Download as pdf
Download as pdf
You are on page 1of 6
PLUMBING PLUNGING WITH A TRANSIT 15 THE BEST VETHDD FOR ALLGHENT A Ac- CURACY. FOLLOW THE ASTROCTIONS AS ADICATED, THC HPOATANCE CF ACCURATE LIGAEN CAN'T BE STRESSED EME AETER YOU YE LUND THE ROCKET ELEVATOR AND THEY WIRES A OUGHT TO SADT TENSOM: THE BUKET ELEVATOR SNOMD BE RC-PLOBCD ITH 3o DAYS. TO-ASSURE THAT THE AUOKET LEVATOR 1§ STILL OM PLUS fio THE CABLES HAVEN'T STRETCHED, TRANSIT. PLUMBING 100 FeeT ADJUST. TURNBUCKLE, FOR FINAL PLUMB: 100 WITH A TRANSIT FIG.NO.I3A, GUYING DETAIL 1 ALL CABLE Sto 3/8" PROPERLY CLAED-C7 = 19 ‘iReeaeT TE. 2. USE OF SCHEV AMCDORS IS STRONGLY DISCOMARED-SEE DEAE ETAILS FOU SECIPMENDED COACRCTE REAR 3, USE OF GIVING BUCETS To ATTACH TO LEMGIRG. ‘2. GOTING 15 BASED ON 20° INTERNALS On AFFORDABLE SERIES SBKET CLEVATOR, 578" WIBE ROPE LOD ESTE USED. THREE (3) CLAMPS PER COMET. | 5. THESE ate BECOMESDATIOS BASED On StePRD EAGIEERIRG | PRUCTICES da EAPERIENE. 0D LIABILITY 1S ASIPED BY UATER'S VORLIMUDE SYSTERS. T= i | ores He accomenD THE FONT. i 3", 3 ware ROPE SLE N08 — 2 = 4 NEVER SADRLE A SEAD HORSE” ' fe eee e| | pre yamnne ca aA RO NOT USE Staenco HEAD ISSORCEE 1S #8 (ERGO. NTEMEDIATE ‘AEE #0) TED TOSETER. COR- (Gere 15-10 6 300 Pst AT 23 Des CEE 00 TEP 1870 BE PO EP CsTieious Ta AUD BEAL SlOALD HE PLACE 08 OUSTOREEL SOILED WIT CE TOD LES [MALEST GEMISTESSED SOIL. eowins 4.08 igus oF costRET bea 158 or #9 eC. Fo sve wie SOFE 3. CANES 15 THE = Fan, THESE CLAWS SRO HE SPACED 2 | feAiT. AT LEAST 10 ACHES OF WIRE SFE SHONLD TERED BACK. HOMIES Fen 57a" WE ROPE ARE REDUCED TO IRS ‘WE BEST LOM PROTECTION. OTE THAT D- DIRE A RE ROR LARP 2 10 ADDS TO OI SAFETY A: PROTECTION A: COSTS vu YeaY LITLE. opLANpfioy, sana 3a0u 3m SS 4 ical zane ora ws waar woe LZ | worroesn onctus: GUY_CABLE BRACKETS 3" rd 3 wane ROPE. ee fied eecageceise— FIG.NO, [38 GUY CABLE BRACKET 2 S| PN | BUCKET ELEVATOR GUYING EVERY 30 FEET. a el oe { a _O) Worldwide

You might also like