coyote conudctor : 2.055.km, Rabbit: 1.997 km,
296 V R PATIL SOUTH KORAMANGALA S17 F15 EXORA Kadubisanahalli. 04.06.22 Conductor dismantling Praveen Attached
agrahara raod Weasel concutor: 0.063km, PPE's not used.
S/T joint and O/D
297 V R PATIL SOUTH KORAMANGALA S17 F13 HAL Vibhutipura extension Doddenekundi 05.06.22 2 2 Praveen Attached Sand and tiles not used in pit and PPE's not used.
termination workd
KC valley Sub station,
298 V R PATIL SOUTH KORAMANGALA S17 F8 KCV Chellagatta. Yemalur 06.06.22 Cable inventory Praveen
299 V R PATIL SOUTH KORAMANGALA S17 F8 KCV HAL air port road Yemalur 07.06.22 Cable inventory Praveen
Kariyammana
300 V R PATIL SOUTH KORAMANGALA S17 F15 EXORA Kadubisanahalli. 08.06.22 Conductor dismantling Praveen Attached Rabbit: 0.536 km
agrahara raod
Kariyammana agrahara
301 V R PATIL SOUTH KORAMANGALA S17 F12 KCV Yemalur village 08.06.22 Conductor dismantling Praveen Attached Coyote conudctor :0.475.km, Rabbit: 0.036 km
raod
Inventory drawing
302 V R PATIL SOUTH KORAMANGALA S17 F8 KCV Indira Nagar Koramangla 09.06.22 Praveen Drawings prepared as per inventory.
preparation
Inventory cable schedule 3c x 400 sq.mm cable Inventory schedule
303 V R PATIL SOUTH KORAMANGALA S17 F8 KCV Indira Nagar Koramangla 10.06.11 Praveen
preparaion prepared of F8 feeder
Inventory cable schedule 3c x 95 sq.mm cable inventory schedule has
304 V R PATIL SOUTH KORAMANGALA S17 F8 KCV Indira Nagar Koramangla 11.06.22 Praveen
preparaion prepared
cable physical invrnotry has completed with
305 V R PATIL SOUTH KORAMANGALA S17 F4 RMZ Sakra Hospital Kadubisanahalli. 14.06.22 Inventory Praveen Attached
PMU and TKC people.
Inventory cable schedule F04 RMZ cable drawing and cable schedule
306 V R PATIL SOUTH KORAMANGALA S17 F4 RMZ Indira Nagar Koramangla 15.06.22 Praveen
preparaion prepared.
HAL Quarters, 3c x 400 sq.mm cable physical Inventory of F13
307 V R PATIL SOUTH KORAMANGALA S17 F13 HAL Doddenekundi 16.06.22 Cable inventory Praveen
Gururaja Layout feeder
3c x 95 sq.mm cable physical Inventory of F13
308 V R PATIL SOUTH KORAMANGALA S17 F13 HAL Gururaja Layout Doddenekundi 17.06.22 Cable inventory Praveen
feeder
3c x 95 sq.mm cable physical Inventory of F13
309 V R PATIL SOUTH KORAMANGALA S17 F13 HAL Gururaja Layout Doddenekundi 18.06.22 Cable inventory Praveen
feeder
3c x 95 sq.mm cable physical Inventory of F13
310 V R PATIL SOUTH KORAMANGALA S17 F13 HAL Gururaja Layout Doddenekundi 20.06.22 Cable inventory Praveen
feeder
Inventory cable schedule &
311 V R PATIL SOUTH KORAMANGALA S17 F13 HAL Indira Nagar Koramangla 21.06.22 Praveen F13 Feeder drawings prepared.
drawing preparaion
Inventory cable schedule &
312 V R PATIL SOUTH KORAMANGALA S17 F13 HAL Indira Nagar Koramangla 22.06.22 Praveen F13 Feeder drawings prepared.
drawing preparaion
F13 Feeder cable schedule (3c x 400 sq.mm )
313 V R PATIL SOUTH KORAMANGALA S17 F13 HAL Indira Nagar Koramangla 23.06.22 Inventory cable schedule Praveen
prepared.
F13 Feeder cable schedule (3c x 95 sq.mm )
314 V R PATIL SOUTH KORAMANGALA S17 F13 HAL Indira Nagar Koramangla 24.06.22 Inventory cable schedule Praveen
prepared.
315 V R PATIL SOUTH KORAMANGALA S17 F13 HAL Indira Nagar Koramangla 25.06..22 observation preparation Praveen F08, F04 & F13 observations prepared.
Open trench, I/D and O/D Depth maintained at open trench is 0.8 mts,
316 V R PATIL SOUTH KORAMANGALA S17 F13 HAL Pragathi layout Doddenekundi 27.06.22 2 4 15 Praveen Attached
terminationt work PPE's not used.
All feeders observations updagted and uploaeded
317 V R PATIL SOUTH KORAMANGALA S17 ALL feeders Indira Nagar Koramangla 28.06.22 observation preparation Praveen
in drive link
To revise the estimated F15, F12,F8,F18, F10,F4, F13 feeders estimated
318 V R PATIL SOUTH KORAMANGALA S17 ALL feeders VR patil office HSR layout 29.06.22 Praveen
quantity of feeders quantity revised.
revise estimate quantity,
revise estimate quantity, OFC duct of all feeders
319 V R PATIL SOUTH KORAMANGALA S17 ALL feeders Indira Nagar Koramangla 30.06.22 OFC duct of all feeders Praveen
quntity verified.
quntity verified.
went to F08 HAL for feeder pooja cermony, All
320 V R PATIL SOUTH KORAMANGALA S17 ALL feeders Indira Nagar Koramangla 01.07.22 observation preparation Praveen feeders observations updagted and uploaeded in
drive link
50 MM:450MTRS,
321 V R PATIL SOUTH KORAMANGALA S17 F08 HAL LBS Nagar Nalluri pura layout 02.07.22 UG cable laying 0.56 Praveen Attached cable not properly handled, PPE;s used.
40MM:450MTRS
LT AB cable LT AB cable commissioned: 1.43 km, Rabbit
322 V R PATIL SOUTH KORAMANGALA S17 F17 HAL Latacauvery layout Jagadeesh nagar 02.07.22 commissioning, Conductor Praveen Attached conductor dismantled: 1.2 KM, LT distribution
dismantling box:35 no's, PPE's not used.
50 MM:110MTRS,
323 V R PATIL SOUTH KORAMANGALA S17 F08 HAL LBS Nagar Nalluri pura layout 03.07.22 UG cable laying 0.55 Praveen Attached End caps not provided, PPE's not used.
40MM:110MTRS
50 MM:70MTRS,
324 V R PATIL SOUTH KORAMANGALA S17 F08 HAL LBS Nagar Nalluri pura layout 04.07.22 UG cable laying 0.34 Praveen Attached End caps not provided, PPE's not used.
40MM:70MTRS
50 MM:400MTRS,
325 V R PATIL SOUTH KORAMANGALA S17 F08 HAL LBS Nagar Nalluri pura layout 05.07.22 UG cable laying 0.5 Praveen Attached End caps not provided, PPE's not used.
40MM:400MTRS
50 MM:180MTRS,
326 V R PATIL SOUTH KORAMANGALA S17 F08 HAL LBS Nagar Nalluri pura layout 06.07.22 UG cable laying 0.15 0.18 Praveen Attached End caps not provided, PPE's not used.
40MM:180MTRS
50 MM:170MTRS, Earth pit not digged at starting of drill bit, PPE's
327 V R PATIL SOUTH KORAMANGALA S17 F08 HAL LBS Nagar Jagadeesh nagar 08.07.22 UG cable laying 0.508 0.17 Praveen Attached
40MM:170MTRS not used.
50 MM:60MTRS,
328 V R PATIL SOUTH KORAMANGALA S17 F08 HAL LBS Nagar Ismlampur 09.07.22 UG cable laying 0.115 Praveen Attached cable not properly handled, PPE;s not used.
40MM:600MTRS
50 MM:100MTRS,
329 V R PATIL SOUTH KORAMANGALA S17 F08 HAL 7th road LBS Nagar 10.07.22 UG cable laying 0.12 Praveen Attached cable not properly handled, PPE;s not used.
40MM:100MTRS
50 MM:600MTRS,
330 V R PATIL SOUTH KORAMANGALA S17 F08 HAL LBS Nagar Jagadeesh nagar 16.07.22 UG cable laying 0.44 0.51 Praveen Attached cable not properly handled, PPE;s not used.
40MM:600MTRS
Outer ring road, 50 MM:130MTRS,
331 V R PATIL SOUTH KORAMANGALA S17 F02HAL Anand Nagar 16.07.22 UG cable laying 0.125 0.125 Praveen Attached cable not properly handled, PPE;s not used.
Jeevitha hospital 40MM:130MTRS
332 V R PATIL SOUTH KORAMANGALA S17 F17 HAL Ramesh Nagar Veerabadra Nagar 16.07.22 AB cable stringing 0.715 Praveen Attached cable not properly handled, PPE;s not used.
50 MM:520MTRS,
333 V R PATIL SOUTH KORAMANGALA S17 F08 HAL LBS Nagar Jagadeesh nagar 17.07.22 UG cable laying 0.184 0.71 Praveen Attached cable not properly handled, PPE;s not used.
40MM:520MTRS
Outer ring road, 50 MM:90MTRS,
334 V R PATIL SOUTH KORAMANGALA S17 F02HAL Anand Nagar 17.07.22 UG cable laying 0.089 0.089 Praveen Attached cable not properly handled, PPE;s not used.
Jeevitha hospital 40MM:90MTRS
Vinayaka Nagar, Jyothi 50 MM:790MTRS,
335 V R PATIL SOUTH KORAMANGALA S17 F08 HAL LBS Nagar 18.07.22 UG cable laying 0.156 0.984 Praveen Attached cable not properly handled, PPE;s not used.
nagar 40MM:790MTRS
Outer ring road, 50 MM:70MTRS,
336 V R PATIL SOUTH KORAMANGALA S17 F02HAL Ananthram reddy layout 18.07.22 UG cable laying 0.17 Praveen Attached cable not properly handled, PPE;s used.
Jeevitha hospital 40MM:70MTRS
Vinayaka Nagar, Jyothi 50 MM:473MTRS,
337 V R PATIL SOUTH KORAMANGALA S17 F08 HAL LBS Nagar 19.07.22 UG cable laying 0.673 Praveen Attached cable not properly handled, PPE;s not used.
nagar 40MM:473MTRS
338 V R PATIL SOUTH KORAMANGALA S17 F17 HAL 8th cross Jagadeesha nagar 19.07.22 UG cable laying 0.155 Praveen Attached cable not properly handled, PPE;s not used.
Vinayaka Nagar, Jyothi 50 MM:258MTRS, cable not properly handled, PPE;s not used, end
339 V R PATIL SOUTH KORAMANGALA S17 F08 HAL LBS Nagar 20.07.22 UG cable laying 0.47 Praveen Attached
nagar 40MM:258MTRS caps not provided.
8th cross, Jagadeesha UG cable laying, AB cable
340 V R PATIL SOUTH KORAMANGALA S17 F17 HAL Ramesh Nagar 20.07.22 0.375 0.692 Praveen Attached cable not properly handled, PPE;s not used.
nagar stringing
Vinayaka Nagar, Jyothi 50 MM:448MTRS,
341 V R PATIL SOUTH KORAMANGALA S17 F08 HAL LBS Nagar 21.07.22 UG cable laying 0.56 Praveen Attached cable not properly handled, PPE;s not used.
nagar 40MM:448MTRS
342 V R PATIL SOUTH KORAMANGALA S17 F17 HAL LBS Nagar Jyothi nagar raod 21.07.22 UG cable laying 0.206 Praveen Attached cable not properly handled, PPE;s not used.
50 MM:130MTRS,
343 V R PATIL SOUTH KORAMANGALA S17 F12 HAL LN reddy main raod Vignan Nagar 21.07.22 UG cable laying 0.246 Praveen Attached cable not properly handled, PPE;s not used.
40MM:130MTRS
104,Annasandrapalya Nakshytra Residency TC 50 MM:201MTRS,
344 V R PATIL SOUTH KORAMANGALA S17 F08 HAL 29.07.22 UG cable laying 0.00 0.250 0.00 0.00 0.00 0.00 0.00 0.00 Yogesh Attached cable not properly handled, PPE;s not used.
Extension , Islampur 407 40MM:201MTRS

104,Annasandrapalya Nakshytra Residency TC 50 MM:00MTRS,


345 V R PATIL SOUTH KORAMANGALA S17 F08 HAL 30.07.22 UG cable laying 0.00 0.000 0.00 0.00 0.00 0.00 0.00 0.00 Yogesh Attached work stop due pampered on HDD machine
Extension , Islampur 407 40MM:00MTRS
830, Annsandraalya 50 MM:80MTRS,
346 V R PATIL SOUTH KORAMANGALA S17 F08 HAL Swamy buildings 01.08.22 UG cable laying 0.00 0.110 0.00 1.00 1.00 0.00 2.00 0.00 Yogesh Attached cable not properly handled, PPE;s not used.
main rd 40MM:80MTRS
XM7C+PPM
50 MM:150MTRS,
347 V R PATIL SOUTH KORAMANGALA S17 F08 HAL Annasandrapalya K.K.R ENCLAVE 02.08.22 UG cable laying 0.00 0.180 0.00 1.00 1.00 0.00 9.00 0.00 Yogesh Attached cable not properly handled, PPE;s not used.
40MM:150MTRS
main road , Islampur
XM6C+X69
50 MM:MTRS,
348 V R PATIL SOUTH KORAMANGALA S17 F08 HAL Annasandrapalya XM9C,R49 03.08.22 UG cable laying 0.00 0.000 0.00 0.00 0.00 0.00 0.00 0.00 Yogesh Attached cable not properly handled, PPE;s not used.
40MM:MTRS
main road , Islampur
XM7C+PPM
OFC work, Loop & Cable 50 MM:MTRS,
349 V R PATIL SOUTH KORAMANGALA S17 F08 HAL Annasandrapalya K.K.R ENCLAVE 06.08.22 0.00 0.000 0.00 0.00 0.00 0.00 0.00 20.00 Yogesh Attached cable not properly handled, PPE;s not used.
raising 40MM:MTRS
main road , Islampur
xm6c + x69, Krishna OFC work, Loop & Cable 50 MM:20MTRS, 40
350 V R PATIL SOUTH KORAMANGALA S17 F08 HAL 408, cross 3rd road 08.08.22 0.00 0.000 0.00 0.00 5.00 0.00 0.00 0.00 Yogesh Attached cable not properly handled, PPE;s not used.
Nagar raising MM:20MTRS
xm9c + h41, B cross OFC work, Loop & Cable 50 MM: MTRS, 40 MM:
351 V R PATIL SOUTH KORAMANGALA S17 F08 HAL nbs nagar Bus stand 09.08.22 0.00 0.000 0.00 1.00 20.00 0.00 0.00 0.00 Yogesh Attached cable not properly handled, PPE;s not used.
rd raising MTRS
27th 1st cross rd, LBS 30th 1st cross rd, LBS OFC work, Loop & Cable 50 MM: MTRS, 40 MM:
352 V R PATIL SOUTH KORAMANGALA S17 F08 HAL 10.08.22 0.00 0.000 0.00 0.00 0.00 0.00 7.00 0.00 Yogesh Attached cable not properly handled, PPE;s not used.
nagar nagar raising MTRS
sri niwasaya nilaya ist 50 MM: MTRS, 40 MM:
353 V R PATIL SOUTH KORAMANGALA S17 F17 HAL white wings 10.08.22 UG cable laying 0.400 0.100 0.00 0.00 0.00 0.00 0.00 0.00 Yogesh Attached cable not properly handled, PPE;s not used.
main rd MTRS
50 MM: 60MTRS, 40
354 V R PATIL SOUTH KORAMANGALA S17 F17 HAL fortune buliding x8mh+vpc 6th main rd 11.08.22 UG cable laying 0.150 0.110 0.00 0.00 0.00 0.00 0.00 0.00 Yogesh Attached cable not properly handled, PPE;s not used.
MM:60 MTRS
4th 2nd cross rd, LBS 49 ,islampur ,kaggadasau OFC work, Loop & Cable 50 MM: MTRS, 40 MM:
355 V R PATIL SOUTH KORAMANGALA S17 F08 HAL 11.08.22 0.00 0.000 0.00 2.00 1.00 0.00 4.00 0.00 Yogesh Attached cable not properly handled, PPE;s not used.
nagar ra raising MTRS
Block C chittrakut 50 MM: 230MTRS, 40
356 V R PATIL SOUTH KORAMANGALA S17 F17 HAL 205, 1st 9th cross rd 12.08.22 UG cable laying 0.00 0.550 0.00 2.00 0.00 0.00 0.00 0.00 Yogesh Attached cable not properly handled, PPE;s not used.
appartment MM:230 MTRS
383/1 7th cross rd
Block A Mahveer
LBS Laying, Loop & Cable 50 MM: MTRS, 40 MM:
357 V R PATIL SOUTH KORAMANGALA S17 F08 HAL Sanctum, Brindawan 13.08.22 0.05 0.113 0.00 0.00 0.00 0.00 0.00 70.00 Yogesh Attached cable not properly handled, PPE;s not used.
Nagar ,Kaggadasapur raising MTRS
layout Lbs nagar
a
XMCJ + 53G XM8J + w22 50 MM: 220MTRS, 40
358 V R PATIL SOUTH KORAMANGALA S17 F17 HAL 13.08.22 UG cable laying 0.000 0.450 0.000 0.000 0.000 0.000 0.000 0.000 Yogesh Attached cable not properly handled, PPE;s not used.
Ramaiah Reddy Talacauvery Society MM:220 MTRS
NEW ORACLE #1/1 LT AB CABLE 50 MM: MTRS, 40 MM:
359 TGPL SOUTH KORAMANGALA S16 F8 SJW 21 2ND CROSS RD 16.08.22 0.000 0.000 0.632 0.000 0.000 0.000 0.000 0.000 Yogesh Attached cable not properly handled, PPE;s not used.
TAVAREKERA RD EXECUTION MTRS
17.08.22 50 MM: 398 MTRS, 40
360 TGPL SOUTH KORAMANGALA S16 F1 ADG 13TH CROSS RD SAI DELOPERS TC 209 UG cable laying 0.000 0.784 0.000 0.000 0.000 0.000 0.000 0.000 Yogesh Attached cable not properly handled, PPE;s not used.
NIGHT MM: 398 MTRS
WJ98+XXF,old
19.08.22 50 MM: 151 MTRS, 40
361 TGPL SOUTH KORAMANGALA S16 F1 ADG Madiwala ,hosur rd, madiwala ,chikka UG cable laying 0 0.251 0 0 0 0 0 0 Yogesh Attached cable not properly handled, PPE;s not used.
NIGHT MM: 151 MTRS
madiwala
HB COMLEX 100 FT 21.08.22 50 MM: 323 MTRS, 40
362 TGPL SOUTH KORAMANGALA S16 F3(9) ADG WJC9+242 VP RD UG cable laying 0.316 0.194 0 0 0 0 0 0 Yogesh Attached cable not properly handled, PPE;s not used.
RING RD NIGHT MM: 323 MTRS